CN108166659A - A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process - Google Patents

A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process Download PDF

Info

Publication number
CN108166659A
CN108166659A CN201711465339.9A CN201711465339A CN108166659A CN 108166659 A CN108166659 A CN 108166659A CN 201711465339 A CN201711465339 A CN 201711465339A CN 108166659 A CN108166659 A CN 108166659A
Authority
CN
China
Prior art keywords
wingceltis item
roof
wingceltis
main
item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711465339.9A
Other languages
Chinese (zh)
Inventor
朱武
陈林堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG YABAITE TECHNOLOGY Co Ltd
Original Assignee
SHANDONG YABAITE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG YABAITE TECHNOLOGY Co Ltd filed Critical SHANDONG YABAITE TECHNOLOGY Co Ltd
Priority to CN201711465339.9A priority Critical patent/CN108166659A/en
Publication of CN108166659A publication Critical patent/CN108166659A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/005Supports for elevated load-supporting roof coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/3601Connecting; Fastening of roof covering supported by the roof structure with interposition of a insulating layer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/3605Connecting; Fastening of roof covering supported directly by the roof structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/36Connecting; Fastening
    • E04D3/361Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets
    • E04D3/362Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets by locking the edge of one slab or sheet within the profiled marginal portion of the adjacent slab or sheet, e.g. using separate connecting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses safety-type, wind resistance lifts metal Roof construction system, including Roof system, main body steel construction and roof decorations structure, Roof system is connect by wingceltis item with main body steel construction, wherein, main wingceltis item and time wingceltis item are equipped in wingceltis item, main wingceltis item is set on the top of main body steel construction, and pass through connector and connect with main body steel construction, main wingceltis item is equipped with casing, main wingceltis item is equipped with slotted hole, casing is connected with main wingceltis item by bolt assembly across slotted hole, and pass through otic placode and both is positioned, backing plate is equipped between bolt assembly and slotted hole, casing is connect by junction steel plate with main wingceltis item, secondary wingceltis item is connect by connecting plate with main wingceltis item;Roof decorations structure is set on above Roof system, and is passed through U-shaped adapter and connect with Roof system.The setting of casing and otic placode of the present invention passes through slotted hole to realize the connection of casing and main wingceltis item, solves wingceltis item telescoping problem caused by difference variation well by bolt assembly.

Description

A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process
Technical field
The invention belongs to build manufacturing technology field, more particularly to a kind of safety-type, wind resistance lifts metal Roof construction system And its mounting process.
Background technology
With the development and progress of economic society, the development trend of diversification, architect is presented in Modern City Building moulding In order to embody the design concept of oneself and city taste, straight and narrow building gradually by " new ", " strange ", " spy " building Form is replaced, and for these special-shaped building roofs, how to realize that quick plateization is assembled, enhances the whole wind resistance of roofing Performance, currently existing steel building usually can lead to roofing framework during construction and use because of difference variation Occur flexible and lead to that it leads to the problem of stress release and roofing wind resistance is taken off.
Invention content
Goal of the invention:In order to insufficient more than overcoming, the object of the present invention is to provide a kind of safety-type, wind resistances to lift metal Roof Construction system and its mounting process, simple in structure, reasonable design solve wingceltis item and stretch caused by difference variation well Problem so as to further improve its wind resistance victory problem, is promoting site operation progress.
Technical solution:To achieve these goals, the present invention provides a kind of safety-type, wind resistances to lift metal Roof construction system System, including:Roof system, main body steel construction and roof decorations structure, the Roof system pass through wingceltis item and main body steel construction Connection, wherein, main wingceltis item and time wingceltis item are equipped in the wingceltis item, the main wingceltis item is set on the top of main body steel construction, and It is connect by connector with main body steel construction, and main wingceltis item is equipped with casing, and the main wingceltis item is equipped with slotted hole, the set Pipe is connected, and pass through otic placode and both is positioned with main wingceltis item by bolt assembly across slotted hole, the bolt assembly Backing plate is equipped between slotted hole, described sleeve pipe connect by junction steel plate with main wingceltis item, the secondary wingceltis item by connecting plate and Main wingceltis item connection;
The roof decorations structure is set on above Roof system, and is passed through U-shaped adapter and connect with Roof system.
Heretofore described one kind is safety-type, wind resistance lifts metal Roof construction system, is covered by being set on main wingceltis item Pipe, and by setting slotted hole on main wingceltis item, the connection of slotted hole realization casing and main wingceltis item is passed through by bolt assembly, and Both is positioned by otic placode, effectively wingceltis item is fixed and limited, solves wingceltis item well because of the temperature difference Telescoping problem caused by variation, so as to further improve its wind resistance victory problem.
Roof structure and roof support structure are equipped in heretofore described Roof system, the roof support structure is set In roof structure, and it is fixedly connected below with secondary wingceltis item.
Perforation plate, heat preservation rock and waterproof roll, the perforation plate are equipped in heretofore described roof structure Set on the top of secondary wingceltis item, the heat preservation rock is set on above perforation plate, and the waterproof roll is set on above heat preservation rock, and The top of the waterproof roll is equipped with standing seam roof slabs, and PE vapour-binding films are equipped between the perforation plate and heat preservation rock, The PE vapour-binding films are equipped with glass silk flosssilk wadding, and the roofing bridle iron is set on the lower section of standing seam roof slabs.
Heretofore described heat preservation rock effectively improves its heat insulation effect using being staggeredly laid with.
Galvanizing lining wingceltis and galvanizing support, galvanizing lining wingceltis are equipped in heretofore described roof support structure In galvanizing support, the roofing bridle iron is set on above galvanizing lining wingceltis, passes through zinc-plated lock below the U-shaped adapter Folder is connect with the roofing bridle iron in Roof system, and the galvanizing support lower section is connect by bolt with time wingceltis item.According to power Profit requires safety-type, wind resistance described in 5 to lift metal Roof construction system, it is characterised in that:The galvanizing lining wingceltis and hot dipping A few font galvanizing lining wingceltises and a few font galvanizings support are respectively adopted in zinc support.
Decorative keel is equipped in heretofore described roof decorations structure, the decorative keel is equipped with decorative panel, the two It by stainless steel Bolted angle connection, is connected between the decorative panel by galvanizing rectangular tube, and passes through gutter structure to decorative panel It is sealed with the junction of galvanizing rectangular tube, the setting of roof decorations structure, while allowing it to roofing realization decoration The ability of the external force resistance of roofing can be further improved.
Heretofore described connecting plate uses trapezoidal connecting plate, and right-angle side is matched with time wingceltis item, trapezoidal connecting plate profit With the characteristic of its shape, it is allowed to be connect with secondary wingceltis item more stable, while also greatly improve what it connect with main wingceltis item Stability further improves the stability of entire support construction.
A kind of heretofore described safety-type, wind resistance lifts the mounting process of metal Roof construction system, specific to install Technique is as follows:
1):Assembly is carried out in face of main wingceltis item on ground according to drawing first, slotted hole is set on main wingceltis item(5), and set on it Casing is put, in connection, backing plate is set at slotted hole, bolt assembly sequentially passes through backing plate, slotted hole to casing and main wingceltis item It is attached, then both is positioned by otic placode;
2):Then assembled good main wingceltis item is set in main body steel construction, main body steel is stretched by the extension below main wingceltis item In structure, and pass through corner fittings and the two is fixedly connected;In main wingceltis setting up procedure;
3):Then secondary wingceltis item is fixedly connected with main wingceltis item by trapezoidal connecting plate;
4):Roof support structure is installed to above time wingceltis item again, roof support structure installation is fixed to by time wingceltis according to drawing On item, i.e., galvanizing support is bolted above secondary wingceltis item, then galvanizing lining wingceltis is passed through into bolt and galvanizing branch Support is fixed;
5):Then start that roof structure spread to build, when paving builds roof structure, roofing bridle iron is first fixed on galvanizing It serves as a contrast on wingceltis, then successively by perforation plate, non-woven fabrics, PE vapour-binding films, glass silk flosssilk wadding, heat preservation rock, waterproof roll and upright lock Side roof boarding is installed on time wingceltis item, wherein being laid with during heat preservation rock is laid with using the fissure of displacement;
6):Then the top of roofing bridle iron is fixedly connected with the lower part of U-shaped adapter by zinc-plated locker, then by U-shaped turn The top of fitting is fixedly connected with decorative keel;
7):Decorative panel is fixed on decorative keel by stainless steel angle steel again, is led at the gap then to connect in two decorative panels It crosses galvanizing rectangular tube to be attached, and passes through gutter structure and the gutter of decorative panel and galvanizing rectangular tube junction is sealed Side.
Above-mentioned technical proposal can be seen that the present invention and have the advantages that:
1st, a kind of heretofore described safety-type, wind resistance lifts metal Roof construction system, by setting casing on main wingceltis item, And by setting slotted hole on main wingceltis item, slotted hole is passed through to realize the connection of casing and main wingceltis item, and lead to by bolt assembly It crosses otic placode to position both, effectively wingceltis item is fixed and limited, solve wingceltis item well because the temperature difference becomes Telescoping problem caused by change, so as to further improve its wind resistance victory problem, while site operation progress is promoted, slotted hole Setting, the effective influence for discharging temperature stress that steel construction is generated due to difference variation to node, to roof purline due to The stretch stress of generation of difference variation is effectively discharged, and makes rod piece close to stretch bending stress, and stress is more reasonable.
2nd, heretofore described zinc-plated locker is connect with the roofing bridle iron in Roof system, it is allowed to realize standing-seam Roof boarding can both ensure that rain water on roof was flowed along specific direction by the use of zinc-plated locker, can also be to TPO coiled materials Waterproof layer plays the role of finished product protection, while roofing entirety wind uplift resistance is made to improve 60%.
3rd, a kind of heretofore described safety-type, wind resistance lifts the mounting process of metal Roof construction system, passes through set The setting of pipe and otic placode, based on the steel construction measured data at scene, after BIM setting-outs, construction site surface units formula is assembled, makes Original set-up time shortens nearly half, and effectively while site operation progress is promoted, the setting of slotted hole is effectively released The influence of temperature stress that steel construction is generated due to difference variation to node is put, to roof purline since difference variation is stretched production Raw stress is effectively discharged, and makes rod piece close to stretch bending stress, and stress is more reasonable.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the sectional view of the present invention;
Fig. 3 is the structure diagram of main wingceltis item in the present invention;
Fig. 4 is the partial schematic diagram of Roof system in the present invention.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the present invention is furture elucidated.
Embodiment 1
A kind of safety-type, wind resistance as depicted lifts metal Roof construction system, including:Roof system 1,2 and of main body steel construction Roof decorations structure 9, the Roof system 1 are connect by wingceltis item 3 with main body steel construction 2, wherein, it is set in the wingceltis item 3 There are main wingceltis item 31 and time wingceltis item 32, the main wingceltis item 31 is set on the top of main body steel construction 2, and passes through connector and main body steel Structure 2 connects, and main wingceltis item 31 is equipped with casing 4, and the main wingceltis item 31 is equipped with slotted hole 5, described sleeve pipe 4 and main wingceltis item 31 are connected, and pass through otic placode 6 and both is positioned by bolt assembly across slotted hole 5, the bolt assembly and oval Backing plate is equipped between hole 5, described sleeve pipe 4 is connect by junction steel plate 7 with main wingceltis item 31, and the secondary wingceltis item 32 passes through connecting plate 8 It is connect with main wingceltis item 31;
The roof decorations structure 9 is set on 1 top of Roof system, and passes through U-shaped adapter 10 and connect with Roof system 1.
Roof structure 11 and roof support structure 12, the roofing branch are equipped in Roof system 1 described in the present embodiment Support structure 2 is set in roof structure 11, and is fixedly connected below with secondary wingceltis item 32.
Perforation plate 111, heat preservation rock 112 and waterproof roll 113, institute are equipped in roof structure 11 described in the present embodiment The perforation plate 111 stated is set on time top of wingceltis item 32, and the heat preservation rock 112 is set on 111 top of perforation plate, the waterproof Coiled material 113 is set on 112 top of heat preservation rock, and the top of the waterproof roll 113 is equipped with standing seam roof slabs 114, described PE vapour-binding films are equipped between perforation plate 111 and heat preservation rock 112, the PE vapour-binding films are equipped with glass silk flosssilk wadding, the room Face bridle iron 115 is set on the lower section of standing seam roof slabs 114.
Heat preservation rock 112 described in the present embodiment is using staggeredly laying.
Galvanizing lining wingceltis 121 and galvanizing support 122 are equipped in roof support structure 12 described in the present embodiment, it is described Galvanizing lining wingceltis 121 is set in galvanizing support 122, and the roofing bridle iron 115 is set on 121 top of galvanizing lining wingceltis, the U 10 lower section of type adapter is connect by zinc-plated locker 116 with the roofing bridle iron 115 in Roof system 1, the galvanizing support 122 lower sections are connect by bolt with time wingceltis item 32.
A few font galvanizing lining wingceltises are respectively adopted in galvanizing lining wingceltis 121 and galvanizing support 122 described in the present embodiment It is supported with a few font galvanizings.
Decorative keel 91 is equipped in roof decorations structure described in the present embodiment 9, the decorative keel 91 is equipped with decoration Plate 92, the two are connected, and pass through gutter between the decorative panel 92 by galvanizing rectangular tube 93 by stainless steel Bolted angle connection Structure is sealed the junction of decorative panel 92 and galvanizing rectangular tube 93.
Connecting plate 8 described in the present embodiment uses trapezoidal connecting plate, and right-angle side is matched with time wingceltis item 32.
Embodiment 2
A kind of safety-type, wind resistance as depicted lifts metal Roof construction system, including:Roof system 1,2 and of main body steel construction Roof decorations structure 9, the Roof system 1 are connect by wingceltis item 3 with main body steel construction 2, wherein, it is set in the wingceltis item 3 There are main wingceltis item 31 and time wingceltis item 32, the main wingceltis item 31 is set on the top of main body steel construction 2, and passes through connector and main body steel Structure 2 connects, and main wingceltis item 31 is equipped with casing 4, and the main wingceltis item 31 is equipped with slotted hole 5, described sleeve pipe 4 and main wingceltis item 31 are connected, and pass through otic placode 6 and both is positioned by bolt assembly across slotted hole 5, the bolt assembly and oval Backing plate is equipped between hole 5, described sleeve pipe 4 is connect by junction steel plate 7 with main wingceltis item 31, and the secondary wingceltis item 32 passes through connecting plate 8 It is connect with main wingceltis item 31;
The roof decorations structure 9 is set on 1 top of Roof system, and passes through U-shaped adapter 10 and connect with Roof system 1.
Roof structure 11 and roof support structure 12, the roofing branch are equipped in Roof system 1 described in the present embodiment Support structure 2 is set in roof structure 11, and is fixedly connected below with secondary wingceltis item 32.
Perforation plate 111, heat preservation rock 112 and waterproof roll 113, institute are equipped in roof structure 11 described in the present embodiment The perforation plate 111 stated is set on time top of wingceltis item 32, and the heat preservation rock 112 is set on 111 top of perforation plate, the waterproof Coiled material 113 is set on 112 top of heat preservation rock, and the top of the waterproof roll 113 is equipped with standing seam roof slabs 114, described PE vapour-binding films are equipped between perforation plate 111 and heat preservation rock 112, the PE vapour-binding films are equipped with glass silk flosssilk wadding, the room Face bridle iron 115 is set on the lower section of standing seam roof slabs 114.
Heat preservation rock 112 described in the present embodiment is using staggeredly laying.
Galvanizing lining wingceltis 121 and galvanizing support 122 are equipped in roof support structure 12 described in the present embodiment, it is described Galvanizing lining wingceltis 121 is set in galvanizing support 122, and the roofing bridle iron 115 is set on 121 top of galvanizing lining wingceltis, the U 10 lower section of type adapter is connect by zinc-plated locker 116 with the roofing bridle iron 115 in Roof system 1, the galvanizing support 122 lower sections are connect by bolt with time wingceltis item 32.
A few font galvanizing lining wingceltises are respectively adopted in galvanizing lining wingceltis 121 and galvanizing support 122 described in the present embodiment It is supported with a few font galvanizings.
Decorative keel 91 is equipped in roof decorations structure described in the present embodiment 9, the decorative keel 91 is equipped with decoration Plate 92, the two are connected, and pass through gutter between the decorative panel 92 by galvanizing rectangular tube 93 by stainless steel Bolted angle connection Structure is sealed the junction of decorative panel 92 and galvanizing rectangular tube 93.
Connecting plate 8 described in the present embodiment uses trapezoidal connecting plate, and right-angle side is matched with time wingceltis item 32.
A kind of safety-type, wind resistance described in the present embodiment lifts the mounting process of metal Roof construction system, specific to pacify It is as follows to fill technique:
1):Assembly is carried out in face of main wingceltis item 31 on ground according to drawing first, slotted hole 5 is set on main wingceltis item 31, and on it Casing 4 is set, in connection, backing plate is set at slotted hole 5, bolt assembly sequentially passes through backing plate, slotted hole 5 to 4 and of casing Main wingceltis item 31 is attached, then both is positioned by otic placode 6;
2):Then assembled good main wingceltis item 31 is set in main body steel construction 2, master is stretched by the extension of main 31 lower section of wingceltis item On body steel construction 2, and pass through corner fittings and the two is fixedly connected;In main 31 setting up procedure of wingceltis item;
3):Then secondary wingceltis item 32 is fixedly connected with main wingceltis item 31 by trapezoidal connecting plate 8;
4):Roof support structure 12 is installed to 32 top of time wingceltis item again, roof support structure 12 is installed by fixation according to drawing Onto secondary wingceltis item 32, i.e., galvanizing support 122 is bolted secondary 32 top of wingceltis item, then galvanizing lining wingceltis 121 is led to Bolt is crossed to fix with galvanizing support 122;
5):Then start that roof structure 11 spread to build, when paving builds roof structure 11, first fix roofing bridle iron 115 In on galvanizing lining wingceltis 121, then successively by perforation plate 111, non-woven fabrics, PE vapour-binding films, glass silk flosssilk wadding, heat preservation rock 112, anti- Water coiled material 113 and standing seam roof slabs 114 are installed on time wingceltis item 32, wherein during heat preservation rock 112 is laid with It is laid with using the fissure of displacement;
6):Then the top of roofing bridle iron 115 is fixedly connected with the lower part of U-shaped adapter 10 by zinc-plated locker 116, then The top of U-shaped adapter 10 is fixedly connected with decorative keel 91;
7):Decorative panel 92 is fixed on decorative keel 91 by stainless steel angle steel again, the seam then to connect in two decorative panels 92 It is attached at gap by galvanizing rectangular tube 93, and passes through gutter structure to 93 junction of decorative panel 92 and galvanizing rectangular tube Gutter carry out edge sealing.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the principle of the present invention, several improvement can also be made, these improvement also should be regarded as the present invention's Protection domain.

Claims (9)

1. a kind of safety-type, wind resistance lifts metal Roof construction system, it is characterised in that:Including:Roof system(1), main body steel knot Structure(2)With roof decorations structure(9), the Roof system(1)Pass through wingceltis item(3)With main body steel construction(2)Connection, wherein, The wingceltis item(3)In be equipped with main wingceltis item(31)With secondary wingceltis item(32), the main wingceltis item(31)Set on main body steel construction(2)'s Top, and pass through connector and main body steel construction(2)Connection, and main wingceltis item(31)It is equipped with casing(4), and the main wingceltis item (31)It is equipped with slotted hole(5), described sleeve pipe(4)With main wingceltis item(31)Slotted hole is passed through by bolt assembly(5)Connection, and lead to Cross otic placode(6)Both is positioned, the bolt assembly and slotted hole(5)Between be equipped with backing plate, described sleeve pipe(4)Pass through Junction steel plate(7)With main wingceltis item(31)Connection, the secondary wingceltis item(32)Pass through connecting plate(8)With main wingceltis item(31)Connection;
The roof decorations structure(9)Set on Roof system(1)Top, and pass through U-shaped adapter(10)With Roof system(1)Even It connects.
2. safety-type, wind resistance according to claim 1 lifts metal Roof construction system, it is characterised in that:The roofing system System(1)In be equipped with roof structure(11)And roof support structure(12), the roof support structure(2)Set on roof structure (11)In, and below with secondary wingceltis item(32)It is fixedly connected.
3. safety-type, wind resistance according to claim 2 lifts metal Roof construction system, it is characterised in that:The roofing knot Structure(11)In be equipped with perforation plate(111), heat preservation rock(112)And waterproof roll(113), the perforation plate(111)If In secondary wingceltis item(32)Top, the heat preservation rock(112)Set on perforation plate(111)Top, the waterproof roll(113)If In heat preservation rock(112)Top, and the waterproof roll(113)Top be equipped with standing seam roof slabs(114), the perforation Bottom plate(111)And heat preservation rock(112)Between be equipped with PE vapour-binding films, the PE vapour-binding films be equipped with glass silk flosssilk wadding, the room Face bridle iron(115)Set on standing seam roof slabs(114)Lower section.
4. safety-type, wind resistance according to claim 3 lifts metal Roof construction system, it is characterised in that:The heat preservation rock Cotton(112)Using staggeredly laying.
5. safety-type, wind resistance according to claim 2 lifts metal Roof construction system, it is characterised in that:The roofing branch Support structure(12)In be equipped with galvanizing serve as a contrast wingceltis(121)It is supported with galvanizing(122), described galvanizing lining wingceltis(121)Set on heat Soak zinc support(122)On, the roofing bridle iron(115)Wingceltis is served as a contrast set on galvanizing(121)Top, the U-shaped adapter(10) Lower section passes through zinc-plated locker(116)With Roof system(1)In roofing bridle iron(115)Connection, the galvanizing support(122) Lower section passes through bolt and time wingceltis item(32)Connection.
6. safety-type, wind resistance according to claim 5 lifts metal Roof construction system, it is characterised in that:The hot dipping Zinc serves as a contrast wingceltis(121)It is supported with galvanizing(122)A few font galvanizing lining wingceltises and a few font galvanizings support are respectively adopted.
7. safety-type, wind resistance according to claim 1 lifts metal Roof construction system, it is characterised in that:The roofing dress Adorn structure(9)In be equipped with decorative keel(91), the decorative keel(91)It is equipped with decorative panel(92), the two passes through stainless steel angle Steel connects, the decorative panel(92)Between pass through galvanizing rectangular tube(93)Connection, and pass through gutter structure to decorative panel(92) With galvanizing rectangular tube(93)Junction be sealed.
8. safety-type, wind resistance according to claim 1 lifts metal Roof construction system, it is characterised in that:The connecting plate (8)Using trapezoidal connecting plate, right-angle side and time wingceltis item(32)It matches.
9. the erector of metal Roof construction system is lifted according to a kind of safety-type, wind resistance of claim 1 to 8 any one of them Skill, it is characterised in that:Specific mounting process is as follows:
1):Main wingceltis item is faced on ground according to drawing first(31)Assembly is carried out, in main wingceltis item(31)Upper setting slotted hole(5), and Casing is set on it(4), in connection, in slotted hole(5)Place's setting backing plate, bolt assembly sequentially pass through backing plate, slotted hole (5)To casing(4)With main wingceltis item(31)It is attached, then passes through otic placode(6)Both is positioned;
2):Then by assembled good main wingceltis item(31)Set on main body steel construction(2)On, pass through main wingceltis item(31)The extension of lower section Stretch into main body steel construction(2)On, and pass through corner fittings and the two is fixedly connected;In main wingceltis item(31)In setting up procedure;
3):Then pass through trapezoidal connecting plate(8)By secondary wingceltis item(32)With main wingceltis item(31)It is fixedly connected;
4):Again by roof support structure(12)It is installed to time wingceltis item(32)Top, according to drawing by roof support structure(12)Peace Dress is fixed to time wingceltis item(32)On, i.e., galvanizing is supported(122)It is bolted secondary wingceltis item(32)Top, then by hot dipping Zinc serves as a contrast wingceltis(121)It is supported by bolt and galvanizing(122)It is fixed;
5):Then start to roof structure(11)It carries out paving to build, roof structure is built in paving(11)When, first by roofing bridle iron (115)It is fixed on galvanizing lining wingceltis(121)On, then successively by perforation plate(111), non-woven fabrics, PE vapour-binding films, glass silk flosssilk wadding, Heat preservation rock(112), waterproof roll(113)And standing seam roof slabs(114)It is installed to time wingceltis item(32)On, wherein protecting Warm rock wool(112)It is laid with during laying using the fissure of displacement;
6):Then pass through zinc-plated locker(116)By roofing bridle iron(115)Top and U-shaped adapter(10)Lower part fix Connection, then by U-shaped adapter(10)Top and decorative keel(91)It is fixedly connected;
7):Again by stainless steel angle steel decorative panel(92)Fixed to decorative keel(91)On, then in two decorative panels(92)Phase Pass through galvanizing rectangular tube at the gap connect(93)It is attached, and passes through gutter structure to decorative panel(92)With galvanizing rectangle Pipe(93)The gutter of junction carries out edge sealing.
CN201711465339.9A 2017-12-28 2017-12-28 A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process Pending CN108166659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711465339.9A CN108166659A (en) 2017-12-28 2017-12-28 A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711465339.9A CN108166659A (en) 2017-12-28 2017-12-28 A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process

Publications (1)

Publication Number Publication Date
CN108166659A true CN108166659A (en) 2018-06-15

Family

ID=62519364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711465339.9A Pending CN108166659A (en) 2017-12-28 2017-12-28 A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process

Country Status (1)

Country Link
CN (1) CN108166659A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356311A (en) * 2018-08-24 2019-02-19 四川佳科幕墙工程有限公司 A kind of new type roof system
CN110067343A (en) * 2019-04-25 2019-07-30 中建八局装饰工程有限公司 The water-proof composite roof and its construction method of steel structure support and honeycomb aluminum plate decoration
CN110778035A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Construction method of combined roof of metal tiles and metal eaves rafters
CN110778036A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Combined roof system of metal tiles and metal eaves rafters
CN111042416A (en) * 2019-11-18 2020-04-21 中铁六局集团有限公司 Roofing with decorative board
CN112982845A (en) * 2021-05-20 2021-06-18 中铁建工集团有限公司 Construction method of metal roof system for improving wind resistance
CN113482246A (en) * 2021-07-13 2021-10-08 中建科工集团有限公司 Novel unit type roof system
CN115233911A (en) * 2022-08-26 2022-10-25 中国建筑第四工程局有限公司 Wind-resistant uncovering roof system for strong wind area
CN118601230A (en) * 2024-08-09 2024-09-06 中建八局东南建设有限公司 A wind-resistant metal panel roof structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201047140Y (en) * 2007-04-18 2008-04-16 上海市第四建筑有限公司 Water proof heat preserving noise prevention decorative roof of steel construction roof truss
JP2011026859A (en) * 2009-07-27 2011-02-10 Gantan Beauty Ind Co Ltd Installation structure for extended member, installation construction method therefor, fitting structure for external installation member using the same, and repairing structure
CN203867095U (en) * 2014-04-30 2014-10-08 浙江东南网架股份有限公司 Aluminum alloy locking clamp system meeting thermal expansion and cold contraction requirement of metal roof board
CN105298027A (en) * 2015-10-19 2016-02-03 上海精锐金属建筑系统有限公司 Universal adaptable-connection support device of rib top of upright seam roof board
CN106013633A (en) * 2016-06-23 2016-10-12 山东雅百特科技有限公司 Safety guarantee system for standing type dual-engaged accessible roof and mounting process of safety guarantee system
CN205742760U (en) * 2016-06-16 2016-11-30 来实建筑系统(上海)有限公司 Fixation base structure
CN106223548A (en) * 2016-08-25 2016-12-14 航天神舟科技发展有限公司 A kind of grid type metal Roof fixing device with all-weather self-adapting function
CN106930475A (en) * 2017-04-28 2017-07-07 山东雅百特科技有限公司 The technique that a kind of standing-seam system strengthens roofing hold-down support stability
CN208586798U (en) * 2017-12-28 2019-03-08 山东雅百特科技有限公司 A kind of wind resistance lifts metal Roof construction system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201047140Y (en) * 2007-04-18 2008-04-16 上海市第四建筑有限公司 Water proof heat preserving noise prevention decorative roof of steel construction roof truss
JP2011026859A (en) * 2009-07-27 2011-02-10 Gantan Beauty Ind Co Ltd Installation structure for extended member, installation construction method therefor, fitting structure for external installation member using the same, and repairing structure
CN203867095U (en) * 2014-04-30 2014-10-08 浙江东南网架股份有限公司 Aluminum alloy locking clamp system meeting thermal expansion and cold contraction requirement of metal roof board
CN105298027A (en) * 2015-10-19 2016-02-03 上海精锐金属建筑系统有限公司 Universal adaptable-connection support device of rib top of upright seam roof board
CN205742760U (en) * 2016-06-16 2016-11-30 来实建筑系统(上海)有限公司 Fixation base structure
CN106013633A (en) * 2016-06-23 2016-10-12 山东雅百特科技有限公司 Safety guarantee system for standing type dual-engaged accessible roof and mounting process of safety guarantee system
CN106223548A (en) * 2016-08-25 2016-12-14 航天神舟科技发展有限公司 A kind of grid type metal Roof fixing device with all-weather self-adapting function
CN106930475A (en) * 2017-04-28 2017-07-07 山东雅百特科技有限公司 The technique that a kind of standing-seam system strengthens roofing hold-down support stability
CN208586798U (en) * 2017-12-28 2019-03-08 山东雅百特科技有限公司 A kind of wind resistance lifts metal Roof construction system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张耕;: "大型公共建筑直立锁边金属屋面抗风揭加固方法探析" *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356311A (en) * 2018-08-24 2019-02-19 四川佳科幕墙工程有限公司 A kind of new type roof system
CN109356311B (en) * 2018-08-24 2024-02-02 四川佳科幕墙工程有限公司 Novel roofing system
CN110067343A (en) * 2019-04-25 2019-07-30 中建八局装饰工程有限公司 The water-proof composite roof and its construction method of steel structure support and honeycomb aluminum plate decoration
CN110067343B (en) * 2019-04-25 2023-11-07 中建八局装饰工程有限公司 Waterproof composite roof with steel structure support and honeycomb aluminum plate decoration and construction method thereof
CN110778035B (en) * 2019-10-30 2020-12-25 中国建筑第八工程局有限公司 Construction method of combined roof of metal tiles and metal eaves rafters
CN110778036B (en) * 2019-10-30 2020-12-25 中国建筑第八工程局有限公司 Combined roof system of metal tiles and metal eaves rafters
CN110778036A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Combined roof system of metal tiles and metal eaves rafters
CN110778035A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Construction method of combined roof of metal tiles and metal eaves rafters
CN111042416A (en) * 2019-11-18 2020-04-21 中铁六局集团有限公司 Roofing with decorative board
CN112982845A (en) * 2021-05-20 2021-06-18 中铁建工集团有限公司 Construction method of metal roof system for improving wind resistance
CN113482246A (en) * 2021-07-13 2021-10-08 中建科工集团有限公司 Novel unit type roof system
CN115233911A (en) * 2022-08-26 2022-10-25 中国建筑第四工程局有限公司 Wind-resistant uncovering roof system for strong wind area
CN115233911B (en) * 2022-08-26 2024-05-17 中国建筑第四工程局有限公司 Wind-proof roofing system of taking off in strong wind area
CN118601230A (en) * 2024-08-09 2024-09-06 中建八局东南建设有限公司 A wind-resistant metal panel roof structure and construction method thereof
CN118601230B (en) * 2024-08-09 2024-10-25 中建八局东南建设有限公司 Wind-resistant metal panel roof structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN108166659A (en) A kind of safety-type, wind resistance lifts metal Roof construction system and its mounting process
CN106677439A (en) Hidden button type super-long metal roof standing seam and construction method thereof
CN109707114A (en) Tile roofing antiskid construction technology engineering method
CN103628634B (en) The energy-conservation dry-method structure of pitched roof heat preservation ventilating and construction method thereof
CN208586798U (en) A kind of wind resistance lifts metal Roof construction system
CN205875551U (en) Containment system who has anti deformability concurrently wears out thing waterproof construction
CN202347748U (en) Double-layer waterproof, heat-insulating and fireproof metal roof
US2373317A (en) Roof covering
CN206859551U (en) A kind of compound thermal-insulating decorative integrated board of embedded metal connector
CN206319427U (en) Prefabricated reinforced concrete composite thermal-insulation external wall panel
CN206495424U (en) A kind of concealed fastener type overlength metal Roof standing-seam
CN107327110A (en) A kind of heat insulation integrated system construction of decorating outer wall of building
CN105369991B (en) A kind of construction method of zero stress seam self-adapting type roofing preset slot waterproof system wide
CN205259470U (en) Archaize building heavy grade tile roofing dry construction mounting structure
CN103225373A (en) Roof eaves board
CN109779163A (en) A kind of light steel construction waterproof parapet and its construction method
CN206737161U (en) The mounting structure of external wall of house compound insulating material
CN208950178U (en) Roof boarding joining place deformation joint node waterproof structure between a kind of podium
CN102071759B (en) Energy-saving decoration system of composite radiated heat-insulation film and construction method thereof
CN107419857A (en) Built-up roofing Durchgangshohle node and its construction method
CN208280631U (en) A kind of superaltitude flexibility faces side supporting
CN208749042U (en) A kind of prefabricated thermal insulation edge list of built-in pipeline
CN207277569U (en) A kind of building body expansion joint decoration construction new construction
CN208981671U (en) A kind of French building eave structure
CN207905166U (en) A kind of slideway type heat-preserving wall body structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615