CN109295816A - A kind of small staggered floor vacantly chooses installation method of marking time - Google Patents
A kind of small staggered floor vacantly chooses installation method of marking time Download PDFInfo
- Publication number
- CN109295816A CN109295816A CN201811006114.1A CN201811006114A CN109295816A CN 109295816 A CN109295816 A CN 109295816A CN 201811006114 A CN201811006114 A CN 201811006114A CN 109295816 A CN109295816 A CN 109295816A
- Authority
- CN
- China
- Prior art keywords
- staggered floor
- casing
- marking time
- vacantly
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 title claims abstract description 16
- 244000050510 Cunninghamia lanceolata Species 0.000 claims abstract description 5
- 238000010079 rubber tapping Methods 0.000 claims abstract description 5
- 239000011248 coating agent Substances 0.000 claims abstract description 4
- 238000000576 coating method Methods 0.000 claims abstract description 4
- 238000005553 drilling Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0046—Loggias
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of small staggered floors vacantly to choose installation method of marking time, it is related to technical field of buildings, the following steps are included: Step 1: choosing part positioning: the lower flat of staggered floor wall is common ground, the upper plane of staggered floor wall is staggered floor ground, common ground and the horizontal setting-out of staggered floor ground finished surface, overhanging part divide equally centralized positioning according to plate thickness of marking time up and down;Step 2: positioning test: step plate centralized positioning drilling, the debugging of horizontal and angle are taken out stand-by;Step 3: integral installation: coating is completed, and expansion sleeve enters staggered floor wall, and expansion sleeve is connected with bolt, back of marking time is located in casing, self-tapping screw is fastened and fixed step plate, casing and overhanging part, and casing is inserted in bolt, and Lip river China fir fastened by screw installs casing part.The present invention can be realized disposable scale, construction production process it is few, material-saving saving of labor, ground completely easily close up the advantages of, have good practical function.
Description
Technical field
The present invention relates to technical field of buildings, specifically a kind of small staggered floor vacantly chooses installation method of marking time.
Background technique
Cantilevered structure is one of structure type common in engineering structure, as in architectural engineering canopy, cornice, outer sun
Platform, overhanging corridor etc., this structure are that beam out or plate are overhang from main structure, form cantilever design, are substantially still contignation.
Traditional overhang installation method is the following steps are included: one, setting-out of marking time: long width positioning;Two, base makes: 1,
Build and repair powder, 2, branch module and cast-in-situ and painting, 3, rough ground add basal plate, 4, mark time after the completion of base and take measurements, 5, ground joist
Production;Three, mark time installation: 1, entire plate has mounting hole;2, assembled plate end cap has hole for nailing, needs touch-up paint.It is deposited using above-mentioned prevention
In multiple scale, long construction period, material of taking a lot of work, close up ugly problem.
Summary of the invention
The purpose of the present invention is to provide a kind of small staggered floors vacantly to choose installation method of marking time, to solve in above-mentioned background technique
The problem of proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of small staggered floor vacantly chooses installation method of marking time, comprising the following steps:
Step 1: choosing part positioning: the lower flat of staggered floor wall is common ground, and the upper plane of staggered floor wall is for staggered floor
Face, common ground and the horizontal setting-out of staggered floor ground finished surface, overhanging part divide equally centralized positioning according to plate thickness of marking time up and down;
Step 2: positioning test: step plate centralized positioning drilling, the debugging of horizontal and angle are taken out stand-by;
Step 3: integral installation: coating is completed, and expansion sleeve enters staggered floor wall, and expansion sleeve is connected with bolt, is positioned with casing
In back of marking time, self-tapping screw is fastened and fixed step plate, casing and overhanging part, and casing is inserted in bolt, Lip river China fir fastened by screw peace
Tubing lower part.
As further scheme of the invention: the upward Tiao MOUNTING-EAR 2% of described sleeve pipe.
As further scheme of the invention: the bolt offers a tooth at staggered floor wall, is screwed on silk tooth
Nut.
As further scheme of the invention: being equipped with pad volume between the nut and staggered floor wall.
Compared with prior art, the beneficial effects of the present invention are: the present invention can be realized disposable scale, construction production work
The advantages of sequence is few, material-saving saving of labor, and ground is completely easily closed up has good practical function.
Detailed description of the invention
Fig. 1 be a kind of small staggered floor vacantly choose installation method of marking time be installed schematic diagram;
Fig. 2 be Fig. 1 described in small staggered floor vacantly choose mark time installation method along line A-A cross-sectional view.
In figure: 1- staggered floor wall, 2- staggered floor ground, 3- expansion sleeve, 4- pad volume, 5- nut, 6- teeth, 7- overhang part,
8- bolt, 9- casing, the Lip river 10- China fir screw, 11- self-tapping screw, 12- step plate.
Specific embodiment
Combined with specific embodiments below, technical scheme in the embodiment of the invention is clearly and completely described, shows
So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention
Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to
In the scope of protection of the invention.
A kind of small staggered floor vacantly chooses installation method of marking time, as shown in Figs. 1-2, comprising the following steps:
Step 1: choosing part positioning: the lower flat of staggered floor wall 1 is common ground, and the upper plane of staggered floor wall 1 is for staggered floor
Face 2, common ground and the horizontal setting-out of 2 finished surface of staggered floor ground, equal branch center is fixed up and down according to 12 thickness of step plate for overhanging part 7
Position;
Step 2: positioning test: 12 centralized positioning of step plate drilling, the upward Tiao MOUNTING-EAR 2% of casing 9, the debugging of horizontal and angle are taken out
For use;
Step 3: integral installation: coating is completed, and expansion sleeve 3 enters staggered floor wall 1, and expansion sleeve 3 is connected with bolt 8, uses casing
9 are located in 12 back side of step plate, and self-tapping screw 11 is fastened and fixed step plate 12, casing 9 and overhanging part 7, casing 9 and is inserted in bolt 8,
The fastening installation of Lip river China fir screw 10 9 lower part of casing, bolt 8 offer a tooth 6 at staggered floor wall 1, and be screwed on nut 5 on silk tooth 6,
Pad volume 4 is equipped between nut 5 and staggered floor wall 1.
The present invention can be realized disposable scale, construction production process it is few, material-saving saving of labor, ground is completely easily closed up excellent
Point has good practical function.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (4)
1. a kind of small staggered floor vacantly chooses installation method of marking time, which comprises the following steps:
Step 1: choosing part positioning: the lower flat of staggered floor wall (1) is common ground, and the upper plane of staggered floor wall (1) is mistake
Layer ground (2), common ground and the horizontal setting-out of staggered floor ground (2) finished surface, overhang part (7) according to step plate (12) thickness above and below
Respectively centralized positioning;
Step 2: positioning test: step plate (12) centralized positioning drilling, the debugging of horizontal and angle are taken out stand-by;
Step 3: integral installation: coating is completed, and expansion sleeve (3) enters staggered floor wall (1), and expansion sleeve (3) is connected with bolt
(8), it is located in step plate (12) back side with casing (9), self-tapping screw (11) is fastened and fixed step plate (12), casing (9) and hangs
It chooses part (7), casing (9) is inserted in bolt (8), Lip river China fir screw (10) fastening installation casing (9) lower part.
2. small staggered floor according to claim 1 vacantly chooses installation method of marking time, which is characterized in that described sleeve pipe (9) is upward
Tiao MOUNTING-EAR 2%.
3. small staggered floor according to claim 1 or 2 vacantly chooses installation method of marking time, which is characterized in that the bolt (8) is leaned on
It is offered a tooth (6) at nearly staggered floor wall (1), be screwed on nut (5) on silk tooth (6).
4. small staggered floor according to claim 3 vacantly chooses installation method of marking time, which is characterized in that the nut (5) and mistake
Pad volume (4) is equipped between layer wall (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811006114.1A CN109295816A (en) | 2018-08-30 | 2018-08-30 | A kind of small staggered floor vacantly chooses installation method of marking time |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811006114.1A CN109295816A (en) | 2018-08-30 | 2018-08-30 | A kind of small staggered floor vacantly chooses installation method of marking time |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109295816A true CN109295816A (en) | 2019-02-01 |
Family
ID=65165657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811006114.1A Pending CN109295816A (en) | 2018-08-30 | 2018-08-30 | A kind of small staggered floor vacantly chooses installation method of marking time |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109295816A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4215435A1 (en) * | 1992-05-11 | 1993-11-18 | Adolf Bucher | Noise damping connector for tread plate and stain check - has blind bore starting from check inside with conical widening towards base for bolt with expansion cone |
EP0698701A1 (en) * | 1994-08-20 | 1996-02-28 | Treppenmeister Partnergemeinschaft Holztreppenhersteller GmbH | Stair step trace |
CN1133948A (en) * | 1995-03-13 | 1996-10-23 | 株式会社游间工房 | Anchor unit with expansive anchor member expanded by utilizing turning force of bolt |
CN200958512Y (en) * | 2006-08-18 | 2007-10-10 | 雷钢 | Special expansion bolt for hollow brick wall |
CN202047408U (en) * | 2011-04-21 | 2011-11-23 | 中国十七冶集团有限公司 | Massif non-damage embedded anchoring device |
CN104196152A (en) * | 2014-08-22 | 2014-12-10 | 同济大学 | Connecting structure for steel coupling beam and concrete wall |
-
2018
- 2018-08-30 CN CN201811006114.1A patent/CN109295816A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4215435A1 (en) * | 1992-05-11 | 1993-11-18 | Adolf Bucher | Noise damping connector for tread plate and stain check - has blind bore starting from check inside with conical widening towards base for bolt with expansion cone |
EP0698701A1 (en) * | 1994-08-20 | 1996-02-28 | Treppenmeister Partnergemeinschaft Holztreppenhersteller GmbH | Stair step trace |
CN1133948A (en) * | 1995-03-13 | 1996-10-23 | 株式会社游间工房 | Anchor unit with expansive anchor member expanded by utilizing turning force of bolt |
CN200958512Y (en) * | 2006-08-18 | 2007-10-10 | 雷钢 | Special expansion bolt for hollow brick wall |
CN202047408U (en) * | 2011-04-21 | 2011-11-23 | 中国十七冶集团有限公司 | Massif non-damage embedded anchoring device |
CN104196152A (en) * | 2014-08-22 | 2014-12-10 | 同济大学 | Connecting structure for steel coupling beam and concrete wall |
Non-Patent Citations (1)
Title |
---|
潘睿: "《房屋建筑学(第三版)》", 30 September 2014, 华中科技大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208792663U (en) | A kind of room finishing system | |
CN108301539A (en) | Unit assembled integration facing light steel keel partition structure and its construction method | |
CN101725227B (en) | Integral construction method for heat preservation and decoration of outer wall | |
CN211448283U (en) | Mounting structure of auxiliary frame and window | |
CN104018650B (en) | Wall plastering plane rushes muscle bar and using method thereof | |
CN103216050B (en) | A kind of building in the style of the ancients eave-rafter construction method of installation | |
CN204919828U (en) | Archaize building's wooden frame and steel structure column's connection structure | |
CN203782997U (en) | Pseudo-classic architecture rafter structure | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN205399932U (en) | Full aluminum alloy floor panel | |
CN106437093A (en) | Architectural decoration and finishing concealed installation tile skirting structure and construction technology thereof | |
CN109295816A (en) | A kind of small staggered floor vacantly chooses installation method of marking time | |
CN205444798U (en) | Floor panel of aluminum alloy | |
CN203961227U (en) | Plane floating screed bar for wall plastering | |
CN109024939A (en) | Steel construction heat preservation mortar for outer wall retaining design and its construction technology with tension member | |
CN202658838U (en) | Exterior wall ornament vitrolite back-bolt type unit hanging and paste structure | |
CN211774781U (en) | External wall insulation decorates intergral template construction structures | |
CN103291093A (en) | Stepped stand building surface layer laying method | |
CN215670776U (en) | Gap bridge structure of floor tiles and wood floors | |
CN209040320U (en) | A kind of steel construction heat preservation mortar for outer wall retaining design with tension member | |
CN212002008U (en) | Wall brick combination paving and pasting platform | |
CN203034624U (en) | Polyphenyl granule insulation board | |
CN209509390U (en) | A kind of novel pendant and its hang ceramic tile | |
CN209025338U (en) | A kind of small staggered floor vacantly chooses mounting structure of marking time | |
CN222413791U (en) | Main structure of residential stair drip line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190201 |