CN108032876B - Station transportation scheduling method and system - Google Patents
Station transportation scheduling method and system Download PDFInfo
- Publication number
- CN108032876B CN108032876B CN201711113188.0A CN201711113188A CN108032876B CN 108032876 B CN108032876 B CN 108032876B CN 201711113188 A CN201711113188 A CN 201711113188A CN 108032876 B CN108032876 B CN 108032876B
- Authority
- CN
- China
- Prior art keywords
- plan
- station
- management module
- station plan
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/04—Automatic systems, e.g. controlled by train; Change-over to manual control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/14—Following schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/30—Trackside multiple control systems, e.g. switch-over between different systems
- B61L27/33—Backup systems, e.g. switching when failures occur
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
本发明公开了一种车站运输调度的方法和系统,方法包括:计划处理模块接收车站计划管理模块下发的车站计划;所述计划处理模块将所述车站计划解析成列车进路计划,并将所述列车进路计划下发至进路处理模块;所述进路处理模块将所述列车进路计划下发至接发列车控制模块处理;所述车站计划管理模块将所述车站计划下发至存储查询模块保存。本发明有益效果包括:车站值班员通过车站计划管理模块将车站计划下发给计划处理模块,计划处理模块将车站计划自动解析为对应的作业进路,并发送到进路处理模块和接发列车控制模块,实现了车站计划的及时有效下发,实现了车站运输的方便调度。
The invention discloses a method and system for station transportation scheduling. The method comprises: a plan processing module receives a station plan issued by a station plan management module; the plan processing module parses the station plan into a train approach plan, The train route plan is sent to the route processing module; the route processing module sends the train route plan to the receiving and dispatching train control module for processing; the station plan management module sends the station plan Save it to the storage query module. The beneficial effects of the invention include: the station attendant sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into the corresponding operation route, and sends it to the route processing module and the receiving and dispatching trains The control module realizes the timely and effective issuance of the station plan, and realizes the convenient scheduling of station transportation.
Description
技术领域technical field
本发明涉及自动控制技术领域,特别涉及一种车站运输调度的方法和系统。The invention relates to the technical field of automatic control, in particular to a method and system for station transportation scheduling.
背景技术Background technique
中国高铁信号系统主要包括列控系统(CTCS)、联锁系统(CBI)、调度集中(CTC,Central Traffic Control)等子系统,以及一些信号辅助系统,如:信号集中监测系统(CSM)、调度命令无线传输系统、电源系统等。China's high-speed rail signaling system mainly includes subsystems such as Train Control System (CTCS), Interlocking System (CBI), Central Traffic Control (CTC, Central Traffic Control), as well as some signal auxiliary systems, such as: Centralized Signal Monitoring System (CSM), dispatching Command wireless transmission system, power supply system, etc.
行车调度人员需应用调度集中系统CTC实现行车计划的制定与下达、列车进路办理、调车作业办理、调度命令发布、信号设备集中控制、设备维修调度、应急行车指挥、非正常情况下接发车等作业。此外,调度员需要通过CTC系统大屏幕和显示器监督列车追踪、列车位置及速度、信号状态、列车进路、区间闭塞等列车运行及信号设备情况。The train dispatcher needs to use the dispatching centralized system CTC to realize the formulation and release of the train plan, the management of the train entry, the management of the shunting operation, the issuance of the dispatch order, the centralized control of the signal equipment, the equipment maintenance and dispatch, the emergency train command, and the train receiving and dispatching under abnormal conditions. Wait for the job. In addition, the dispatcher needs to supervise the train operation and signal equipment such as train tracking, train position and speed, signal status, train approach, section blockage, etc. through the large screen and display of the CTC system.
CTC系统是调度中心(调度员)对某一区段内的信号设备进行集中控制,对列车运行直接指挥、管理的技术装备。CTC系统是综合了计算机技术、网络通信技术和现代控制技术,采用智能化分散自律设计原则,以列车运行调整计划控制为中心,兼顾列车与调车作业的高度自动化的调度指挥系统。The CTC system is the technical equipment that the dispatch center (dispatcher) centrally controls the signal equipment in a certain section, and directly commands and manages the train operation. CTC system is a highly automated dispatch command system that integrates computer technology, network communication technology and modern control technology, adopts the principle of intelligent decentralized self-discipline design, takes train operation adjustment plan control as the center, and takes into account train and shunting operations.
CTC系统由调度中心子系统、车站子系统以及调度中心与车站及车站之间的网络子系统三部分组成,如图1所示。The CTC system consists of three parts: the dispatch center subsystem, the station subsystem, and the network subsystem between the dispatch center and the station and the station, as shown in Figure 1.
调度中心子系统是CTC系统的核心,主要由服务器设备及各调度台用户终端设备组成。服务器设备包括:数据库服务器、应用服务器、通信前置服务器、接口服务器、对外信息提供服务器、对外时钟服务器。调度台用户终端设备包括:调度员工作站、助理调度员工作站、综合维修工作站、站场显示工作站、综合查询工作站、值班主任工作站、计划员工作站、调度维护工作站等。The dispatch center subsystem is the core of the CTC system, mainly composed of server equipment and user terminal equipment of each dispatch station. Server equipment includes: database server, application server, communication front-end server, interface server, external information providing server, and external clock server. The user terminal equipment of the dispatching desk includes: dispatcher workstation, assistant dispatcher workstation, comprehensive maintenance workstation, station display workstation, comprehensive query workstation, duty supervisor workstation, planner workstation, dispatching maintenance workstation, etc.
车站自律机是CTC系统的关键设备,应满足以下功能要求:应能接收调度中心的列车运行调整计划、直接操作指令和车站值班员直接操作指令,经检测无冲突后适时发送给车站联锁系统执行;应能实时接收车站信号设备状态表示信息,进行列车车次号跟踪,收集行车运行实际数据,并上传至调度中心;应能掌握车站联锁系统对进路命令执行的情况,并根据反馈信息对有关进路进行必要的调整;应能接收相邻各两站的列车报点和设备状态信息。The station autonomous machine is the key equipment of the CTC system. It should meet the following functional requirements: It should be able to receive the train operation adjustment plan, direct operation instructions and direct operation instructions of the station attendant from the dispatch center, and send it to the station interlocking system in a timely manner after detecting no conflict. Execution; should be able to receive the status information of the station signal equipment in real time, track the train number, collect the actual data of the running operation, and upload it to the dispatch center; should be able to grasp the execution of the entry command by the station interlocking system, and based on the feedback information Necessary adjustments shall be made to the relevant routes; the train announcements and equipment status information of the two adjacent stations shall be received.
发明内容SUMMARY OF THE INVENTION
本发明提供一种车站运输调度的方法和系统,用以解决现有CTC系统无法满足运输指挥需要的问题。The present invention provides a method and system for station transportation scheduling, which is used to solve the problem that the existing CTC system cannot meet the needs of transportation command.
本发明提供一种车站运输调度的方法,包括:The present invention provides a method for station transportation scheduling, comprising:
所述计划处理模块接收车站计划管理模块下发的车站计划;The plan processing module receives the station plan issued by the station plan management module;
所述计划处理模块将所述车站计划解析成列车进路计划,并将所述列车进路计划下发至进路处理模块;The plan processing module parses the station plan into a train route plan, and sends the train route plan to the route processing module;
所述进路处理模块将所述列车进路计划下发至接发列车控制模块处理;The route processing module sends the train route plan to the receiving and dispatching train control module for processing;
所述车站计划管理模块将所述车站计划下发至存储查询模块保存。The station plan management module sends the station plan to the storage query module for storage.
本发明实施例的一些有益效果可以包括:车站值班员通过车站计划管理模块将车站计划下发给计划处理模块,计划处理模块将车站计划自动解析为对应的作业进路,并发送到进路处理模块和接发列车控制模块,实现了车站计划的及时有效下发,实现了车站运输的方便调度。Some beneficial effects of the embodiments of the present invention may include: the station attendant sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into a corresponding operation route and sends it to the route processing module The module and the receiving and dispatching train control module realize the timely and effective issuance of the station plan, and realize the convenient scheduling of the station transportation.
在一个实施例中,所述方法还包括:In one embodiment, the method further includes:
所述车站计划管理模块启动时向所述存储查询模块发送加载数据库中的车站计划请求和运行图阶段计划请求;When the station plan management module is started, it sends the station plan request and the operation map stage plan request in the loading database to the storage query module;
所述车站计划管理模块接收所述存储查询模块下发的车站计划信息和运行图阶段计划信息,并根据所述车站计划信息和运行图阶段计划信息更新界面显示信息。The station plan management module receives the station plan information and the operation map stage plan information issued by the storage query module, and updates the interface display information according to the station plan information and the operation map stage plan information.
该实施例中,增加了车站计划管理模块初始化的流程,车站计划管理模块向存储查询模块发送请求加载数据库里的车站计划信息并向存储查询模块请求阶段计划。In this embodiment, a process of initializing the station plan management module is added. The station plan management module sends a request to the storage query module to load the station plan information in the database and requests the storage query module for a phase plan.
在一个实施例中,还包括:In one embodiment, it also includes:
在主备切换时,备车站计划管理模块向所述存储查询模块发送加载数据库中的车站计划请求;When the main and standby switches are switched, the standby station plan management module sends the station plan request in the loading database to the storage query module;
所述备车站计划管理模块接收存储查询模块返回的车站计划请求回执,向主车站计划管理模块发送本机升为主机的信息;The standby station plan management module receives the station plan request receipt returned by the storage query module, and sends the information that the local machine is upgraded to the host computer to the main station plan management module;
所述备车站计划管理模块升为新主车站计划管理模块,所述主车站计划管理模块降为新备车站计划管理模块;The backup station planning management module is upgraded to a new main station planning management module, and the main station planning management module is downgraded to a new backup station planning management module;
所述新主车站计划管理模块向所述存储查询模块发送运行图阶段计划请求,并接收所述存储查询模块下发的运行图阶段计划信息,并根据所述运行图阶段计划信息更新界面显示信息。The new main station plan management module sends an operation map stage plan request to the storage query module, receives the operation map stage plan information issued by the storage query module, and updates the interface display information according to the operation map stage plan information .
所述原备车站计划管理模块接收存储查询模块返回的车站计划请求回执,具体包括:The original station plan management module receives the station plan request receipt returned by the storage query module, which specifically includes:
如果回执结果为所述车站计划请求加载成功,所述原备车站计划管理模块根据所述车站计划信息更新界面显示信息;If the result of the receipt is that the station plan request is loaded successfully, the original station plan management module updates the interface display information according to the station plan information;
如果回执结果为所述车站计划请求加载失败,所述原备车站计划管理模块向原主车站计划管理模块发送加载全体车站计划信息的请求;If the result of the receipt is that the station plan request fails to be loaded, the original standby station plan management module sends a request to load the overall station plan information to the original main station plan management module;
所述原备车站计划管理模块接收所述原主车站计划管理模块发送的所述全体车站计划信息。The original standby station plan management module receives the overall station plan information sent by the original main station plan management module.
本实施例增加了车站计划管理模块主备切换的处理流程,保证了车站运输调度系统的安全运行,提高了车站运输调度系统的容灾性能。This embodiment increases the processing flow of the master-standby switching of the station planning management module, ensures the safe operation of the station transportation dispatching system, and improves the disaster recovery performance of the station transportation dispatching system.
本发明提供一种车站运输调度的系统,包括计划处理模块、车站计划管理模块、进路处理模块、存储查询模块和接发列车控制模块:The present invention provides a system for station transportation scheduling, including a plan processing module, a station plan management module, an approach processing module, a storage query module and a train control module:
所述计划处理模块,用于接收所述车站计划管理模块下发的车站计划,将所述车站计划解析成列车进路计划,并将所述列车进路计划下发至所述进路处理模块;The plan processing module is configured to receive the station plan issued by the station plan management module, parse the station plan into a train route plan, and issue the train route plan to the route processing module ;
所述进路处理模块,用于将所述列车进路计划下发至接发列车控制模块处理;The route processing module is configured to issue the train route plan to the receiving and dispatching train control module for processing;
所述车站计划管理模块,用于将所述车站计划下发至计划处理模块处理,将所述车站计划下发至所述存储查询模块保存;接收所述存储查询模块下发的车站计划信息和运行图阶段计划信息,并根据所述车站计划信息和运行图阶段计划信息更新界面显示信息。The station plan management module is configured to send the station plan to the plan processing module for processing, send the station plan to the storage query module for storage; receive the station plan information and information sent by the storage query module. The operation diagram stage planning information, and the interface display information is updated according to the station planning information and the operation diagram stage planning information.
本实施例的车站运输调度系统,车站值班员通过车站计划管理模块将车站计划下发给计划处理模块,计划处理模块将车站计划自动解析为对应的作业进路,并发送到进路处理模块和接发列车控制模块,实现了车站计划的及时有效下发,实现了车站运输的方便调度。In the station transportation scheduling system of this embodiment, the station attendant sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into the corresponding operation route, and sends it to the route processing module and the route processing module. The receiving and dispatching train control module realizes the timely and effective issuance of the station plan, and realizes the convenient scheduling of station transportation.
在一个实施例中,系统还包括存储查询模块:In one embodiment, the system further includes a storage query module:
所述车站计划管理模块,用于向所述存储查询模块发送加载数据库中的车站计划请求和运行图阶段计划请求;The station plan management module is configured to send the station plan request and the operation map stage plan request in the loading database to the storage query module;
接收所述存储查询模块下发的车站计划信息和运行图阶段计划信息,并根据所述车站计划信息和运行图阶段计划信息更新界面显示信息。Receive the station plan information and the operation map stage plan information issued by the storage query module, and update the interface display information according to the station plan information and the operation map stage plan information.
所述存储查询模块,用于接收所述车站计划并保存至数据库,用于接收所述车站计划管理模块发送的所述车站计划和所述阶段计划的请求,并将所述车站计划和所述阶段计划请求回执发送至所述车站计划管理模块。The storage query module is used to receive the station plan and save it to a database, and is used to receive the station plan and the stage plan request sent by the station plan management module, and to send the station plan and the stage plan. The stage plan request receipt is sent to the station plan management module.
本实施例中,增加了车站计划管理模块初始化的流程,存储查询模块向车站计划管理模块加载数据库里的车站计划信息并向存储查询模块请求阶段计划。In this embodiment, an initialization process of the station plan management module is added, and the storage query module loads the station plan information in the database to the station plan management module and requests the storage query module for a phase plan.
在一个实施例中,系统还包括备车站计划管理模块和主车站计划管理模块:In one embodiment, the system further includes a backup station plan management module and a main station plan management module:
所述备车站计划管理模块,用于在主备切换时向所述存储查询模块发送加载数据库中的车站计划请求,接收存储查询模块返回的车站计划请求回执;升为新主车站计划管理模块后,向所述存储查询模块发送运行图阶段计划请求,并接收所述存储查询模块下发的运行图阶段计划信息,并根据所述运行图阶段计划信息更新界面显示信息;The standby station plan management module is used to send the station plan request in the loading database to the storage query module when the main and standby switches are switched, and receive the station plan request receipt returned by the storage query module; after upgrading to the new main station plan management module , sending a plan request for the operation diagram stage to the storage query module, and receiving the operation diagram stage plan information issued by the storage query module, and updating the interface display information according to the operation diagram stage plan information;
所述主车站计划管理模块,用于在主备切换时接收所述备车站计划管理模块发送的本机升为主机的信息。The master station plan management module is configured to receive the information that the local machine is upgraded to the master station sent by the backup station plan management module when the master station is switched.
所述备车站计划管理模块,具体用于如果存储查询模块返回的车站计划请求回执结果为所述车站计划请求加载成功,根据所述车站计划信息更新界面显示信息;The standby station plan management module is specifically configured to update the interface display information according to the station plan information if the station plan request receipt returned by the storage query module is that the station plan request has been loaded successfully;
如果存储查询模块返回的车站计划请求回执结果为所述车站计划请求加载失败,则向所述主车站计划管理模块发送加载全体车站计划信息的请求;If the station plan request acknowledgment result returned by the storage query module is that the station plan request fails to be loaded, send a request to load the overall station plan information to the main station plan management module;
所述主车站计划管理模块,用于向所述备车站计划管理模块发送所述全体车站计划信息。The main station plan management module is configured to send the overall station plan information to the backup station plan management module.
本实施例增加了车站计划管理模块主备切换的处理流程,保证了车站运输调度系统的安全运行,提高了车站运输调度系统的容灾性能。This embodiment increases the processing flow of the master-standby switching of the station planning management module, ensures the safe operation of the station transportation dispatching system, and improves the disaster recovery performance of the station transportation dispatching system.
本发明的其它特征和优点将在随后的说明书中阐述,并且,部分地从说明书中变得显而易见,或者通过实施本发明而了解。本发明的目的和其他优点可通过在所写的说明书、权利要求书、以及附图中所特别指出的结构来实现和获得。Other features and advantages of the present invention will be set forth in the description which follows, and in part will be apparent from the description, or may be learned by practice of the invention. The objectives and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description, claims, and drawings.
下面通过附图和实施例,对本发明的技术方案做进一步的详细描述。The technical solutions of the present invention will be further described in detail below through the accompanying drawings and embodiments.
附图说明Description of drawings
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention. In the attached image:
图1为现有CTC系统结构示意图;FIG. 1 is a schematic structural diagram of an existing CTC system;
图2为本发明实施例中一种车站运输调度的系统示意图;FIG. 2 is a schematic diagram of a system for station transportation scheduling in an embodiment of the present invention;
图3为本发明实施例中一种车站运输调度的方法实施例一的流程图;FIG. 3 is a flowchart of Embodiment 1 of a method for station transportation scheduling in an embodiment of the present invention;
图4为本发明实施例中一种车站运输调度的方法实施例二的流程图;FIG. 4 is a flowchart of Embodiment 2 of a method for station transportation scheduling in an embodiment of the present invention;
图5为本发明实施例中一种车站运输调度的方法实施例三的流程图。FIG. 5 is a flowchart of Embodiment 3 of a method for station transportation scheduling in an embodiment of the present invention.
具体实施方式Detailed ways
以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, but not to limit the present invention.
图3为本发明实施例中一种车站运输调度的方法的流程图。如图3所示,包括以下步骤S301-S308:FIG. 3 is a flowchart of a method for station transportation scheduling in an embodiment of the present invention. As shown in Figure 3, the following steps S301-S308 are included:
步骤301,车站计划管理模块接收用户输入的下发车站计划的指令。In step 301, the station plan management module receives an instruction to issue a station plan input by a user.
步骤302,车站计划管理模块向计划处理模块下达车站计划。Step 302, the station plan management module issues the station plan to the plan processing module.
步骤303,计划处理模块向车站计划管理模块返回车站计划的接收回执。Step 303, the plan processing module returns the station plan receipt receipt to the station plan management module.
步骤304,计划处理模块将上述车站计划指令解析成车站进路计划。Step 304, the planning processing module parses the above station planning instruction into a station approach plan.
步骤305,计划处理模块将解析后的车站进路计划下发给进路处理模块。Step 305, the plan processing module sends the parsed station route plan to the route processing module.
步骤306,进路处理模块将接收的车站进路计划转发给接发列车控制模块。Step 306, the route processing module forwards the received station route plan to the control module of the receiving and dispatching trains.
步骤307,车站计划管理模块将上述车站计划信息下发给存储查询模块保存。Step 307, the station plan management module sends the above station plan information to the storage query module for storage.
步骤308,存储查询模块向车站计划管理模块返回车站计划信息的保存回执。In step 308, the storage query module returns the storage receipt of the station plan information to the station plan management module.
本实施例的车站运输调度的方法,车站值班员通过车站计划管理模块将车站计划下发给计划处理模块,计划处理模块将车站计划自动解析为对应的作业进路,并发送到进路处理模块和接发列车控制模块,实现了车站计划的及时有效下发,实现了车站运输的方便调度。In the method of station transportation scheduling in this embodiment, the station attendant sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into the corresponding operation route and sends it to the route processing module And the receiving and dispatching train control module, realizes the timely and effective issuance of the station plan, and realizes the convenient scheduling of station transportation.
图4为本发明实施例中一种车站运输调度的方法实施例二的流程图。如图4所示,本实施例包括:FIG. 4 is a flowchart of Embodiment 2 of a method for station transportation scheduling in an embodiment of the present invention. As shown in Figure 4, this embodiment includes:
步骤401,车站计划管理模块程序启动。Step 401, the station plan management module program is started.
步骤402,车站计划管理模块加载配置,系统开始运行。Step 402, the station plan management module loads the configuration, and the system starts to run.
步骤403,车站计划管理模块向存储查询模块发送加载数据库中的车站计划请求。In step 403, the station plan management module sends a request to load the station plan in the database to the storage query module.
步骤404,车站计划管理模块向存储查询模块发送加载数据库中的运行图阶段计划请求。In step 404, the station plan management module sends a plan request for loading the operation diagram stage in the database to the storage query module.
步骤405,存储查询模块向车站计划管理模块发送车站计划信息。Step 405, the storage query module sends the station plan information to the station plan management module.
步骤406,车站计划管理模块根据车站计划信息更新界面显示信息。Step 406, the station plan management module updates the interface display information according to the station plan information.
步骤407,存储查询模块向车站计划管理模块发送运行图阶段计划信息。Step 407 , the storage query module sends the plan information of the operation diagram stage to the station plan management module.
步骤408,车站计划管理模块根据运行图阶段计划信息更新界面显示信息Step 408, the station plan management module updates the interface display information according to the plan information of the operation diagram stage
本实施例的车站运输调度的方法,在图3实施例的基础上,增加了车站计划管理模块初始化的流程,车站计划管理模块向存储查询模块请求加载数据库里的车站计划信息并向存储查询模块请求阶段计划,接收存储查询模块发送的请求回执更新界面显示信息。In the method for station transportation scheduling in this embodiment, on the basis of the embodiment in FIG. 3 , an initialization process of the station plan management module is added. The station plan management module requests the storage query module to load the station plan information in the database and sends it to the storage query module. The request phase plan, receiving the request receipt sent by the storage query module, and updating the interface display information.
图5为本发明实施例中一种车站运输调度的方法实施例三的流程图。如图5所示,本实施例中的A车站计划管理模块(原备车站计划管理模块)为备车站计划管理模块,B车站计划管理模块(原主车站计划管理模块)为主车站计划管理模块,本实施例包括:FIG. 5 is a flowchart of Embodiment 3 of a method for station transportation scheduling in an embodiment of the present invention. As shown in FIG. 5 , the plan management module of station A (the original standby station plan management module) in this embodiment is the plan management module of the standby station, and the plan management module of station B (the original main station plan management module) is the plan management module of the main station. This embodiment includes:
步骤501,A车站计划管理模块程序启用。In step 501, the program of the station A plan management module is activated.
步骤502,A车站计划管理模块向存储查询模块发送加载数据库中的车站计划请求。In step 502, the station plan management module of A sends a request for loading the station plan in the database to the storage query module.
步骤503,存储查询模块向A车站计划管理模块返回车站计划请求回执。Step 503, the storage query module returns a station plan request receipt to the station plan management module A.
步骤504,如果回执结果为车站计划请求加载成功,A车站计划管理模块根据车站计划信息更新界面显示信息。Step 504, if the result of the receipt is that the station plan request is loaded successfully, the station plan management module A updates the interface display information according to the station plan information.
步骤505,如果回执结果为所述车站计划请求加载失败,A车站计划管理模块向B车站计划管理模块发送加载全体车站计划信息的请求。Step 505, if the result of the receipt is that the station plan request fails to be loaded, the station plan management module A sends a request for loading the plan information of the entire station to the station plan management module B.
步骤506,B车站计划管理模块向A车站计划管理模块发送全体车站计划信息。In step 506, the planning management module of station B sends the planning information of the whole station to the planning management module of station A.
步骤507,A车站计划管理模块升为主机,并向B车站计划管理模块发送本机升为主机的信息。Step 507 , the plan management module of station A is upgraded to the host computer, and the information that the local station is upgraded to the host computer is sent to the plan management module of station B.
步骤508,B车站计划管理模块降为备机,清空缓存。Step 508, the plan management module of station B is downgraded to a standby machine, and the cache is cleared.
步骤509,A车站计划管理模块向存储查询模块发送运行图阶段计划请求。Step 509 , the station A plan management module sends a plan request for the operation diagram stage to the storage query module.
步骤510,存储查询模块向A车站计划管理模块发送运行图阶段计划。Step 510, the storage query module sends the plan of the operation diagram stage to the station A plan management module.
步骤511,A车站计划管理模块更新缓存。Step 511, the station A plan management module updates the cache.
步骤512,值班员点击″更新″按钮。Step 512, the watchman clicks the "Update" button.
步骤513,A车站计划管理模块更新界面。Step 513, the station A plan management module updates the interface.
本实施例的车站运输调度的方法,在图3实施例的基础上,增加了车站计划管理模块主备切换的处理流程,保证了车站运输调度系统的安全运行,提高了车站运输调度系统的容灾性能。The method for station transportation scheduling in this embodiment, on the basis of the embodiment in FIG. 3 , adds the processing flow of the master-standby switching of the station planning management module, which ensures the safe operation of the station transportation scheduling system and improves the capacity of the station transportation scheduling system. disaster performance.
图2为本发明实施例中一种车站运输调度的系统示意图,如图2所示,本实施例的车站运输调度系统包括计划处理模块、车站计划管理模块、进路处理模块、存储查询模块和接发列车控制模块,车站计划管理模块设置于车务终端A/车务终端B中,接发列车控制模块、计划处理模块和进路处理模块设置于车站自律机中,存储查询模块设置于车站服务器中:FIG. 2 is a schematic diagram of a station transportation scheduling system in an embodiment of the present invention. As shown in FIG. 2 , the station transportation scheduling system in this embodiment includes a plan processing module, a station plan management module, an approach processing module, a storage query module and The receiving and dispatching train control module, the station plan management module is set in the train service terminal A/the train service terminal B, the receiving and dispatching train control module, the planning processing module and the route processing module are set in the station autonomous machine, and the storage query module is set in the station In the server:
所述计划处理模块,用于接收所述车站计划管理模块下发的车站计划,将所述车站计划指令解析成列车进路计划,并将所述列车进路计划下发至所述进路处理模块;The plan processing module is configured to receive the station plan issued by the station plan management module, parse the station plan instruction into a train route plan, and issue the train route plan to the route processing module;
所述进路处理模块,用于将所述列车进路计划下发至接发列车控制模块处理;The route processing module is configured to issue the train route plan to the receiving and dispatching train control module for processing;
所述车站计划管理模块,用于将所述车站计划下发至所述存储查询模块保存。The station plan management module is configured to issue the station plan to the storage query module for storage.
本实施例的车站运输调度的系统,车站值班员通过车站计划管理模块将车站计划下发给计划处理模块,计划处理模块将车站计划自动解析为对应的作业进路,并发送到进路处理模块和接发列车控制模块,实现了车站计划的及时有效下发,实现了车站运输的方便调度。In the station transportation scheduling system of this embodiment, the station attendant sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into the corresponding operation route and sends it to the route processing module And the receiving and dispatching train control module, realizes the timely and effective issuance of the station plan, and realizes the convenient scheduling of station transportation.
其中,车站运输调度系统还包括存储查询模块:Among them, the station transportation scheduling system also includes a storage query module:
所述车站计划管理模块向所述存储查询模块发送加载数据库中的车站计划请求和运行图阶段计划请求;The station plan management module sends the station plan request and the operation map stage plan request in the loading database to the storage query module;
接收所述存储查询模块下发的车站计划信息和运行图阶段计划信息,并根据所述车站计划信息和运行图阶段计划信息更新界面显示信息。Receive the station plan information and the operation map stage plan information issued by the storage query module, and update the interface display information according to the station plan information and the operation map stage plan information.
本实施例的车站运输调度的系统,在图2实施例的基础上,增加了车站计划管理模块更新的流程,车站计划管理模块向存储查询模块请求加载数据库里的车站计划信息并请求阶段计划。The station transportation scheduling system of this embodiment, on the basis of the embodiment of FIG. 2 , adds a process of updating the station plan management module. The station plan management module requests the storage query module to load the station plan information in the database and request the stage plan.
其中,车站运输调度系统还包括备车站计划管理模块和主车站计划管理模块:Among them, the station transportation scheduling system also includes the standby station plan management module and the main station plan management module:
所述备车站计划管理模块,用于向所述存储查询模块发送加载数据库中的车站计划请求,接收存储查询模块返回的车站计划请求回执;升为新主车站计划管理模块后,向所述存储查询模块发送运行图阶段计划请求,并接收所述存储查询模块下发的运行图阶段计划信息,并根据所述运行图阶段计划信息更新界面显示信息;The standby station plan management module is used to send the station plan request in the loading database to the storage query module, and receive the station plan request receipt returned by the storage query module; after being upgraded to the new main station plan management module, to the storage query module. The query module sends a plan request for the operation diagram stage, receives the operation diagram stage plan information issued by the storage query module, and updates the interface display information according to the operation diagram stage plan information;
所述主车站计划管理模块,用于接收所述备车站计划管理模块发送的本机升为主机的信息。The main station plan management module is configured to receive the information that the local machine is upgraded to the host computer sent by the backup station plan management module.
其中,所述备车站计划管理模块,具体用于如果存储查询模块返回的车站计划请求回执结果为所述车站计划请求加载成功,根据所述车站计划信息更新界面显示信息;Wherein, the standby station plan management module is specifically configured to update the interface display information according to the station plan information if the station plan request receipt returned by the storage query module is that the station plan request has been loaded successfully;
如果存储查询模块返回的车站计划请求回执结果为所述车站计划请求加载失败,则向所述主车站计划管理模块发送加载全体车站计划信息的请求;If the station plan request acknowledgment result returned by the storage query module is that the station plan request fails to be loaded, send a request to load the overall station plan information to the main station plan management module;
所述主车站计划管理模块,用于向所述备车站计划管理模块发送所述全体车站计划信息。The main station plan management module is configured to send the overall station plan information to the backup station plan management module.
本实施例的车站运输调度的系统,在图2实施例的基础上,增加了车站计划管理模块主备切换的处理流程,保证了车站运输调度系统的安全运行,提高了车站运输调度系统的容灾性能。In the station transportation scheduling system of this embodiment, on the basis of the embodiment shown in FIG. 2 , the processing flow of the master-standby switching of the station planning management module is added, which ensures the safe operation of the station transportation scheduling system and improves the capacity of the station transportation scheduling system. disaster performance.
本领域内的技术人员应明白,本发明的实施例可提供为方法、系统、或计算机程序产品。因此,本发明可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本发明可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器和光学存储器等)上实施的计算机程序产品的形式。As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media having computer-usable program code embodied therein, including but not limited to disk storage, optical storage, and the like.
本发明是参照根据本发明实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block in the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to the processor of a general purpose computer, special purpose computer, embedded processor or other programmable data processing device to produce a machine such that the instructions executed by the processor of the computer or other programmable data processing device produce Means for implementing the functions specified in a flow or flow of a flowchart and/or a block or blocks of a block diagram.
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory result in an article of manufacture comprising instruction means, the instructions The apparatus implements the functions specified in the flow or flow of the flowcharts and/or the block or blocks of the block diagrams.
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。These computer program instructions can also be loaded on a computer or other programmable data processing device to cause a series of operational steps to be performed on the computer or other programmable device to produce a computer-implemented process such that The instructions provide steps for implementing the functions specified in the flow or blocks of the flowcharts and/or the block or blocks of the block diagrams.
显然,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention. Thus, provided that these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims (8)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711113188.0A CN108032876B (en) | 2017-11-13 | 2017-11-13 | Station transportation scheduling method and system |
HUE18876592A HUE056284T2 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
PCT/CN2018/085944 WO2019091063A1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
EP18876592.9A EP3608200B1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
RS20211262A RS62443B1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
HRP20211865TT HRP20211865T1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711113188.0A CN108032876B (en) | 2017-11-13 | 2017-11-13 | Station transportation scheduling method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108032876A CN108032876A (en) | 2018-05-15 |
CN108032876B true CN108032876B (en) | 2020-02-14 |
Family
ID=62092657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711113188.0A Active CN108032876B (en) | 2017-11-13 | 2017-11-13 | Station transportation scheduling method and system |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP3608200B1 (en) |
CN (1) | CN108032876B (en) |
HR (1) | HRP20211865T1 (en) |
HU (1) | HUE056284T2 (en) |
RS (1) | RS62443B1 (en) |
WO (1) | WO2019091063A1 (en) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108674451B (en) * | 2018-05-17 | 2020-09-08 | 北京全路通信信号研究设计院集团有限公司 | Method and system for processing key logic state |
CN108749859B (en) * | 2018-05-31 | 2020-06-26 | 北京全路通信信号研究设计院集团有限公司 | Train dispatching centralized control system and control method |
CN109249964A (en) * | 2018-09-14 | 2019-01-22 | 北京全路通信信号研究设计院集团有限公司 | Clock synchronization system based on dispatching centralized system |
CN111081159A (en) * | 2019-12-30 | 2020-04-28 | 株洲亿鸿精密科技发展有限公司 | Station platform LED intelligence ground mark |
CN111137328B (en) * | 2020-01-22 | 2024-02-20 | 卡斯柯信号有限公司 | Tramcar driving dispatching management system |
CN111332341B (en) * | 2020-02-18 | 2022-07-15 | 卡斯柯信号有限公司 | Realization method for entering route handling of centralized control station based on CTC3.0 |
CN111489277B (en) * | 2020-03-16 | 2023-07-18 | 中铁程科技有限责任公司 | Line data processing method, device, storage medium and computer equipment |
CN112511801A (en) * | 2020-11-19 | 2021-03-16 | 天津凯发电气股份有限公司 | Method for retrieving videos of auxiliary monitoring system by railway telecontrol monitoring system |
CN113147838B (en) * | 2021-04-02 | 2022-08-26 | 卡斯柯信号有限公司 | Automatic vehicle adding method for operation recovery of subway sudden accident |
EP4101728A1 (en) * | 2021-06-11 | 2022-12-14 | ALSTOM Transport Technologies | System for locally managing railway traffic in railway stations |
CN113715879A (en) * | 2021-11-04 | 2021-11-30 | 北京全路通信信号研究设计院集团有限公司 | Shunting operation management and control method and system |
CN114296422B (en) * | 2021-11-23 | 2024-03-29 | 卡斯柯信号有限公司 | CTC 3.0-based station yard centralized display and control method, equipment and medium |
CN114312921B (en) * | 2021-11-23 | 2023-09-08 | 卡斯柯信号有限公司 | Column modulation conflict checking method, device, equipment and medium based on autonomous machine |
CN114394132B (en) * | 2021-12-30 | 2023-08-25 | 卡斯柯信号有限公司 | Improved method, equipment and medium for handling shunting route of dispatching centralized system |
CN115329417B (en) * | 2022-03-30 | 2024-06-07 | 西南交通大学 | A hub column flow diagram compilation method and system |
CN115257884B (en) * | 2022-08-19 | 2024-04-26 | 交控科技股份有限公司 | Rail transit energy-saving control method and device based on passenger carrying state |
CN115767015B (en) * | 2022-11-03 | 2023-08-08 | 广州非课信息科技有限公司 | Engineering personnel scheduling management system based on collaborative office platform |
CN116080721B (en) * | 2022-12-30 | 2024-11-08 | 中国铁道科学研究院集团有限公司通信信号研究所 | Efficient shunting control module and intelligent shunting method |
CN116161088A (en) * | 2023-04-25 | 2023-05-26 | 北京全路通信信号研究设计院集团有限公司 | Method and system for determining train position |
CN119204616A (en) * | 2024-11-28 | 2024-12-27 | 中国铁道科学研究院集团有限公司通信信号研究所 | A method for integrating stage plans of stations jointly managed by multiple dispatching stations |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5950966A (en) * | 1997-09-17 | 1999-09-14 | Westinghouse Airbrake Company | Distributed positive train control system |
CN201371810Y (en) * | 2009-06-29 | 2009-12-30 | 中国铁道科学研究院运输及经济研究所 | Throat of Passenger Dedicated Line Passenger Station |
CN101767590B (en) * | 2010-03-02 | 2011-12-21 | 中国铁道科学研究院通信信号研究所 | Control method and system for combining management and control |
CN101934807B (en) * | 2010-08-24 | 2011-09-28 | 北京交大资产经营有限公司 | Train control system-based mobile authorization calculating method |
CN102194166A (en) * | 2011-04-20 | 2011-09-21 | 铁道部运输局 | Passenger transport information processing system based on in-depth data integration |
CN102358337B (en) * | 2011-08-10 | 2015-01-21 | 北京和利时系统工程有限公司 | Rail transit train monitoring system and method |
JP6038693B2 (en) * | 2013-03-11 | 2016-12-07 | 株式会社日立製作所 | Course control device, course control method, and course control program |
CN104773191B (en) * | 2014-01-15 | 2017-01-18 | 上海亨钧科技有限公司 | Automatic centralized enterprise railway control method and system thereof |
EP2974939B1 (en) * | 2014-07-17 | 2023-06-07 | Hitachi, Ltd. | Train management system |
CN105278379B (en) * | 2015-10-30 | 2018-02-23 | 中国铁道科学研究院通信信号研究所 | A kind of MTU depot centralized control system |
-
2017
- 2017-11-13 CN CN201711113188.0A patent/CN108032876B/en active Active
-
2018
- 2018-05-08 WO PCT/CN2018/085944 patent/WO2019091063A1/en unknown
- 2018-05-08 HU HUE18876592A patent/HUE056284T2/en unknown
- 2018-05-08 HR HRP20211865TT patent/HRP20211865T1/en unknown
- 2018-05-08 EP EP18876592.9A patent/EP3608200B1/en active Active
- 2018-05-08 RS RS20211262A patent/RS62443B1/en unknown
Also Published As
Publication number | Publication date |
---|---|
WO2019091063A1 (en) | 2019-05-16 |
HUE056284T2 (en) | 2022-02-28 |
RS62443B1 (en) | 2021-11-30 |
EP3608200A1 (en) | 2020-02-12 |
HRP20211865T1 (en) | 2022-03-04 |
CN108032876A (en) | 2018-05-15 |
EP3608200B1 (en) | 2021-09-01 |
EP3608200A4 (en) | 2020-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108032876B (en) | Station transportation scheduling method and system | |
US12020574B2 (en) | Cloud simulation apparatus and method for verifying rail transit-oriented full-automatic unmanned driving scene | |
CN106476857B (en) | A kind of rail traffic dispatching and command system and method | |
CN103707904B (en) | Temporary speed-limiting method under the rail CBTC pattern of a kind of city and speed limiting system | |
EP3747727B1 (en) | Data processing system and method | |
CN107831713B (en) | A kind of locomotive based on multistation field/railcar Dynamic Tracking and system | |
CN108528477A (en) | A kind of metro depot/parking lot complex automatic system | |
CN100519293C (en) | Wireless locomotive signal dual-engine warm standby control method | |
CN102556125A (en) | Maintenance support system of automatic train control system | |
EP3763598A1 (en) | Centralized train dispatch control system and control method | |
CN102616255A (en) | CTC (centralized traffic control) management method and system of high-speed railway | |
CN102211600A (en) | Temporary speed-limiting method, server and system | |
CN102230804B (en) | Method for updating and displaying navigation route of real-time traffic status and navigation server | |
CN102064962A (en) | Method for implementing input and output assemblies of ATS (Automatic Train Supervision) system based on named pipeline communication | |
CN101504621A (en) | Distributed system and equipment for preventing global resource out-of-order, and its application method | |
CN101786459B (en) | Train temporary speed-limiting method based on self-organizing network | |
WO2019200671A1 (en) | Master/standby machine data synchronization method for railway centralized traffic control system | |
CN105959214B (en) | A kind of area transformer substation end I data communication gateway machine | |
CN108616518B (en) | Interface of dispatching centralized system, dispatching centralized system and information transmission method | |
CN102184471A (en) | Integrated management platform and passenger service system | |
CN202870906U (en) | Station-level safety production command center system | |
CN102194166A (en) | Passenger transport information processing system based on in-depth data integration | |
CN108616591A (en) | Interface device and method for data exchange | |
JP2019104306A (en) | Traffic operational information integrated management system and traffic operational information integrated management method | |
CN111717245B (en) | Full-automatic train operation control method based on virtual yard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |