CN107724706A - A kind of Cracks On Concrete Floors reinforcement process - Google Patents
A kind of Cracks On Concrete Floors reinforcement process Download PDFInfo
- Publication number
- CN107724706A CN107724706A CN201711000946.8A CN201711000946A CN107724706A CN 107724706 A CN107724706 A CN 107724706A CN 201711000946 A CN201711000946 A CN 201711000946A CN 107724706 A CN107724706 A CN 107724706A
- Authority
- CN
- China
- Prior art keywords
- cracks
- concrete floors
- reinforcement process
- floor slab
- process according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 title claims abstract description 20
- 239000011440 grout Substances 0.000 claims abstract description 27
- 210000002445 nipple Anatomy 0.000 claims abstract description 27
- 238000010276 construction Methods 0.000 claims abstract description 26
- 238000007789 sealing Methods 0.000 claims abstract description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 13
- 150000001875 compounds Chemical class 0.000 claims abstract description 11
- 239000011083 cement mortar Substances 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 4
- 235000013336 milk Nutrition 0.000 claims description 10
- 239000008267 milk Substances 0.000 claims description 10
- 210000004080 milk Anatomy 0.000 claims description 10
- 239000004568 cement Substances 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 241000256135 Chironomus thummi Species 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 description 7
- 238000005336 cracking Methods 0.000 description 6
- 238000007596 consolidation process Methods 0.000 description 3
- 239000003292 glue Substances 0.000 description 3
- 239000012535 impurity Substances 0.000 description 3
- 239000000843 powder Substances 0.000 description 3
- 239000000654 additive Substances 0.000 description 2
- 230000000996 additive effect Effects 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 239000010881 fly ash Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 229920002472 Starch Polymers 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 210000000481 breast Anatomy 0.000 description 1
- 229940112822 chewing gum Drugs 0.000 description 1
- 235000015218 chewing gum Nutrition 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of Cracks On Concrete Floors reinforcement process, belong to floor field of reinforcement, its step includes:Construction hole is drilled through in cracks on floor slab;Back and forth washed by water to construction hole again;In construction hole site installation grout nipple;In cracks on floor slab surface smear sealing compound;Grouter connection grout nipple carries out pouring into cement mortar.This kind of Cracks On Concrete Floors reinforcement process, mixed mud cracks on floor slab can be sealed and reinforced.
Description
Technical field
The present invention relates to floor field of reinforcement, more particularly to a kind of Cracks On Concrete Floors reinforcement process.
Background technology
Concrete cracking is a world-famous puzzle, and wanting not ftracture is nearly impossible, and cracking has on a variety of floors
There is surface crack to also have through crack, as long as it is all acceptable that country is required of surface crack no more than 0.3mm now,
If this factor of through crack just has, it is enough.Needed in raw material water it is bigger easily cracking, mainly powder, cement,
Miberal powder, flyash etc., also there is certain relation with sandstone;Additive also has a powder, the larger easy cracking of self-constriction, such as
Red flyash and sandstone;Middle modulus of fineness also easily ftractureing less than 2.6, additive usage is larger also easy to produce cracking;
Also the ratio of mud also has an impact, especially summer because moisture loss influence it is bigger;In addition also have and construct, such as pump
When add water, vibration is insufficient, and the unreasonable late maintaining of molding not enough can all cause to ftracture, and design aspect design portion is rationally led
Cause cracking.
The content of the invention
It is above-mentioned to solve the problems, such as, the invention provides a kind of Cracks On Concrete Floors reinforcement process, mixed mud can be sealed
Tulou plank split is reinforced.
The technical solution used in the present invention is:A kind of Cracks On Concrete Floors reinforcement process, its step include:In floor
Crack drills through construction hole;Back and forth washed by water to construction hole again;In construction hole site installation grout nipple;Sealed in cracks on floor slab surface smear
Chewing-gum;Grouter connection grout nipple carries out pouring into cement mortar.
In above-mentioned technical proposal, before cracks on floor slab drills through construction hole, first cracks on floor slab is dug into V-groove, ensures grouting
Stability.
In above-mentioned technical proposal, construction hole drill fetch bit is setting at the wider place, staggered place, end of cracks on floor slab or running through
Place, to ensure to reduce to cracks on floor slab destruction and ensure consolidation effect.
In above-mentioned technical proposal, every cracks on floor slab is at least provided with two construction holes, to install grout nipple and be used as exhaust.
In above-mentioned technical proposal, the spacing in hole of constructing ensure that the density in construction hole, grouting effect between 35cm-40cm
Fruit is more preferable.
In above-mentioned technical proposal, the width of sealing compound ensures that the sealing of sealing compound is imitated relative to the wide 1-3cm of cracks on floor slab
Fruit.
In above-mentioned technical proposal, the grouting pressure that grouter connection grout nipple is in the milk is gradually risen by low, to ensure
The stability of grouting.
In above-mentioned technical proposal, the grouting pressure that grouter connection grout nipple is in the milk is 0.2 to 0.4Mpa, ensures to fill
Starch effect and cracks on floor slab structure will not be deteriorated simultaneously.
In above-mentioned technical proposal, when grout nipple is in the milk, when the midge rate of grouter is less than 0.1L/ minutes, then
Constant pressure stops slip casting after grouting 3-8 minutes, ensure filling full water mud.
In above-mentioned technical proposal, after the completion of grouter grouting, grout nipple is blocked;Again after cement slurry sets, it will be in the milk
Mouth takes out, and is filled and led up with sealing compound at grouting, seals the cracks on floor slab after reinforcing.
The beneficial effects of the invention are as follows:This kind of Cracks On Concrete Floors reinforcement process, back and forth wash by water, can remove to construction hole
Impurity in cracks on floor slab, the cement mortar in grouting is set to be sufficient filling with and not influence cement mortar structure, and moisture content moistening floor
Behind crack, cement mortar and cracks on floor slab combine more preferably, and consolidation effect is more preferably.
Embodiment
A kind of Cracks On Concrete Floors reinforcement process, its step include:
First to clearing away impurity at cracks on floor slab, the impurity generally refers to unconsolidated formation existing for cracks on floor slab, dust dirt
Etc.;Surface concrete is cut to cracks on floor slab, until cracks on floor slab exposes solid internal layer, and by cracks on floor slab chisel into V-groove,
Ensure the stability of grouting;
Construction hole is drilled through in cracks on floor slab;Construct hole drill fetch bit setting at the wider place, staggered place, end of cracks on floor slab or
Through part, to ensure to reduce to cracks on floor slab destruction and ensure consolidation effect;The spacing in construction hole is protected between 35cm-40cm
The density in construction hole is demonstrate,proved, grouting effect is more preferable;Every cracks on floor slab is at least provided with two construction holes, to install grout nipple and work
For exhaust;
It is put into high-pressure water pipe to construction hole again back and forth wash by water to construction hole, the delivery port of high-pressure water pipe is in water pipe main body
Side, do not stop rotatably to wash away the hole wall in hole of constructing, and ceaselessly change high-pressure water pipe up and down in construction hole
Depth position, the silt in construct hole and crack is cleared up and prevents sediment deposition;
In the bottom spreading glue of grout nipple base, grout nipple is pasted on construction hole, with the installation grouting of construction hole
Mouth;And the centre bore of grout nipple need to be directed at crack, glue is avoided to block the slurry hole of grout nipple;
In cracks on floor slab surface smear sealing compound, the width of sealing compound ensures sealing compound relative to the wide 1-3cm of cracks on floor slab
Sealing effectiveness;After adhesive curing, cracks on floor slab is sprayed into from grout nipple with air gun, to examine cracks on floor slab insertion situation and sealing
The sealing situation of glue;
Grouter connection grout nipple carries out pouring into cement mortar;The grouting pressure that grouter connection grout nipple is in the milk is by low
Gradually rise, to ensure the stability of grouting;The grouting pressure that grouter connection grout nipple is in the milk is 0.2 to 0.4Mpa,
Ensure grouting effect and cracks on floor slab structure will not be deteriorated simultaneously;When grout nipple is in the milk, when the midge rate of grouter is small
When 0.1L/ minutes, then stop slip casting after constant pressure grouting 3-8 minutes, ensure filling full water mud.
After the completion of grouter grouting, grout nipple is blocked;Again after cement slurry sets, grout nipple is taken out, uses sealing compound
Fill and lead up at grouting, seal the cracks on floor slab after reinforcing.
Embodiment above is merely illustrative and not limiting to the invention, therefore all according to described in present patent application scope
The equivalent change or modification done of method, be included in the range of present patent application.
Claims (10)
1. a kind of Cracks On Concrete Floors reinforcement process, it is characterised in that its step includes:Construction hole is drilled through in cracks on floor slab;
Back and forth washed by water to construction hole again;In construction hole site installation grout nipple;In cracks on floor slab surface smear sealing compound;Grouter connects
Grout nipple carries out pouring into cement mortar.
A kind of 2. Cracks On Concrete Floors reinforcement process according to claim 1, it is characterised in that:Drilled through in cracks on floor slab
Construct before hole, first dig cracks on floor slab into V-groove.
A kind of 3. Cracks On Concrete Floors reinforcement process according to claim 1, it is characterised in that:Construction hole drill fetch bit is put
At the wider place of cracks on floor slab, staggered place, end or through part.
A kind of 4. Cracks On Concrete Floors reinforcement process according to claim 1 or 3, it is characterised in that:Every floor splits
Seam is at least provided with two construction holes.
A kind of 5. Cracks On Concrete Floors reinforcement process according to claim 1 or 3, it is characterised in that:Between construction hole
Away between 35cm-40cm.
A kind of 6. Cracks On Concrete Floors reinforcement process according to claim 1 or 2, it is characterised in that:The width of sealing compound
Degree is relative to the wide 1-3cm of cracks on floor slab.
A kind of 7. Cracks On Concrete Floors reinforcement process according to claim 1, it is characterised in that:Grouter connection grouting
The grouting pressure that mouth is in the milk is gradually risen by low.
A kind of 8. Cracks On Concrete Floors reinforcement process according to claim 1 or 7, it is characterised in that:Grouter connects
The grouting pressure that grout nipple is in the milk is 0.2 to 0.4Mpa.
A kind of 9. Cracks On Concrete Floors reinforcement process according to claim 1 or 7, it is characterised in that:Enter in grout nipple
During row grouting, when the midge rate of grouter is less than 0.1L/ minutes, then stop slip casting after constant pressure grouting 3-8 minutes.
A kind of 10. Cracks On Concrete Floors reinforcement process according to claim 1 or 2, it is characterised in that:Grouter is in the milk
After the completion of, grout nipple is blocked;Again after cement slurry sets, grout nipple is taken out, filled and led up with sealing compound at grouting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711000946.8A CN107724706A (en) | 2017-10-24 | 2017-10-24 | A kind of Cracks On Concrete Floors reinforcement process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711000946.8A CN107724706A (en) | 2017-10-24 | 2017-10-24 | A kind of Cracks On Concrete Floors reinforcement process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107724706A true CN107724706A (en) | 2018-02-23 |
Family
ID=61213298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711000946.8A Pending CN107724706A (en) | 2017-10-24 | 2017-10-24 | A kind of Cracks On Concrete Floors reinforcement process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107724706A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0194567A2 (en) * | 1985-03-06 | 1986-09-17 | Friedrich Maurer Söhne GmbH & Co. KG | Device for bridging expansion joints, particularly in bridges, road sections or the like |
CN2771389Y (en) * | 2005-03-02 | 2006-04-12 | 武汉武大巨成加固实业有限公司 | Direct-insertion type concrete crack grouting nozzle |
CN1888354A (en) * | 2006-07-14 | 2007-01-03 | 山东省建筑科学研究院 | Self-pressing crack treating device and construction technique |
CN101736908A (en) * | 2008-11-04 | 2010-06-16 | 唐益龙 | Method for preventing and treating concrete surface crack |
CN101942905A (en) * | 2010-09-09 | 2011-01-12 | 新蒲建设集团有限公司 | Method for treating assembly-type floorslab cracks |
CN103452332A (en) * | 2013-09-11 | 2013-12-18 | 中建中东有限责任公司 | Method for repairing construction engineering floor slab crack |
CN107023176A (en) * | 2017-03-29 | 2017-08-08 | 中铁十九局集团有限公司 | Method and device for repairing crack of low-pressure concrete structure |
-
2017
- 2017-10-24 CN CN201711000946.8A patent/CN107724706A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0194567A2 (en) * | 1985-03-06 | 1986-09-17 | Friedrich Maurer Söhne GmbH & Co. KG | Device for bridging expansion joints, particularly in bridges, road sections or the like |
CN2771389Y (en) * | 2005-03-02 | 2006-04-12 | 武汉武大巨成加固实业有限公司 | Direct-insertion type concrete crack grouting nozzle |
CN1888354A (en) * | 2006-07-14 | 2007-01-03 | 山东省建筑科学研究院 | Self-pressing crack treating device and construction technique |
CN101736908A (en) * | 2008-11-04 | 2010-06-16 | 唐益龙 | Method for preventing and treating concrete surface crack |
CN101942905A (en) * | 2010-09-09 | 2011-01-12 | 新蒲建设集团有限公司 | Method for treating assembly-type floorslab cracks |
CN103452332A (en) * | 2013-09-11 | 2013-12-18 | 中建中东有限责任公司 | Method for repairing construction engineering floor slab crack |
CN107023176A (en) * | 2017-03-29 | 2017-08-08 | 中铁十九局集团有限公司 | Method and device for repairing crack of low-pressure concrete structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453913B (en) | A kind of Shaft Stopes front pre-grouting method | |
CN1193141C (en) | Combined grouting construction process of reinforcing foundation | |
CN100572683C (en) | The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices | |
CN101260672B (en) | Grouting method for rocky slope with weak surface and anchor pipe used for grouting | |
CN108517899A (en) | Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall | |
CN101413245B (en) | Rotary spray drill bit and treatment method for emptying treatment of concrete floor slab bottom | |
CN106381840A (en) | Leaking stoppage grouting method for cracks under high pressure flowing water state | |
KR100973745B1 (en) | Grouting tip device and ground improvement method using same | |
CN205558920U (en) | Fissured repair structure of last lining cutting of tunnel wall | |
CN105178858B (en) | A kind of drilling tool for two-tube high-pressure rotary-spray technique | |
CN106284295A (en) | Multichannel high-pressure vibro-grouting jet groutinl construction method | |
CN113774970A (en) | Cast-in-place pile socketed section defect repairing construction method | |
CN110195444A (en) | Basement leakage back side processing method | |
CN110130325B (en) | Construction method for rock drilling and grouting | |
CN101929343B (en) | Profile steel pulling and grouting method of SMW (Soil Mixing Wall) process | |
NO180042B (en) | Method of injecting a mortar material | |
KR20090002833A (en) | Construction device that fills the ground gap by spraying sand at the same time as H-beam drawing | |
CN107604903A (en) | A kind of miniature steel pipe isolation pile reinforced construction method | |
CN1380470A (en) | Impervious wall construction and soilslip-resisting and leakage-blocking process | |
CN106147732A (en) | A kind of compound rapid hardening silicate leak stopping slurry and blocking method thereof | |
CN107724706A (en) | A kind of Cracks On Concrete Floors reinforcement process | |
CN114483063A (en) | Construction method for slurry shield river channel | |
CN108149637A (en) | A kind of vertical bank revetment structure and its construction method | |
CN105781580A (en) | Tunnel crack repair method | |
CN105863665B (en) | A kind of processing method of stone matter tunnel inverted arch scum silica frost |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180223 |