CN108951312A - Bolted rigid frog - Google Patents
Bolted rigid frog Download PDFInfo
- Publication number
- CN108951312A CN108951312A CN201810943854.1A CN201810943854A CN108951312A CN 108951312 A CN108951312 A CN 108951312A CN 201810943854 A CN201810943854 A CN 201810943854A CN 108951312 A CN108951312 A CN 108951312A
- Authority
- CN
- China
- Prior art keywords
- rail
- frog
- heart rail
- heart
- bolted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 42
- 229910052742 iron Inorganic materials 0.000 claims abstract description 21
- 238000005452 bending Methods 0.000 claims abstract description 20
- 238000004519 manufacturing process Methods 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 8
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 229910000851 Alloy steel Inorganic materials 0.000 description 12
- 238000003466 welding Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 229910000617 Mangalloy Inorganic materials 0.000 description 2
- ZLMJMSJWJFRBEC-UHFFFAOYSA-N Potassium Chemical compound [K] ZLMJMSJWJFRBEC-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005242 forging Methods 0.000 description 2
- 235000000396 iron Nutrition 0.000 description 2
- 229910052700 potassium Inorganic materials 0.000 description 2
- 239000011591 potassium Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000003491 array Methods 0.000 description 1
- 238000013036 cure process Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000011295 pitch Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001755 vocal effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B7/00—Switches; Crossings
- E01B7/10—Frogs
- E01B7/12—Fixed frogs made of one part or composite
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Connection Of Plates (AREA)
Abstract
The present invention relates to one kind to paste sharp structure by using between long and short heart rail, interval iron is set, and reaching the bolted rigid frog for improving the position stress and improving railway frog, bolted rigid frog is assembled by high-strength bolt by two symmetrical wing rails and the identical long heart rail of bending angle, short heart rail and interval iron.Advantage: first is that bolted rigid frog is assembled by high-strength bolt by two symmetrical wing rails and the identical long and short heart rail of bending angle, interval iron, not only it solved bolted rigid frog heart rail light section bias, improved the stress of heart rail, but also improved railway frog service life;Second is that bolted rigid frog is because structure is simple, technical maturity, the manufacturing cycle is short and meets gapless track requirement.
Description
Technical field
The present invention relates to one kind by, using sharp structure is pasted, interval iron being arranged between long and short heart rail, and reaching improves
The position stress and the bolted rigid frog for improving railway frog belong to railway frog manufacturing field.
Background technique
201010606116.1, title " a kind of embedded combined high manganese steel frog " has the fork heart, fork with rail and wing rail.
The fork heart is formed using High Strength Wear-Resistance Material block cast, and is pitched the heart and be embedded between the wing rail of two two symmetric arrays, is led to
It crosses bolt connection pair and rail washer two wing rails and the fork heart are connected and fixed;Two forks are symmetrically fastened on rail
The two sides of the tail portion of the heart are pitched, and are located between two wing rails, and secondary, rail washer and interval iron is bolted by two wings
Rail is connected and fixed with the tail portion of the fork heart and two forks with rail.The present invention pitches center portion position and uses High Strength Wear-Resistance Material block cast
Molding, and cure process is carried out to its surface and meets heavy-haul line demand to improve the service life of railway frog;Railway frog both ends
Using burning optimization on line rail, solve the problems, such as that gapless track is laid with site welding.
201010606107.2, title " a kind of alloy steel combined frog in wedge-shaped structure ", the web of the rail of alloy steel core rail
Two sidewalls are the lower end inclined-plane I tilted to the web of the rail, make the approximate wedge shape of the cross sectional shape of the web of the rail, and the inner face of wedge-shaped interval iron is
The inclined-plane II being bonded with inclined-plane I;Two wing rails are symmetrically positioned in the two sides of alloy steel core rail, and two wedge-shaped interval irons are symmetrically positioned in the wing
Between rail and alloy steel core rail, and wedge-shaped interval iron outer end face is bonded with the web of the rail sidewall shape of wing rail, the inclined-plane II of inner face
It is closely connected with inclined-plane I, secondary and rail washer is bolted and connects two wing rails, two wedge-shaped interval irons and alloy steel core rail
It is fixed together;Two are pitched the two sides for being symmetricly set on the tail portion of alloy steel core rail with rail, and are located between two wing rails, and lead to
It crosses bolt connection pair, rail washer and general interval iron three is connected and fixed.The present invention passes through wedge-shaped alloy steel core
Rail is used cooperatively with wedge-shaped interval iron, solves the problems, such as between alloy steel combination frog heart rail and wing rail up and down with respect to the changing of the relative positions, increasing
The overall stability of strong railway frog, improves the service life of whole group railway frog.
201620584979.6, title " a kind of smithwelding combined type obtuse frog ", belongs to railway switch technical field, it by
Stock rail, the forging fork heart, heart rail, side rail, interval iron, bolt group, side's pad, anti-loose measure pad assembling composition;Its structure are as follows: heart rail is
Two symmetrical track relative symmetry settings, the angle after two heart rail combinations are 18 55 ', 29 ", two heart rail front end interception length
120mm is spent, the fork heart after forging is welded to the basal orbit front end of heart rail using flash welding connection;The heart rail is in whole knot
Be symmetrical arranged in structure, for two groups of heart rail rail points with respect to 286mm, stock rail and side rail setting angle are 161 4 ', 31 ", side rail with substantially
Flangeway distance between rail is 47mm;Side's pad is mounted in the web of the rail of side rail, the screw bolt passes of bolt group side rail, basic
Rail, heart rail, interval iron, stock rail, side rail, anti-loose measure pad by bolt group bolt fastening.
Background technique 1 is related to a kind of potassium steel fork heart assembled frog, and potassium steel pitches the heart (the one knot with wing rail mosaic block
Structure).Background technique 2 and 3 is related to a kind of alloy steel core rail assembled frog, is alloy steel core rail and fork with rail, wing rail, wing rail
Mosaic block is assembled by the interval ferropexy of different structure.But nothing is unable to satisfy for fixed solid manganese steel frog
Line requirements are stitched, although alloy steel combination frog solves the problems, such as gapless track site welding, but alloy steel core rail structure process
Complexity, manufacturing cycle are long.
Summary of the invention
Purpose of design: avoiding the shortcoming in background technique, designs a kind of by sharp using patch between long and short heart rail
Interval iron is arranged in structure, and reaches the bolted rigid frog for improving the position stress and improving railway frog.
Design scheme: in order to realize above-mentioned purpose of design.The present invention in structure design, mainly solves bolted rigid frog
Heart rail light section is eccentric, improves the stress of heart rail, so that railway frog service life is improved, by two symmetrical wing rails and bending angle
It is assembled by high-strength bolt to spend identical long heart rail, short heart rail, interval iron.Long and short heart rail bending angle is identical, be α/
2(α is railway frog angle), heart rail light section bias is avoided, batch micro operations are convenient for.And used between long and short heart rail and paste sharp structure,
And interval iron is set, the overall stability of enhancing structure improves the position stress;Two wing rail bending angles are identical,
For α (α is railway frog angle), railway frog flangeway improves the accuracy of manufacture of railway frog using formation is machined after assembling.
Technical solution 1: a kind of bolted rigid frog, bolted rigid frog are identical by two symmetrical wing rails and bending angle
Long heart rail, short heart rail and interval iron are assembled by high-strength bolt.
Technical solution 2: a kind of design method of bolted rigid frog, including railway frog, long heart rail and short heart rail bending angle
It is identical, it is α/2, and using the sharp structure of patch between long heart rail and short heart rail, and interval iron is set, wing rail one and wing rail two are curved
Dog-ear degree is identical, is α, and two wing rail bending angles are identical, is α, and railway frog flangeway is improved using formation is machined after assembling
The accuracy of manufacture of railway frog.
Compared with the background technology, the present invention, first is that bolted rigid frog is identical by two symmetrical wing rails and bending angle
Long and short heart rail, interval iron are assembled by high-strength bolt, have both solved bolted rigid frog heart rail light section bias, have improved the heart
The stress of rail, and improve railway frog service life;Second is that bolted rigid frog is because structure is simple, technical maturity, manufacturing cycle
It is short and meet gapless track requirement;It is manufactured third is that railway frog is all made of with the rail of route same material, meets showing for gapless track
Field welding requirements;Fourth is that frog structure improves force-bearing situation, the stability of railway frog is improved.Fifth is that frog structure is simple, compact, easily
In manufacture.
Detailed description of the invention
Fig. 1 is the overlooking structure diagram of bolted rigid frog.
Fig. 2 be in Fig. 1 A-A to schematic cross-sectional view.
Fig. 3 is the schematic cross-sectional view of B-B direction in Fig. 1.
Fig. 4 be in Fig. 1 C-C to schematic cross-sectional view.
Fig. 5 be in Fig. 1 D-D to schematic cross-sectional view.
Fig. 6 is the decomposition diagram of Fig. 1.
Specific embodiment
Embodiment 1: referring to attached drawing 1-6.A kind of bolted rigid frog, bolted rigid frog by two symmetrical wing rails 3 and 4 and
The identical long heart rail 1 of bending angle, short heart rail 2 and interval iron 5 are assembled by high-strength bolt 6.The long heart rail 1 and the short heart
2 bending angle of rail is identical, is α/2;The wing rail 1 is identical with 24 bending angle of wing rail, is α.The α is frog angle
Degree.Label 8 is anti-loosening device of bolt, and 7 be rail washer.
Embodiment 2: on the basis of embodiment 1, a kind of design method of bolted rigid frog, including railway frog, long heart rail
It is identical with short heart rail bending angle, it is α/2, and using the sharp structure of patch between long heart rail and short heart rail, and interval iron is set,
Wing rail one is identical with two bending angle of wing rail, is α, and two wing rail bending angles are identical, is α, railway frog flangeway is using assembling
Machining is formed afterwards, improves the accuracy of manufacture of railway frog.
It is to be understood that: although above-described embodiment retouches mentality of designing of the invention detailed text of contrasting
It states, but these verbal descriptions, only the simple text of mentality of designing of the present invention is described, rather than to mentality of designing of the present invention
Limitation, any combination, increase or modification without departing from mentality of designing of the present invention falls within the protection scope of the present invention.
Claims (5)
1. a kind of bolted rigid frog, it is characterized in that: bolted rigid frog is by two symmetrical wing rails and the identical length of bending angle
Heart rail, short heart rail and interval iron are assembled by high-strength bolt.
2. bolted rigid frog according to claim 1, it is characterized in that: the long heart rail and short heart rail bending angle phase
It together, is α/2.
3. bolted rigid frog according to claim 1, it is characterized in that: two bending angle phase of the wing rail one and wing rail
It together, is α.
4. bolted rigid frog according to claim 2 or 3, it is characterized in that: the α is railway frog angle.
5. a kind of design method of bolted rigid frog, including railway frog, it is characterized in that: long heart rail and short heart rail bending angle phase
Together, it is α/2, and using the sharp structure of patch between long heart rail and short heart rail, and interval iron is set, wing rail one and wing rail two is bent
Angle is identical, is α, and two wing rail bending angles are identical, is α, and railway frog flangeway improves rut using formation is machined after assembling
The accuracy of manufacture of fork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810943854.1A CN108951312B (en) | 2018-08-18 | 2018-08-18 | Rail combined frog |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810943854.1A CN108951312B (en) | 2018-08-18 | 2018-08-18 | Rail combined frog |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108951312A true CN108951312A (en) | 2018-12-07 |
CN108951312B CN108951312B (en) | 2024-07-23 |
Family
ID=64469881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810943854.1A Active CN108951312B (en) | 2018-08-18 | 2018-08-18 | Rail combined frog |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108951312B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109513784A (en) * | 2018-12-26 | 2019-03-26 | 中国铁建重工集团有限公司 | Tooling |
CN110528339A (en) * | 2019-07-29 | 2019-12-03 | 中铁工程设计咨询集团有限公司 | The double limb elasticity of dislocation type can flexual center rut fork |
CN110593022A (en) * | 2019-09-10 | 2019-12-20 | 中国铁建重工集团股份有限公司 | Frogs and tracks |
CN111809454A (en) * | 2020-08-10 | 2020-10-23 | 中铁宝桥集团有限公司 | Alloy steel point-rail combined obtuse frog |
WO2023039962A1 (en) * | 2021-09-16 | 2023-03-23 | 中铁宝桥集团有限公司 | Movable point frog |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB617759A (en) * | 1946-11-05 | 1949-02-10 | Samuel Hunter Gordon | Improvements in railway and like crossings |
CN200985477Y (en) * | 2006-12-05 | 2007-12-05 | 顾经文 | Alloy steel rolling rail fixed frog |
CN201738193U (en) * | 2010-07-26 | 2011-02-09 | 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 | Full bainitic steel forge-welding frog |
CN205917535U (en) * | 2016-06-16 | 2017-02-01 | 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 | Alloy steel assembled frog |
CN209024900U (en) * | 2018-08-18 | 2019-06-25 | 中铁宝桥集团有限公司 | Bolted rigid frog |
-
2018
- 2018-08-18 CN CN201810943854.1A patent/CN108951312B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB617759A (en) * | 1946-11-05 | 1949-02-10 | Samuel Hunter Gordon | Improvements in railway and like crossings |
CN200985477Y (en) * | 2006-12-05 | 2007-12-05 | 顾经文 | Alloy steel rolling rail fixed frog |
CN201738193U (en) * | 2010-07-26 | 2011-02-09 | 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 | Full bainitic steel forge-welding frog |
CN205917535U (en) * | 2016-06-16 | 2017-02-01 | 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 | Alloy steel assembled frog |
CN209024900U (en) * | 2018-08-18 | 2019-06-25 | 中铁宝桥集团有限公司 | Bolted rigid frog |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109513784A (en) * | 2018-12-26 | 2019-03-26 | 中国铁建重工集团有限公司 | Tooling |
CN109513784B (en) * | 2018-12-26 | 2023-10-13 | 中国铁建重工集团股份有限公司 | Tooling |
CN110528339A (en) * | 2019-07-29 | 2019-12-03 | 中铁工程设计咨询集团有限公司 | The double limb elasticity of dislocation type can flexual center rut fork |
CN110593022A (en) * | 2019-09-10 | 2019-12-20 | 中国铁建重工集团股份有限公司 | Frogs and tracks |
CN111809454A (en) * | 2020-08-10 | 2020-10-23 | 中铁宝桥集团有限公司 | Alloy steel point-rail combined obtuse frog |
WO2023039962A1 (en) * | 2021-09-16 | 2023-03-23 | 中铁宝桥集团有限公司 | Movable point frog |
Also Published As
Publication number | Publication date |
---|---|
CN108951312B (en) | 2024-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108951312A (en) | Bolted rigid frog | |
CN106400618B (en) | Dual alloy integrated forged frog and its manufacturing method | |
CN204455824U (en) | A kind of cable stayed bridge Suo Liang connects anchor tie plate assembly | |
CN209024900U (en) | Bolted rigid frog | |
CN104499382A (en) | Combined frog of forged high-manganese-steel point rail | |
WO2022199588A1 (en) | Seamless combination frog | |
CN204803690U (en) | Pairing gold solid forging railway frog | |
CN209227292U (en) | A kind of not contour vee crossing's alloy steel combination frog | |
CN208869879U (en) | Combined type high manganese steel frog | |
CN109183527A (en) | A kind of not contour vee crossing's alloy steel combination frog | |
CN106149483A (en) | A kind of assembled frog fork heart and fork are with the assembling structure of rail | |
CN209428856U (en) | A kind of welding assembled frog | |
CN208415008U (en) | Heart assembled frog is pitched in asymmetric formula potassium steel block cast | |
CN216615333U (en) | Seamless combined frog | |
CN208917602U (en) | Inserted forging potassium steel combines fixed railway frog | |
CN214245139U (en) | Split type combination frog | |
CN109594432A (en) | A kind of fixed combined frog crossing point rail bindiny mechanism | |
CN207227871U (en) | Fusion cast frog | |
CN210287979U (en) | Anti-jumping and adjustable fixed combined frog | |
CN205077334U (en) | Novel embedded manganese fork core structure | |
CN111979848B (en) | Reinforced alloy steel core rail combined acute angle frog | |
CN209508728U (en) | A kind of fixed combined frog crossing point rail bindiny mechanism | |
CN2570315Y (en) | Alloyed steel composite frog | |
KR100705337B1 (en) | Welding Crossing for Railway Turnout and Manufacturing Method Thereof | |
CN209740475U (en) | end reinforcing and supporting mechanism of escalator truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |