[go: up one dir, main page]

CN107178208A - Workbench for high-rise building construction and construction method thereof - Google Patents

Workbench for high-rise building construction and construction method thereof Download PDF

Info

Publication number
CN107178208A
CN107178208A CN201610138340.XA CN201610138340A CN107178208A CN 107178208 A CN107178208 A CN 107178208A CN 201610138340 A CN201610138340 A CN 201610138340A CN 107178208 A CN107178208 A CN 107178208A
Authority
CN
China
Prior art keywords
construction
workbench
storage area
template die
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610138340.XA
Other languages
Chinese (zh)
Other versions
CN107178208B (en
Inventor
黄天祥
黄慧敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOULIHUA BUILDING MATERIALS (HUIZHOU) CO Ltd
Original Assignee
Yau Lee Wah Concrete Precast Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yau Lee Wah Concrete Precast Products Co ltd filed Critical Yau Lee Wah Concrete Precast Products Co ltd
Priority to CN201610138340.XA priority Critical patent/CN107178208B/en
Priority to SG10201603923PA priority patent/SG10201603923PA/en
Publication of CN107178208A publication Critical patent/CN107178208A/en
Application granted granted Critical
Publication of CN107178208B publication Critical patent/CN107178208B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/16Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a workbench for high-rise building construction and a construction method using the workbench, wherein the workbench comprises: the construction platform comprises a supporting frame (2) which is convenient to disassemble or fix on a building, and a construction platform (1) which is fixed on the upper part of the supporting frame (2), wherein the supporting frame (2) is fixed on the upper part of the supporting frame; a railing (11) is fixedly arranged on the outer side of the construction platform (1); the formwork storage area (3) is arranged on the outer side of the supporting frame (2), the formwork storage area (3) is located below the construction platform (1) and protrudes out of the construction platform (1) along the horizontal direction, a concave position capable of containing the formwork is formed, and more than two upright posts (31) for preventing the formwork from turning outwards are fixedly arranged on the outer side of the formwork storage area (3). The workbench for high-rise building construction can greatly save the storage field on the ground of a construction site, reduce the hoisting time of a tower crane and enable the construction to be more convenient and faster.

Description

用于高层建筑施工的工作台及其施工方法 Workbench for high-rise building construction and its construction method

技术领域 technical field

本发明涉及一种建筑施工用的支架结构及其施工方法,特别是涉及一种可用于建筑施工的工作台结构及应用该工作台的施工方法,尤其适用于地面施工场地有限的高层建筑的施工。 The present invention relates to a support structure for building construction and its construction method, in particular to a workbench structure which can be used in building construction and a construction method using the workbench, especially suitable for the construction of high-rise buildings with limited ground construction sites .

背景技术 Background technique

现有技术中,在香港及新加坡等地,建筑施工多采用大型铁板模, 大型铁板模通常使用4mm厚度的钢板做面板,配合角铁、槽钢等型材做骨架受力,组合焊接成整体后,成为尺寸比较大件的模板,用于楼层的结构或非结构墙现浇混凝土施工。使用铁板模施工,比较使用铝模板、木模板施工有明显的优势,在于能大幅提升施工速度,明显提高施工现浇混凝土质量,从而节省施工成本。 In the prior art, in places such as Hong Kong and Singapore, large-scale iron formwork is often used for construction. Large-scale iron formwork usually uses steel plates with a thickness of 4mm as the panels, and uses angle iron, channel steel and other profiles as the skeleton to bear the force, and is combined and welded into a After being integrated, it becomes a formwork with a relatively large size, which is used for the construction of cast-in-place concrete for the structure of the floor or non-structural walls. Compared with aluminum formwork and wood formwork, the use of iron formwork has obvious advantages in that it can greatly increase the construction speed and significantly improve the quality of cast-in-place concrete, thereby saving construction costs.

在使用铁板模施工的时候,建筑外墙因为要安装铁板模,所以要求配套用于支撑铁板模及提供施工人员通道的工作平台。通常,工作平台也使用钢板、角铁、槽钢、工字钢等型材焊接组合而成,通常工作平台通过螺丝或其他连接形式悬挂在建筑施工时的外墙立面上,其基本功能要求能配合支撑铁板模灌注墙身混凝土,同时,能提供工人操作铁板模的工作位置,同时能为工人操作提供安全保障。 When using iron formwork for construction, because iron formwork needs to be installed on the exterior wall of the building, it is required to be equipped with a working platform for supporting the iron formwork and providing access for construction personnel. Usually, the working platform is also welded and combined with steel plates, angle irons, channel steel, I-beams and other profiles. Usually the working platform is hung on the exterior wall facade during building construction by screws or other connection forms. Cooperate with the supporting iron formwork to pour the concrete of the wall body, at the same time, it can provide the working position for the workers to operate the iron formwork, and at the same time provide safety guarantee for the workers to operate.

一般而言,工作台通常设计二层,上层供支撑铁板模及施工楼面用,下层供修补施工板模与混凝土墙的连接位置。特殊情况下,工作台也可以按施工要求设计三层或四层。 Generally speaking, the workbench is usually designed with two floors, the upper floor is used to support the iron formwork and the construction floor, and the lower floor is used to repair the connection position between the construction formwork and the concrete wall. In special cases, the workbench can also be designed with three or four floors according to the construction requirements.

铁板模施工时,通常一层楼面会分成左右两部分,一部分先施工,另一部分后行,如左部分在浇筑混凝土墙身的时候,右部分则施工下一层的楼面等工序。当左部分墙身完成施工后,将左部分墙身使用的大型铁板模通过塔吊吊运到右边部分,施工右边部分的墙身,吊运板模这个工序称为飞模。同时,因应大楼形状等因素,有一些板模并不适合飞到另一部分使用,这部分板模称为寄位板,通常来说,寄位板会用塔吊吊放到地面寄存,到施工使用时,再将其从地面吊到楼面上使用。 During the construction of iron formwork, the floor of the first floor is usually divided into left and right parts, one part is constructed first, and the other part is carried out later. For example, when the left part is pouring the concrete wall, the right part is used for the construction of the next floor. After the construction of the left part of the wall is completed, the large iron formwork used in the left part of the wall is transported to the right part by tower crane, and the construction of the right part of the wall is carried out. The process of lifting the formwork is called flying formwork. At the same time, due to factors such as the shape of the building, some formwork is not suitable for flying to another part. This part of the formwork is called the registration board. Generally speaking, the registration board will be placed on the ground with a tower crane for storage, and it will be used in construction. , then hoist it from the ground to the floor for use.

因此,现有的这种工作台和施工方法需要占用较大的地面空间来存放板模,对于施工场地较小的高层建筑工地尤其不好解决,而且板模要使用塔吊反复上、下吊装,需要占用塔吊较多的时间,不仅费工费时,还增加了施工成本。 Therefore, existing this workbench and construction method need take larger ground space to store formwork, especially difficult solution for the less high-rise construction site of construction site, and formwork will use tower crane to lift up and down repeatedly, It needs to take up a lot of time for the tower crane, which is not only labor-intensive and time-consuming, but also increases the construction cost.

发明内容 Contents of the invention

本发明针对现有技术的缺陷,提供一种可存放暂时不使用的板模的用于高层建筑施工的工作台以及应用该工作台的施工方法。 Aiming at the defects of the prior art, the invention provides a workbench for high-rise building construction that can store temporarily unused formwork and a construction method using the workbench.

本发明的技术方案如下:设计一种用于高层建筑施工的工作台,包括:方便拆卸或固定在建筑物上的支承架、固定在所述支承架上部的施工平台支承架;所述施工平台外侧固设有栏杆;还包括设置在所述支承架外侧的板模存放区,该板模存放区位于所述施工平台的下方并沿水平方向突出于施工平台之外,由此形成可容纳板模的凹位,该板模存放区外侧固设有两根以上防止板模外翻的立柱。 The technical scheme of the present invention is as follows: design a kind of workbench that is used for high-rise building construction, comprise: the support frame that is convenient to disassemble or be fixed on the building, the construction platform support frame that is fixed on the support frame top; The construction platform Railings are fixed on the outside; it also includes a formwork storage area arranged on the outside of the support frame, the formwork storage area is located below the construction platform and protrudes outside the construction platform in the horizontal direction, thereby forming an accommodating plate The concave position of the mold, the outside of the formwork storage area is fixed with more than two columns to prevent the formwork from eversion.

所述立柱的顶部向外弯折。 The top of the column is bent outward.

所述板模存放区具有倾斜底面,该倾斜底面越往内侧越低。 The template storage area has an inclined bottom surface, and the inclined bottom surface becomes lower toward the inner side.

本发明的工作台还包括固定在所述支承架底部的二层平台,所述板模存放区位于该二层平台的外侧。 The workbench of the present invention also includes a second-tier platform fixed at the bottom of the supporting frame, and the formwork storage area is located outside the second-tier platform.

所述板模存放区的底部支承于一底座上,该底座顶面至所述施工平台顶面之间的高差为1.2米至1.5米,所述栏杆顶部高出该施工平台顶面1.1米至1.3米。 The bottom of the formwork storage area is supported on a base, the height difference between the top surface of the base and the top surface of the construction platform is 1.2 meters to 1.5 meters, and the top of the railing is 1.1 meters higher than the top surface of the construction platform to 1.3 meters.

本发明的工作台还包括固设于所述二层平台下方的底层平台,该底层平台的高度为1.7米至1.8米。 The workbench of the present invention also includes a bottom platform fixed under the second-floor platform, and the height of the bottom platform is 1.7 to 1.8 meters.

所述施工平台的栏杆外侧至板模存放区的立柱内侧之间的水平距离为25厘米至35厘米。 The horizontal distance between the outside of the railing of the construction platform and the inside of the column in the formwork storage area is 25 cm to 35 cm.

所述板模存放区的相邻立柱之间的间距为1.3米至1.5米。 The distance between adjacent columns in the formwork storage area is 1.3m to 1.5m.

所述支承架由直杆和斜杆连结而成并通过螺栓固定在建筑物上。 The supporting frame is formed by connecting straight rods and oblique rods and is fixed on the building by bolts.

一种应用上述工作台的施工方法,包括如下步骤: A construction method using the above workbench, comprising the following steps:

a.利用内、外板模完成建筑物某部分混凝土墙体的浇筑后,将适用的板模拆卸并吊装至建筑物的另一部分使用,余下不适用的板模拆卸并吊装至本层工作台的板模存放区内; a. After pouring the concrete wall of a certain part of the building using the inner and outer formwork, disassemble the applicable formwork and hoist it to another part of the building for use, and disassemble the remaining unsuitable formwork and hoist it to the workbench of this floor in the formwork storage area;

b.在上述已完成的墙体顶部完成第N层楼面的施工; b. Complete the construction of the Nth floor on top of the above-mentioned completed wall;

c. 扎第N层墙体钢筋,将所需要的内、外板模从建筑物其他部分以及所述板模存放区处分别吊装至该第N层对应的墙身位置并拼装好,浇筑混凝土,完成该N层墙体的施工。 c. Bind the steel bars of the Nth floor wall, hoist the required inner and outer formwork from other parts of the building and the formwork storage area to the corresponding wall position of the Nth floor and assemble them, and pour concrete , to complete the construction of the N-layer wall.

在所述步骤a之后、步骤b之前,将所述工作台及存放于其上的板模一起吊装至上一层并固定在所述已完成的墙体上。 After step a and before step b, the workbench and the formwork stored thereon are hoisted to the upper floor together and fixed on the completed wall.

与现有技术相比较,本发明的用于高层建筑施工的工作台具有以下有益效果:寄位或飞模的板模在施工不使用时可以直接存放在相应的工作台的板模存放区内,可大大减少施工过程中塔吊的吊运时间和距离,节省了工地地面的存放场地,使施工更方便快捷。 Compared with the prior art, the workbench for high-rise building construction of the present invention has the following beneficial effects: the formwork of the place or flying formwork can be directly stored in the formwork storage area of the corresponding workbench when the construction is not in use , can greatly reduce the lifting time and distance of the tower crane during the construction process, save the storage space on the ground of the construction site, and make the construction more convenient and fast.

附图说明 Description of drawings

图1为本发明用于高层建筑施工的工作台的结构示意图; Fig. 1 is the structural representation of the workbench that the present invention is used for high-rise building construction;

图2为刚完成楼面施工时的示意图; Fig. 2 is a schematic diagram when the floor construction has just been completed;

图3为扎墙体钢筋时的示意图; Fig. 3 is the schematic diagram when tying the wall body reinforcing bar;

图4为吊装板模时的示意图; Fig. 4 is the schematic diagram when hoisting formwork;

图5为拼装板模时的示意图; Fig. 5 is the schematic diagram when assembling formwork;

图6为浇筑墙体混凝土时的示意图; Fig. 6 is the schematic diagram when pouring body of wall concrete;

图7为拆卸并吊装板模时的示意图; Fig. 7 is the schematic diagram when dismounting and hoisting formwork;

图8为吊装工作台时的示意图。 Fig. 8 is a schematic diagram when the workbench is hoisted.

具体实施方式 detailed description

下面结合附图和实施例对本发明作进一步的详细说明。 The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

如图1所示,本发明用于高层建筑施工的工作台主要包括:施工平台1、用于支撑固定所述施工平台1的支承架2、板模存放区3以及二层平台5。其中,所述施工平台1位于最上层,可供人在上面走动以执行施工操作等,其外侧固设有栏杆11。所述支承架2设置在所述施工平台1下方,由多根直杆和斜杆连结成支撑骨架并通过螺栓固定在已达到受力条件的混凝土墙体上,方便拆卸和安装,支承架2的结构考虑了存放板模的重力、自重、活荷载、高处施工风力、工人施工操作的活荷载等,保证达到规范的安全系数要求,符合各地施工规范要求。所述二层平台5固定在支承架2的底部,所述板模存放区3位于所述二层平台5的外侧并沿水平方向突出于施工平台1之外,该施工平台1的栏杆11外侧至板模存放区3的立柱31内侧之间的水平距离为25厘米至35厘米,由此形成可容纳板模的凹位,当然,这个距离可根据板模的尺寸而适当调整,该板模存放区3外侧固设有两根以上立柱31以防止板模向外翻,相邻立柱31之间的间距为1.3米至1.5米,其间距可根据板模的尺寸而适当调整。 As shown in FIG. 1 , the workbench used for high-rise building construction in the present invention mainly includes: a construction platform 1 , a support frame 2 for supporting and fixing the construction platform 1 , a formwork storage area 3 and a second-floor platform 5 . Wherein, the construction platform 1 is located on the uppermost floor, and people can walk on it to perform construction operations, etc., and railings 11 are fixed on the outer side thereof. The support frame 2 is arranged under the construction platform 1, and is connected by a plurality of straight rods and oblique rods to form a support frame and is fixed on the concrete wall that has reached the stress condition by bolts, which is convenient for disassembly and installation. The support frame 2 The structure takes into account the gravity, self-weight, live load of the stored formwork, high construction wind force, live load of workers' construction operations, etc., to ensure that the safety factor requirements of the regulations are met, and the construction specifications of various places are met. The second-floor platform 5 is fixed on the bottom of the support frame 2, the formwork storage area 3 is located outside the second-floor platform 5 and protrudes outside the construction platform 1 in the horizontal direction, and the outside of the railing 11 of the construction platform 1 The horizontal distance to the inside of the column 31 of the formwork storage area 3 is 25 cm to 35 centimeters, thereby forming a recess that can accommodate the formwork. Of course, this distance can be appropriately adjusted according to the size of the formwork. Two or more columns 31 are fixed on the outside of the storage area 3 to prevent the formwork from turning outwards. The spacing between adjacent columns 31 is 1.3 meters to 1.5 meters, and its spacing can be adjusted appropriately according to the size of the formwork.

为了使吊装时比较容易导入板模,所述立柱31的顶部向外弯折形成弯折部34。另外,所述板模存放区3设有倾斜底面32,该倾斜底面32越往内侧越低,由此放入板模71时,如图2所示,该板模71底部会向内滑动,此时再将板模71上部固定于所述施工平台1的栏杆11上,即可使得板模71大致呈竖向方式放置。 In order to make it easier to introduce the formwork during hoisting, the top of the column 31 is bent outward to form a bent portion 34 . In addition, the formwork storage area 3 is provided with an inclined bottom surface 32, and the inclined bottom surface 32 becomes lower as it moves toward the inner side, so when the formwork 71 is put in, as shown in Figure 2, the bottom of the formwork 71 will slide inwards, At this time, the upper part of the formwork 71 is fixed on the railing 11 of the construction platform 1, so that the formwork 71 can be placed in a roughly vertical manner.

所述板模存放区3的底部支承于一底座33上,该底座33顶面至所述施工平台1顶面之间的高差为1.2米至1.5米,所述栏杆11顶部高出该施工平台1顶面1.1米至1.3米,采用上述尺寸使得板模71位于板模存放区3内时,站立在施工平台1上的工人的手臂可以很方便地探出栏杆11执行吊装操作。 The bottom of the formwork storage area 3 is supported on a base 33, the height difference between the top surface of the base 33 and the top surface of the construction platform 1 is 1.2 meters to 1.5 meters, and the top of the railing 11 is higher than the construction platform. The top surface of the platform 1 is 1.1 to 1.3 meters. When the above-mentioned dimensions make the formwork 71 located in the formwork storage area 3, the arms of workers standing on the construction platform 1 can easily stick out the railing 11 to perform hoisting operations.

另外,由于楼面与墙体衔接的地方比较粗糙,需要打磨平整,为此本发明的工作台在所述二层平台5下方还固设有底层平台6,该底层平台6的高度为1.7米至1.8米,这样可以覆盖需要打磨平整的墙体范围。 In addition, since the joint between the floor and the wall is relatively rough, it needs to be smoothed, so the workbench of the present invention is also fixed with a bottom platform 6 below the second-floor platform 5, and the height of the bottom platform 6 is 1.7 meters. Up to 1.8 meters, which can cover the range of walls that need to be sanded flat.

本发明的应用上述工作台的施工方法包括但并不限于如下步骤: The construction method using the above-mentioned workbench of the present invention includes but is not limited to the following steps:

1.如图2所示,利用工作台的施工平台1在已完成的墙体81顶部完成第N层楼面82的浇筑施工,此时,浇筑墙体用的部分板模放置在所述板模存放区3内。 1. As shown in Figure 2, utilize the construction platform 1 of workbench to complete the pouring construction of the Nth floor floor 82 at the top of completed wall 81, at this moment, the part formwork that pours the body of wall usefulness is placed on the said plate In the mold storage area 3.

2.如图3所示,利用工作台的施工平台1扎第N层墙体钢筋83。 2. As shown in Figure 3, use the construction platform 1 of the workbench to bind the Nth layer wall reinforcement 83.

3.如图4所示,将浇筑墙体所需要的内、外板模72和71从所述建筑物其他部分已施工好的墙体处以及板模存放区3分别吊装至第N层对应的墙身位置。 3. As shown in Figure 4, the inner and outer formwork 72 and 71 required for pouring the wall are hoisted respectively from the constructed walls of other parts of the building and the formwork storage area 3 to the corresponding position of the wall.

4.如图5所示,将内、外板模72和71拼装起来形成第N层墙体的模板。 4. As shown in Figure 5, the inner and outer formwork 72 and 71 are assembled to form the formwork of the Nth layer of wall.

5.如图6所示,利用内、外板模72和71上设置的平台73往墙体的模板内浇筑混凝土,完成该第N层墙体81的施工。 5. As shown in Figure 6, use the platform 73 provided on the inner and outer formwork 72 and 71 to pour concrete into the formwork of the wall to complete the construction of the Nth layer of wall 81.

6.如图7所示,将所述第N层墙体81的板模拆卸下来,其中适用的板模72吊装至建筑物的另一部分使用,余下不适用的板模71则吊装至本层工作台的板模存放区3内并固定。 6. As shown in Figure 7, the formwork of the Nth floor wall 81 is disassembled, wherein the applicable formwork 72 is hoisted to another part of the building for use, and the remaining unsuitable formwork 71 is then hoisted to this floor And fixed in the template storage area 3 of workbench.

7.如图8所示,将所述工作台及存放于其上的板模71一起吊装至上一层并固定在所述第N层的墙体上。 7. As shown in Figure 8, hoist the workbench and the formwork 71 stored thereon to the upper floor and fix it on the wall of the Nth floor.

重复上述步骤即可完成建筑物墙体及楼面的浇筑施工。 The pouring construction of the body of wall and the floor of the building can be completed by repeating the above steps.

可见,利用本发明的工作台,可以很方便地存放暂时不使用的板模71,无需占用地面的存放场地,而施工地面的场地面积大小对施工的影响特别大,通常能节约施工场地对紧促的施工会带来很大的帮助,而且还可以大大减小塔吊的占用时间,更加省工省时。 It can be seen that utilizing the workbench of the present invention can conveniently store temporarily unused formwork 71 without occupying a storage space on the ground, and the size of the construction ground has a particularly large impact on the construction, which can usually save the construction site. The accelerated construction will bring great help, and it can also greatly reduce the occupation time of the tower crane, saving labor and time.

以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (11)

1. a kind of workbench for high-building construction, including:Conveniently dismantle or be fixed on the bearing support on building(2), be fixed on the bearing support(2)The operation platform on top(1)Bearing support(2);The operation platform(1)Outside is installed with railing(11);It is characterized in that:
Also include being arranged on the bearing support(2)The template die storage area in outside(3), the template die storage area(3)Positioned at the operation platform(1)Lower section and protrude from operation platform in the horizontal direction(1)Outside, the recess of template die can be accommodated by being consequently formed, the template die storage area(3)Outside is installed with more than two columns for preventing template die from turning up(31).
2. the workbench according to claim 1 for high-building construction, it is characterised in that:The column(31)Top outward bending.
3. the workbench according to claim 1 for high-building construction, it is characterised in that:The template die storage area(3)With ramped bottom surface(32), the ramped bottom surface(32)More past inner side is lower.
4. the workbench for high-building construction according to claim 1,2 or 3, it is characterised in that:Also include being fixed on the bearing support(2)The two-layer platform of bottom(5), the template die storage area(3)Positioned at the two-layer platform(5)Outside.
5. the workbench according to claim 4 for high-building construction, it is characterised in that:The template die storage area(3)Bottom supporting in a base(33)On, the base(33)Top surface is to the operation platform(1)The discrepancy in elevation between top surface is 1.2 meters to 1.5 meters, the railing(11)Top is higher by the operation platform(1)1.1 meters to 1.3 meters of top surface.
6. the workbench according to claim 4 for high-building construction, it is characterised in that:Also include being fixedly arranged on the two-layer platform(5)The underlying platform of lower section(6), the underlying platform(6)Height be 1.7 meters to 1.8 meters.
7. the workbench according to claim 4 for high-building construction, it is characterised in that:The operation platform(1)Railing(11)Outside is to template die storage area(3)Column(31)Horizontal range between inner side is 25 centimetres to 35 centimetres.
8. the workbench according to claim 4 for high-building construction, it is characterised in that:The template die storage area(3)Adjacent upright posts(31)Between spacing be 1.3 meters to 1.5 meters.
9. the workbench according to claim 4 for high-building construction, it is characterised in that:The bearing support(2)Linked and be bolted on building by straight-bar and brace.
10. the construction method of any one of a kind of application claim 1 to 9 workbench, it is characterised in that comprise the following steps:
A. completed using inside and outside template die after the pouring of building part concrete wall, applicable template die dismantle and lifted to another part of building use, the remaining template die not applied to is dismantled and lifted to the template die storage area of this layer of workbench(3)It is interior;
B. the construction of n-th layer flooring is completed at the top of above-mentioned completed wall;
C. n-th layer wall steel bar is pricked, by required inside and outside template die from building other parts and the template die storage area(3)Place is lifted to the corresponding wall body position of the n-th layer and assembled good, casting concrete respectively, completes the construction of the N layers of wall.
11. construction method according to claim 10, it is characterised in that:After the step a, before step b, the template die of the workbench and storage thereon is lifted to last layer and is fixed on the completed wall together.
CN201610138340.XA 2016-03-11 2016-03-11 Workbench for high-rise building construction and construction method thereof Active CN107178208B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610138340.XA CN107178208B (en) 2016-03-11 2016-03-11 Workbench for high-rise building construction and construction method thereof
SG10201603923PA SG10201603923PA (en) 2016-03-11 2016-05-17 Working platform used in high-rise building construction and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610138340.XA CN107178208B (en) 2016-03-11 2016-03-11 Workbench for high-rise building construction and construction method thereof

Publications (2)

Publication Number Publication Date
CN107178208A true CN107178208A (en) 2017-09-19
CN107178208B CN107178208B (en) 2019-01-11

Family

ID=59830044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610138340.XA Active CN107178208B (en) 2016-03-11 2016-03-11 Workbench for high-rise building construction and construction method thereof

Country Status (2)

Country Link
CN (1) CN107178208B (en)
SG (1) SG10201603923PA (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2908673Y (en) * 2006-06-29 2007-06-06 北京卓良模板有限公司 Building shuttering
FR3013066A1 (en) * 2013-11-14 2015-05-15 Outinord St Amand WORK PLATFORM IN CONVERTIBLE ENCORBELLEMENT
CN104712146A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Steel bar binding construction method in wall body construction
CN105239775A (en) * 2015-09-08 2016-01-13 广州市恒盛建设工程有限公司 Rebar mounting quality dynamic control method used for silo slip-form construction
CN205421927U (en) * 2016-03-11 2016-08-03 有利华建筑预制件有限公司 Workbenches for high-rise building construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2908673Y (en) * 2006-06-29 2007-06-06 北京卓良模板有限公司 Building shuttering
FR3013066A1 (en) * 2013-11-14 2015-05-15 Outinord St Amand WORK PLATFORM IN CONVERTIBLE ENCORBELLEMENT
CN104712146A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Steel bar binding construction method in wall body construction
CN105239775A (en) * 2015-09-08 2016-01-13 广州市恒盛建设工程有限公司 Rebar mounting quality dynamic control method used for silo slip-form construction
CN205421927U (en) * 2016-03-11 2016-08-03 有利华建筑预制件有限公司 Workbenches for high-rise building construction

Also Published As

Publication number Publication date
SG10201603923PA (en) 2017-10-30
CN107178208B (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN106869489A (en) Super High Core Walls Structure level and vertical synchronous construction top module system and construction method
CN107313506A (en) Building frame construction and its construction method provided with side bar
CN106592826A (en) Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer
CN214575640U (en) U-shaped synchronous construction formwork system for vertical and horizontal structures of cast concrete
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN103935911A (en) Tower crane attached wall support structure and construction method thereof
CN114517575A (en) Formwork-attached assembling type double-layer integral hoisting elevator shaft construction method
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN109404010A (en) A kind of aluminum tunnel modular system and its operating method
JP3074765U (en) Pillar building construction system equipment
CN106869479A (en) Bailey bracket sliding formwork system construction method
KR101140884B1 (en) Gangform device constructed for wall and constructing method this using
CN211898502U (en) Construction elevator high conversion foundation
CN212359061U (en) PC staircase safety protection operation platform
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN106639303A (en) Hydraulic climbing formwork frame special for lift
CN205421927U (en) Workbenches for high-rise building construction
CN107178208A (en) Workbench for high-rise building construction and construction method thereof
CN203320922U (en) Supporting device for forming of elevator shaft template
CN205100543U (en) A New Construction System for Commercial Buildings
CN204804320U (en) Moving as a whole formula template is assembled in advance to building
CN203559574U (en) Elevator shaft formwork supporting movable support
CN202689494U (en) Elevator shaft template support
CN205894640U (en) A safety protection and construction platform for construction of elevator well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180105

Address after: China Hongkong Kowloon Changyue Enterprise Square No. nine first floor 10

Applicant after: Favorable building materials Co., Ltd.

Address before: China Hongkong Kowloon Changyue Enterprise Square No. nine first floor 10

Applicant before: Yau Lee Wah Concrete Precast Co.,Ltd.

TA01 Transfer of patent application right
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1241951

Country of ref document: HK

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211221

Address after: Red field village, Xinwei Town, Huiyang District, Huizhou, Guangdong

Patentee after: Youlihua building materials (Huizhou) Co.,Ltd.

Address before: China Hongkong Kowloon Changyue Enterprise Square No. nine first floor 10

Patentee before: Advantageous building materials Co.,Ltd.

TR01 Transfer of patent right