CN107654246A - Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method - Google Patents

Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method Download PDF

Info

Publication number
CN107654246A
CN107654246A CN201711037224.XA CN201711037224A CN107654246A CN 107654246 A CN107654246 A CN 107654246A CN 201711037224 A CN201711037224 A CN 201711037224A CN 107654246 A CN107654246 A CN 107654246A
Authority
CN
China
Prior art keywords
arm
support arm
turntable
steel arch
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711037224.XA
Other languages
Chinese (zh)
Inventor
魏金
李胜永
刘永磊
王骞
焦爽
李冰涛
赵行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Original Assignee
Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd filed Critical Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Priority to CN201711037224.XA priority Critical patent/CN107654246A/en
Publication of CN107654246A publication Critical patent/CN107654246A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明属于山岭隧道工程施工专用机械设备领域。一种隧道用三臂三篮钢拱架安装机及钢拱架施工方法,包括底盘、主支撑臂和副支撑臂,所述底盘上设置有驾驶室、动力系统和控制系统;在主支撑臂的前端设置有回转台,所述回转台上设置有吊篮和拼装夹具头,所述回转台与主支撑臂之间设置有自平衡系统;所述副支撑臂前端设置有回转台,所述回转台上设置有吊篮和拼装夹具头,所述副支撑臂与对应的回转台之间设置有自平衡系统;所述自平衡系统使得回转台始终处于水平状态。本发明大大提高了隧道施工的效率,加快隧道施工进度,缩短施工工期,节约成本,大大加强了隧道施工的安全性,促进隧道施工机械化、成套化、信息化的发展进程。

The invention belongs to the field of special mechanical equipment for mountain tunnel engineering construction. A three-arm three-basket steel arch installation machine for tunnels and a steel arch construction method, including a chassis, a main support arm and an auxiliary support arm, the chassis is provided with a driver's cab, a power system and a control system; the main support arm The front end of the turntable is provided with a turntable, the turntable is provided with a hanging basket and an assembly fixture head, and a self-balancing system is arranged between the turntable and the main support arm; the front end of the auxiliary support arm is provided with a turntable, and the A hanging basket and an assembly jig head are arranged on the turntable, and a self-balancing system is arranged between the auxiliary support arm and the corresponding turntable; the self-balancing system keeps the turntable always in a horizontal state. The invention greatly improves the efficiency of tunnel construction, accelerates the progress of tunnel construction, shortens the construction period, saves costs, greatly enhances the safety of tunnel construction, and promotes the development process of tunnel construction mechanization, complete set and informationization.

Description

隧道用三臂三篮钢拱架安装机及钢拱架施工方法Three-arm three-basket steel arch installation machine for tunnel and steel arch construction method

技术领域technical field

本发明属于山岭隧道工程施工专用机械设备领域,具体涉及一种隧道用三臂三篮钢拱架安装机及钢拱架施工方法。The invention belongs to the field of special mechanical equipment for mountain tunnel engineering construction, and in particular relates to a three-arm three-basket steel arch installation machine for tunnels and a steel arch construction method.

背景技术Background technique

我国目前在隧道施工中,随着国家对隧道施工”机械化、成套化、信息化”要求的不断提高,隧道施工设备的成套化配置不断得到发展。隧道施工开挖设备、支护设备、二衬设备、运输设备等一系列成套化设备在隧道施工中展露手脚。在一系列施工设备中,隧道开挖的支护设备是效率最低的一种,制约着整个隧道施工的效率。拱架安装机就隧道施工的初期支护设备。当围岩软弱破碎严重时,拼装拱架对于控制围岩变形,防止坍塌起很大作用。钢拱架一般采用型钢拱架和格栅钢架两种结构,并与拉筋、网片、锁脚锚杆和喷射混凝土构成联合支护。In the current tunnel construction in my country, with the continuous improvement of the country's "mechanization, complete set, and informationization" requirements for tunnel construction, the complete set configuration of tunnel construction equipment has been continuously developed. A series of complete sets of equipment such as tunnel construction excavation equipment, support equipment, secondary lining equipment, and transportation equipment show their hands and feet in tunnel construction. Among a series of construction equipment, the support equipment for tunnel excavation is the one with the lowest efficiency, which restricts the efficiency of the entire tunnel construction. The arch installation machine is the initial support equipment for tunnel construction. When the surrounding rock is weak and broken seriously, the assembled arch plays a great role in controlling the deformation of the surrounding rock and preventing collapse. The steel arch frame generally adopts two structures of section steel arch frame and grid steel frame, and forms a joint support with tie bars, mesh sheets, lock-foot anchor rods and shotcrete.

钢拱架安装主要采用人工安装方式,这种安装方式施工人员多、劳动强度大、作业效率低,并且安装质量不高、施工危险性较大。目前国内已有研发的单臂拱架安装机、三臂拱架安装机(带工作篮)等设备用于满足山岭隧道钢拱架的安装工作。单臂拱架安装机工作效率低,三臂拱架安装机工作效率高,但是大多是履带式底盘,行动不便,速度缓慢,不利于施工隧道的转场。国外也有研发的各种钢拱架安装机,但这些机械主要根据国外施工情况而研制,不适合国内施工情况。The installation of the steel arch frame mainly adopts the manual installation method, which requires many construction workers, high labor intensity, low work efficiency, low installation quality and high construction risk. At present, there are single-arm arch installation machines, three-arm arch installation machines (with work baskets) and other equipment developed in China to meet the installation work of mountain tunnel steel arches. The working efficiency of the single-arm arch installation machine is low, and the work efficiency of the three-arm arch installation machine is high, but most of them are crawler chassis, which is inconvenient to move and slow, which is not conducive to the transition of the construction tunnel. There are also various steel arch installation machines developed abroad, but these machines are mainly developed according to foreign construction conditions and are not suitable for domestic construction conditions.

根据这些情况,本发明主要结合国内隧道施工实际情况,设计成本低、使用方便、性能可靠的三臂三篮钢拱架安装机。According to these circumstances, the present invention mainly combines the actual conditions of domestic tunnel construction to design a three-arm three-basket steel arch installation machine with low cost, convenient use and reliable performance.

发明内容Contents of the invention

本发明的目的是针对上述存在的问题和不足,提供一种结构设计合理,稳定性好,并有效提高钢拱架施工的效率和施工的准确性的隧道用三臂三篮钢拱架安装机及钢拱架施工方法。The purpose of the present invention is to solve the problems and deficiencies mentioned above, and provide a three-arm three-basket steel arch installation machine for tunnels with reasonable structural design, good stability, and effective improvement of the efficiency and accuracy of steel arch construction. and steel arch construction methods.

为达到上述目的,所采取的技术方案是:In order to achieve the above purpose, the technical solutions adopted are:

一种隧道用三臂三篮钢拱架安装机,包括底盘,所述底盘上设置有驾驶室、动力系统和控制系统;主支撑臂,所述主支撑臂设置在底盘前端中部,且主支撑臂相对于底盘能够进行俯仰动作和左右回转动作;所述主支撑臂沿长度方向能够伸缩动作,且在主支撑臂的前端设置有回转台,所述回转台上设置有吊篮和拼装夹具头,所述回转台与主支撑臂之间设置有自平衡系统;和副支撑臂,所述副支撑臂为对应设置在主支撑臂两侧的两根,所述副支撑臂与底盘之间设置有滑移架,副支撑臂匹配滑动设置在滑移架上,且副支撑臂相对于滑移架能够俯仰动作;所述副支撑臂沿长度方向能够伸缩动作,且在副支撑臂的前端设置有回转台,所述回转台上设置有吊篮和拼装夹具头,所述副支撑臂与对应的回转台之间设置有自平衡系统;所述自平衡系统使得回转台始终处于水平状态。A three-arm three-basket steel arch installation machine for tunnels, comprising a chassis on which a driver's cab, a power system and a control system are arranged; The arm can perform pitching action and left-right turning action relative to the chassis; the main support arm can move telescopically along the length direction, and a turntable is arranged at the front end of the main support arm, and a hanging basket and an assembly fixture head are arranged on the turntable , a self-balancing system is provided between the turntable and the main support arm; There is a sliding frame, the auxiliary supporting arm is matched and slidably arranged on the sliding frame, and the auxiliary supporting arm can pitch relative to the sliding frame; the auxiliary supporting arm can move telescopically along the length direction, and is set There is a turntable, on which a hanging basket and an assembly jig head are arranged, and a self-balancing system is set between the auxiliary support arm and the corresponding turntable; the self-balancing system keeps the turntable always in a horizontal state.

所述主支撑臂与底盘之间枢接设置有中撑座,所述中撑座与底盘之间均设置有回转油缸,中撑座与主支撑臂之间均设置有臂梁俯仰油缸。A middle support is pivotally connected between the main support arm and the chassis, a rotary oil cylinder is arranged between the middle support and the chassis, and an arm beam pitch oil cylinder is arranged between the middle support and the main support arm.

所述隧道用三臂三篮钢拱架安装机为上下双层结构,所述滑移架与底盘之间设置有支撑柱,滑移架上匹配滑动设置有滑移座,所述副支撑臂枢接设置在滑移座上,且滑移座与副支撑臂之间设置有臂梁俯仰油缸。The three-arm three-basket steel arch installation machine for the tunnel has an upper and lower double-layer structure. A support column is arranged between the sliding frame and the chassis. A sliding seat is provided on the sliding frame for matching and sliding. The auxiliary support arm The pivot connection is arranged on the sliding seat, and an arm beam pitch oil cylinder is arranged between the sliding seat and the auxiliary support arm.

所述控制系统包括液压控制系统和电气控制系统,所述主支撑臂采用电比例控制阀进行电比例控制;所述副支撑臂和拼装夹具头均采用电比例控制阀和流量阀双重控制,实现电比例控制和微动控制;所述动力系统为柴电双动力系统。The control system includes a hydraulic control system and an electrical control system. The main support arm adopts an electric proportional control valve for electric proportional control; Electric proportional control and inching control; the power system is a diesel-electric dual power system.

所述自平衡系统为设置在回转台与对应的主支撑臂或副支撑臂之间的调平油缸,所述调平油缸与驱动主支撑臂或副支撑臂俯仰动作的臂梁俯仰油缸并行联动,当臂梁俯仰油缸进行伸缩动作时,对应的调平油缸同步伸缩动作,使得回转台保持水平状态。The self-balancing system is a leveling oil cylinder arranged between the turntable and the corresponding main support arm or auxiliary support arm, and the leveling oil cylinder is linked in parallel with the arm beam pitching oil cylinder that drives the main support arm or auxiliary support arm to pitch. , when the jib beam pitching cylinder performs telescopic movement, the corresponding leveling cylinder moves synchronously, so that the turntable remains horizontal.

所述底盘上设置有两个驾驶室,两个所述驾驶室分别相向设置在底盘的两端,并分别控制两个方向的行走;所述底盘为轮式底盘,且在底盘底部设置有伸缩支腿;所述主支撑臂和副支撑臂均为两级伸缩结构,并通过伸缩油缸驱动。The chassis is provided with two cabs, and the two cabs are respectively arranged at opposite ends of the chassis, and respectively control the walking in two directions; the chassis is a wheeled chassis, and a telescopic Outriggers; the main support arm and the auxiliary support arm are two-stage telescopic structures, and are driven by telescopic oil cylinders.

所述拼装夹具头包括枢接设置在回转台上的夹具摆臂、驱动夹具摆臂俯仰动作的夹具俯仰油缸、枢接设置在夹具摆臂端部的夹具头、以及设置在夹具头与夹具摆臂之间的抬头油缸;所述夹具头前端开设有呈U型的夹持槽,在夹持槽两侧设置有夹持块和驱动夹持块的夹紧油缸。The assembled jig head includes a jig swing arm pivotally arranged on the turret, a jig pitch oil cylinder for driving the jig swing arm to pitch, a jig head pivotally arranged at the end of the jig swing arm, and a jig head and jig swing. The lifting cylinder between the arms; the front end of the clamp head is provided with a U-shaped clamping groove, and a clamping block and a clamping cylinder for driving the clamping block are arranged on both sides of the clamping groove.

所述拼装夹具头包括固定设置在回转台上的固定架、枢接设置在固定架上的摆动架、驱动摆动架俯仰动作的夹具俯仰油缸、枢接设置在摆动架端部的夹具头和抬头油缸;所述夹具头包括枢接设置在摆动架前端的固定夹具头、枢接在固定夹具头上的活动夹具头和设置在固定夹具头和活动夹具头之间的夹紧油缸;所述抬头油缸设置在固定夹具头和摆动架之间。The assembled jig head includes a fixed frame fixedly arranged on the turntable, a swing frame pivotally arranged on the fixed frame, a fixture pitching oil cylinder for driving the swing frame to pitch, a clamp head and a lifting head pivotally arranged at the end of the swing frame. Oil cylinder; the clamp head includes a fixed clamp head pivotally arranged on the front end of the swing frame, a movable clamp head pivotally connected to the fixed clamp head and a clamping oil cylinder arranged between the fixed clamp head and the movable clamp head; the lifting head The oil cylinder is arranged between the fixed jig head and the swing frame.

所述回转台上设置有辅助拼装托架,所述辅助拼装托架包括设置在回转台上的托架支座、枢接设置在托架支座上的托举杆和设置在托举杆与托架支座之间的托举油缸。An auxiliary assembling bracket is provided on the turntable, and the auxiliary assembling bracket includes a bracket support arranged on the turntable, a lifting rod pivotally arranged on the bracket support, and a lifting rod arranged between the lifting rod and the Lift cylinders between carriage supports.

一种隧道钢拱架施工方法,所述隧道钢拱架施工方法为利用上述的隧道用三臂三篮钢拱架安装机的钢拱架的夹取拼装方法。A tunnel steel arch construction method, the tunnel steel arch construction method is a steel arch clamping and assembling method using the above-mentioned three-arm three-basket steel arch installation machine for tunnels.

采用上述技术方案,所取得的有益效果是:Adopt above-mentioned technical scheme, the beneficial effect that obtains is:

本发明通过对隧道成套化施工中钢拱架安装拼接设备的进一步优化,大大提高了隧道施工的效率,加快隧道施工进度,缩短施工工期,节约成本,大大加强了隧道施工的安全性,减少人员劳动强度,优化施工工艺中操作的便捷性,促进隧道施工机械化、成套化、信息化的发展进程。The invention further optimizes the installation and splicing equipment of the steel arch frame in the complete set of tunnel construction, greatly improves the efficiency of tunnel construction, speeds up the progress of tunnel construction, shortens the construction period, saves costs, greatly enhances the safety of tunnel construction, and reduces personnel Reduce labor intensity, optimize the convenience of operation in the construction process, and promote the development process of tunnel construction mechanization, complete set, and informatization.

本申请中的三臂三篮能够同时工作,主支撑臂及其上部的主拼装夹具头用于抓举和支撑整榀拱架(H或工字钢拱、花拱)、副支撑臂及其上部的辅助拼装夹具头完成其它拱架的拼装,吊篮用于完成拱架间拉筋与网片焊接作业。上部的副支撑臂臂与下部主支撑臂相互配合,快速完成钢拱架的拼装,能够完成Ⅲ、Ⅳ级围岩全断面及两台阶拱架的拼装。The three arms and three baskets in this application can work at the same time, the main support arm and its upper main assembly jig head are used to snatch and support the whole arch (H or I-shaped steel arch, flower arch), the auxiliary support arm and its upper part The auxiliary assembly jig head is used to complete the assembly of other arches, and the hanging basket is used to complete the welding work between the reinforcement and the mesh between the arches. The upper auxiliary support arm and the lower main support arm cooperate with each other to quickly complete the assembly of the steel arch frame, and can complete the assembly of the full section of the surrounding rock of grade III and IV and the assembly of the two-step arch frame.

本申请中的工作范围大,整机结构分为上下两层,上部辅助臂具有前后滑移功能,增大隧洞纵向工作范围、同时增加副支撑臂臂拼装时对两台阶的适应性,应用范围更广。副支撑臂的仰俯、拼装夹具头的水平回转和托举摆动都设置电比例控制和流量阀的微控。通过微控能够更加灵活过多成拼装作业。从而能够提高施工效率和施工的准确性。The scope of work in this application is large, the structure of the whole machine is divided into upper and lower layers, and the upper auxiliary arm has the function of sliding forward and backward, which increases the longitudinal working range of the tunnel, and at the same time increases the adaptability to the two steps when the auxiliary support arm is assembled. wider. The pitching of the auxiliary support arm, the horizontal rotation and lifting swing of the assembled fixture head are all equipped with electric proportional control and micro-control of the flow valve. Through the micro-control, it can be more flexible and complete the assembly operation. Thereby, the construction efficiency and construction accuracy can be improved.

本申请中的底盘采用轮胎式底盘,机动性好、速度快、成本低,且本申请采用全液压设计、比例控制加微动控制,可控性高,冲击小;其动力系统均为柴电双动力系统,采用电动机作业零排放、无污染、噪音低,柴油机辅助动力;在行驶时,主支撑臂臂处于全缩状态,副支撑臂臂缩回最短,并通过滑移架将臂收回车内。行驶稳定性高,且底盘前部设置有前液压平衡支腿,在支护工作时前液压平衡支腿展开,工作稳定性好。The chassis in this application adopts tire-type chassis, which has good maneuverability, fast speed and low cost, and this application adopts full hydraulic design, proportional control plus micro-motion control, which has high controllability and small impact; its power system is diesel-electric Dual power system, using electric motors for zero emission, no pollution, low noise, and diesel engine auxiliary power; when driving, the main support arm is in a fully retracted state, and the auxiliary support arm is retracted to the shortest, and the arm is retracted to the car through the sliding frame Inside. The driving stability is high, and the front part of the chassis is equipped with a front hydraulic balance outrigger, and the front hydraulic balance outrigger is deployed during support work, so the working stability is good.

附图说明Description of drawings

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2为图1的俯视结构示意图。FIG. 2 is a schematic top view of the structure of FIG. 1 .

图3为主支撑臂的工作状态结构示意图。Fig. 3 is a schematic diagram of the working state structure of the main support arm.

图4为副支撑臂的工作状态结构示意图。Fig. 4 is a schematic structural diagram of the working state of the auxiliary support arm.

图5为主支撑臂和副支撑臂的工作范围图。Figure 5 is a diagram of the working range of the main support arm and the auxiliary support arm.

图6为拼装夹具头的结构示意图之一。Fig. 6 is one of the structural schematic diagrams of the assembly jig head.

图7为拼装夹具头的结构示意图之二。Fig. 7 is the second structural schematic diagram of the assembly jig head.

图8为辅助拼装托架的结构示意图。Fig. 8 is a schematic structural view of the auxiliary assembly bracket.

图9为本发明的隧道钢拱架拼装步骤一。Fig. 9 is the assembly step 1 of the tunnel steel arch of the present invention.

图10为本发明的隧道钢拱架拼装步骤二。Fig. 10 is the second step of assembling the tunnel steel arch according to the present invention.

图11为本发明的隧道钢拱架拼装步骤三。Fig. 11 is the third step of assembling the tunnel steel arch of the present invention.

图中序号:100为底盘、101为驾驶室、102为动力系统、103为控制系统、104为伸缩支腿、200为主支撑臂、201为回转台、202为吊篮、203为拼装夹具头、204为中撑座、205为回转油缸、206为臂梁俯仰油缸、207为调平油缸、300为副支撑臂、301为滑移架、302为支撑柱、303为滑移座、401为夹具摆臂、402为夹具俯仰油缸、403为抬头油缸、404为夹持槽、405为夹持块、406为夹紧油缸、407为夹具头、411为固定架、412为摆动架、413为固定夹具头、414为活动夹具头、421为托架支座、422为托举杆、423为托举油缸。Serial numbers in the figure: 100 is the chassis, 101 is the cab, 102 is the power system, 103 is the control system, 104 is the telescopic outrigger, 200 is the main support arm, 201 is the turntable, 202 is the hanging basket, 203 is the assembly fixture head , 204 is the middle support seat, 205 is the rotary oil cylinder, 206 is the arm beam pitching oil cylinder, 207 is the leveling oil cylinder, 300 is the auxiliary support arm, 301 is the sliding frame, 302 is the supporting column, 303 is the sliding seat, 401 is The swing arm of the fixture, 402 is the pitching cylinder of the fixture, 403 is the lifting cylinder, 404 is the clamping groove, 405 is the clamping block, 406 is the clamping cylinder, 407 is the fixture head, 411 is the fixed frame, 412 is the swing frame, 413 is Fixed clamp head, 414 are movable clamp heads, 421 are bracket supports, 422 are lifting rods, and 423 are lifting oil cylinders.

具体实施方式Detailed ways

以下结合附图对本发明的具体实施方式做详细说明。The specific implementation manners of the present invention will be described in detail below in conjunction with the accompanying drawings.

参见图1-图8,本发明一种隧道用三臂三篮钢拱架安装机,包括底盘100、主支撑臂200和副支撑臂300,其中,底盘100上设置有驾驶室101、动力系统102和控制系统103,底盘100上设置有两个驾驶室101,两个驾驶室101分别相向设置在底盘100的两端,并分别控制两个方向的行走,其位于后部的驾驶室控制车辆行走,便于拱架安装机的出洞转场,且通过将液压系统布置于后部,使后部驾驶视野广阔,提高舒适性和安全性。前部驾驶室座椅设置为可上下调节高度,通过高度的调节改善行驶时的视野,便于拱架安装机的进场。提高人员驾驶的舒适性;底盘100为轮式底盘,整机结构重量分布均匀,轮胎及车桥受力均匀,轮胎等使用寿命长,稳定性好。底盘采用轮胎式底盘,机动性好、速度快、转场速度快,成本低,且在底盘100底部设置有伸缩支腿104;主支撑臂200和副支撑臂300均为两级伸缩结构,并通过伸缩油缸驱动。Referring to Figures 1-8, a three-arm three-basket steel arch installation machine for tunnels according to the present invention includes a chassis 100, a main support arm 200 and a secondary support arm 300, wherein the chassis 100 is provided with a driver's cab 101 and a power system 102 and a control system 103, two cabs 101 are arranged on the chassis 100, and the two cabs 101 are respectively arranged at opposite ends of the chassis 100, and control the walking in two directions respectively, and the cab at the rear controls the vehicle Walking facilitates the transition of the arch installation machine out of the hole, and by arranging the hydraulic system at the rear, the driving field of view at the rear is wide, and the comfort and safety are improved. The height of the front cab seat can be adjusted up and down to improve the vision when driving and facilitate the entry of the arch installation machine. Improve the driving comfort of personnel; the chassis 100 is a wheeled chassis, the weight distribution of the whole machine structure is uniform, the tires and axles are evenly stressed, the tires and the like have a long service life and good stability. The chassis adopts a tire-type chassis, which has good maneuverability, fast speed, fast transition speed, and low cost, and telescopic outriggers 104 are arranged at the bottom of the chassis 100; the main support arm 200 and the auxiliary support arm 300 are two-stage telescopic structures, and Driven by a telescopic cylinder.

主支撑臂200设置在底盘100前端中部,主支撑臂200相对于底盘能够进行俯仰动作和左右回转动作,主支撑臂以水平线为基准,其能够向下旋转15°~25°,向上旋转50°~70°,具体的,在主支撑臂200与底盘100之间枢接设置有中撑座204,所述中撑座204与底盘100之间均设置有回转油缸205,中撑座204与主支撑臂200之间均设置有臂梁俯仰油缸206;主支撑臂200的两级伸缩结构使得其能够沿长度方向伸缩动作,且在主支撑臂200的前端设置有回转台201,回转台201上设置有吊篮202和拼装夹具头203,回转台与主支撑臂之间设置有自平衡系统。主支撑臂能够实现伸缩、仰俯和左右摆动三个动作;主支撑臂上的吊篮和拼装夹具头用于抓取拱架和拼装拱架的各动作,共含水平回转、垂直摆动、低头与抬头抓取、夹紧等共5个动作,自平衡系统为设置在回转台201与对应的主支撑臂200之间的调平油缸207,调平油缸207与驱动主支撑臂的臂梁俯仰油缸并行联动,当臂梁俯仰油缸进行伸缩动作时,对应的调平油缸同步伸缩动作,使得回转台保持水平状态。图5中S1所示为主支撑臂的工作范围。The main support arm 200 is arranged in the middle of the front end of the chassis 100. The main support arm 200 can perform pitching and left-right rotation movements relative to the chassis. The main support arm is based on the horizontal line, and it can rotate 15°~25° downward and 50° upward ~70°. Specifically, a middle support 204 is pivotally connected between the main support arm 200 and the chassis 100, and a rotary oil cylinder 205 is arranged between the middle support 204 and the chassis 100. The middle support 204 and the main Both support arms 200 are provided with arm beam pitching oil cylinders 206; the two-stage telescopic structure of the main support arm 200 enables it to move telescopically along the length direction, and a turntable 201 is arranged at the front end of the main support arm 200, and on the turntable 201 A hanging basket 202 and an assembly jig head 203 are provided, and a self-balancing system is provided between the turntable and the main support arm. The main support arm can realize three actions of telescopic, pitching and swinging from side to side; the hanging basket and the assembly fixture head on the main support arm are used to grasp the various actions of the arch and the assembly arch, including horizontal rotation, vertical swing, and bowing. There are 5 actions including lifting the head and clamping. The self-balancing system is the leveling cylinder 207 installed between the turntable 201 and the corresponding main support arm 200. The leveling cylinder 207 and the arm beam that drives the main support arm are pitched. The oil cylinders are linked in parallel. When the jib pitching oil cylinders perform telescopic movements, the corresponding leveling oil cylinders synchronously extend and retract to keep the turntable in a horizontal state. S1 in Figure 5 shows the working range of the main support arm.

副支撑臂300为对应设置在主支撑臂200两侧的两根,副支撑臂300与底盘100之间设置有滑移架301,副支撑臂300匹配滑动设置在滑移架301上,且副支撑臂300相对于滑移架301能够俯仰动作,副支撑臂以水平线为基准,其能够向下旋转15°~25°,向上旋转50°~70°,具体的是,隧道用三臂三篮钢拱架安装机采用上下双层结构,滑移架301与底盘100之间设置有支撑柱302,滑移架301上匹配滑动设置有滑移座303,副支撑臂300枢接设置在滑移座303上,且滑移座303与副支撑臂300之间设置有臂梁俯仰油缸206;副支撑臂还能够沿长度方向伸缩动作,且在副支撑臂的前端也设置有回转台201,回转台201上设置有吊篮202和拼装夹具头203,副支撑臂与对应的回转台之间设置有自平衡系统,该自平衡系统为设置在回转台201与对应的副支撑臂300之间的调平油缸207,调平油缸207与驱动副支撑臂的臂梁俯仰油缸并行联动,当臂梁俯仰油缸进行伸缩动作时,对应的调平油缸同步伸缩动作,使得回转台保持水平状态,图5中S2所示为副支撑臂的工作范围。The auxiliary support arms 300 are two correspondingly arranged on both sides of the main support arm 200, a sliding frame 301 is arranged between the auxiliary supporting arms 300 and the chassis 100, and the auxiliary supporting arms 300 are matched and slidably arranged on the sliding frame 301, and the auxiliary The support arm 300 can move in pitch relative to the sliding frame 301, and the auxiliary support arm can rotate 15°~25° downwards and 50°~70° upwards based on the horizontal line. Specifically, the three-arm three-basket for the tunnel The steel arch installation machine adopts an upper and lower double-layer structure. A supporting column 302 is arranged between the sliding frame 301 and the chassis 100. A sliding seat 303 is provided for matching sliding on the sliding frame 301. The auxiliary support arm 300 is pivotally arranged on the sliding On the seat 303, and between the sliding seat 303 and the auxiliary support arm 300, an arm beam pitching oil cylinder 206 is arranged; the auxiliary support arm can also move telescopically along the length direction, and a turntable 201 is also arranged at the front end of the auxiliary support arm. The platform 201 is provided with a hanging basket 202 and an assembly fixture head 203, and a self-balancing system is arranged between the auxiliary support arm and the corresponding turntable, and the self-balancing system is set between the turntable 201 and the corresponding auxiliary support arm 300. Leveling oil cylinder 207, leveling oil cylinder 207 is linked in parallel with the boom pitching oil cylinder that drives the auxiliary support arm, when the boom pitching oil cylinder performs telescopic movement, the corresponding leveling oil cylinder telescopically moves synchronously, so that the turntable maintains a horizontal state, as shown in Figure 5 S2 in middle shows the working range of the auxiliary support arm.

本申请中的滑移架与底盘通过支撑柱连接,滑移架和副支撑臂构成上部结构,可整体拆装,便于运输。上部副支撑臂及拼装夹具头通过滑移架可前后滑行,在行驶状态,副支撑臂通过滑移架滑移至后部,并且副支撑臂处于全缩状态,整机重量分部均匀,底盘受力性好,行驶稳定性高。在拼装状态,副支撑臂通过滑移架滑移至前侧,并且位于底盘的上部,更利于拼装两台阶拱架,隧道施工地质适应性更强。下部结构含底盘及主支撑臂。主支撑臂设置在车体前端中部,可左右摆动一定角度,实现拱架的拼装定位。底盘设置前后伸缩支腿、前伸缩支腿还可在车体宽度方向伸缩,工作状态时,前后支推全部展开,增加工作时稳定性。The sliding frame in the present application is connected with the chassis through the supporting column, and the sliding frame and the auxiliary supporting arm constitute the upper structure, which can be disassembled and assembled as a whole, and is convenient for transportation. The upper auxiliary support arm and the assembled fixture head can slide forward and backward through the sliding frame. In the driving state, the auxiliary supporting arm slides to the rear through the sliding frame, and the auxiliary supporting arm is in a fully retracted state. The weight of the whole machine is evenly distributed, and the chassis Good force resistance and high driving stability. In the assembled state, the auxiliary support arm slides to the front side through the sliding frame and is located on the upper part of the chassis, which is more conducive to the assembly of the two-step arch frame, and the geological adaptability of the tunnel construction is stronger. The lower structure includes the chassis and the main support arm. The main support arm is arranged in the middle of the front end of the car body, and can swing left and right at a certain angle to realize the assembly and positioning of the arch frame. The chassis is equipped with front and rear telescopic outriggers, and the front telescopic outriggers can also expand and contract in the width direction of the car body. In the working state, the front and rear props are fully extended to increase the stability during work.

本实施例中的控制系统包括液压控制系统和电气控制系统,主支撑臂200采用电比例控制阀进行电比例控制;副支撑臂200和拼装夹具头203均采用电比例控制阀和流量阀双重控制,实现电比例控制和微动控制,更利于拱架的拼装和螺栓孔的对接;其动力系统为柴电双动力系统。The control system in this embodiment includes a hydraulic control system and an electrical control system. The main support arm 200 adopts an electric proportional control valve for electric proportional control; , to achieve electric proportional control and micro-control, which is more conducive to the assembly of arches and the docking of bolt holes; its power system is a diesel-electric dual power system.

在本实施例中的拼装夹具头为多种结构,主支撑臂上的拼装夹具头和副支撑臂上的拼装夹具头结构针对不同的工况和作用,采用不同或相同结构的拼装夹具头,本实施例中的拼装夹具头的其中一种结构为:该拼装夹具头包括枢接设置在回转台201上的夹具摆臂401、驱动夹具摆臂俯仰动作的夹具俯仰油缸402、枢接设置在夹具摆臂端部的夹具头407、以及设置在夹具头与夹具摆臂之间的抬头油缸403;所述夹具头前端开设有呈U型的夹持槽404,在夹持槽两侧设置有夹持块405和驱动夹持块的夹紧油缸406。The assembly jig head in this embodiment has multiple structures. The assembly jig head on the main support arm and the assembly jig head structure on the auxiliary support arm adopt different or the same structure of the assembly jig head for different working conditions and functions. One of the structures of the assembled jig head in this embodiment is: the assembled jig head includes a jig swing arm 401 pivotally arranged on the turntable 201, a jig pitch cylinder 402 for driving the jig swing arm to pitch, The clamp head 407 at the end of the clamp swing arm, and the lifting oil cylinder 403 arranged between the clamp head and the clamp swing arm; the front end of the clamp head is provided with a U-shaped clamping groove 404, and there are A clamping block 405 and a clamping oil cylinder 406 for driving the clamping block.

第二种拼装夹具头的结构为:该拼装夹具头包括固定设置在回转台201上的固定架411、枢接设置在固定架上的摆动架412、驱动摆动架俯仰动作的夹具俯仰油缸402、枢接设置在摆动架端部的夹具头和抬头油缸403;夹具头包括枢接设置在摆动架前端的固定夹具头413、枢接在固定夹具头上的活动夹具头414和设置在固定夹具头和活动夹具头之间的夹紧油缸405;抬头油缸403设置在固定夹具头和摆动架之间。The structure of the second type of assembled jig head is: the assembled jig head includes a fixed frame 411 fixedly arranged on the turntable 201, a swing frame 412 pivotally arranged on the fixed frame, a jig pitch cylinder 402 for driving the swing frame to pitch, The clamp head and the lifting cylinder 403 which are pivotally arranged at the end of the swing frame; and the clamping cylinder 405 between the movable clamp head; the lifting cylinder 403 is arranged between the fixed clamp head and the swing frame.

本实施例中的其夹持块、固定夹具头、活动夹具头均为尼龙或橡胶块,能够有效的增加夹持摩擦力,拼装夹具头相对于回转台能够实现100°~130°范围内的旋转调整。In this embodiment, the clamping block, the fixed clamp head, and the movable clamp head are all nylon or rubber blocks, which can effectively increase the clamping friction, and the assembled clamp head can achieve a rotation within the range of 100°~130° relative to the rotary table. Rotate to adjust.

本实施例在进行钢拱架拼装过程中,为了便于操作施工,可以在回转台201上设置有辅助拼装托架,所述辅助拼装托架包括设置在回转台上的托架支座421、枢接设置在托架支座上的托举杆422和设置在托举杆与托架支座之间的托举油缸423。In this embodiment, during the steel arch assembly process, in order to facilitate the operation and construction, an auxiliary assembly bracket can be provided on the turntable 201, and the auxiliary assembly bracket includes a bracket support 421, a pivot Connect the lifting rod 422 arranged on the bracket support and the lifting oil cylinder 423 arranged between the lifting rod and the bracket support.

进一步的,如图9-图11所示,本申请还公开了一种隧道钢拱架施工方法,隧道钢拱架施工方法为利用上述的隧道用三臂三篮钢拱架安装机的钢拱架的夹取拼装方法。Further, as shown in Figures 9-11, this application also discloses a tunnel steel arch construction method. The tunnel steel arch construction method is to use the steel arch of the above-mentioned three-arm three-basket steel arch installation machine for tunnels. The clamping and assembling method of the rack.

以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明的范围内。本发明要求的保护范围由所附的权利要求书及其等同物界定。The basic principles, main features and advantages of the present invention have been shown and described above. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments. What are described in the above-mentioned embodiments and the description are only the principles of the present invention. Variations and improvements, which fall within the scope of the claimed invention. The scope of protection required by the present invention is defined by the appended claims and their equivalents.

Claims (10)

1.一种隧道用三臂三篮钢拱架安装机,其特征在于,包括:1. A three-arm three-basket steel arch installation machine for tunnels, characterized in that it comprises: 底盘,所述底盘上设置有驾驶室、动力系统和控制系统;Chassis, the chassis is provided with cab, power system and control system; 主支撑臂,所述主支撑臂设置在底盘前端中部,且主支撑臂相对于底盘能够进行俯仰动作和左右回转动作;所述主支撑臂沿长度方向能够伸缩动作,且在主支撑臂的前端设置有回转台,所述回转台上设置有吊篮和拼装夹具头,所述回转台与主支撑臂之间设置有自平衡系统;The main support arm, the main support arm is arranged in the middle of the front end of the chassis, and the main support arm can perform pitching and left-right rotation movements relative to the chassis; A turntable is provided with a hanging basket and an assembly fixture head on the turntable, and a self-balancing system is arranged between the turntable and the main support arm; 和副支撑臂,所述副支撑臂为对应设置在主支撑臂两侧的两根,所述副支撑臂与底盘之间设置有滑移架,副支撑臂匹配滑动设置在滑移架上,且副支撑臂相对于滑移架能够俯仰动作;所述副支撑臂沿长度方向能够伸缩动作,且在副支撑臂的前端设置有回转台,所述回转台上设置有吊篮和拼装夹具头,所述副支撑臂与对应的回转台之间设置有自平衡系统;and the auxiliary support arm, the auxiliary support arms are two correspondingly arranged on both sides of the main support arm, a sliding frame is arranged between the auxiliary supporting arm and the chassis, and the auxiliary supporting arm is matched and slidably arranged on the sliding frame, And the sub-support arm can pitch relative to the sliding frame; the sub-support arm can move telescopically along the length direction, and a turntable is arranged at the front end of the sub-support arm, and a hanging basket and an assembly fixture head are arranged on the turntable , a self-balancing system is provided between the secondary support arm and the corresponding turntable; 所述自平衡系统使得回转台始终处于水平状态。The self-balancing system keeps the turntable in a horizontal state all the time. 2.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述主支撑臂与底盘之间枢接设置有中撑座,所述中撑座与底盘之间均设置有回转油缸,中撑座与主支撑臂之间均设置有臂梁俯仰油缸。2. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, characterized in that, a middle support is pivotally connected between the main support arm and the chassis, and the distance between the middle support and the chassis is There are rotary oil cylinders between them, and arm beam pitching oil cylinders between the middle support and the main support arm. 3.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述隧道用三臂三篮钢拱架安装机为上下双层结构,所述滑移架与底盘之间设置有支撑柱,滑移架上匹配滑动设置有滑移座,所述副支撑臂枢接设置在滑移座上,且滑移座与副支撑臂之间设置有臂梁俯仰油缸。3. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, characterized in that, the three-arm three-basket steel arch installation machine for tunnels is an upper and lower double-layer structure, and the sliding frame and A support column is set between the chassis, and a sliding seat is matched and slidably arranged on the sliding frame, and the auxiliary support arm is pivotally arranged on the sliding seat, and an arm beam pitching oil cylinder is arranged between the sliding seat and the auxiliary supporting arm . 4.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述控制系统包括液压控制系统和电气控制系统,所述主支撑臂采用电比例控制阀进行电比例控制;所述副支撑臂和拼装夹具头均采用电比例控制阀和流量阀双重控制,实现电比例控制和微动控制;所述动力系统为柴电双动力系统。4. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, wherein the control system includes a hydraulic control system and an electrical control system, and the main support arm adopts an electric proportional control valve for electric control. Proportional control; the auxiliary support arm and the assembly fixture head are both controlled by electric proportional control valves and flow valves to realize electric proportional control and inching control; the power system is a diesel-electric dual power system. 5.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述自平衡系统为设置在回转台与对应的主支撑臂或副支撑臂之间的调平油缸,所述调平油缸与驱动主支撑臂或副支撑臂俯仰动作的臂梁俯仰油缸并行联动,当臂梁俯仰油缸进行伸缩动作时,对应的调平油缸同步伸缩动作,使得回转台保持水平状态。5. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, wherein the self-balancing system is a leveling system installed between the turntable and the corresponding main support arm or auxiliary support arm. Oil cylinder, the leveling oil cylinder is linked in parallel with the arm beam pitching oil cylinder that drives the main support arm or the auxiliary support arm to pitch. When the arm beam pitching oil cylinder performs telescopic movement, the corresponding leveling oil cylinder synchronously telescopically moves, so that the turntable remains horizontal state. 6.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述底盘上设置有两个驾驶室,两个所述驾驶室分别相向设置在底盘的两端,并分别控制两个方向的行走;所述底盘为轮式底盘,且在底盘底部设置有伸缩支腿;所述主支撑臂和副支撑臂均为两级伸缩结构,并通过伸缩油缸驱动。6. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, characterized in that two cabs are arranged on the chassis, and the two cabs are respectively arranged at opposite ends of the chassis , and control the walking in two directions respectively; the chassis is a wheeled chassis, and telescopic outriggers are arranged at the bottom of the chassis; the main support arm and the auxiliary support arm are two-stage telescopic structures, and are driven by telescopic oil cylinders. 7.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述拼装夹具头包括枢接设置在回转台上的夹具摆臂、驱动夹具摆臂俯仰动作的夹具俯仰油缸、枢接设置在夹具摆臂端部的夹具头、以及设置在夹具头与夹具摆臂之间的抬头油缸;所述夹具头前端开设有呈U型的夹持槽,在夹持槽两侧设置有夹持块和驱动夹持块的夹紧油缸。7. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, wherein the assembly jig head includes a jig swing arm pivotally arranged on the turntable, and a device for driving the jig swing arm to pitch. The jig pitch cylinder, the jig head pivotally arranged at the end of the jig swing arm, and the head-up cylinder set between the jig head and the jig swing arm; the front end of the jig head is provided with a U-shaped clamping groove. A clamping block and a clamping oil cylinder for driving the clamping block are arranged on both sides of the groove. 8.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述拼装夹具头包括固定设置在回转台上的固定架、枢接设置在固定架上的摆动架、驱动摆动架俯仰动作的夹具俯仰油缸、枢接设置在摆动架端部的夹具头和抬头油缸;所述夹具头包括枢接设置在摆动架前端的固定夹具头、枢接在固定夹具头上的活动夹具头和设置在固定夹具头和活动夹具头之间的夹紧油缸;所述抬头油缸设置在固定夹具头和摆动架之间。8. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, wherein the assembly jig head includes a fixed frame fixed on the turntable, and a swinging frame pivotally arranged on the fixed frame. Frame, the jig pitching cylinder that drives the swing frame to pitch, the jig head and head oil cylinder that are pivotally arranged at the end of the swing frame; the jig head includes a fixed jig head that is pivotally arranged The upper movable clamp head and the clamping cylinder arranged between the fixed clamp head and the movable clamp head; the lifting cylinder is arranged between the fixed clamp head and the swing frame. 9.根据权利要求1所述的隧道用三臂三篮钢拱架安装机,其特征在于,所述回转台上设置有辅助拼装托架,所述辅助拼装托架包括设置在回转台上的托架支座、枢接设置在托架支座上的托举杆和设置在托举杆与托架支座之间的托举油缸。9. The three-arm three-basket steel arch installation machine for tunnels according to claim 1, wherein an auxiliary assembly bracket is provided on the turntable, and the auxiliary assembly bracket includes a The bracket support, the lifting rod pivotally arranged on the bracket support and the lifting oil cylinder arranged between the lifting rod and the bracket support. 10.一种隧道钢拱架施工方法,其特征在于:所述隧道钢拱架施工方法为利用权利要求1-9任一所述的隧道用三臂三篮钢拱架安装机的钢拱架的夹取拼装方法。10. A tunnel steel arch construction method, characterized in that: said tunnel steel arch construction method is to use the steel arch of the three-arm three-basket steel arch installation machine for tunnels according to any one of claims 1-9 The clamping and assembling method.
CN201711037224.XA 2017-10-30 2017-10-30 Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method Pending CN107654246A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711037224.XA CN107654246A (en) 2017-10-30 2017-10-30 Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711037224.XA CN107654246A (en) 2017-10-30 2017-10-30 Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method

Publications (1)

Publication Number Publication Date
CN107654246A true CN107654246A (en) 2018-02-02

Family

ID=61096108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711037224.XA Pending CN107654246A (en) 2017-10-30 2017-10-30 Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method

Country Status (1)

Country Link
CN (1) CN107654246A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661678A (en) * 2018-07-23 2018-10-16 中国铁建重工集团有限公司 Tunneling equipment and its support system
CN108798729A (en) * 2018-08-06 2018-11-13 中国铁建重工集团有限公司 Arch installs trolley
CN109209451A (en) * 2018-09-11 2019-01-15 中国铁建重工集团有限公司 A kind of hanging basket and tunnel arch install trolley
CN109458218A (en) * 2018-09-12 2019-03-12 中国铁建重工集团有限公司 Straight arm type heavy duty Multipurpose tunnel operating platform
CN109538252A (en) * 2018-11-20 2019-03-29 四川蓝海智能装备制造有限公司 The erection method of multi-functional arch trolley and more Pin arches
CN109989774A (en) * 2019-05-16 2019-07-09 中国铁建重工集团股份有限公司 Hang waterproof board tunnel and lay platform truck
CN110159321A (en) * 2019-05-14 2019-08-23 中铁工程装备集团隧道设备制造有限公司 A kind of tunnel arch fitting machine slipping mechanism

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205805588U (en) * 2016-07-20 2016-12-14 北京新能正源环境科技有限公司 Bow member chassis mechanical hand and bow member chassis
CN106761855A (en) * 2017-01-09 2017-05-31 北京新能正源环境科技有限公司 Bow member chassis
US20170152745A1 (en) * 2014-06-30 2017-06-01 Sandvik Intelectual Property Ab Tunnel support installation apparatus
CN107023309A (en) * 2017-06-19 2017-08-08 成都市新筑混凝土机械设备有限公司 Bow member installs chassis
CN107060844A (en) * 2017-06-06 2017-08-18 中铁工程装备集团隧道设备制造有限公司 Tunnel the basket steel arch-shelf fitting machine of two-arm two and steel arch frame construction method
CN207406359U (en) * 2017-10-30 2018-05-25 中铁工程装备集团隧道设备制造有限公司 Tunnel three arms, three basket steel arch-shelf fitting machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170152745A1 (en) * 2014-06-30 2017-06-01 Sandvik Intelectual Property Ab Tunnel support installation apparatus
CN205805588U (en) * 2016-07-20 2016-12-14 北京新能正源环境科技有限公司 Bow member chassis mechanical hand and bow member chassis
CN106761855A (en) * 2017-01-09 2017-05-31 北京新能正源环境科技有限公司 Bow member chassis
CN107060844A (en) * 2017-06-06 2017-08-18 中铁工程装备集团隧道设备制造有限公司 Tunnel the basket steel arch-shelf fitting machine of two-arm two and steel arch frame construction method
CN107023309A (en) * 2017-06-19 2017-08-08 成都市新筑混凝土机械设备有限公司 Bow member installs chassis
CN207406359U (en) * 2017-10-30 2018-05-25 中铁工程装备集团隧道设备制造有限公司 Tunnel three arms, three basket steel arch-shelf fitting machine

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661678A (en) * 2018-07-23 2018-10-16 中国铁建重工集团有限公司 Tunneling equipment and its support system
CN108798729A (en) * 2018-08-06 2018-11-13 中国铁建重工集团有限公司 Arch installs trolley
CN108798729B (en) * 2018-08-06 2024-06-14 中国铁建重工集团股份有限公司 Arch frame mounting trolley
CN109209451A (en) * 2018-09-11 2019-01-15 中国铁建重工集团有限公司 A kind of hanging basket and tunnel arch install trolley
CN109458218A (en) * 2018-09-12 2019-03-12 中国铁建重工集团有限公司 Straight arm type heavy duty Multipurpose tunnel operating platform
CN109538252A (en) * 2018-11-20 2019-03-29 四川蓝海智能装备制造有限公司 The erection method of multi-functional arch trolley and more Pin arches
CN109538252B (en) * 2018-11-20 2023-10-27 四川蓝海智能装备制造有限公司 Multifunctional arch frame trolley and erection method of multiple arch frames
CN110159321A (en) * 2019-05-14 2019-08-23 中铁工程装备集团隧道设备制造有限公司 A kind of tunnel arch fitting machine slipping mechanism
CN109989774A (en) * 2019-05-16 2019-07-09 中国铁建重工集团股份有限公司 Hang waterproof board tunnel and lay platform truck

Similar Documents

Publication Publication Date Title
CN107654246A (en) Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method
CN107842311B (en) Multifunctional tunnel rock drilling and arch erecting integrated machine
CN107060844B (en) Two-arm two-basket steel arch installing machine for tunnel and steel arch construction method
CN104747078B (en) A kind of tunnel construction trolley
CN104879061A (en) Multifunctional self-propelled portal wagon drill
CN108131153A (en) A kind of multifunctional tunnel working vehicle
CN204716251U (en) Circular orbit formula multifunctional rock drilling trolley
CN102094579A (en) Full-hydraulic tire rock drilling anchoring drill carriage
CN101832102A (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN110130965B (en) A kind of advanced support bracket for comprehensive mechanized excavation and using method
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN207406359U (en) Tunnel three arms, three basket steel arch-shelf fitting machine
CN105587328B (en) One kind suspension mining multi-arm roofboltier of beam type
CN113530575B (en) An arch installation trolley for tunnel multi-function construction
CN107514264A (en) A kind of new Multifunctional performing machine for constructing tunnel
CN103470184B (en) Double-arm hydraulic tunneling jumbo
CN201953311U (en) All-hydraulic rubber-tyred rock drilling anchoring boring rig
CN113530552B (en) A tunnel comprehensive excavation trolley
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN204703761U (en) A kind of tunnel construction trolley
CN202688884U (en) Back support leg walking support lifting mechanism of highway bridge girder erection machine
CN113530553B (en) A three-step construction technology based on a tunnel excavation and support integrated trolley
CN218909684U (en) Lifting and high-altitude platform collaborative operation integrated vehicle
CN204716132U (en) Gantry type multifunctional rock drilling trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180202

RJ01 Rejection of invention patent application after publication