[go: up one dir, main page]

CN109376007A - A kind of process management method and system of host high load - Google Patents

A kind of process management method and system of host high load Download PDF

Info

Publication number
CN109376007A
CN109376007A CN201811102795.1A CN201811102795A CN109376007A CN 109376007 A CN109376007 A CN 109376007A CN 201811102795 A CN201811102795 A CN 201811102795A CN 109376007 A CN109376007 A CN 109376007A
Authority
CN
China
Prior art keywords
class
priority
high load
cpu usage
host
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811102795.1A
Other languages
Chinese (zh)
Inventor
魏明
谭敏
胡翔
周琦
杜开亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Fiberhome Technical Services Co Ltd
Original Assignee
Wuhan Fiberhome Technical Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Fiberhome Technical Services Co Ltd filed Critical Wuhan Fiberhome Technical Services Co Ltd
Priority to CN201811102795.1A priority Critical patent/CN109376007A/en
Publication of CN109376007A publication Critical patent/CN109376007A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/505Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses the process management methods and system of a kind of host high load, it is related to field of communication technology, the CPU occupation proportion of query procedure of the present invention, it is analyzed using Pareto diagram algorithm, find out the A class process in CPU usage, only it is managed on wherein influencing maximum several processes, the judgement for row major grade of going forward side by side, termination process is determined a need for according to the priority of feedback, to realize the intelligent management to host high load process, evade the service operation more safety and stability that the contingency artificially judged makes host, reaches safe and efficient purpose.Using intelligent, automation managing process of the invention, changes the mode for needing irregularly artificially to be monitored management in the past, reduce maintenance work amoun, improve the efficiency of management, reduce the operation cost of enterprise.

Description

A kind of process management method and system of host high load
Technical field
The present invention relates to fields of communication technology, and in particular to a kind of process management method and system of host high load.
Background technique
With the accelerated development of internet and the level of informatization, cloud causes the pass of each market in the whole world and enterprise Note has been identified as being the generally acknowledged future thrust of IT.Shown in Figure 1, cloud service provider provides cloud computing product, For medium-sized and small enterprises build all-network infrastructure and software required for informationization, hardware operate platform, and be responsible for it is all before A series of services such as implementation, the maintenance in later period of phase, enterprise does not need to buy software and hardware, construction computer room, recruitment IT personnel, before only needing Phase pays disposable project implementation expense and regularly software rental service takes, and can enjoy information system by internet.Together When, cloud computing needs to control workload sprawling constantly and resource uses there is also resource risk.Cloud sprawling or cloud service mention For it is excessive will break the bank, while causing huge performance issue, therefore just seem outstanding to the management of process of host high load It is important.
It is managed by the way of mainly intervening at present using personal monitoring and manually the management of host high load process Main flow is as follows:
1, computer room administrator sets the CPU usage threshold value of individual process, one according to host technology standard requirements As setting after no longer adjust.
2, host is run, when the CPU usage of some process reaches threshold value, sending warning information.
3, administrator carries out artificial judgment to the significance level of the process.
4, worked normally when administrator thinks that the process severity level is lower or can jeopardize host, can be turned off manually this into Journey continues to monitor, when accounting for not if administrator thinks that the process severity level is higher and will not jeopardize host and work normally It deals with.
The shortcomings that prior art, is as follows:
1, unified fixed CPU usage threshold value setting, can not comprehensively consider the case where CPU is occupied between multiple processes, If occupancy threshold is higher to will lead to host work inefficiency, occupancy threshold is relatively low and will lead to alarm frequently, increases Human cost.
2, CPU usage threshold value is not unalterable, more than the method for fixed threshold alarm, adapt to host can not very well Practical business demand, and cause the waste of performance.
3, artificial detection is easy to appear dependent on judgement of the administrator to process significance level due to not having specific standards The mistake of process is closed, to influence regular traffic, O&M difficulty is big.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide a kind of managements of process of host high load Method and system are realized to the intelligent management of host high load process, reach safe and efficient purpose.
To achieve the above objectives, the technical solution adopted by the present invention is that: a kind of process management method of host high load, packet Include following steps:
The CPU usage for inquiring each process is analyzed using Pareto diagram algorithm, obtains the A class of setting CPU usage Process;
The priority for inquiring A class process, decides whether to close the process according to A class process priority.
According in a first aspect, in the first possible implementation of the first aspect, inquiring the CPU usage of each process Before, further comprising the steps of: identification host CPU utilization rate filters accidental CPU usage and leaps high phenomenon.
According in a first aspect, in the second possible implementation of the first aspect, the A class process is CPU occupancy Rate is the process of 0%-60%.
According in a first aspect, in a third possible implementation of the first aspect, the priority of A class process is inquired, Decide whether to close the process according to A class process priority, specifically includes the following steps:
Inquiring A class process indicates the nice value of priority height, if the nice value of A class process is more than nice value setting threshold Value, then initiate system recovery command, close the process.
According in a first aspect, in a fourth possible implementation of the first aspect, the nice value given threshold is 10。
Second aspect provides a kind of process management system of host high load, comprising:
Process screening module, is used for: inquiring the CPU usage of each process, is analyzed, obtained using Pareto diagram algorithm The A class process of CPU usage is set out;
Process processing module, is used for: the priority of inquiry A class process decides whether to close according to A class process priority The process.
According to second aspect, in the first possible implementation of the second aspect, which further includes CPU usage Filtering module is used for: being inquired before the CPU usage of each process, is identified host CPU utilization rate, filters accidental CPU and use Rate is leapt high phenomenon.
According to second aspect, in a second possible implementation of the second aspect, the A class process is CPU occupancy Rate is the process of 0%-60%.
According to second aspect, in the third possible implementation of the second aspect, the process screening module inquires A The priority of class process decides whether to close the process according to A class process priority, specifically includes the following steps:
Inquiring A class process indicates the nice value of priority height, if the nice value of A class process is more than nice value setting threshold Value, then initiate system recovery command, close the process.
According to second aspect, in the fourth possible implementation of the second aspect, the nice value given threshold is 10。
Compared with the prior art, the advantages of the present invention are as follows:
(1) the CPU occupation proportion of query procedure of the present invention, is analyzed using Pareto diagram algorithm, finds out CPU usage In A class process, be only managed on wherein influencing maximum several processes, the judgement for row major grade of going forward side by side, according to feedback Priority determines a need for termination process, to realize to the intelligent management of host high load process, evades and artificially judging Contingency makes the service operation more safety and stability of host, reaches safe and efficient purpose.
(2) intelligent using the present invention, automation managing process changes and needs irregularly artificially to be monitored pipe in the past The mode of reason reduces maintenance work amoun, improves the efficiency of management, reduce the operation cost of enterprise.
(3) it inquires before the CPU usage of each process, identifies host CPU utilization rate, filter accidental CPU usage punching High phenomenon avoids accidental CPU usage from leaping high the division result of phenomena impair A class process, and then influences to host high load The management effect of process.
Detailed description of the invention
Fig. 1 is cloud computing product block schematic illustration in background technique;
Fig. 2 is the flow diagram of the process management method of host high load in the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the process management system of host high load in the embodiment of the present invention.
Specific embodiment
Term explanation:
Pareto diagram: Pareto diagram (Pareto chart) is the quality problems that will occur and quality improvement project according to weight Want a kind of chart that degree is arranged successively and is used.It is named with the name of Italian economist V.Pareto.Pareto Figure is called arrangement figure, His- togram, is the histogram drawn according to occurrence frequency size order, how many is indicated the result is that by really The reason of recognizing type or scope is caused.When Business Process Reengineering, it is often necessary to discovery influences the main aspect of things, Pareto (Pareto) analysis method can be used in this.Pareto (Pareto) analysis is a kind of statistical science method, Ke Yiyong Generate the task of the limited quantity of remarkable result to overall effect in operation flow in screening.It uses sixteen famous principles (80% task can be completed by 20% work), in the improvement and optimization of quality, most problem It (80%) is caused by the reason (20%) by several keys.Influence principal element and be generally divided into 3 classes: A class is cumulative percent Factor in 80% range, it is main influence factor.B class be in addition to A class cumulative percent in 80%-90% range Interior factor is secondary cause.C class is factor of the percentage in 90%-100% range in addition to two class of A, B.Therefore Pareto Figure is called ABC analysis chart method.
Nice value: indicating the height of priority, in LINUX system, from -20 to+19 (the not homologous ray of range of nice value Value range be different), positive value indicate low priority, negative value indicate high priority, value is that zero expression will not adjust this The priority of process.Program with highest priority, nice value is minimum, so value -20 makes one in LINUX system Item task becomes extremely important;In contrast, if the nice of task is+19, then it represents that it is a noble, unselfish times Business, the bigger portion of the CPU time for allowing every other task more valuable than oneself enjoying, this namely title of nice One's purpose in coming.Process is endowed different priority values in creation, and as said before, the value of nice is to indicate process priority value It can be corrected data value, therefore, each process is endowed a nice value when its plan executes, and such system can root According to the resource of system and all kinds of resource consumption situations of specific process, the priority value of pro-active intervention process.In usual situation Under, subprocess can inherit the nice value of parent process, for example during system starting, init process can be endowed 0, other institutes Process inherits this nice value (because subprocess that other processes are all init).
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Embodiment 1:
Shown in Figure 2, the embodiment of the present invention provides a kind of process management method of host high load, including following step It is rapid:
The CPU usage for inquiring each process is analyzed using Pareto diagram algorithm, obtains the A class of setting CPU usage Process;
The priority for inquiring A class process, decides whether to close the process according to A class process priority.
The CPU occupation proportion of query procedure of the present invention, is analyzed using Pareto diagram algorithm, is found out in CPU usage A class process, be only managed on wherein influencing maximum several processes, the judgement for row major grade of going forward side by side, according to the excellent of feedback First grade determines a need for termination process, to realize to the intelligent management of host high load process, evades the idol artificially judged Right property makes the service operation more safety and stability of host, reaches safe and efficient purpose.
Using intelligent, automation managing process of the invention, changes and need irregularly artificially to be monitored management in the past Mode, reduce maintenance work amoun, improve the efficiency of management, reduce the operation cost of enterprise.It should be noted that for aforementioned Each method embodiment, for simple description, therefore, it is stated as a series of action combinations, but those skilled in the art It should be aware of, the present invention is not limited by the sequence of acts described.
Embodiment 2:
On the basis of embodiment 1, in Pareto diagram, different classes of data are arranged according to its frequency descending, and Accumulative perception figure is drawn in same figure.Pareto diagram can embody pareto efficient allocation: the overwhelming majority of data is present in In few categories, few remaining data are dispersed in most of classification.This two groups commonly referred to as " vital few Number " and " inappreciable most of ".
Pareto diagram can distinguish " inappreciable most of " and " vital only a few ", so that people be facilitated to pay close attention to In important classification.Pareto diagram be optimize with improved effective tool, especially apply in terms of quality testing.
It is analyzed using Pareto diagram algorithm, obtains the A class process of setting CPU usage, detailed process is as follows:
1. listing all processes;
2. the CPU usage of the process of measurement, the identical measurement unit of CPU usage of each process;
3. the overall measurement that percentages calculate each process;
4. accumulative perception is equal to 100% from top to bottom;
5. one block of creation and line map, route account for cumulative percentage;
6. obtaining the Type division result of process.The Type division of process is as follows:
1.A class process: CPU usage adds up the process that composition ratio is 0%~60%, is usually no more than 5, is denoted as A class Process.
2.B class process: CPU usage adds up the process that composition ratio is 60%~90%, is denoted as B class process.
3.C class process: CPU usage adds up the process that composition ratio is 90%~100%, is denoted as C class process.
This method is only managed A class process, and the CPU usage of A class process adds up composition ratio can be according to practical business It is adjusted.
This method is ranked up the CPU usage of process, and is analyzed by Pareto diagram algorithm, identifies CPU A class factor in occupancy, so as to be managed to the maximum several processes of influence.
Embodiment 3:
On the basis of embodiment 1, the priority for inquiring A class process decides whether to close and be somebody's turn to do according to A class process priority Process, specifically includes the following steps:
Inquiring A class process indicates the nice value of priority height, if the nice value of A class process is more than nice value setting threshold Value, such as: threshold value 10 then initiates system recovery command, closes the process.The range of nice value is [- 20,19], if A class into Nice value in journey is in [10,19], i.e., priority is lower, then initiates system recovery command, and then the process is automatically closed.
It is assessed according to the A process in Pareto diagram, the nice value of A process is determined by seeking unity of standard, to priority Lower and excessively high CPU usage process is recycled, and realizes the intelligent management to process under high load condition.
Although combining each embodiment herein, invention has been described, however, claimed of the invention in implementation In the process, those skilled in the art are by checking the attached drawing, disclosure and the appended claims, it will be appreciated that and it is real Other variations of the existing open embodiment.In the claims, one word of " comprising " is not excluded for other component parts or step, "a" or "an" is not excluded for a possibility that multiple.Mutually different has been recited in mutually different dependent certain measures, but this is simultaneously These measures are not represented cannot combine generate good effect.
Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said It is bright to be merely used to help understand method and its thought of the invention;At the same time, for those skilled in the art, according to this hair Bright thought, there will be changes in the specific implementation manner and application range, in conclusion the content of the present specification should not manage Solution is limitation of the present invention.
Embodiment 4:
On the basis of embodiment 1, it inquires before the CPU usage of each process, further comprising the steps of:
It identifies host CPU utilization rate, filters accidental CPU usage and leap high phenomenon.Accidental CPU usage is avoided to leap high The division result of phenomena impair A class process, and then influence the management effect to host high load process.
Because running state of a process is real-time change in host, so the importance of process should be also real-time change 's;Category division should be carried out to process according to the degree that CPU is occupied simultaneously, to different classes of process, the mode of management It should have any different.The present invention carries out comprehensive in real time according to the CPU usage, appreciable severity level and accidental sexual factor of process Close analysis.This method can first be filtered the sporadic CPU occupancy situation of process, according to the CPU occupation proportion of process into Cheng Jinhang classification, is only managed on wherein influencing maximum several processes, and excellent using the progress of the process query interface of open source The judgement of first grade determines a need for termination process according to the priority of feedback, to realize the intelligence to host high load process It can manage, reach safe and efficient purpose.
Embodiment 5:
Shown in Figure 3 on the basis of embodiment 4, the embodiment of the invention discloses a kind of processes of host high load Management system, comprising:
Process screening module, is used for: inquiring the CPU usage of each process, is analyzed, obtained using Pareto diagram algorithm A class process out;
Process processing module, is used for: the priority of inquiry A class process decides whether to close according to A class process priority The process.
According to an embodiment of the present invention, some steps may be performed in other sequences or simultaneously.Secondly, art technology Personnel also should be aware of, and the embodiments described in the specification are all preferred embodiments, and related actions and modules is not It must be necessary to the present invention.Those of ordinary skill in the art will appreciate that realizing the whole in above-described embodiment method or portion Split flow is relevant hardware can be instructed to complete by computer program, and above-mentioned program can be stored in a kind of calculating In machine read/write memory medium, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, above-mentioned Storage medium can be magnetic disk, CD, read-only memory (ROM:Read-OnlyMemory) or random access memory (RAM:RandomAccess Memory) etc..
Embodiment 6:
On the basis of embodiment 4, which further includes CPU usage filtering module, is used for: inquiring each process Before CPU usage, host CPU utilization rate is identified, filter accidental CPU usage and leap high phenomenon.The A class process is CPU The process that occupancy is 0%~60%.
The priority of process screening module inquiry A class process, deciding whether to close according to A class process priority should be into Journey, specifically includes the following steps:
Inquiring A class process indicates the nice value of priority height, if the nice value of A class process is more than nice value setting threshold Value then initiates system recovery command, closes the process for example, nice value given threshold is 10.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (10)

1. a kind of process management method of host high load, which comprises the following steps:
The CPU usage for inquiring each process is analyzed using Pareto diagram algorithm, obtain setting CPU usage A class into Journey;
The priority for inquiring A class process, decides whether to close the process according to A class process priority.
2. a kind of process management method of host high load as described in claim 1, it is characterised in that: inquire each process Further comprising the steps of before CPU usage: identification host CPU utilization rate filters accidental CPU usage and leaps high phenomenon.
3. a kind of process management method of host high load as described in claim 1, it is characterised in that: the A class process is The process that CPU usage is 0%~60%.
4. a kind of process management method of host high load as described in claim 1, it is characterised in that: inquiry A class process Priority decides whether to close the process according to A class process priority, specifically includes the following steps:
Inquiring A class process indicates the nice value of priority height, if the nice value of A class process is more than nice value given threshold, Initiation system recovery command, closes the process.
5. a kind of process management method of host high load as claimed in claim 4, it is characterised in that: the nice value setting Threshold value is 10.
6. a kind of process management system of host high load characterized by comprising
Process screening module, is used for: inquiring the CPU usage of each process, is analyzed using Pareto diagram algorithm, obtain and set Determine the A class process of CPU usage;
Process processing module, is used for: the priority of inquiry A class process, and deciding whether to close according to A class process priority should be into Journey.
7. a kind of process management system of host high load as claimed in claim 6, it is characterised in that: the system further includes CPU usage filtering module, is used for: inquiring before the CPU usage of each process, identifies host CPU utilization rate, filters accidental CPU usage leap high phenomenon.
8. a kind of process management system of host high load as claimed in claim 6, it is characterised in that: the A class process is The process that CPU usage is 0%~60%.
9. a kind of process management system of host high load as claimed in claim 6, it is characterised in that: the process screens mould Block inquires the priority of A class process, decides whether to close the process according to A class process priority, specifically includes the following steps:
Inquiring A class process indicates the nice value of priority height, if the nice value of A class process is more than nice value given threshold, Initiation system recovery command, closes the process.
10. a kind of process management system of host high load as claimed in claim 9, it is characterised in that: the nice value is set Determining threshold value is 10.
CN201811102795.1A 2018-09-20 2018-09-20 A kind of process management method and system of host high load Pending CN109376007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811102795.1A CN109376007A (en) 2018-09-20 2018-09-20 A kind of process management method and system of host high load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811102795.1A CN109376007A (en) 2018-09-20 2018-09-20 A kind of process management method and system of host high load

Publications (1)

Publication Number Publication Date
CN109376007A true CN109376007A (en) 2019-02-22

Family

ID=65401598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811102795.1A Pending CN109376007A (en) 2018-09-20 2018-09-20 A kind of process management method and system of host high load

Country Status (1)

Country Link
CN (1) CN109376007A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111930481A (en) * 2020-07-16 2020-11-13 重庆帮企科技集团有限公司 Android system-based process priority improving method and device
CN113783796A (en) * 2021-07-22 2021-12-10 许继集团有限公司 A communication method and device for a commutation system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6584488B1 (en) * 1999-04-12 2003-06-24 International Business Machines Corporation Controlling allocation of system resources with an enhanced priority calculation
CN105159770A (en) * 2015-09-21 2015-12-16 天脉聚源(北京)传媒科技有限公司 Progress management method and apparatus
CN107145389A (en) * 2017-03-09 2017-09-08 深圳市先河系统技术有限公司 A kind of system process monitoring method and computing device
CN107943657A (en) * 2017-11-24 2018-04-20 郑州云海信息技术有限公司 A kind of linux system problem automatic analysis method and system
CN108322336A (en) * 2018-01-15 2018-07-24 北京华胜天成信息技术发展有限公司 Intelligent management and system towards domestic autonomous controllable server

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6584488B1 (en) * 1999-04-12 2003-06-24 International Business Machines Corporation Controlling allocation of system resources with an enhanced priority calculation
CN105159770A (en) * 2015-09-21 2015-12-16 天脉聚源(北京)传媒科技有限公司 Progress management method and apparatus
CN107145389A (en) * 2017-03-09 2017-09-08 深圳市先河系统技术有限公司 A kind of system process monitoring method and computing device
CN107943657A (en) * 2017-11-24 2018-04-20 郑州云海信息技术有限公司 A kind of linux system problem automatic analysis method and system
CN108322336A (en) * 2018-01-15 2018-07-24 北京华胜天成信息技术发展有限公司 Intelligent management and system towards domestic autonomous controllable server

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
LARRY WEBBER等: "《Quality Control For Dummies》", 31 December 2007 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111930481A (en) * 2020-07-16 2020-11-13 重庆帮企科技集团有限公司 Android system-based process priority improving method and device
CN113783796A (en) * 2021-07-22 2021-12-10 许继集团有限公司 A communication method and device for a commutation system

Similar Documents

Publication Publication Date Title
CN111966995A (en) User permission dynamic control method and device based on user behavior and equipment
DE202011110892U1 (en) System of active risk management to reduce the likelihood of job scheduling in computer clusters
CN111127105A (en) User hierarchical model construction method and system, and operation analysis method and system
CN114880303B (en) A method, apparatus, device, medium, and product for outputting business data.
CN110609830A (en) Decision engine system based on auditing strategy
CN119535983A (en) An operation and maintenance control method and system based on automation strategy
CN118643099A (en) Distributed database automatic expansion system and method based on real-time performance monitoring
CN109376007A (en) A kind of process management method and system of host high load
Feng et al. Research of deep learning and adaptive threshold-based signaling storm prediction and top cause tracking
CN117971488A (en) Storage management method and related device for distributed database cluster
CN110363381A (en) A kind of information processing method and device
CN112632066B (en) Automatic sub-table data access method and device, electronic equipment and storage medium
CN120386687A (en) System monitoring method, device and storage medium
CN120263641A (en) A master node arbitration method, device, equipment and medium for a multi-control storage system
CN109039714A (en) The management method and device of resource in cloud computing system
CN118394534A (en) Method, system, product, device and medium for expanding and shrinking volume of cluster application service
CN112000634B (en) Capacity management method, system, equipment and storage medium of NAS storage file system
CN118096246A (en) Enterprise portrait system and method
CN112783637A (en) Resource regulation and control method and device
CN117251284A (en) Resource management system, method, electronic equipment and storage medium
CN117082113A (en) Distributed equipment monitoring system and method based on data fusion
CN114039835A (en) An application resource grid comprehensive management and control strategy service system
CN115082116A (en) Risk control customer screening method, device, device, and computer-readable storage medium
CN119047926B (en) Efficiency evaluation resource information management system
CN110222993A (en) A kind of partner selection and evaluation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222