CN107476774A - The processing method of burying in a kind of drill-pouring work progress mesopore - Google Patents
The processing method of burying in a kind of drill-pouring work progress mesopore Download PDFInfo
- Publication number
- CN107476774A CN107476774A CN201710750291.XA CN201710750291A CN107476774A CN 107476774 A CN107476774 A CN 107476774A CN 201710750291 A CN201710750291 A CN 201710750291A CN 107476774 A CN107476774 A CN 107476774A
- Authority
- CN
- China
- Prior art keywords
- drill bit
- hole
- small
- steel wire
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 10
- 238000000034 method Methods 0.000 claims abstract description 10
- 238000004140 cleaning Methods 0.000 claims abstract description 6
- 239000013049 sediment Substances 0.000 claims abstract description 6
- 239000002689 soil Substances 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 39
- 239000010959 steel Substances 0.000 claims description 39
- 238000005553 drilling Methods 0.000 claims description 16
- 239000000725 suspension Substances 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 5
- 239000002023 wood Substances 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims 1
- 239000011248 coating agent Substances 0.000 abstract description 4
- 238000000576 coating method Methods 0.000 abstract description 4
- 239000002893 slag Substances 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B31/00—Fishing for or freeing objects in boreholes or wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Marine Sciences & Fisheries (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
The processing method of burying, this method comprise the following steps in a kind of drill-pouring work progress mesopore:Step 1:Determine that drill bit is embedded in the depth in hole;Step 2:Determine the depth that drill bit is buried by dilapidation;Step 3:Drill bit is set to be in upward stress;Step 4:Small drill bit is set down to be crept into along hole wall side;Step 5:Slag tap;Step 6:Repeat the above steps 4 and 5, then the drill two holes around hole wall;Step 7:Cleaning eye bottom sediment;Step 8:Drill bit is set to be in maximum weighted state;Step 9:Loosen the soil layer around bottom hole drill bit;Step 10:Continue down to pound to drill bit repeatedly using small drill bit, until drill bit can take out completely;Complete the processing of burying.The technical problems to be solved by the invention are to provide a kind of processing method of burying in drill-pouring work progress mesopore, can solve the problems, such as that coating occurs burying and can not taken out, operation is simple, without the use of large scale equipment, greatly reduces cost.
Description
Technical field
The present invention relates to bored pile construction field, the place of burying in especially a kind of drill-pouring work progress mesopore
Reason method.
Background technology
Using percussive drill coating in carry out bored pile construction when, due to around hole wall soil layer it is uneven
Property, collapse hole accident often occurs.In generation hole during collapse hole accident, if drill bit can not take out in time in hole, often occur
Underground drilling accident.Traditional treatment method is to use the timely borehole cleaning of air compressor machine, then acts method of pulling out using strength, explosion rises and pulled out at method
Reason, but for collapsed in hole collapse that thing is more and dilapidation based on block stone, rubble and sandy gravel, drill bit buried depth it is larger when, take
The method of stating is difficult to success.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of processing side of burying in drill-pouring work progress mesopore
Method, can solve the problems, such as that coating occurs burying and can not taken out, operation is simple, without the use of large scale equipment, drops significantly
Low cost.
In order to solve the above technical problems, the technical solution adopted in the present invention is:A kind of drill-pouring work progress mesopore
The processing method of interior burying, this method comprise the following steps:
Step 1:During bored pile construction, after underground drilling accident in hole occurs for drilling, first according to suspension drill bit
Mark on steel wire rope, determine that drill bit is embedded in the depth H in hole;
Step 2:The hole depth after collapse hole occurs is measured with lining rope in aperture, determines the depth h that drill bit is buried by dilapidation;
Step 3:The steel wire rope of suspension drill bit is cut off in aperture, steel wire rope is divided into the first steel wire rope and the second steel wire rope, and will
First steel wire rope of suspension drill bit is suspended on drilling machine mast with guide chain cucurbit, and drill bit is in upward stress;
Step 4:Small drill bit is hung on the second steel wire rope, and guider is set up with the lumps of wood in aperture, changes the second steel wire rope
Direction, small drill bit is down crept into along hole wall side, drilling depth exceed institute's burying head bottom;
Step 5:Small drill bit is proposed, is positioned over outside drilling, small draw tube will be hung on draw tube hoisting rope, to the small drill bit of step 4
Slagged tap in the hole drilled out;
Step 6:Repeat the above steps 4 and 5, then the drill two holes around hole wall, and above-mentioned two hole is together with the hole that step 5 obtains
Arranged in equilateral triangle;
Step 7:The small drill bit hung on second steel wire rope is replaced by flat chisel, removing small drill bit around hole wall using flat chisel does not have
The sediment in place is got into, and the small draw tube 10 on draw tube hoisting rope is put to cleaning eye bottom sediment in hole;
Step 8:Flat chisel is unloaded, the guider in aperture is removed, fixes percussive drill, by the first steel wire rope and the second steel wire rope
Connection forms steel wire rope, is lifted up drill bit, drill bit is in maximum weighted state;
Step 9:Small draw tube on draw tube hoisting rope is unloaded, changes small drill bit, transfers to bottom hole, then lifting is small up and down
Drill bit, pound to the drill bit being embedded in hole, make to shake caused by it, loosen the soil layer around bottom hole drill bit;
Step 10:Pounding into hole during drill bit, observing the mark situation of change on steel wire rope, up moved when marking,
Then continue up to lift drill bit, be at maximum weighted state, then continue down to pound repeatedly to drill bit using small drill bit, directly
It can be taken out completely to drill bit;
Complete the processing of burying.
Small drill bit is the drill bit of 30 centimetres of diameter.
Small draw tube is the draw tube of 25 centimetres of diameter.
The processing method of burying in a kind of drill-pouring work progress mesopore provided by the invention, using small drill bit, flat chisel
And small draw tube removes the dilapidation around drill bit, condition is created for processing burying;Up lifting hole subdrilling head, is at most
Big upward stress, drill bit in hole is down pounded by small drill bit repeatedly, is made to shake caused by drill bit, is loosened bottom hole drill bit week
The soil layer enclosed, reach the purpose for taking out drill bit;Can solve the problems, such as that coating occurs burying and can not taken out, it is simple to operate easy
OK, without the use of large scale equipment, cost is greatly reduced.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic diagram of step 1 of the present invention and step 2;
Fig. 2 is the schematic diagram of step 3 of the present invention;
Fig. 3 is the schematic diagram of step 4 of the present invention;
Fig. 4 is the schematic diagram of step 5 of the present invention;
Fig. 5 is the schematic diagram of step 7 of the present invention;
Fig. 6 is that step 9 of the present invention and step 10 use small drill bit down to pound the schematic diagram to drill bit repeatedly.
Embodiment
As shown in figs 1 to 6, in a kind of drill-pouring work progress mesopore burying processing method, this method include it is following
Step:
Step 1:During bored pile construction, after underground drilling accident in hole occurs for drilling, first according to suspension drill bit 1
Mark 3 on steel wire rope 2, determine that drill bit 1 is embedded in the depth H in hole;
Step 2:The hole depth after collapse hole occurs is measured with lining rope 4 in aperture, determines the depth h that drill bit 1 is buried by dilapidation;
Step 3:The steel wire rope 2 of suspension drill bit 1 is cut off in aperture, steel wire rope 2 is divided into the first steel wire rope 11 and the second steel wire rope
12, and the first steel wire rope 11 for hanging drill bit 1 is suspended on drilling machine mast 6 with guide chain cucurbit 5, and it is in drill bit 1
Upward stress;
Step 4:Small drill bit 7 is hung on the second steel wire rope 12, and guider 8 is set up with the lumps of wood in aperture, changes the second steel
The direction of cord 12, small drill bit 7 is set down to be crept into along hole wall side, drilling depth exceedes the bottom of institute's burying first 1;
Step 5:Small drill bit 7 is proposed, is positioned over outside drilling, small draw tube 9 will be hung on draw tube hoisting rope 13, it is small to step 4
Slagged tap in the hole that drill bit 7 drills out;
Step 6:Repeat the above steps 4 and 5, then the drill two holes around hole wall, and above-mentioned two hole is together with the hole that step 5 obtains
Arranged in equilateral triangle;
Step 7:The small drill bit 7 hung on second steel wire rope 12 is replaced by flat chisel 10, removed using flat chisel 10 small around hole wall
Drill bit 7 does not get into the sediment in place, and the small draw tube 9 on draw tube hoisting rope 13 is put to cleaning eye bottom in hole and sunk
Slag;
Step 8:Flat chisel 10 is unloaded, the guider 8 in aperture is removed, fixes percussive drill, by the first steel wire rope 11 and second
The connection of steel wire rope 12 forms steel wire rope 2, is lifted up drill bit 1, drill bit 1 is in maximum weighted state;
Step 9:Small draw tube 9 on draw tube hoisting rope 13 is unloaded, small drill bit 7 is changed, transfers to bottom hole, is then carried up and down
Small drill bit 7 is risen, is pounded to the drill bit 1 being embedded in hole, makes to shake caused by it, loosens the soil layer around bottom hole drill bit 1;
Step 10:Pounding into hole during drill bit 1, observing the situation of change of mark 3 on steel wire rope 2, moved up when mark 3 is past
It is dynamic, then continue up to lift drill bit 1, be at maximum weighted state, then continue down to pound repeatedly to brill using small drill bit 7
First 1, until drill bit 1 can take out completely;
Complete the processing of burying.
Small drill bit 7 is the drill bit of 30 centimetres of diameter.
Small draw tube 9 is the draw tube of 25 centimetres of diameter.
Claims (3)
1. the processing method of burying in a kind of drill-pouring work progress mesopore, it is characterised in that this method comprises the following steps:
Step 1:During bored pile construction, after underground drilling accident in hole occurs for drilling, first according to suspension drill bit(1)
Steel wire rope(2)On mark(3), determine drill bit(1)The depth H being embedded in hole;
Step 2:In aperture lining rope(4)Hole depth after collapse hole occurs for measurement, determines drill bit(1)The depth h buried by dilapidation;
Step 3:Suspension drill bit is cut off in aperture(1)Steel wire rope(2), make steel wire rope(2)It is divided into the first steel wire rope(11)With
Two steel wire ropes(12), and drill bit will be hung(1)The first steel wire rope(11)With guide chain cucurbit(5)It is suspended on drilling machine mast
(6)On, and make drill bit(1)In upward stress;
Step 4:In the second steel wire rope(12)The upper small drill bit of suspension(7), and set up guider with the lumps of wood in aperture(8), change
Second steel wire rope(12)Direction, make small drill bit(7)Down crept into along hole wall side, drilling depth exceedes institute's burying head(1)'s
Bottom;
Step 5:It is proposed small drill bit(7), it is positioned over outside drilling, by draw tube hoisting rope(13)The upper small draw tube of suspension(9), to step
Rapid 4 small drill bit(7)Slagged tap in the hole drilled out;
Step 6:Repeat the above steps 4 and 5, then the drill two holes around hole wall, and above-mentioned two hole is together with the hole that step 5 obtains
Arranged in equilateral triangle;
Step 7:By the second steel wire rope(12)The small drill bit of upper suspension(7)It is replaced by flat chisel(10), using flat chisel(10)Cleaning hole
Small drill bit around wall(7)The sediment in place is not got into, and by draw tube hoisting rope(13)On small draw tube(9)Put to hole
Interior cleaning eye bottom sediment;
Step 8:Unload flat chisel(10), remove the guider in aperture(8), percussive drill is fixed, by the first steel wire rope(11)
With the second steel wire rope(12)Connection forms steel wire rope(2), it is lifted up drill bit(1), make drill bit(1)In maximum weighted state;
Step 9:By draw tube hoisting rope(13)On small draw tube(9)Unload, change small drill bit(7), bottom hole is transferred to, then
Small drill bit is lifted up and down(7), pound to the drill bit being embedded in hole(1), make to shake caused by it, loosen bottom hole drill bit(1)Around
Soil layer;
Step 10:Pounding the drill bit into hole(1)During, observe steel wire rope(2)On mark(3)Situation of change, work as mark
(3)Up move, then continue up to lift drill bit(1), maximum weighted state is at, then using small drill bit(7)Continue
Down pound repeatedly to drill bit(1), until drill bit(1)It can take out completely;
Complete the processing of burying.
2. the processing method of burying in a kind of drill-pouring work progress mesopore according to claim 1, it is characterised in that:
Small drill bit(7)For 30 centimetres of drill bit of diameter.
3. the processing method of burying in a kind of drill-pouring work progress mesopore according to claim 1, it is characterised in that:
Small draw tube(9)For 25 centimetres of draw tube of diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710750291.XA CN107476774B (en) | 2017-08-28 | 2017-08-28 | The processing method of burying in a kind of drill-pouring work progress mesoporous |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710750291.XA CN107476774B (en) | 2017-08-28 | 2017-08-28 | The processing method of burying in a kind of drill-pouring work progress mesoporous |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107476774A true CN107476774A (en) | 2017-12-15 |
CN107476774B CN107476774B (en) | 2019-10-25 |
Family
ID=60603761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710750291.XA Active CN107476774B (en) | 2017-08-28 | 2017-08-28 | The processing method of burying in a kind of drill-pouring work progress mesoporous |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107476774B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764819A (en) * | 2020-05-11 | 2020-10-13 | 中交路桥建设有限公司 | Buried drilling treatment method for collapsed hole of pile foundation in aeolian sand stratum |
CN112112593A (en) * | 2020-09-28 | 2020-12-22 | 中国十七冶集团有限公司 | Method for processing percussion drill hole-forming buried drill |
CN112127811A (en) * | 2020-09-25 | 2020-12-25 | 中国一冶集团有限公司 | Limiting device and using method thereof |
CN115450579A (en) * | 2022-10-18 | 2022-12-09 | 中铁三局集团有限公司 | Construction method for safely and quickly salvaging percussion drill bit |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0411560B1 (en) * | 1989-08-03 | 1994-05-04 | TREVI S.p.A. | Apparatus for consolidating soil |
CN101368386A (en) * | 2007-08-16 | 2009-02-18 | 江苏华东建设基础工程总公司 | Pile extractor and construction method for pile extraction |
CN101550697A (en) * | 2008-04-03 | 2009-10-07 | 上海宝冶建设有限公司 | Pulling-out method of underground piles by sleeving, vibrating and punching |
CN203248054U (en) * | 2013-05-02 | 2013-10-23 | 葛洲坝集团基础工程有限公司 | Hammering construction device |
CN105862862A (en) * | 2016-04-06 | 2016-08-17 | 广东省建筑工程机械施工有限公司 | Salvage method for large-diameter pile buried hammer |
CN105888595A (en) * | 2016-06-29 | 2016-08-24 | 中国冶集团有限公司 | Special device and method for fishing drill bit of rotary drilling rig in case of drilling blocking |
CN106948347A (en) * | 2017-04-01 | 2017-07-14 | 南京瑞迪建设科技有限公司 | Pile extracting method and pile pulling system |
-
2017
- 2017-08-28 CN CN201710750291.XA patent/CN107476774B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0411560B1 (en) * | 1989-08-03 | 1994-05-04 | TREVI S.p.A. | Apparatus for consolidating soil |
CN101368386A (en) * | 2007-08-16 | 2009-02-18 | 江苏华东建设基础工程总公司 | Pile extractor and construction method for pile extraction |
CN101550697A (en) * | 2008-04-03 | 2009-10-07 | 上海宝冶建设有限公司 | Pulling-out method of underground piles by sleeving, vibrating and punching |
CN203248054U (en) * | 2013-05-02 | 2013-10-23 | 葛洲坝集团基础工程有限公司 | Hammering construction device |
CN105862862A (en) * | 2016-04-06 | 2016-08-17 | 广东省建筑工程机械施工有限公司 | Salvage method for large-diameter pile buried hammer |
CN105888595A (en) * | 2016-06-29 | 2016-08-24 | 中国冶集团有限公司 | Special device and method for fishing drill bit of rotary drilling rig in case of drilling blocking |
CN106948347A (en) * | 2017-04-01 | 2017-07-14 | 南京瑞迪建设科技有限公司 | Pile extracting method and pile pulling system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764819A (en) * | 2020-05-11 | 2020-10-13 | 中交路桥建设有限公司 | Buried drilling treatment method for collapsed hole of pile foundation in aeolian sand stratum |
CN111764819B (en) * | 2020-05-11 | 2021-12-10 | 中交路桥建设有限公司 | Buried drilling treatment method for collapsed hole of pile foundation in aeolian sand stratum |
CN112127811A (en) * | 2020-09-25 | 2020-12-25 | 中国一冶集团有限公司 | Limiting device and using method thereof |
CN112112593A (en) * | 2020-09-28 | 2020-12-22 | 中国十七冶集团有限公司 | Method for processing percussion drill hole-forming buried drill |
CN115450579A (en) * | 2022-10-18 | 2022-12-09 | 中铁三局集团有限公司 | Construction method for safely and quickly salvaging percussion drill bit |
Also Published As
Publication number | Publication date |
---|---|
CN107476774B (en) | 2019-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2906026Y (en) | Double-barrel hard rock core drill for large-diameter pile hole | |
CN107476774B (en) | The processing method of burying in a kind of drill-pouring work progress mesoporous | |
WO2009049470A1 (en) | A bored pile drilling machine | |
CN204753589U (en) | A static pressure stake machine complete machine is planted in reaming | |
CN106400803A (en) | Integral cast-in-situ bored pile head breaking process | |
CN105569560A (en) | Full casing type long auger drilled pile driver and construction method using the pile driver | |
CN106088125B (en) | Soil body underwater demolition drawing out soil equipment and its method immediately below the cutting shoe of open caisson | |
CN106869126A (en) | The quick green construction remove device on the waste and old basis in city | |
CN1963044A (en) | Construction method for withdrawal of waste pile | |
CN105113976B (en) | Wire brush bit convolution rig and solve burying, fall bore, the method for bit freezing | |
CN104278676A (en) | Real-time treatment method and equipment of bored pile head | |
CN207934087U (en) | A kind of water mill bores the constructing structure of cooperation manually digging hole | |
CN102926654B (en) | Pile Hole Ring Cutting System and Pile Hole Ring Cutting Method | |
CN110984893A (en) | Punching and grabbing drilling device and using method thereof | |
CN105421457B (en) | Spiral pile tube fetches earth machine | |
KR102178354B1 (en) | Pile pullout apparatus | |
CN108086309B (en) | Mini pile reinforcement cage installation method | |
CN117702739A (en) | Deep loose soil layer multistage steel casing embedding method | |
CN218376319U (en) | Telescopic drill rod reverse circulation down-the-hole hammer drilling machine | |
CN215632834U (en) | Drill rod lifting and lowering device for drilling process of down-the-hole hammer of rotary drilling rig | |
CN206617118U (en) | A kind of large diameter borehole drill bit with boring mud fishing device | |
JP2005281972A (en) | Reverse circulation drill | |
JP2018204320A (en) | Pile driving machine and pile driving method | |
JPH0941859A (en) | Hard rock layer drilling method and its device | |
CN113530476A (en) | A drill pipe lifting and lowering drilling device for rotary drilling rig down-the-hole hammer drilling process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 443000 Hubei city of Yichang Province, Jianshe Road No. 40 Applicant after: China Gezhouba Group Municipal Engineering Co., Ltd. Address before: 443000 Hubei city of Yichang Province, Jianshe Road No. 40 Applicant before: CGGC FOUNDATION ENGINEERING CO., LTD. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |