[go: up one dir, main page]

CN109056630A - Ecological gulf road based on permeable dike - Google Patents

Ecological gulf road based on permeable dike Download PDF

Info

Publication number
CN109056630A
CN109056630A CN201811154923.7A CN201811154923A CN109056630A CN 109056630 A CN109056630 A CN 109056630A CN 201811154923 A CN201811154923 A CN 201811154923A CN 109056630 A CN109056630 A CN 109056630A
Authority
CN
China
Prior art keywords
ecological
permeable
river
layer
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811154923.7A
Other languages
Chinese (zh)
Inventor
高淼
高增荣
焦树国
马冰玉
万涛
倪长宝
徐波
金辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Six Ring Landscape (liaoning) Ltd By Share Ltd
Original Assignee
Six Ring Landscape (liaoning) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Six Ring Landscape (liaoning) Ltd By Share Ltd filed Critical Six Ring Landscape (liaoning) Ltd By Share Ltd
Priority to CN201811154923.7A priority Critical patent/CN109056630A/en
Publication of CN109056630A publication Critical patent/CN109056630A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种基于透水坝的生态湾道,包括设置在生态岛(3)的上游侧与所述河道(1)的河岸(7)之间的透水坝(5);所述透水坝(5)的顶部中间处向下开设容纳室(51),所述容纳室(51)的内部设置多个人工生物栅(51a);所述容纳室(51)的侧壁为钢筋砼透水墙(52),所述容纳室(51)的顶部盖设生态浮床(55);所述人工生物栅(51a)挂设在所述生态浮床(55)的底部;由石料堆砌的透水坝(5)将湾道(2)与河道(1)的主槽分隔,通过控制透水坝(5)顶端标高,调节湾道(2)水位。汛期时洪水通过透水坝(5)顶端溢流至湾道(2),可增加河道(1)的洪水调蓄总量;雨后,由于透水坝(5)阻水,湾道(2)内水流速远小于河道(1)内的水流速,为水生动物提供适宜的生存繁衍场所。

The invention discloses an ecological bay based on a permeable dam, comprising a permeable dam (5) arranged between the upstream side of an ecological island (3) and the bank (7) of the river channel (1); the permeable dam (5) The top middle part downwards offers accommodation chamber (51), and the interior of described accommodation chamber (51) is provided with a plurality of artificial biological grids (51a); The side wall of described accommodation chamber (51) is reinforced concrete permeable wall (52), the top of the accommodation chamber (51) is covered with an ecological floating bed (55); the artificial biological grid (51a) is hung on the bottom of the ecological floating bed (55); the permeable dam (5) piled up by stones ) separates the bay (2) from the main channel of the river (1), and adjusts the water level of the bay (2) by controlling the elevation of the top of the permeable dam (5). During the flood season, the flood overflows to the bay channel (2) through the top of the permeable dam (5), which can increase the total amount of flood regulation and storage in the river channel (1); The water velocity is much smaller than that in the river channel (1), providing a suitable living and breeding place for aquatic animals.

Description

Ecological gulf road based on permeable dike
Technical field
The present invention relates to river renovation technique fields, more specifically to the permeable dike in a kind of ecological gulf road.
Background technique
Ecological gulf road is for river channel ecology and habitat rehabilitation.In river, it is slowly hollow with respect to major trough to build flow velocity for overbank Ground provides the place of existence and procreation for fish and benthon.
As the conservation measures of fluvial ecosystem, ecological gulf road is an important environmental element.In recent years, due to rivers and creeks The transformation on linearization(-sation) and riverbank makes the environment of none good existence and procreation of aquatile, it is made to lose rivers and creeks structure The diversity made develops unbalanced so as to cause ecosystem.Therefore, it is reorganized and outfit in planning in rivers and creeks, expands the ring in its cross section Border element becomes particularly significant.
To solve the above-mentioned problems, our company proposes a kind of ecological gulf road (notification number is CN 207659172U) and includes The connecting portion in river and the gulf road of the side outwardly convex formation in the river, the gulf road and the river is equipped with two A Eco-Island;The part that two Eco-Islands leak out the river water surface is not in contact with each other each other, and two Eco-Islands The bank for leaking out the part and the river and gulf road of the river water surface is not in contact with each other.Water flow passes through living between two Eco-Islands Space between Eco-Island and river is flowed into the road of gulf.
For above-mentioned ecological gulf road, water is fed directly in the road of gulf, and the water velocity in the road of gulf is too fast, still unfavorable In the fish in the road of gulf and dwell bottom biological existence and procreation.
Summary of the invention
The present invention to solve the above-mentioned problems, proposes a kind of ecological gulf road based on permeable dike, solves water flow in the road of gulf It is too fast, the fish that are unfavorable in the road of gulf and dwell bottom biological existence and procreation the problem of.
In order to achieve the above object, the present invention provides a kind of ecological gulf road based on permeable dike, including river and in institute State the gulf road that the side outwardly convex in river is formed, the junction setting Eco-Island in the gulf road and the river, the ecology Permeable dike is set between the upstream side and riverbank on island.
The top of the permeable dike is higher than the normal water line in the river, lower than the flood level mark in the river.
Accommodating chamber is opened up at the top center of the permeable dike downwards, multiple artificial bio-membranes are arranged in the inside of the accommodating chamber Grid;The side wall of the accommodating chamber is reinforced concrete permeable wall, and be intervally arranged multiple permeable holes on the reinforced concrete permeable wall;The appearance Receive room top cover set it is biological floating bed;Artificial bio-membrane's grid are hung on the biological floating bed bottom.
Side dam body of the permeable dike close to the river is divided into three layers, from top to bottom respectively small particle filter material layer, Middle partial size filter material layer and the first big partial size filter material layer;Dam body of the permeable dike close to the side in the gulf road is to be filtered by big partial size Expect the second largest partial size filter material layer constituted.
Ecology bag is laid on the outside of the dam body of the permeable dike, the ecology bag and the biological floating bed top are aquatic plant Nitride layer.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the lower section two sides of the permeable dike and the first gabion net cage Spats is connected, and the bottom of the first gabion net cage spats connects the first rubble-mound foundation, and first rubble-mound foundation is embedded in river In substratum.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the bottom of the permeable dike is equipped with reinforced concrete antiseepage pedestal, The reinforced concrete antiseepage pedestal is embedded in the soil layer of river bed.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the riverbank includes setting gradually from the outside to the inside Rain penetration case, snakelike galvanized wire gabion, boulder shore protection and the second gabion net cage spats.
The bottom of the second gabion net cage spats connects the second rubble pedestal, and the second rubble pedestal is embedded in river bed In soil layer;The upper side of the second gabion net cage spats, the lower section of the boulder shore protection is arranged in the boulder shore protection It is laid with the first blotter.
Multiple deal piles are buried at the upper side interval of the boulder shore protection, and the snakelike galvanized wire gabion is arranged in multiple pines Between timber, is filled out in the snakelike galvanized wire gabion and set rubble.
Rainwater infiltration tanks are arranged in the upper side of the snakelike galvanized wire gabion, and it is broken that the bottom of the rainwater infiltration tanks is laid with second Stone bed course.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the rainwater infiltration tanks are interlocked by multistage timber and gravel It is laid with, and is laid with the gravel layer walked for people at the top of the rainwater infiltration tanks.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the top of the snakelike galvanized wire gabion is hygrophyte layer.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the periphery of the Eco-Island is equipped with multiple arranges in around shape The spud pile of column.
The above-mentioned ecological gulf based on permeable dike, under preferred embodiment, the main body of the Eco-Island be by planting soil accumulation and At soil horizon, the top kind of the soil horizon is implanted with vegetable layer, and the bottom of the soil horizon is laid with rubble filter layer.
The above-mentioned ecological gulf based on permeable dike under preferred embodiment, is laid between the soil horizon and the rubble filter layer Permeable nonwoven layer.
The permeable dike Jiang Wandao and river major trough that the present invention is piled up by building stones separate, and pass through control permeable dike top mark Height adjusts gulf road water level.Flood can increase river flood and regulate and store total amount by the overflow of permeable dike top to gulf road when flood season;Rain Afterwards, since permeable dike blocks water, it is numerous to provide suitable existence for aquatic animal much smaller than the water flow velocity in river for water flow velocity in the road of gulf Spread out place.
The reinforced concrete antiseepage pedestal of permeable dike is to prevent water from permeating the damage dam foundation from dam bottom;First gabion net cage spats be by Wire netting package block stone is made into, and is to prevent the water flow erosion dam foundation, while preventing ecology bag in the drag force of water to protect slope foot Under the action of glide.Reinforced concrete permeable wall plays a part of to bear upstream waterpower.
(refer to before dam close to the side close to river) before the dam of permeable dike and be divided into four layers, from bottom to top, three first layers are filters Material, infiltration coefficient can effectively alleviate the silting of dam body from becoming smaller greatly in this way, extend the validity period on dam, are for one layer topmost Ecology bag, planting plants cover one layer of ecology bag on the upstream face surface on dam;Divide two layers behind the dam of permeable dike, lower layer first Big partial size filter material layer, covers one layer of ecology bag on the surface of filtrate.
It is the accommodating chamber in dam between twice reinforced concrete permeable wall, water can be full of, be placed with the life for being hung with artificial bio-membrane's grid State floating bed, biological floating bed upper plantation have the water plant of stronger catharsis to water quality, reinforce ecological permeable dam to the net of water quality Change effect.
Ecology bag is polypropylene (PP) or polyester fiber (PET) is made of raw material, before being covered on the dam of permeable dike Rear surface, second is that intercepting biggish suspended matter in water, prevents and treats dam body first is that filtrate is prevented to be lost under the action of the drag force of water Silting;Third is that playing the role of loaded filter, seepage failure is prevented and treated;When ecology bag silting is serious, when permeable dike loses water permeable ability, It can be replaced.
Riverbank uses Ecological Disposal, is divided into three sections from the bottom to top, and bottom bank band is boulder shore protection, can prevent current scour river Bank bottom, while the gap between boulder can provide aquatic animal living space;Floods and droughts interlocks bank band for multistage snakelike galvanized wire Gabion and stone filling, the planting soil that wadding warp matches between level, and humidogene, emergent aquactic plant are planted, hygrophyte layer is constituted, Can simultaneously purifying rainwater and runoff rainwater;Pushing up bank band is the gravel layer that multistage timber gravel is constituted, to bank when can prevent flood Wash away, while pass through gravel layer purify runoff rainwater.
Detailed description of the invention
Fig. 1 is structure top view of the invention;
Fig. 2 is the partial enlarged view in Fig. 1 at e;
Fig. 3 is the partial enlarged view in Fig. 1 at a;
Fig. 4 is the structure top view of permeable dike in the present invention;
Fig. 5 is the B-B cross-sectional view of Fig. 4;
Fig. 6 is the partial schematic diagram in Fig. 5 at b;
Fig. 7 is the A-A cross-sectional view of Fig. 1;
Fig. 8 is the partial enlarged view in Fig. 7 at d;
Fig. 9 is the partial enlarged view in Fig. 7 at c.
In figure, 1, river, 1a, normal water line, 1b, flood level mark, 2, Wan Dao, 3, Eco-Island, 32, soil horizon, 33, vegetation Layer, 34, rubble filter layer, 35, permeable nonwoven layer, 4, spud pile, 5, permeable dike, 51, accommodating chamber, 51a, artificial bio-membrane's grid, 52, reinforced concrete permeable wall, 52a, permeable hole, 53, ecology bag, 54, water plant layer, 54a, small particle filter material layer, 54b, middle grain Diameter filter material layer, 55c, the first big partial size filter material layer, 55, biological floating bed, the 56, first gabion net cage spats, the 57, first rubble mound Plinth, 58, reinforced concrete antiseepage pedestal, 59, the second largest partial size filter material layer, 7, riverbank, 71, rain penetration case, 71a, the second rubble pad Layer, 71b, gravel layer, 72, snakelike galvanized wire gabion, 72b, hygrophyte layer, 72a, deal pile, 73, boulder shore protection, 73a, the One blotter, the 74, second gabion net cage spats, the 75, second rubble pedestal.
Specific embodiment
As shown in Figure 1, the present invention is a kind of ecological gulf road based on permeable dike, including river 1 and in the river 1 Eco-Island 3 is arranged in the gulf road 2 that side outwardly convex is formed, the gulf road 2 and the junction in the river 1, the Eco-Island 3 Permeable dike 5 is set between upstream side and riverbank 7.The instruction direction of arrow is directed toward under river 1 from the upstream in river 1 in Fig. 1 Trip.
As shown in figure 5, the top of the permeable dike 5 is higher than the normal water line 1a in the river 1, lower than the river 1 Flood level mark 1b.
As shown in Figure 4, Figure 5, accommodating chamber 51 is opened up at the top center of the permeable dike 5 downwards, the accommodating chamber 51 Multiple artificial bio-membrane's grid 51a are arranged in inside;The side wall of the accommodating chamber 51 is reinforced concrete permeable wall 52, the reinforced concrete permeable wall Be intervally arranged multiple permeable hole 52a on 52;The top cover of the accommodating chamber 51 sets biological floating bed 55;Artificial bio-membrane's grid 51a It is hung on biological floating bed 55 bottom.
Side dam body of the permeable dike 5 close to the river 1 is divided into three layers, from top to bottom respectively small particle filter material layer 54a, the middle big partial size filter material layer 54c of partial size filter material layer 54b and first;Dam body of the permeable dike 5 close to the side in the gulf road 2 For the second largest partial size filter material layer 59 being made of big partial size filtrate.
Ecology bag 53, the ecology bag 53 and biological floating bed 55 top are laid on the outside of the dam body of the permeable dike 5 For water plant layer 54.
Ecology bag 53 is polypropylene (PP) or polyester fiber (PET) is two-sided ironing needle punched non-woven fabrics processing made of raw material It forms, centre folder is filled out improvement soil and is made, and punches in the upper layer geotextiles of ecology bag 53, aborts plant kind to the inside Son cultivates water plant.Dam front and rear surfaces are covered on, first is that filtrate is prevented to be lost under the action of the drag force of water, two It is to intercept biggish suspended matter in water, prevents and treats dam body silting;Third is that playing the role of loaded filter, seepage failure is prevented and treated;Work as ecology Bag silting is serious, when permeable dike loses water permeable ability, can be replaced.
As shown in Figure 5, Figure 6, the lower section two sides of the permeable dike 5 are connected with the first gabion net cage spats 56, and described first The bottom of gabion net cage spats 56 connects the first rubble-mound foundation 57, and first rubble-mound foundation 57 is embedded in the soil layer of river bed.
The bottom of the permeable dike 5 is equipped with reinforced concrete antiseepage pedestal 58, and the reinforced concrete antiseepage pedestal 58 is embedded in river bed In soil layer.
The reinforced concrete antiseepage pedestal 58 of permeable dike 5 is to prevent water from permeating the damage dam foundation from dam bottom in the present invention;First gabion Net cage spats 56 is made by wire netting package block stone, is to prevent the water flow erosion dam foundation, while preventing ecology to protect slope foot Bag 53 glides under the action of the drag force of water.Reinforced concrete permeable wall 52 plays a part of to bear upstream waterpower.
(refer to before dam close to the side close to river) before the dam of permeable dike 5 and be divided into four layers, from bottom to top, three first layers are filters Material, infiltration coefficient can effectively alleviate the silting of dam body from becoming smaller greatly in this way, extend the validity period on dam, are for one layer topmost Ecology bag 53, planting plants cover one layer of ecology bag 53 on the upstream face surface of permeable dike 5;Divide two layers behind the dam of permeable dike, Lower layer is the first big partial size filter material layer, and one layer of ecology bag 53 is covered on the surface of filtrate.
It is the accommodating chamber 51 in dam between twice reinforced concrete permeable wall 52, water can be full of, be placed with and be hung with artificial bio-membrane's grid Biological floating bed the 55 of 51a, plantation has the water plant of stronger catharsis to water quality on biological floating bed 55, reinforces ecological permeable dam To the catharsis of water quality.
As shown in FIG. 1 to 3, the riverbank 7 includes rain penetration case 71, the snakelike lead set gradually from the outside to the inside Silk gabion 72, boulder shore protection 73 and the second gabion net cage spats 74.
As shown in Fig. 7~Fig. 8, the bottom of the second gabion net cage spats 74 connects the second rubble pedestal 75, and described the Two rubble pedestals 75 are embedded in the soil layer of river bed;The side of the second gabion net cage spats 74 is arranged in the boulder shore protection 73 The lower section of top, the boulder shore protection 73 is laid with the first blotter 73a.
Multiple deal pile 72a are buried at the upper side interval of the boulder shore protection 73, and the snakelike galvanized wire gabion 72 is arranged Between multiple deal pile 72a, is filled out in the snakelike galvanized wire gabion 72 and set rubble.
Rainwater infiltration tanks 71 are arranged in the upper side of the snakelike galvanized wire gabion 72, and the bottom of the rainwater infiltration tanks 71 is laid with Second blotter 71a.
The rainwater infiltration tanks 71 are staggeredly laid with by multistage timber and gravel, and in the rainwater infiltration tanks 71 Top is laid with the gravel layer 71b to walk for people.
As shown in Figure 7, Figure 8, the top of the snakelike galvanized wire gabion 72 is hygrophyte layer 72b.
Riverbank 7 uses Ecological Disposal, is divided into three sections from the bottom to top, and bottom bank band is boulder shore protection 73, can prevent water flow from rushing Riverbank bottom is brushed, while the gap between boulder can provide aquatic animal living space;Floods and droughts interlocks bank band for multistage snake Shape galvanized wire gabion 72 and stone filling, the planting soil that wadding warp matches between level, and humidogene, emergent aquactic plant are planted, it constitutes wet Plant layer, can simultaneously purifying rainwater and runoff rainwater;Pushing up bank band is the gravel layer 71b that multistage timber gravel is constituted, and can be prevented Bank is washed away when flood, while runoff rainwater is purified by gravel layer.
As shown in Figure 1 and Figure 2, the periphery of the Eco-Island 3 is equipped with multiple spud piles 4 in around shape arrangement, spud pile 4 For reinforcing Eco-Island 3.
As shown in Fig. 7, Fig. 9, the main body of the Eco-Island 3 is soil horizon 32 made of being accumulated as planting soil, the soil The top kind of earth layer 32 is implanted with vegetable layer 33, and the bottom of the soil horizon 32 is laid with rubble filter layer 34.The soil horizon 32 with The rubble filter layer 3) between be laid with permeable nonwoven layer 35.
The present invention is separated gulf road 2 and the major trough in river 1 by the permeable dike 5 that building stones are piled up, and is pushed up by control permeable dike 5 Absolute altitude is held, 2 water level of gulf road is adjusted.Flood can increase the flood tune in river 1 by 5 top overflow of permeable dike to gulf road 2 when flood season Store total amount;After rain, since permeable dike 5 blocks water, water flow velocity is provided much smaller than the water flow velocity in river 1 for aquatic animal in gulf road 2 Place is multiplied in suitable existence.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art within the technical scope of the present disclosure, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1.一种基于透水坝的生态湾道,包括河道(1)以及在所述河道(1)的一侧向外凸起形成的湾道(2),所述湾道(2)与所述河道(1)的连接处设置生态岛(3),其特征在于,所述生态岛(3)的上游侧与河岸(7)之间设置透水坝(5);1. An ecological bay based on a permeable dam, comprising a river course (1) and a bay (2) protruding outwards on one side of the river (1), the bay (2) and the An ecological island (3) is set at the junction of the river course (1), characterized in that a permeable dam (5) is set between the upstream side of the ecological island (3) and the river bank (7); 所述透水坝(5)的顶部高于所述河道(1)的常水位线(1a),低于所述河道(1)的洪水位线(1b);The top of the permeable dam (5) is higher than the normal water level (1a) of the river (1) and lower than the flood level (1b) of the river (1); 所述透水坝(5)的顶部中间处向下开设容纳室(51),所述容纳室(51)的内部设置多个人工生物栅(51a);所述容纳室(51)的侧壁为钢筋砼透水墙(52),所述钢筋砼透水墙(52)上间隔排布多个透水孔(52a);所述容纳室(51)的顶部盖设生态浮床(55);所述人工生物栅(51a)挂设在所述生态浮床(55)的底部;The middle part of the top of the permeable dam (5) is provided with an accommodation chamber (51) downwards, and a plurality of artificial bio-barriers (51a) are arranged in the interior of the accommodation chamber (51); the side walls of the accommodation chamber (51) are A reinforced concrete permeable wall (52), a plurality of permeable holes (52a) are arranged at intervals on the reinforced concrete permeable wall (52); an ecological floating bed (55) is covered on the top of the accommodation chamber (51); the artificial biological The grid (51a) is hung on the bottom of the ecological floating bed (55); 所述透水坝(5)靠近所述河道(1)的一侧坝体分为三层,自上而下分别为小粒径滤料层(54a),中粒径滤料层(54b)和第一大粒径滤料层(54c);所述透水坝(5)靠近所述湾道(2)的一侧的坝体为由大粒径滤料构成的第二大粒径滤料层(59);The side dam body of the permeable dam (5) close to the river course (1) is divided into three layers, from top to bottom are respectively a small particle size filter material layer (54a), a medium particle size filter material layer (54b) and The first large particle size filter material layer (54c); the dam body on the side of the permeable dam (5) near the bay (2) is the second large particle size filter material layer made of large particle size filter material (59); 所述透水坝(5)的坝体外侧铺设生态袋(53),所述生态袋(53)及所述生态浮床(55)的上方为水生植物层(54)。An ecological bag (53) is laid outside the dam body of the permeable dam (5), and an aquatic plant layer (54) is above the ecological bag (53) and the ecological floating bed (55). 2.根据权利要求1所述基于透水坝的生态湾道,其特征在于,所述透水坝(5)的下方两侧与第一石笼网箱护脚(56)相连,所述第一石笼网箱护脚(56)的底部连接第一毛石基础(57),所述第一毛石基础(57)埋设在河底土层内。2. The ecological bay based on the permeable dam according to claim 1, characterized in that, the lower sides of the permeable dam (5) are connected to the first gabion cage foot guards (56), and the first gabion The bottom of the cage cage foot protection (56) is connected with the first rubble foundation (57), and the first rubble foundation (57) is buried in the river bottom soil layer. 3.根据权利要求2所述基于透水坝的生态湾道,其特征在于,所述透水坝(5)的底部设有钢筋砼防渗基座(58),所述钢筋砼防渗基座(58)埋设在河底土层内。3. according to the described ecological bay road based on permeable dam of claim 2, it is characterized in that, the bottom of described permeable dam (5) is provided with reinforced concrete anti-seepage base (58), and described reinforced concrete anti-seepage base ( 58) buried in the river bottom soil layer. 4.根据权利要求1~3任一所述基于透水坝的生态湾道,其特征在于,所述河岸(7)包括由外侧向内侧依次设置的雨水渗透箱(71)、蛇形铅丝石笼(72)、大块石护岸(73)以及第二石笼网箱护脚(74);4. The ecological bay based on a permeable dam according to any one of claims 1 to 3, characterized in that, the river bank (7) includes a rainwater infiltration box (71) arranged sequentially from the outside to the inside, a serpentine lead wire gabion (72), large stone revetment (73) and the second gabion cage foot protection (74); 所述第二石笼网箱护脚(74)的底部连接第二毛石基座(75),所述第二毛石基座(75)埋设在河底土层内;所述大块石护岸(73)设置在所述第二石笼网箱护脚(74)的侧上方,所述大块石护岸(73)的下方铺设第一碎石垫层(73a);The bottom of the second gabion cage foot protection (74) is connected with the second rough stone base (75), and the second rough stone base (75) is buried in the river bottom soil layer; the large stone revetment (73) be arranged on the side above the second gabion cage foot protection (74), and lay the first crushed stone cushion (73a) below the large stone revetment (73); 所述大块石护岸(73)的侧上方间隔埋设多个松木桩(72a),所述蛇形铅丝石笼(72)设置在多个松木桩(72a)之间,所述蛇形铅丝石笼(72)内填设碎石;A plurality of pine piles (72a) are buried at intervals above the side of the large stone revetment (73), and the serpentine lead wire gabion (72) is arranged between the plurality of pine piles (72a). Gravel is filled in the cage (72); 所述蛇形铅丝石笼(72)的侧上方设置雨水渗滤箱(71),所述雨水渗滤箱(71)的底部铺设第二碎石垫层(71a)。A rainwater infiltration box (71) is arranged above the side of the serpentine lead wire gabion (72), and a second gravel cushion (71a) is laid on the bottom of the rainwater infiltration box (71). 5.根据权利要求4所述基于透水坝的生态湾道,其特征在于,所述雨水渗滤箱(71)由多级木桩及砾石交错铺设而成,并且在所述雨水渗滤箱(71)的顶部铺设供人们行走的砾石层(71b)。5. according to the described ecological bay road based on the permeable dam of claim 4, it is characterized in that, the rainwater infiltration box (71) is formed by interlacing laying of multi-level stakes and gravel, and in the rainwater infiltration box ( The top of 71) is laid with a gravel layer (71b) for people to walk on. 6.根据权利要求5所述基于透水坝的生态湾道,其特征在于,所述蛇形铅丝石笼(72)的上方为湿生植物层(72b)。6. The ecological bay based on a permeable dam according to claim 5, characterized in that, above the serpentine lead wire gabion (72) is a hygrophyte layer (72b). 7.根据权利要求6所述基于透水坝的生态湾道,其特征在于,所述生态岛(3)的外周设有多个呈围绕状排列的固定桩(4)。7. The ecological bay road based on a permeable dam according to claim 6, characterized in that, the outer periphery of the ecological island (3) is provided with a plurality of fixed piles (4) arranged in a surrounding shape. 8.根据权利要求7所述基于透水坝的生态湾道,其特征在于,所述生态岛(3)的主体为由种植土壤堆积而成的土壤层(32),所述土壤层(32)的顶部种植有植被层(33),所述土壤层(32)的底部铺设碎石过滤层(34)。8. The ecological bay road based on the permeable dam according to claim 7, characterized in that, the main body of the ecological island (3) is a soil layer (32) formed by planting soil accumulation, and the soil layer (32) A vegetation layer (33) is planted on the top of the soil layer, and a gravel filter layer (34) is laid on the bottom of the soil layer (32). 9.根据权利要求8所述基于透水坝的生态湾道,其特征在于,所述土壤层(32)与所述碎石过滤层(34)之间铺设透水无纺布层(35)。9. The ecological bay based on a permeable dam according to claim 8, characterized in that a water-permeable non-woven fabric layer (35) is laid between the soil layer (32) and the gravel filter layer (34).
CN201811154923.7A 2018-09-30 2018-09-30 Ecological gulf road based on permeable dike Pending CN109056630A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811154923.7A CN109056630A (en) 2018-09-30 2018-09-30 Ecological gulf road based on permeable dike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811154923.7A CN109056630A (en) 2018-09-30 2018-09-30 Ecological gulf road based on permeable dike

Publications (1)

Publication Number Publication Date
CN109056630A true CN109056630A (en) 2018-12-21

Family

ID=64766969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811154923.7A Pending CN109056630A (en) 2018-09-30 2018-09-30 Ecological gulf road based on permeable dike

Country Status (1)

Country Link
CN (1) CN109056630A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736257A (en) * 2019-03-06 2019-05-10 中交上海航道勘察设计研究院有限公司 It is a kind of for constructing the double river structures and its construction method of ecological circulation water system
CN110230318A (en) * 2019-06-25 2019-09-13 中交上海航道勘察设计研究院有限公司 Raft foundation structure for the construction of lake region man-made island
CN111851425A (en) * 2020-07-09 2020-10-30 王安 An ecological retaining dam

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100648957B1 (en) * 2006-08-07 2006-11-24 주식회사 남원건설엔지니어링 Ecological block block installation structure for river levee protection
CN101074558A (en) * 2007-01-25 2007-11-21 河北农业大学 Urban water bank ecological restoration device
JP2008127795A (en) * 2006-11-17 2008-06-05 Shimizu Corp Concrete revetment structure
CN104452674A (en) * 2014-11-28 2015-03-25 上海师范大学 Combined type ecological permeable dam
CN105297671A (en) * 2015-09-30 2016-02-03 山东省分析测试中心 Ecological comprehensive treatment system of northern mountain river channel and construction method thereof
CN107100132A (en) * 2017-06-27 2017-08-29 郑州大学 A kind of matrix alternative ecology filter dam
CN207121477U (en) * 2017-08-10 2018-03-20 湖南益众水利建设有限公司 A kind of combined biological dam
CN108046535A (en) * 2017-12-25 2018-05-18 安徽朗拓环境工程有限公司 A kind of movable type ecological purification dam technology
CN207659172U (en) * 2017-11-24 2018-07-27 六环景观(辽宁)股份有限公司 Ecological gulf road
CN209227471U (en) * 2018-09-30 2019-08-09 六环景观(辽宁)股份有限公司 Ecological gulf road based on permeable dike

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100648957B1 (en) * 2006-08-07 2006-11-24 주식회사 남원건설엔지니어링 Ecological block block installation structure for river levee protection
JP2008127795A (en) * 2006-11-17 2008-06-05 Shimizu Corp Concrete revetment structure
CN101074558A (en) * 2007-01-25 2007-11-21 河北农业大学 Urban water bank ecological restoration device
CN104452674A (en) * 2014-11-28 2015-03-25 上海师范大学 Combined type ecological permeable dam
CN105297671A (en) * 2015-09-30 2016-02-03 山东省分析测试中心 Ecological comprehensive treatment system of northern mountain river channel and construction method thereof
CN107100132A (en) * 2017-06-27 2017-08-29 郑州大学 A kind of matrix alternative ecology filter dam
CN207121477U (en) * 2017-08-10 2018-03-20 湖南益众水利建设有限公司 A kind of combined biological dam
CN207659172U (en) * 2017-11-24 2018-07-27 六环景观(辽宁)股份有限公司 Ecological gulf road
CN108046535A (en) * 2017-12-25 2018-05-18 安徽朗拓环境工程有限公司 A kind of movable type ecological purification dam technology
CN209227471U (en) * 2018-09-30 2019-08-09 六环景观(辽宁)股份有限公司 Ecological gulf road based on permeable dike

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736257A (en) * 2019-03-06 2019-05-10 中交上海航道勘察设计研究院有限公司 It is a kind of for constructing the double river structures and its construction method of ecological circulation water system
CN110230318A (en) * 2019-06-25 2019-09-13 中交上海航道勘察设计研究院有限公司 Raft foundation structure for the construction of lake region man-made island
CN111851425A (en) * 2020-07-09 2020-10-30 王安 An ecological retaining dam

Similar Documents

Publication Publication Date Title
CN211368589U (en) Compound ecological revetment structure
KR100824938B1 (en) Vegetation mats for river banks and surface protection and construction methods
KR100920027B1 (en) Geotextile Reinforced Curtain Wall Structure and Greening Method
CN211621457U (en) Anti-scouring river ecological revetment structure
KR101662690B1 (en) River Bank Protection Structure made of Polyurethane having Fish Habitat and Porous Plant Hole without Foot Protection Work, and Constructing Method thereof
CN109056630A (en) Ecological gulf road based on permeable dike
CN113737723A (en) Ecological bank protection device and ecological bank protection method
KR100574741B1 (en) Multipurpose ecological fox system using geotextile band and construction method
CN209227471U (en) Ecological gulf road based on permeable dike
KR101231655B1 (en) Fish-breeding strucrute and eco-incubator strucrute using the same
CN215052665U (en) Compound riverbed environment system based on ecological flow velocity
KR100886746B1 (en) Eco-friendly vegetation wire mesh basket revetment method
KR101367848B1 (en) System for accelerating salt removal by artificial water supply and method for accelerating salt using the same
CN108729409A (en) A kind of river antiseepage stores ecological restoring apparatus again
KR100665965B1 (en) Vegetation mat for revetment
CN205329629U (en) Ecological revetment matrix structure
KR0147724B1 (en) Revetment method for making the curve point of natural type watercourse
CN207525721U (en) A kind of eco-drainage ditch structure
KR200461490Y1 (en) Vegetation Mat
KR101350359B1 (en) A river having natural fishways and riffles, and the method for constructing the same
RU2685192C1 (en) Gabion mattress with flexible construction
RU2399720C2 (en) Batter drainage of biopositive design
KR0147723B1 (en) A revetment method for making natural type watercourse
RU2393294C1 (en) Method for erection of batter drainage of biopositive design
JP2852879B2 (en) River covering block and concrete covering block revetment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication