[go: up one dir, main page]

CN108286254A - Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure - Google Patents

Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure Download PDF

Info

Publication number
CN108286254A
CN108286254A CN201710054782.0A CN201710054782A CN108286254A CN 108286254 A CN108286254 A CN 108286254A CN 201710054782 A CN201710054782 A CN 201710054782A CN 108286254 A CN108286254 A CN 108286254A
Authority
CN
China
Prior art keywords
pit
foundation pit
construction
adjacent
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710054782.0A
Other languages
Chinese (zh)
Inventor
刘向科
王利民
许世雄
唐永福
林建军
左其和
崔江余
李嘉冀
张国立
黄金晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JIANGONG GROUP Co Ltd
Beijing Jiaotong University
BCEG Civil Engineering Co Ltd
Original Assignee
BEIJING JIANGONG GROUP Co Ltd
Beijing Jiaotong University
BCEG Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JIANGONG GROUP Co Ltd, Beijing Jiaotong University, BCEG Civil Engineering Co Ltd filed Critical BEIJING JIANGONG GROUP Co Ltd
Priority to CN201710054782.0A priority Critical patent/CN108286254A/en
Publication of CN108286254A publication Critical patent/CN108286254A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及建筑工程技术领域,是一种邻近重要结构长条形基坑预留土体分隔分区开挖施工的结构及施工方法,所述结构包括:邻近重要结构和长条形基坑,邻近重要结构侧独立设置小坑,垂直方向相邻基坑预留土体并放坡支护,为独立分坑的开挖提供水平反力,其他区域与独立小坑同时施工。本发明对常规邻近重要结构长条形深大基坑独立分坑依次开挖施工方法进行了创新,保证邻近基坑重要结构安全的前提下,实现除预留土范围外其他区域同时施工,从而降低了施工部署难度,有效缩短总体工期。

The invention relates to the technical field of construction engineering, and relates to a structure and a construction method for excavating and excavating the reserved soil body of a strip-shaped foundation pit adjacent to an important structure. Small pits are set independently on the important structure side, and soil is reserved for adjacent foundation pits in the vertical direction and sloped for support, providing horizontal reaction force for the excavation of independent sub-pit, and other areas are constructed simultaneously with independent small pits. The present invention innovates the sequential excavation construction method of the conventional long-strip deep and large foundation pits adjacent to important structures, and realizes simultaneous construction in other areas except the reserved soil range under the premise of ensuring the safety of important structures adjacent to the foundation pit, thereby It reduces the difficulty of construction deployment and effectively shortens the overall construction period.

Description

邻近重要结构长条形基坑预留土体分隔分区开挖施工结构The construction structure of the excavation of the reserved soil in the long-strip foundation pit adjacent to the important structure

技术领域technical field

本发明涉及建筑基坑工程技术领域,具体是涉及一种邻近重要结构长条形基坑预留土体分隔分区开挖施工结构及施工方法。The invention relates to the technical field of building foundation pit engineering, in particular to a construction structure and a construction method for excavating and excavating the reserved soil body in a strip-shaped foundation pit adjacent to an important structure.

背景技术Background technique

近些年来,我国房地产业蓬勃发展,各类建筑如雨后春笋,城市建筑用地愈发紧张。为了充分利用空间,缓解城市用地不足,现代化城市采用了向高空和地下发展的策略,高层、超高层建筑越来越多,大型深基坑技术也被越来越多地运用。In recent years, my country's real estate industry has developed vigorously, various types of buildings have sprung up, and urban construction land has become increasingly tense. In order to make full use of space and alleviate the shortage of urban land, modern cities have adopted strategies to develop high-altitude and underground. There are more and more high-rise and super high-rise buildings, and large-scale deep foundation pit technology is also being used more and more.

随着城市布局与总体规划的发展变化,紧邻重要结构进行大规模地下空间一体化开发,形成多种功能交混综合体的工程越来越多。为了保证邻近重要结构的安全,相邻深基坑工程通常采用分坑分区依次施工的工序安排。这种工序安排存在施工速度慢、总体工期长、施工成本高,施工部署困难等多种问题。With the development and changes of urban layout and overall planning, there are more and more projects for the integrated development of large-scale underground space adjacent to important structures, forming complexes with multiple functions. In order to ensure the safety of adjacent important structures, the adjacent deep foundation pit engineering usually adopts the process arrangement of subdivided pits and sequential construction. This process arrangement has many problems such as slow construction speed, long overall construction period, high construction cost, and difficult construction deployment.

例如各大城市都正在兴建或准备兴建的地铁。城市地铁的修建过程中涉及到大量的深基坑工程,并且常常是处于密集建筑区内,就不免出现深基坑施工和周围建筑物的相互影响问题。对于这类相邻深基坑施工问题,大量学者已经认识到以往的基坑工程强度设计理论已经不能满足工程周围环境的安全性要求,越来越严格的基坑工程变形控制要求运用到实际工程之中,但相邻深基坑施工问题仍然还有许多需要解决的难题。For example, the subways that are being built or are about to be built in major cities. A large number of deep foundation pit projects are involved in the construction of urban subways, and they are often located in densely built areas, so the mutual influence between deep foundation pit construction and surrounding buildings inevitably arises. Regarding the construction of such adjacent deep foundation pits, a large number of scholars have realized that the previous strength design theory of foundation pit engineering can no longer meet the safety requirements of the surrounding environment of the project, and the increasingly strict requirements for deformation control of foundation pit engineering are applied to actual projects. Among them, there are still many problems to be solved in the construction of adjacent deep foundation pits.

发明内容Contents of the invention

为了克服邻近重要结构进行深大基坑分坑、分区依次施工常规工序安排存在的施工速度慢、总体工期长、施工成本高,施工部署困难等多种问题,本发明提供了一种邻近重要结构长条形基坑预留土体分隔分区开挖施工结构,本发明还提供了所述结构的施工方法。In order to overcome various problems such as slow construction speed, long overall construction period, high construction cost, and difficulty in construction deployment when deep and large foundation pits are divided into deep and large foundation pits adjacent to important structures, and conventional construction procedures are arranged sequentially in different areas, the present invention provides an adjacent important structure. The excavation construction structure of the reserved soil in the long strip foundation pit is divided into partitions, and the invention also provides a construction method of the structure.

本发明的技术方案是:一种邻近重要结构长条形基坑预留土体分隔分区开挖施工结构,主要包括长条形基坑和重要结构;The technical solution of the present invention is: a construction structure for excavating and excavating the reserved soil body of a strip-shaped foundation pit adjacent to an important structure, which mainly includes a strip-shaped foundation pit and an important structure;

所述重要结构为已经存在,已正常运营,位于拟开挖长条形基坑短边侧,需要在基坑开挖过程中重点保护的结构;The important structure mentioned already exists and is in normal operation, located on the short side of the long strip foundation pit to be excavated, and needs to be protected during the excavation process of the foundation pit;

所述长条形基坑为基坑长边与短边长度比例大于3的基坑,短边方向紧邻重要结构,可划分为独立小分坑、预留土体区和其他分区三大区域;The strip-shaped foundation pit is a foundation pit whose length ratio between the long side and the short side is greater than 3, and the short side is adjacent to important structures, and can be divided into three major areas: independent small sub-pit, reserved soil area and other partitions;

所述独立小分坑为长条形基坑紧邻重要结构侧,利用围护结构独立划分,要求保证率先开挖施工的小型基坑;The independent small sub-pit is a long strip foundation pit adjacent to the side of the important structure, which is independently divided by the enclosure structure, and is required to ensure the first excavation and construction of small-scale foundation pits;

所述预留土体区为在独立小分坑相邻基坑留置的坡顶宽度1~2倍基坑开挖深度,为简易预留土体放坡支护的土台,目的是为独立小分坑开挖提供水平支撑反力;The reserved soil area is the slope top width 1 to 2 times the excavation depth of the foundation pit left in the adjacent foundation pit of the independent small sub-pit. Sub-pit excavation provides horizontal support and reaction force;

所述其他分区为由预留土体分隔,远离重要结构和独立小分坑的区域,也可根据周边环境及基坑长宽比条件采用此结构组织施工;The other partitions are areas separated by reserved soil and away from important structures and independent small sub-pit, and this structure can also be used for construction according to the surrounding environment and the length-to-width ratio of the foundation pit;

所述其他分区内设置坑中坑,所述坑中坑是位于其他分区正中央位置且面积小于其他分区的深坑,主要由围护桩与底板构成;A pit-in-a-pit is set in the other partitions, and the pit-in-a-pit is a deep pit located in the center of the other partitions with an area smaller than that of other partitions, and is mainly composed of retaining piles and a bottom plate;

所述长条形基坑周围为基坑围护结构,所述基坑围护结构包括基坑围护连续墙和基坑围护桩,在所述括基坑围护连续墙内设有锚杆一。The perimeter of the strip-shaped foundation pit is a foundation pit enclosure structure, and the foundation pit enclosure structure includes a foundation pit enclosure continuous wall and a foundation pit enclosure protection pile, and anchors are arranged in the foundation pit enclosure continuous wall. pole one.

进一步地,在上述方案中,所述预留土体放坡支护为采用如土钉墙放坡支护等较经济的支护形式能够保证预留土坡体稳定的支护方式。Further, in the above scheme, the reserved soil grading support is a support method that can ensure the stability of the reserved soil slope by adopting a more economical support form such as soil nailing wall grading support.

本发明还提供了邻近重要结构长条形基坑预留土体分隔分区开挖施工的方法,步骤如下:The present invention also provides a method for excavating and excavating the reserved soil adjacent to the strip-shaped foundation pit adjacent to the important structure, and the steps are as follows:

第一步:场地整平,完成长条形基坑分区施工划分,邻近重要结构设置独立小分坑,相邻分区预留一定宽度土体,与独立小分坑由分坑桩分隔,剩余区域为其他分区;Step 1: Level the site, complete the construction division of the long strip foundation pit, set up independent small sub-pits adjacent to important structures, reserve a certain width of soil for adjacent sub-divisions, and separate small sub-pits from independent small sub-pits by sub-pit piles, and the remaining areas for other partitions;

第二步:在地面完成基坑围护结构施工;Step 2: Complete the foundation pit enclosure structure construction on the ground;

第三步:除预留土体区外,其他所有分区同时开挖施工,优先保证邻近重要结构的独立小分坑施工进度;Step 3: Except for the reserved soil area, all other areas shall be excavated at the same time, and priority shall be given to ensuring the construction progress of independent small sub-pits adjacent to important structures;

第四步:待独立小分坑区域主体结构出±0.00后,开挖预留土体区,同时从预留土体区内向邻近重要结构内植入锚杆二;Step 4: After the main structure of the independent small sub-pit area is ±0.00, excavate the reserved soil area, and at the same time implant anchor rod 2 from the reserved soil area to the adjacent important structure;

第五步:预留土体区施工至基底,自下而上施工主体结构时,根据数值模拟与监测数据分析结果,可适当取消结构与分坑桩之间水平换撑;Step 5: Reserve the soil area for construction to the base, and when constructing the main structure from bottom to top, according to the results of numerical simulation and monitoring data analysis, the horizontal support between the structure and the sub-pit piles can be appropriately canceled;

第六步:分坑桩两侧结构完成±0.00以下结构施工后,自上而下拆除分坑桩;Step 6: After the construction of the structure below ±0.00 on both sides of the sub-pit pile is completed, the sub-pit pile is removed from top to bottom;

第七步:如第五步结构换撑取消施做,则分坑桩可自上而下一次性拆除至基底;Step 7: If the structure replacement in step 5 is cancelled, the sub-pit piles can be dismantled from top to bottom to the base at one time;

第八步:如分坑桩自上而下一次性拆除至基底,则后浇带可自下而上依次封闭,分坑桩两侧结构连通为整体。Step 8: If the sub-pit piles are removed to the base at one time from top to bottom, the post-casting belt can be closed sequentially from bottom to top, and the structures on both sides of the sub-pit piles are connected as a whole.

进一步地,在后浇带部位预先埋入长为500mm的角钢,后浇带预先埋入角钢,可以保证主体结构的安全。Furthermore, a 500mm long angle steel is pre-embedded in the post-casting belt, and the post-casting belt is pre-embedded with the angle steel, which can ensure the safety of the main structure.

本发明的有益效果是:The beneficial effects of the present invention are:

(1)相比多个分坑依次开挖施工方法,预留土体分隔分区开挖施工方法,既能有效控制邻近重要结构和相邻基坑自身的安全风险,又可以确保邻近重要结构分坑率先完工;(1) Compared with the sequential excavation method of multiple sub-pits, the excavation method of reserved soil separated by partitions can not only effectively control the safety risks of adjacent important structures and the adjacent foundation pit itself, but also ensure that the adjacent important structures are divided into two parts. The pit was completed first;

(2)解决了多个分坑依次开挖带来的劳动力与机械的窝工或多次进出场等施工部署问题,并有效节约了施工成本;(2) It solves the construction deployment problems caused by the sequential excavation of multiple sub-pits, such as labor and machinery layoffs or multiple entry and exit, and effectively saves construction costs;

(3)预留土体分隔分区施工,实现除预留土区域外,所有分区同时施工,可有效缩短工程总体工期。(3) The reserved soil is divided into partitions for construction, so that all partitions except the reserved soil area can be constructed at the same time, which can effectively shorten the overall construction period of the project.

附图说明Description of drawings

图1是本发明专利邻近重要结构长条形基坑预留土体分隔分区开挖施工区域划分结构示意图的平面图;Fig. 1 is the plane view of the divisional structural schematic diagram of the excavation construction area of the excavation construction area reserved by the reserved soil body of the strip-shaped foundation pit adjacent to the important structure of the patent of the present invention;

图2是本发明专利邻近重要结构长条形基坑预留土体分隔分区开挖施工区域划分结构示意图的主视图;Fig. 2 is the front view of the divisional structural diagram of the excavation construction area division of the excavation construction area reserved for the excavation and construction area of the reserved soil body in the elongated foundation pit adjacent to the important structure of the patent of the present invention;

图3为分坑桩两侧结构水平换撑示意图;Fig. 3 is a schematic diagram of horizontal support replacement of the structure on both sides of the divided pit pile;

图4为分坑桩自上而下一次性拆除示意图;Fig. 4 is a schematic diagram of one-time dismantling of the split-pit pile from top to bottom;

图5为分坑桩范围结构后浇带自下而上封闭施工示意图;Fig. 5 is a bottom-up closed construction schematic diagram of the post-casting zone structure of the divided pit pile;

其中,1—重要结构;2—独立小分坑;3—预留土体区;4—其他分区;5—分坑桩;6—结构换撑;7—底板换撑;8—基坑围护桩;9—后浇带;10—主体结构,11—基坑围护连续墙,12—锚杆一,13—锚杆二,14—坑中坑。Among them, 1—important structure; 2—independent small sub-pit; 3—reserved soil area; 4—other partitions; 5—divided pit pile; 6—replacement of structure; Guard pile; 9—post-pouring belt; 10—main structure, 11—diaphragm wall for foundation pit enclosure, 12—anchor 1, 13—anchor 2, 14—pit-in-pit.

具体实施方式Detailed ways

如附图1、图2所示的邻近重要结构长条形基坑预留土体分隔分区开挖施工结构,主要包括长条形基坑和重要结构;重要结构1为已经存在,已正常运营,位于拟开挖长条形基坑短边侧,需要在基坑开挖过程中重点保护的结构;长条形基坑为基坑长边与短边长度比例大于3的基坑,短边方向紧邻重要结构1,可划分为独立小分坑2、预留土体区3和其他分区4三大区域;独立小分坑2为长条形基坑紧邻重要结构1侧,利用围护结构独立划分,要求保证率先开挖施工的小型基坑;预留土体区3为在独立小分坑2相邻基坑留置的坡顶宽度1~2倍基坑开挖深度,为简易预留土体放坡支护的土台,目的是为独立小分坑开挖提供水平支撑反力,预留土体放坡支护为采用如土钉墙放坡支护等较经济的支护形式能够保证预留土坡体稳定的支护方式;其他分区4为由预留土体分隔,远离重要结构1和独立小分坑2的区域;其他分区4内设置坑中坑15,坑中坑15是位于其他分区4正中央位置且面积小于其他分区4的深坑,主要由围护桩与底板构成;长条形基坑周围为基坑围护结构,基坑围护结构包括基坑围护连续墙11和基坑围护桩8,在所述括基坑围护连续墙内设有锚杆一12。As shown in attached drawings 1 and 2, the excavation construction structure of the reserved soil of the long-strip foundation pit adjacent to the important structure is divided into partitions, mainly including the long-strip foundation pit and important structures; the important structure 1 already exists and has been in normal operation , is located on the short side of the long strip foundation pit to be excavated, and needs to be protected during the excavation process of the foundation pit; the long strip foundation pit is a foundation pit whose length ratio between the long side and the short side of the foundation pit is greater than 3, and the short side The direction is close to the important structure 1, which can be divided into three major areas: the independent small sub-pit 2, the reserved soil area 3 and other sub-divisions 4; Independently divided, it is required to ensure the first excavation of the small foundation pit; the reserved soil area 3 is the slope top width 1 to 2 times the excavation depth of the foundation pit left in the independent small sub-pit 2 adjacent to the foundation pit, which is reserved for simple The purpose of the soil platform for soil grading support is to provide horizontal support for the excavation of independent small sub-pit. The support method to ensure the stability of the reserved soil slope; the other partition 4 is an area separated by the reserved soil, away from the important structure 1 and the independent small sub-pit 2; the other partition 4 is set with a pit within a pit 15 and a pit within a pit 15 It is a deep pit located in the center of other division 4 and its area is smaller than that of other division 4. It is mainly composed of enclosure piles and floor plates; the surrounding of the long strip foundation pit is the foundation pit enclosure structure, and the foundation pit enclosure structure includes foundation pit enclosure Diaphragm wall 11 and foundation pit enclosing pile 8 are provided with anchor rod one 12 in the described foundation pit enclosing continuous wall.

下面以苏州某地下空间工程北区为例,结合附图对本发明进行进一步说明。Below, the present invention will be further described by taking the northern area of an underground space project in Suzhou as an example, in conjunction with the accompanying drawings.

苏州某地下空间工程北区基坑总面积约2.44万平方米,呈长方形,南北最长约301m,东西宽处为84m,窄处为64m,基坑周长约792m。场地整平后标高2.70m。基坑挖深约17.8m。基坑84m短边方向紧邻地铁某车站,距车站结构外边线约32m。The total area of the foundation pit in the north area of an underground space project in Suzhou is about 24,400 square meters. After the site is leveled, the elevation is 2.70m. The depth of the foundation pit is about 17.8m. The 84m short side of the foundation pit is adjacent to a subway station, about 32m away from the outer line of the station structure.

北区分两个独立基坑,远离地铁侧为大基坑,采用800mm厚地下连续墙+三道混凝土内支撑,邻近地铁侧为小基坑,采用800mm厚地下连续墙+四道内支撑(一道混凝土撑+三道钢支撑),两坑之间采用分坑桩分隔。There are two independent foundation pits in the north area, the large foundation pit on the side away from the subway adopts an 800mm thick underground diaphragm wall + three inner concrete supports, and the small foundation pit on the side adjacent to the subway adopts an 800mm thick underground diaphragm wall + four inner supports (one concrete inner support support + three steel supports), between the two pits Divided by pit piles.

为保护地铁线路及车站正常运营,要求率先完成紧邻地铁小坑区域,之后再施工相邻大坑区域。经反复研究决定采用本发明的施工方法。In order to protect the normal operation of subway lines and stations, it is required to first complete the area adjacent to the small pit of the subway, and then construct the area adjacent to the large pit. Through repeated studies, it is decided to adopt the construction method of the present invention.

实施步骤如下:The implementation steps are as follows:

第一步:场地整平,完成长条形基坑分区施工划分。邻近重要结构(地铁)1侧为独立分坑2,相邻大坑紧邻小坑侧留置一定宽度预留土体区3,与独立分坑2由分坑桩5分隔,剩余区域为其他分区4;Step 1: Level the site and complete the construction division of the strip-shaped foundation pit. The adjacent important structure (subway) 1 side is an independent sub-pit 2, and the adjacent large pit is adjacent to the side of the small pit. A certain width of reserved soil area 3 is reserved, which is separated from the independent sub-pit 2 by sub-pit piles 5, and the remaining area is other sub-divisions 4 ;

第二步:在地面完成基坑围护结构8施工;The second step: complete the foundation pit enclosure structure 8 construction on the ground;

第三步:除预留土体区3外,其他所有分区2和4同时开挖施工,优先保证邻近重要(地铁)结构侧独立分坑2的施工进度;Step 3: Except for the reserved soil body area 3, all other areas 2 and 4 are excavated at the same time, giving priority to ensuring the construction progress of the independent sub-pit 2 adjacent to the important (subway) structure side;

第四步:待独立分坑2区域主体结构10出±0.00后,开挖预留土体区3,同时从预留土体区3内向邻近重要结构1内植入锚杆二13;Step 4: After the main structure 10 in the area of the independent sub-pit 2 is ±0.00, excavate the reserved soil area 3, and at the same time implant the anchor rod 2 13 from the reserved soil area 3 to the adjacent important structure 1;

第五步:预留土体区3分区施工至基底,自下而上施工主体结构10时,根据数值模拟与监测数据分析结果,可适当取消主体结构10与分坑桩5之间水平结构换撑6,如图3所示;Step 5: The reserved soil area 3 is constructed to the base, and when the main structure 10 is constructed from bottom to top, according to the analysis results of numerical simulation and monitoring data, the horizontal structure replacement between the main structure 10 and the sub-pit pile 5 can be appropriately canceled. Support 6, as shown in Figure 3;

第六步:分坑桩5两侧主体结构10完成±0.00以下施工后,自上而下拆除分坑桩5;Step 6: After the main structure 10 on both sides of the sub-pit pile 5 is completed below ±0.00, the sub-pit pile 5 is removed from top to bottom;

第七步:如第五步结构换撑6取消施做,则分坑桩5可自上而下一次性拆除至基底,如图4所示;Step 7: If the structure replacement 6 in the fifth step is cancelled, the sub-pit pile 5 can be dismantled to the base from top to bottom at one time, as shown in Figure 4;

第八步:如分坑桩5自上而下一次性拆除至基底,则后浇带9可自下而上依次封闭,分坑桩两侧主体结构10连通为整体,如图5所示。Step 8: If the sub-pit pile 5 is removed to the base from top to bottom at one time, the post-casting belt 9 can be closed sequentially from bottom to top, and the main structures 10 on both sides of the sub-pit pile are connected as a whole, as shown in Figure 5.

尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式,这些均属于本发明的保护范围之内。Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are only illustrative and not restrictive. Those of ordinary skill in the art Under the enlightenment of the present invention, people can also make many forms without departing from the purpose of the present invention and the scope of protection of the claims, and these all belong to the protection scope of the present invention.

Claims (3)

1.一种邻近重要结构长条形基坑预留土体分隔分区开挖施工结构,其特征在于,主要包括长条形基坑和重要结构;1. A construction structure for excavating and excavating reserved soil in strip-shaped foundation pits adjacent to important structures, characterized in that it mainly includes strip-shaped foundation pits and important structures; 所述重要结构为已经存在,已正常运营,位于拟开挖长条形基坑短边侧,需要在基坑开挖过程中重点保护的结构;The important structure mentioned already exists and is in normal operation, located on the short side of the long strip foundation pit to be excavated, and needs to be protected during the excavation process of the foundation pit; 所述长条形基坑为基坑长边与短边长度比例大于3的基坑,短边方向紧邻重要结构,可划分为独立小分坑、预留土体区和其他分区三大区域;The strip-shaped foundation pit is a foundation pit whose length ratio between the long side and the short side is greater than 3, and the short side is adjacent to important structures, and can be divided into three major areas: independent small sub-pit, reserved soil area and other partitions; 所述独立小分坑为长条形基坑紧邻重要结构侧,利用围护结构独立划分,要求保证率先开挖施工的小型基坑;The independent small sub-pit is a long strip foundation pit adjacent to the side of the important structure, which is independently divided by the enclosure structure, and is required to ensure the first excavation and construction of small-scale foundation pits; 所述预留土体区为在独立小分坑相邻基坑留置的坡顶宽度1~2倍基坑开挖深度,为简易的预留土体放坡支护的土台;The reserved soil area is a slope top width 1 to 2 times the excavation depth of the foundation pit left in the independent small sub-pit adjacent to the foundation pit, and is a simple soil platform for grading and supporting the reserved soil; 所述其他分区为由预留土体分隔,远离重要结构和独立小分坑的区域;The other divisions are areas separated by reserved soil and far away from important structures and independent small subdivisions; 所述其他分区内设置坑中坑,所述坑中坑是位于其他分区正中央位置且面积小于其他分区的深坑,主要由围护桩与底板构成;A pit-in-a-pit is set in the other partitions, and the pit-in-a-pit is a deep pit located in the center of the other partitions with an area smaller than that of other partitions, and is mainly composed of retaining piles and a bottom plate; 所述长条形基坑周围为基坑围护结构,所述基坑围护结构包括基坑围护连续墙和基坑围护桩。The perimeter of the strip-shaped foundation pit is a foundation pit enclosure structure, and the foundation pit enclosure structure includes a foundation pit enclosure continuous wall and foundation pit enclosure protection piles. 2.根据权利要求1所述的一种邻近重要结构长条形基坑预留土体分隔分区开挖施工结构,其特征在于,所述预留土体放坡支护为采用如土钉墙放坡支护等较经济的支护形式能够保证预留土坡体稳定的支护方式。2. According to claim 1, the excavation construction structure for the reserved soil body of a strip-shaped foundation pit adjacent to an important structure is characterized in that, the grading support of the reserved soil body is such as a soil nail wall More economical support forms such as grading support can ensure the stability of the reserved soil slope. 3.根据权利要求1或2所述的一种邻近重要结构长条形基坑预留土体分隔分区开挖施工结构的施工方法,其特征在于,实施步骤如下:3. according to claim 1 or 2, a kind of construction method of excavating the construction structure of the reserved soil in the strip-shaped foundation pit adjacent to the important structure, is characterized in that, the implementation steps are as follows: 第一步:场地整平,完成长条形基坑分区施工划分,邻近重要结构设置独立小分坑,相邻分区预留一定宽度土体,与独立小分坑由分坑桩分隔,剩余区域为其他分区;Step 1: Level the site, complete the construction division of the long strip foundation pit, set up independent small sub-pits adjacent to important structures, reserve a certain width of soil for adjacent sub-divisions, and separate small sub-pits from independent small sub-pits by sub-pit piles, and the remaining areas for other partitions; 第二步:在地面完成基坑围护结构施工;Step 2: Complete the foundation pit enclosure structure construction on the ground; 第三步:除预留土体区外,其他所有分区同时开挖施工,优先保证邻近重要结构的独立小分坑施工进度;Step 3: Except for the reserved soil area, all other areas shall be excavated at the same time, and priority shall be given to ensuring the construction progress of independent small sub-pits adjacent to important structures; 第四步:待独立小分坑区域主体结构出±0.00后,开挖预留土体区,同时从预留土体区内向邻近重要结构内植入锚杆二;Step 4: After the main structure of the independent small sub-pit area is ±0.00, excavate the reserved soil area, and at the same time implant anchor rod 2 from the reserved soil area to the adjacent important structure; 第五步:预留土体区施工至基底,自下而上施工主体结构时,根据数值模拟与监测数据分析结果,可适当取消结构与分坑桩之间水平换撑;Step 5: Reserve the soil area for construction to the base, and when constructing the main structure from bottom to top, according to the results of numerical simulation and monitoring data analysis, the horizontal support between the structure and the sub-pit piles can be appropriately canceled; 第六步:分坑桩两侧结构完成±0.00以下结构施工后,自上而下拆除分坑桩;Step 6: After the construction of the structure below ±0.00 on both sides of the sub-pit pile is completed, the sub-pit pile is removed from top to bottom; 第七步:如第五步结构换撑取消施做,则分坑桩可自上而下一次性拆除至基底;Step 7: If the structure replacement in step 5 is cancelled, the sub-pit piles can be dismantled from top to bottom to the base at one time; 第八步:如分坑桩自上而下一次性拆除至基底,则后浇带可自下而上依次封闭,分坑桩两侧结构连通为整体。Step 8: If the sub-pit piles are removed to the base at one time from top to bottom, the post-casting belt can be closed sequentially from bottom to top, and the structures on both sides of the sub-pit piles are connected as a whole.
CN201710054782.0A 2017-01-24 2017-01-24 Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure Pending CN108286254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710054782.0A CN108286254A (en) 2017-01-24 2017-01-24 Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710054782.0A CN108286254A (en) 2017-01-24 2017-01-24 Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure

Publications (1)

Publication Number Publication Date
CN108286254A true CN108286254A (en) 2018-07-17

Family

ID=62831305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710054782.0A Pending CN108286254A (en) 2017-01-24 2017-01-24 Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure

Country Status (1)

Country Link
CN (1) CN108286254A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487798A (en) * 2018-12-29 2019-03-19 中交(广州)建设有限公司 Station asymmetry excavation supporting structure and construction technology

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510520A (en) * 2013-10-09 2014-01-15 上海市建工设计研究院有限公司 Sectionalized construction method of deep and large foundation pit
CN103590406A (en) * 2013-11-29 2014-02-19 中船第九设计研究院工程有限公司 Construction method for synchronously excavating ultra-large type deep foundation pits in partitioned mode

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510520A (en) * 2013-10-09 2014-01-15 上海市建工设计研究院有限公司 Sectionalized construction method of deep and large foundation pit
CN103590406A (en) * 2013-11-29 2014-02-19 中船第九设计研究院工程有限公司 Construction method for synchronously excavating ultra-large type deep foundation pits in partitioned mode

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许世雄等: "长条形深大基坑分坑支护分区开挖施工及工序优化技术", 《施工技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487798A (en) * 2018-12-29 2019-03-19 中交(广州)建设有限公司 Station asymmetry excavation supporting structure and construction technology
CN109487798B (en) * 2018-12-29 2024-03-22 中交(广州)建设有限公司 Asymmetric excavation construction process for station

Similar Documents

Publication Publication Date Title
CN102704957B (en) Shed-frame method for shallowly burying large-sized underground structure construction
Ou et al. A parametric study of wall deflections in deep excavations with the installation of cross walls
CN105089061B (en) Ultra-deep foundation pit supporting method
CN105155549B (en) Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof
CN101408025B (en) Construction method of foundation pit using main structure as supporting point
CN108278115A (en) A kind of three step Rapid Construction of Tunnels method of big arch springing and structure based on pre-timbering with tubular prop
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN205475249U (en) Landing stage structure that fetches earth under deep basal pit annular supports
CN104963705B (en) A kind of underground space tunneling construction method
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN110159296A (en) Structural system for controlling deformation of subway shield tunnel and construction method thereof
CN105735354A (en) Covered-excavation full-top-down construction method of municipal underground engineering
Klemperer Excavations at Hulton Abbey, Staffordshire 1987-1994
CN213682122U (en) Foundation ditch crowd excavation structure of complicated abnormal shape foundation ditch in subway transfer station
CN103104102A (en) Construction method for underground storey-addition reconstruction
CN106245916B (en) The three-dimensional construction method of Group Buildings
CN106245677B (en) The construction method of the Group Buildings underground space
CN109610466A (en) Asynchronous construction method and structure of irregular deep foundation pits on both sides of existing subway stations
CN108842820A (en) A kind of subway station transfer node section foundation ditch construction method
CN105625184A (en) Subway station building method using bridge and station combined building mode
CN108286254A (en) Neighbouring important feature strip foundation pit remaining soils separate subregion excavation construction structure
CN108316314A (en) A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
Barker Some aspects of the excavation of timber buildings
CN204456131U (en) A kind of structural floor that utilizes is as the structural system of horizontal support
CN205088686U (en) Support structure of foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180717

RJ01 Rejection of invention patent application after publication