[go: up one dir, main page]

CN109618588A - A kind of rubble refuse dump side slope earthing restorative procedure - Google Patents

A kind of rubble refuse dump side slope earthing restorative procedure Download PDF

Info

Publication number
CN109618588A
CN109618588A CN201811652774.7A CN201811652774A CN109618588A CN 109618588 A CN109618588 A CN 109618588A CN 201811652774 A CN201811652774 A CN 201811652774A CN 109618588 A CN109618588 A CN 109618588A
Authority
CN
China
Prior art keywords
soil
rubble
side slope
refuse dump
overburden
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811652774.7A
Other languages
Chinese (zh)
Inventor
赵瑞
刘震
王君芳
闫志勇
王进
周裕森
王乌恩巴图
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Mengcao Ecological Environment (Group) Co., Ltd.
Inner Mongolia mengcao Mining Technology Co., Ltd
Original Assignee
Inner Mongolia Mengcao Mine Environmental Control Co Ltd
Ecological Environment Of Inner Mongolia Mongolian Grass (group) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Mengcao Mine Environmental Control Co Ltd, Ecological Environment Of Inner Mongolia Mongolian Grass (group) Ltd By Share Ltd filed Critical Inner Mongolia Mengcao Mine Environmental Control Co Ltd
Priority to CN201811652774.7A priority Critical patent/CN109618588A/en
Publication of CN109618588A publication Critical patent/CN109618588A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The present invention relates to a kind of rubble refuse dump side slope earthing restorative procedures, belong to refuse dump repair process technical field.The rubble refuse dump side slope earthing restorative procedure forms overburden layer, makes real overburden layer, then scatter seeds material in overburden layer the following steps are included: cover overburden soil in the surface of rubble refuse dump side slope;The thickness of earth covering of overburden soil is 20-30cm.On the one hand the side slope earthing restorative procedure can effectively ensure that plant normal growth, promote northern areas seed fast germination growth, soil layer can on the other hand merged with rubble side slope boundary, stablize slope surface, and chance water is avoided to collapse.

Description

A kind of rubble refuse dump side slope earthing restorative procedure
Technical field
The present invention relates to refuse dump repair process technical fields, and in particular to a kind of rubble refuse dump side slope earthing reparation Method.
Background technique
Refuse dump is also known as waste-rock yard, refers to that mining dumps the place that object concentrates discharge.Refuse dump is a kind of huge people The loose heap pad of work, there are serious safety problem, refuse dump unstability will lead to mine soil field disaster and Important Project accident, no The normal production for only influencing mine, also will make mine suffer huge economic loss.
Currently, the earthing of refuse dump is relatively arbitrarily, some overburden soil stability is poor, is easy to wash away in runoff or rainwater effect Under be flushed away, some is easy to appear erosion groove, is unfavorable for the growth of seed or vegetation.
Summary of the invention
The purpose of the present invention is to provide a kind of rubble refuse dump side slope earthing restorative procedure, the side slope earthing restorative procedures On the one hand it can effectively ensure that plant normal growth, promote northern areas seed fast germination growth, on the other hand can make soil Layer is merged with rubble side slope boundary, stablizes slope surface, avoids meeting water collapsing.
The present invention solves its technical problem and adopts the following technical solutions to realize:
The present invention proposes a kind of rubble refuse dump side slope earthing restorative procedure, comprising the following steps: in rubble refuse dump side The surface on slope covers overburden soil, forms overburden layer, makes real overburden layer, then scatters seeds material in overburden layer.Overburden soil covers Soil thickness is 20-30cm.
It in some embodiments, include planting soil and decomposed manure in overburden soil.
In some embodiments, seed material includes grass-seed, planting soil, organic fertilizer and water-retaining agent.
The beneficial effect of rubble refuse dump side slope earthing restorative procedure that present pre-ferred embodiments provide includes:
By the way that thickness of earth covering control within the scope of 20-30cm, makes real overburden layer and the material that scatters seeds, a side Face can effectively ensure that plant normal growth, promote northern areas seed fast germination growth, on the other hand can make soil layer with The fusion of rubble side slope boundary, stablizes slope surface, avoids meeting water collapsing.
Specific embodiment
It in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below will be in the embodiment of the present invention Technical solution be clearly and completely described.The person that is not specified actual conditions in embodiment, according to normal conditions or manufacturer builds The condition of view carries out.Reagents or instruments used without specified manufacturer is the conventional production that can be obtained by commercially available purchase Product.
The rubble refuse dump side slope earthing restorative procedure of the embodiment of the present invention is specifically described below.
Rubble refuse dump side slope earthing restorative procedure in the application for example may comprise steps of: in rubble refuse dump The surface of side slope covers overburden soil, forms overburden layer, makes real overburden layer, then scatters seeds material in overburden layer.
In this application, the thickness of earth covering of overburden soil be 20-30cm, such as can for 20cm, 22cm, 24cm, 26cm, 28cm or 30cm, or 21cm, 23cm, 25cm, 27cm or 29cm can also be other any within the scope of 20-30cm Thickness value.
In some embodiments, the thickness of earth covering of overburden soil is 22-28cm, in other embodiments, overburden soil Thickness of earth covering be 24-26cm.
By the way that thickness of earth covering control within the above range, on the one hand can be ensured plant normal growth, another aspect energy It enough avoids meeting water collapsing.It is worth noting that, if thickness of earth covering is excessively thin, being easy to be washed away or even existed by runoff in northern area It is usually washed away in watering proce;If thickness of earth covering is blocked up, it will appear the more loose feelings of soil layer in the side slope of rubble refuse dump Condition, not only operation difficulty is big, but also stability is poor, is also easy to form erosion groove.
It include planting soil and decomposed manure in overburden soil in the application.Planting soil and decomposed manure can be from markets Enough it can buy.
Wherein, planting soil refers to the defeated pine of good physical and chemical properties, structure, ventilation, and retain water and nutrients ability is strong, is suitable for ornamental plant The soil of growth.
It in some embodiments, can the minerals containing 40-60vt% and 8-10vt% in above-mentioned planting soil Organic matter.Wherein, the content of minerals can for 40vt%, 42vt%, 45vt%, 48vt%, 50vt%, 52vt%, 55vt%, 58vt% or 60vt% can also be other any content values within the scope of 40-60vt%.The content of organic matter can be with For 8vt%, 8.5vt%, 9vt%, 9.5vt% or 10vt%, or other any content values within the scope of 8-10vt%. In addition to this, it may also include a certain amount of moisture and a certain amount of air in planting soil.Minerals containing above-mentioned content and The planting soil of organic matter may advantageously facilitate the growth of northern plant.
In some embodiments, the soil granular of planting soil can be 1-3mm, such as 1mm, 1.5mm, 2mm, 2.5mm or 3mm can also be other any particle size values within the scope of 1-3mm.Into one, the total porosity of soil granular is 58-60%, such as 58%, 58.5%, 59%, 59.5% or 60% etc., aeration porosity 18-20%, such as 18%, 18.5%, 19%, 19.5% Or 20% etc..
Above-mentioned soil aggregate structure is that a kind of soil texture for being formed as aggregate is bonded together by several pedological units, Fine pore is formed between its simple grain, forms macrovoid between aggregate, and fine pore is able to maintain moisture, and macrovoid is able to maintain ventilation. Soil granular is controlled in 1-3mm, and by the control of the total porosity of soil granular in 58-60%, aeration porosity is controlled in 18- 20%, it can relatively be conducive to guarantee that northern plant has preferable upgrowth situation.
Decomposed manure be it is decomposed after organic fertilizer, plant and (or) animal are mainly derived from, through biological substance, animals and plants Waste, plant residue processing.It is such as a variety of without poisonous and harmful substance but rich in a large amount of benefit materials in decomposed manure Organic acid, peptides and the nutrient abundant including nitrogen, phosphorus, potassium.Using decomposed manure as in overburden soil at / mono-, full nutrition can not only be provided for the grass-seed in seed material, and fertilizer efficiency is long, can increase and to update soil organic Matter promotes microbial reproduction, improves the physicochemical property and bioactivity of soil.
In some embodiments, in overburden soil, the mass ratio of planting soil and decomposed manure can be 8-12:1, such as 8: 1,8.5:1,9:1,9.5:1,10:1,10.5:1,11:1,11.5:1 or 12:1.In a specific embodiment, overburden soil In, the mass ratio of planting soil and decomposed manure is 10:1.
After the surface of rubble refuse dump side slope covers overburden soil, mechanically or manually overburden layer can be made real, to play Stablize slope surface overburden layer, the effect for merging soil layer with rubble side slope boundary.
In the application, seed material includes grass-seed, planting soil, organic fertilizer and water-retaining agent.Grass-seed, planting soil, organic fertilizer and Water-retaining agent can enough can buy from market.Organic fertilizer and water-retaining agent are added in grass-seed, is conducive to stablize slope surface, and make northern area Domain grass-seed fast germination growth, improves grass-seed germination percentage and survival rate.
Wherein, grass-seed refers to the seed of grass, and grass-seed involved in the application refers mainly to the kind for being suitable for the careless class of north growth Son, such as clover, prairie milk vetch, lyme grass, shrub lespedeza, wheatgrass or sheep's hay etc., above-mentioned each grass-seed can be used alone, and can also mix makes With.Planting soil and organic fertilizer in the seed material can be identical as planting soil contained in overburden soil and decomposed manure.
Water-retaining agent is super absorbent resin, nontoxic, can release water and water suction repeatedly.Optionally, water-retaining agent can Think acrylamide and acrylic acid salt crosslinking copolymerization object (such as polyacrylamide, Sodium Polyacrylate, polyacrylic acid potassium or polyacrylic acid Ammonium etc.), or starch grafted acrylate crosslinking copolymerization object (such as starch grafted acrylate).
By the way that water-retaining agent is added in seed material, can play the role of including below:
First, water conservation: water-retaining agent is not soluble in water, but can absorb suitable own wt into hundred times of water, and water-retaining agent can be effective Moisture evaporation is inhibited largely moisture to be inhibited to evaporate after penetrating into water-retaining agent in soil, it is aqueous to improve soil saturation Amount, reduces the saturated hydraulic conductivity of soil, to slow down the speed of soil release water, reduces infiltration and the stream of soil moisture It loses, achievees the purpose that water conservation, crop root growth and development can also be stimulated, make that the length of root increases, item number increases.
Second, fertilizer conservation: water-retaining agent has the function of that absorbing and protect water storage divides, can be by crops such as organic fertilizers soluble in water Nutriment required for growing is fixed wherein, reduces the leaching loss of soluble nutrient to a certain extent, reaches water-saving Section fertilizer, improves the effect of water and fertilizer utilization rate.
Third, heat preservation: water-retaining agent has good thermal insulation property, after applying water-retaining agent, protects using the moisture of absorption The Thermoregulation nocturnal temperature of part daylight generation is held, so that soil day and night temperature reduces.
4th, improve soil texture: during water-retaining agent is manured into soil, the regularity with water swelling and dehydration shrinkage becomes Change, surrounding soil can be made to become loose from consolidation, hole increases, to improve the penetrating situation of soil to a certain extent.
In some embodiments, in seed material, grass-seed, planting soil, organic fertilizer and water-retaining agent mass ratio can be (1:5:1:0.5)-(1.5:5:1:1), such as 1:5:1:0.5,1.2:5:1:0.5,1.5:5:1:0.5,1:5:1:0.5,1:5:1: 0.8 or 1:5:1:1 etc..In a specific embodiment, in seed material, grass-seed, planting soil, organic fertilizer and water-retaining agent matter Amount is than being 1:5:1:1.
Feature and performance of the invention are described in further detail with reference to embodiments.
Embodiment 1
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 8:1, overburden soil is formed.Wherein, planting soil contains The soil granular of the minerals of 40vt% and the organic matter of 8vt%, planting soil is 1mm, and the total porosity of soil granular is 58%, aeration porosity 18%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 20cm is formed Layer, then makes real overburden layer.
Clover, planting soil, organic fertilizer and polyacrylamide are uniformly mixed in mass ratio for 1:5:1:0.5, then spread It is sowed at overburden layer.
Embodiment 2
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 10:1, overburden soil is formed.Wherein, planting soil contains The soil granular of the minerals of 50vt% and the organic matter of 9vt%, planting soil is 2mm, and the total porosity of soil granular is 59%, aeration porosity 19%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 25cm is formed Layer, then makes real overburden layer.
It is in mass ratio by grass-seed (clover and prairie milk vetch 1:1 are obtained by mixing), planting soil, organic fertilizer and polyacrylamide 1:5:1:1 is uniformly mixed, and is then broadcasted sowing in overburden layer.
Embodiment 3
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 12:1, overburden soil is formed.Wherein, planting soil contains The soil granular of the minerals of 60vt% and the organic matter of 10vt%, planting soil is 3mm, and the total porosity of soil granular is 60%, aeration porosity 20%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 30cm is formed Layer, then makes real overburden layer.
In mass ratio by grass-seed (lyme grass and shrub lespedeza 1:1 are obtained by mixing), planting soil, organic fertilizer and polyacrylamide It is uniformly mixed, is then broadcasted sowing in overburden layer for 1.5:5:1:0.5.
Embodiment 4
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 9:1, overburden soil is formed.Wherein, planting soil contains The minerals of 45vt% and the organic matter of 8.5vt%, the soil granular of planting soil are 1.5mm, the total porosity of soil granular It is 58.5%, aeration porosity 19.5%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 22cm is formed Layer, then makes real overburden layer.
Wheatgrass, planting soil, organic fertilizer and starch grafted acrylate are uniformly mixed in mass ratio for 1:5:1:0.5, Then broadcast sowing in overburden layer.
Embodiment 5
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 11:1, overburden soil is formed.Wherein, planting soil contains The minerals of 55vt% and the organic matter of 9.5vt%, the soil granular of planting soil are 2.5mm, the total porosity of soil granular It is 59.5%, aeration porosity 18.5%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 28cm is formed Layer, then makes real overburden layer.
Sheep's hay, planting soil, organic fertilizer and starch grafted acrylate are uniformly mixed in mass ratio for 1:5:1:0.8, Then broadcast sowing in overburden layer.
Embodiment 6
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 8.5:1, overburden soil is formed.Wherein, planting soil contains There are the minerals of 52vt% and the organic matter of 9.2vt%, the soil granular of planting soil is 2.2mm, the total pore space of soil granular Degree is 58.5%, aeration porosity 18.5%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 24cm is formed Layer, then makes real overburden layer.
By grass-seed (clover, lyme grass and shrub lespedeza 1:1:1 are obtained by mixing), planting soil, organic fertilizer and Sodium Polyacrylate It is uniformly mixed, then broadcasts sowing in overburden layer for 1.2:5:1:0.5 in mass ratio.
Embodiment 7
It is carried out the following processing using a certain rubble refuse dump in the north as pending area:
Planting soil and decomposed manure are uniformly mixed in mass ratio for 11.5:1, overburden soil is formed.Wherein, planting soil contains There are the minerals of 48vt% and the organic matter of 8.4vt%, the soil granular of planting soil is 1.6mm, the total pore space of soil granular Degree is 59%, aeration porosity 20%.
By above-mentioned overburden soil uniform fold in the surface of rubble refuse dump side slope, the earthing that thickness of earth covering is 26cm is formed Layer, then makes real overburden layer.
Grass-seed (clover, lyme grass and sheep's hay 1:1:1 are obtained by mixing), planting soil, organic fertilizer and Sodium Polyacrylate are pressed Mass ratio is uniformly mixed for 1:5:1:1, then broadcasts sowing in overburden layer.
Test example
By taking embodiment 2 as an example, control group 1-4 is set, four groups of control groups and the difference of embodiment 2 are only that: control group 1 Thickness of earth covering be 10cm, the thickness of earth covering of control group 2 is 50cm, and organic fertilizer, control are not contained in the seed material of control group 3 Water-retaining agent is not contained in the seed material of group 4, compare above-mentioned 4 groups of control groups and embodiment 2 to same rubble casting side slope into The effect of row earthing reparation, the results are shown in Table 1.
1 result of table
Comparative example 2 and control group 1 and control group 2 as can be seen that by thickness of earth covering control 20-30cm can be lower Keep overburden layer more stable in or higher than the thickness of earth covering.Comparative example 2 is with control group 3 and control group 4 as can be seen that planting Organic fertilizer and water-retaining agent are added in sub- material, is conducive to the germination percentage and survival rate that improve grass-seed.
In conclusion on the one hand side slope earthing restorative procedure in rubble refuse dump provided by the present application can effectively ensure that plant Normal growth promotes northern areas seed fast germination growth, soil layer can on the other hand merged with rubble side slope boundary, surely Determine slope surface, avoids meeting water collapsing.
Embodiments described above is a part of the embodiment of the present invention, instead of all the embodiments.Reality of the invention The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts Every other embodiment, shall fall within the protection scope of the present invention.

Claims (10)

1. a kind of rubble refuse dump side slope earthing restorative procedure, which comprises the following steps:
Overburden soil is covered in the surface of rubble refuse dump side slope, overburden layer is formed, the overburden layer is made real, then in the earthing Layer scatters seeds material;The thickness of earth covering of the overburden soil is 20-30cm.
2. side slope earthing restorative procedure in rubble refuse dump according to claim 1, which is characterized in that wrapped in the overburden soil Include planting soil and decomposed manure.
3. side slope earthing restorative procedure in rubble refuse dump according to claim 2, which is characterized in that in the overburden soil, The mass ratio of the planting soil and the decomposed manure is 8-12:1.
4. side slope earthing restorative procedure in rubble refuse dump according to claim 3, which is characterized in that in the overburden soil, The mass ratio of the planting soil and the decomposed manure is 10:1.
5. side slope earthing restorative procedure in rubble refuse dump according to claim 2, which is characterized in that contain in the planting soil There are the minerals of 40-60vt% and the organic matter of 8-10vt%.
6. side slope earthing restorative procedure in rubble refuse dump according to claim 2, which is characterized in that the soil of the planting soil Earth granule is 1-3mm.
7. side slope earthing restorative procedure in rubble refuse dump according to claim 6, which is characterized in that the soil granular Total porosity is 58-60%, aeration porosity 18-20%.
8. side slope earthing restorative procedure in rubble refuse dump according to claim 1, which is characterized in that the seed material packet Include grass-seed, planting soil, organic fertilizer and water-retaining agent.
9. side slope earthing restorative procedure in rubble refuse dump according to claim 8, which is characterized in that the seed material In, the grass-seed, the planting soil, the organic fertilizer and the water-retaining agent mass ratio be (1:5:1:0.5)-(1.5:5:1: 1)。
10. side slope earthing restorative procedure in rubble refuse dump according to claim 9, which is characterized in that the seed material In, the grass-seed, the planting soil, the organic fertilizer and the water-retaining agent mass ratio be 1:5:1:1.
CN201811652774.7A 2018-12-29 2018-12-29 A kind of rubble refuse dump side slope earthing restorative procedure Pending CN109618588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811652774.7A CN109618588A (en) 2018-12-29 2018-12-29 A kind of rubble refuse dump side slope earthing restorative procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811652774.7A CN109618588A (en) 2018-12-29 2018-12-29 A kind of rubble refuse dump side slope earthing restorative procedure

Publications (1)

Publication Number Publication Date
CN109618588A true CN109618588A (en) 2019-04-16

Family

ID=66056301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811652774.7A Pending CN109618588A (en) 2018-12-29 2018-12-29 A kind of rubble refuse dump side slope earthing restorative procedure

Country Status (1)

Country Link
CN (1) CN109618588A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113617826A (en) * 2021-06-30 2021-11-09 中冶成都勘察研究总院有限公司 Step earthing method for repairing mine
CN116438974A (en) * 2023-03-24 2023-07-18 陕西省环境调查评估中心 Repairing device and repairing method for mine living environment treatment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101103672A (en) * 2005-07-14 2008-01-16 广东省生态环境与土壤研究所 Method for planting evergreen vegetation slope highway in south China
GEP20084356B (en) * 2005-09-15 2008-04-29 Koba Kilasonia Method for slope erosion protection
CN102160483A (en) * 2011-02-28 2011-08-24 甘肃源岗农林开发有限公司 Method for afforesting desert and retaining water
CN106034456A (en) * 2016-06-03 2016-10-26 华能伊敏煤电有限责任公司 Reclamation and earthing method for mudstone dump side slope
CN107012829A (en) * 2017-04-25 2017-08-04 河海大学 Soften domatic silt soil and flinty slope remodeling method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101103672A (en) * 2005-07-14 2008-01-16 广东省生态环境与土壤研究所 Method for planting evergreen vegetation slope highway in south China
GEP20084356B (en) * 2005-09-15 2008-04-29 Koba Kilasonia Method for slope erosion protection
CN102160483A (en) * 2011-02-28 2011-08-24 甘肃源岗农林开发有限公司 Method for afforesting desert and retaining water
CN106034456A (en) * 2016-06-03 2016-10-26 华能伊敏煤电有限责任公司 Reclamation and earthing method for mudstone dump side slope
CN107012829A (en) * 2017-04-25 2017-08-04 河海大学 Soften domatic silt soil and flinty slope remodeling method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
关连珠: "《普通土壤学》", 31 January 2016 *
冯美军: "《公路边坡生态恢复及防护技术》", 30 April 2014 *
武继承等: "《保水剂对土壤环境与作物效应的影响》", 31 December 2011 *
赵雁: "《草坪学》", 31 August 2017 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113617826A (en) * 2021-06-30 2021-11-09 中冶成都勘察研究总院有限公司 Step earthing method for repairing mine
CN116438974A (en) * 2023-03-24 2023-07-18 陕西省环境调查评估中心 Repairing device and repairing method for mine living environment treatment
CN116438974B (en) * 2023-03-24 2024-06-04 陕西省环境调查评估中心 Repairing device and repairing method for mine living environment treatment

Similar Documents

Publication Publication Date Title
CN104119168B (en) The production method of concave convex rod compression Nutrition Soil
CN108184358A (en) A kind of physics and the effective ways in bioconjugation improvement salt-soda soil
US7347150B2 (en) Non-plowing method for establishing vegetation and a nutrient matrix thereof
CN102754572A (en) Plant cultivating substrate as well as preparation method and application of same
US20030205072A1 (en) Soil improving and fertilising composition
CN105367216A (en) Plastic fiber cultivating soil and preparation method thereof
CN103039338A (en) Mushroom dreg compound substrate formula for soilless culture of cucumbers
CN108156874A (en) Plant naringi crenulata and the method for improveing clay fertilizer situation in strand sandyization salt-soda soil
CN103420738A (en) Fertilizer
CN103081664A (en) Method for planting sea-buckthorn in sandy land
CN102827612A (en) Soil water-holding agent and application method thereof
CN105009726A (en) Sticky soil type saline land soil improvement method employing hydrolysis polyacrylonitrile soil subsoiling agent
WO2008133488A1 (en) Process of improved semi-static composting for the production of a humectant substrate of low density of use thereof in nurseries and greenhouses
CN109438110A (en) A kind of saline soil and its preparation method and application
CN109618588A (en) A kind of rubble refuse dump side slope earthing restorative procedure
CN106365908A (en) Tailing pond soil conditioner and application method thereof
CN102911671B (en) Preparation method of soil conditioner based on rice hull waste
CN108218626A (en) One kind is sowed grass seeds by duster matrix and preparation method thereof
CN107580937A (en) Utilize the method for planting Chinese tamarisk improvement salt-soda soil
CN108476896A (en) A kind of hillside fields water retention cultivating method of beautiful millettia root
Chikuvire et al. Lantana camara and Tithonia diversifolia leaf teas improve the growth and yield of Brassica napus
CN113519338B (en) A method for interplanting mulberry trees and corn in sandy land
CN109328677A (en) A kind of division propagation method of wild country melon
LT7017B (en) Sapropel based organic fertilizer and method of production therof using crushed white peat and hydrogel
CN108782049A (en) Make high-yield planting method between salt-soda soil quinoa and sunflower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191220

Address after: 010020 705, floor 7, building a, Yutai building, Saihan District, Hohhot City, Inner Mongolia Autonomous Region

Applicant after: Inner Mongolia mengcao Mining Technology Co., Ltd

Applicant after: Inner Mongolia Mengcao Ecological Environment (Group) Co., Ltd.

Address before: 010000 the Inner Mongolia Autonomous Region Hohhot city Shengle Economic Zone Shengle five Street South

Applicant before: Inner Mongolia Mengcao Ecological Environment (Group) Co., Ltd.

Applicant before: Inner Mongolia Mengcao Mine Environmental Control Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication