CN106791712A - A kind of monitoring system and method in construction site - Google Patents
A kind of monitoring system and method in construction site Download PDFInfo
- Publication number
- CN106791712A CN106791712A CN201710083248.2A CN201710083248A CN106791712A CN 106791712 A CN106791712 A CN 106791712A CN 201710083248 A CN201710083248 A CN 201710083248A CN 106791712 A CN106791712 A CN 106791712A
- Authority
- CN
- China
- Prior art keywords
- construction site
- monitoring information
- monitoring
- module
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 59
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000004458 analytical method Methods 0.000 claims description 18
- 230000006399 behavior Effects 0.000 claims description 4
- 239000004973 liquid crystal related substance Substances 0.000 claims description 2
- 230000005611 electricity Effects 0.000 claims 1
- 238000007689 inspection Methods 0.000 abstract description 13
- 206010000372 Accident at work Diseases 0.000 abstract description 3
- 238000005728 strengthening Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 9
- 238000002360 preparation method Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 231100001261 hazardous Toxicity 0.000 description 2
- 230000009545 invasion Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
Landscapes
- Engineering & Computer Science (AREA)
- Multimedia (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Alarm Systems (AREA)
Abstract
The present invention relates to monitoring field, more particularly to a kind of monitoring system and method in construction site.The present invention aids in monitoring by unmanned plane, the collection of image and video is carried out to engineering construction whole process, can there are effective grasp construction speed and security situation, safety management is the important component of project management, prevent industrial accident, it is the basis of finished item set objective, is also the guarantee that project is able to smoothly implement.Strengthen Safety Management, the need for it is crucial to carry out safety inspection, typically by strengthening staffing, increases the inspection frequency to realize, but this mode can not completely adapt to existing Large-scale Project Construction and manage.So the present invention is applied to during heavy construction Safety Management, increase the safety reliability of job site, reduce the probability that security incident occurs.
Description
Technical field
The present invention relates to monitoring field, more particularly to a kind of monitoring system and method in construction site.
Background technology
With the continuous propulsion of Urbanization in China, the positive fast development of construction industry, the project scale of construction is increasing, and construction is difficult
Degree more and more higher, project management is faced with increasing challenge.Safety management is the important component of project management, Du
Exhausted industrial accident, is the basis of finished item set objective, is also the guarantee that project is able to smoothly implement.Strengthen bursting tube
Reason, it is crucial to carry out safety inspection, typically by strengthening staffing, increases the inspection frequency to realize, but this mode is
The need for existing Large-scale Project Construction can not completely being adapted to and being managed.So, attempt using a series of high-tech hands such as unmanned planes
Section is applied to during heavy construction Safety Management, and personnel to NULLCHECK high are needed to some safety inspections, also some ground
Square personnel cannot be introduced into checking place that the safety reliability of increase job site reduces the probability that security incident occurs.
The content of the invention
For the problem that prior art is present, now there is provided a kind of monitoring system and method in construction site.
Specific technical scheme is as follows:
A kind of monitoring method in construction site, including:
Step S1, unmanned plane shoots and sends the monitoring information in construction site;
Step S2, mobile phone is received and stores the monitoring information;
Step S3, the mobile phone shows the monitoring information, and analyzes the potential safety hazard that the monitoring information is present.
Preferably, the monitoring information includes video or picture.
Preferably, also include after the step S3:
Step S4, the result of the potential safety hazard of the mobile phone display analysis.
Preferably, the unmanned plane shoots the monitoring information of elevator and/or tower crane and/or scaffold.
The beneficial effect of above-mentioned technical proposal is:
According to the monitor mode that the past is traditional, eminence faces side, suspension scaffold structure alien invasion, large scale equipment point hazardous area
Domain is all the blind area for checking, easily there is potential safety hazard.After above-mentioned technical proposal introduces unmanned plane, sky can be carried out to job site
The supervision of middle cruising auxiliary security, by controlling unmanned plane during flying to the place of " people to not, can't see ", and by clearly according to
Whether piece observation state herein is reliable.Human and material resources, financial resources are largely saved.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the embodiment of the monitoring system in construction site of the invention;
Fig. 2 is a kind of flow chart of the embodiment of the monitoring method in construction site of the invention.
Specific embodiment
It should be noted that in the case where not conflicting, following technical proposals can be mutually combined between technical characteristic.
Specific embodiment of the invention is further described below in conjunction with the accompanying drawings:
A kind of monitoring system in construction site, as shown in figure 1, including:
Unmanned plane, shoots and sends the monitoring information in construction site;
Receiver module, connects unmanned plane, receives monitoring information;
Memory module, connects receiver module, stores monitoring information;
First display module, connects receiver module, display monitoring information;
Analysis module, connects receiver module, obtains the potential safety hazard that simultaneously analysis monitoring information is present.
In the present embodiment, unmanned plane can shoot the situation in construction site, and the monitoring information that will be shot sends, and receives
Module receives monitoring information, is stored by memory module, the first display module display monitoring information, and analysis module is by inside
The analysis of software, can analyze potential safety hazard present in monitoring information.
In a preferred embodiment of the invention, monitoring information includes video or picture.
In a preferred embodiment of the invention, analysis module is also connected with the second display module, and the second display module is used to
The result of display analysis module analysis.
In a preferred embodiment of the invention, receiver module, memory module, the first display module and analysis module are integrated
In a mobile terminal.
In a preferred embodiment of the invention, memory module includes nonvolatile memory;And/or
First display module is liquid crystal display.
In a preferred embodiment of the invention, unmanned plane shoots construction elevator and/or tower crane and/or scaffold/or applies
The monitoring information of work human behavior.
In above-described embodiment, can fly to eminence and face side, suspension scaffold structure alien invasion, large scale equipment point hazardous area
Domain is all the blind area for checking, easily there is potential safety hazard.After this time introduces unmanned plane, aerial cruising can be carried out to job site auxiliary
Security control is helped, by controlling unmanned plane during flying to the place of " people to not, can't see ", and this is observed by clear photograph
Whether the state at place is reliable.Human and material resources, financial resources are largely saved.
A kind of monitoring method in construction site, as shown in Fig. 2 including:
Step S1, unmanned plane shoots and sends the monitoring information in construction site;
Step S2, mobile phone is received and stores monitoring information;
The potential safety hazard that step S3, mobile phone display monitoring information, and analysis monitoring information are present.
In a preferred embodiment of the invention, monitoring information includes video or picture.
In a preferred embodiment of the invention, also include after step S3:
Step S4, the result of the potential safety hazard of mobile phone display analysis.
In a preferred embodiment of the invention, unmanned plane shoots elevator and/or tower crane and/or scaffold/or constructor
The monitoring information of member's behavior.
Unattended flow is constituted including " early-stage preparations --- flight check --- data processing " three parts, its operator
Formula is that operating personnel manipulate the SUAV for being provided with high-definition camera by ground control system, or by GPS navigation system
System design flight path, flies to associated construction region or makes an inspection tour site safety gathered data, passes ground back by wireless transmitting system
Face receiver, ground receiver is decoded by signal, and the data that airborne acquisition is arrived are shown in real time in display terminal.
Early-stage preparations mainly include:Safety inspection scheme is formulated, safety inspection place and circuit is selected, prepares basic number
According to determining unmanned plane landing place etc..Preliminary preparation is the important prerequisite that unmanned plane is applied to site safety management, only
Early-stage preparations enough fully, just can guarantee that unmanned plane during flying check quality, reach the effect got twice the result with half the effort.
Flight check mainly includes:Assembling unmanned plane, checks unmanned plane mechanical performance, power supply, camera, remote control system,
Unmanned plane is taken off, flight is controlled, flight is patrolled, land.The unmanned plane of certain heavy construction pinpoints safety inspection by manually operating
Complete, safety patrol is taken off using manual remote control, then switches to automatic state of flight, and nobody is controlled using GPS positioning system
Machine is patrolled by scheduled circuit, and the mode for completing to be landed by manual remote control after inspection task is carried out.
Data processing mainly includes:Data are downloaded and arrangement, data processing, data interpretation, formation report, Data storage
Deng.Data preparation is the core that unmanned plane is applied to safety management in construction site, can in time find that construction is existing by data preparation
The hidden danger of field presence is simultaneously effectively disposed, and reduces the probability that industrial accident occurs.
In above-described embodiment, aided in by unmanned plane timely, image and/or video are carried out to engineering construction whole process
Collection, can there is following some effect:
(1) it is effective to grasp construction speed and quality condition;
(3) be training, exchange data foundation is provided;
(4) appraised and chosen excellent for engineering and picture and video data are provided;
(5) effectively prevent security incident generation;
By explanation and accompanying drawing, the exemplary embodiments of the ad hoc structure of specific embodiment are given, based on essence of the invention
God, can also make other conversions.Although foregoing invention proposes existing preferred embodiment, however, these contents are not intended as
Limitation.
For a person skilled in the art, after reading described above, various changes and modifications undoubtedly will be evident that.
Therefore, appending claims should regard the whole variations and modifications for covering true intention of the invention and scope as.In power
Any and all scope and content of equal value, are all considered as still belonging to the intent and scope of the invention in the range of sharp claim.
Case study on implementation:
Certain heavy construction is one and integrates " office building, high-rise apartment building, garage parking, market, supermarket, underground people's air defense "
Comprehensive engineering, 2 layers of underground, 23 layers on the ground, building height 99.6m, overall floorage is up to 250,000 square metres.Construction process
It is middle to there is the dangerous larger part-to-item project more than certain scale such as " deep basal pit, high and big die plate support, builder's jack ",
Wherein deep basal pit maximum cutting depth 7m, the maximum scaffolding height 18m of high and big die plate support, builder's jack maximum scaffolding height
24m.Construction area broad covered area, Safety Risk in Production is high, organizes and coordinates difficulty greatly, in order to increase field surveillance management intensity,
Project management department takes the safety management mode of " based on hand inspection, supplemented by unmanned plane inspection ".By aerial inspection analysis in time
A series of security risks that the aspects such as job site work high above the ground, fire-fighting are present, find that personnel's ground check is difficult to see in time
Potential safety hazard, it is to avoid the generation of security incident.
Claims (10)
1. a kind of monitoring system in construction site, it is characterised in that including:
Unmanned plane, shoots and sends the monitoring information in construction site;
Receiver module, connects the unmanned plane, receives the monitoring information;
Memory module, connects the receiver module, stores the monitoring information;
First display module, connects the receiver module, shows the monitoring information;
Analysis module, connects the receiver module, obtains and analyze the potential safety hazard that the monitoring information is present.
2. the monitoring system in construction site according to claim 1, it is characterised in that the monitoring information include video or
Picture.
3. the monitoring system in construction site according to claim 1, it is characterised in that the analysis module is also connected with second
Display module, second display module is used to show the result of the analysis module analysis.
4. the monitoring system in construction site according to claim 1, it is characterised in that the receiver module, the storage
Module, first display module and the analysis module are integrated in a mobile terminal.
5. the monitoring system in construction site according to claim 1, it is characterised in that the memory module includes non-volatile
Property memory;And/or first display module be liquid crystal display.
6. the monitoring system in construction site according to claim 1, it is characterised in that the unmanned plane shoots construction elevator
And/or tower crane and/or scaffold/or the monitoring information of workmen's behavior.
7. a kind of monitoring method in construction site, it is characterised in that including:
Step S1, unmanned plane captured in real-time simultaneously sends the monitoring information in construction site;
Step S2, mobile phone is received and stores the monitoring information;
Step S3, the mobile phone shows the monitoring information, and analyzes the potential safety hazard that the monitoring information is present.
8. the monitoring method in construction site according to claim 7, it is characterised in that the monitoring information include video or
Picture.
9. the monitoring method in construction site according to claim 7, it is characterised in that also include after the step S3:
Step S4, the result of the potential safety hazard of the mobile phone display analysis.
10. the monitoring method in construction site according to claim 7, it is characterised in that the unmanned plane shoots construction electricity
Ladder and/or tower crane and/or scaffold and/or the monitoring information of workmen's behavior.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710083248.2A CN106791712A (en) | 2017-02-16 | 2017-02-16 | A kind of monitoring system and method in construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710083248.2A CN106791712A (en) | 2017-02-16 | 2017-02-16 | A kind of monitoring system and method in construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106791712A true CN106791712A (en) | 2017-05-31 |
Family
ID=58958666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710083248.2A Pending CN106791712A (en) | 2017-02-16 | 2017-02-16 | A kind of monitoring system and method in construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106791712A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107244422A (en) * | 2017-08-11 | 2017-10-13 | 成都希德电子信息技术有限公司 | Unmanned plane accessory system is used in tower crane construction |
CN107450589A (en) * | 2017-07-25 | 2017-12-08 | 广东容祺智能科技有限公司 | A kind of construction safety based on unmanned plane is maked an inspection tour and early warning system |
CN108445767A (en) * | 2018-05-16 | 2018-08-24 | 安徽建筑大学 | Visual on-site safety supervision and management system based on unmanned aerial vehicle |
CN108469727A (en) * | 2018-04-23 | 2018-08-31 | 湖南城市学院 | A kind of construction of prevention work platform of skyscraper |
CN109557935A (en) * | 2018-11-01 | 2019-04-02 | 广州圣安环保科技有限公司 | A kind of safety monitoring during construction method and system based on unmanned plane |
CN110351525A (en) * | 2019-07-22 | 2019-10-18 | 吴江市腾凯通信工程有限公司 | A kind of road construction site monitoring system |
CN113705952A (en) * | 2021-06-24 | 2021-11-26 | 中建七局安装工程有限公司 | Intelligent building management and control system based on field information |
CN117993087A (en) * | 2024-04-07 | 2024-05-07 | 中国建筑第二工程局有限公司 | BIM (building information modeling) -based quick assembly disc buckle horse way system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000060870A1 (en) * | 1999-04-08 | 2000-10-12 | Internet Pictures Corporation | Remote controlled platform for camera |
US20120169842A1 (en) * | 2010-12-16 | 2012-07-05 | Chuang Daniel B | Imaging systems and methods for immersive surveillance |
CN105516362A (en) * | 2016-01-21 | 2016-04-20 | 韩松 | System and method for monitoring engineering project operation site |
CN105684435A (en) * | 2016-01-13 | 2016-06-15 | 张阳 | Alarm method and system for sport field |
CN205883418U (en) * | 2016-08-12 | 2017-01-11 | 苏州安特智物联科技有限公司 | Building site personnel video registration system |
-
2017
- 2017-02-16 CN CN201710083248.2A patent/CN106791712A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000060870A1 (en) * | 1999-04-08 | 2000-10-12 | Internet Pictures Corporation | Remote controlled platform for camera |
US20120169842A1 (en) * | 2010-12-16 | 2012-07-05 | Chuang Daniel B | Imaging systems and methods for immersive surveillance |
CN105684435A (en) * | 2016-01-13 | 2016-06-15 | 张阳 | Alarm method and system for sport field |
CN105516362A (en) * | 2016-01-21 | 2016-04-20 | 韩松 | System and method for monitoring engineering project operation site |
CN205883418U (en) * | 2016-08-12 | 2017-01-11 | 苏州安特智物联科技有限公司 | Building site personnel video registration system |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107450589A (en) * | 2017-07-25 | 2017-12-08 | 广东容祺智能科技有限公司 | A kind of construction safety based on unmanned plane is maked an inspection tour and early warning system |
CN107244422A (en) * | 2017-08-11 | 2017-10-13 | 成都希德电子信息技术有限公司 | Unmanned plane accessory system is used in tower crane construction |
CN108469727A (en) * | 2018-04-23 | 2018-08-31 | 湖南城市学院 | A kind of construction of prevention work platform of skyscraper |
CN108445767A (en) * | 2018-05-16 | 2018-08-24 | 安徽建筑大学 | Visual on-site safety supervision and management system based on unmanned aerial vehicle |
CN108445767B (en) * | 2018-05-16 | 2021-04-27 | 安徽建筑大学 | A visual field safety supervision and management system based on UAV |
CN109557935A (en) * | 2018-11-01 | 2019-04-02 | 广州圣安环保科技有限公司 | A kind of safety monitoring during construction method and system based on unmanned plane |
CN110351525A (en) * | 2019-07-22 | 2019-10-18 | 吴江市腾凯通信工程有限公司 | A kind of road construction site monitoring system |
CN113705952A (en) * | 2021-06-24 | 2021-11-26 | 中建七局安装工程有限公司 | Intelligent building management and control system based on field information |
CN117993087A (en) * | 2024-04-07 | 2024-05-07 | 中国建筑第二工程局有限公司 | BIM (building information modeling) -based quick assembly disc buckle horse way system and method |
CN117993087B (en) * | 2024-04-07 | 2024-06-18 | 中国建筑第二工程局有限公司 | A fast-assembly buckle bridleway system and method based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106791712A (en) | A kind of monitoring system and method in construction site | |
CN111341068B (en) | Construction method of drilling site dangerous area early warning system based on deep learning | |
CN103455036B (en) | A kind of scene aerial patrol method and aircraft | |
CN104994346A (en) | Intelligent construction safety management monitoring system and image alarm processing method thereof | |
CN102096977A (en) | Method for video monitoring and prewarning of intrusive external force | |
CN115660241A (en) | Digital mine inspection system and implementation method | |
CN105511491B (en) | A kind of unmanned plane device for driving away and method | |
CN105033449B (en) | Unmanned-plane-based high-altitude welding and cutting method | |
CN105096043B (en) | A kind of automatic working method maked an inspection tour with emergency command device in deep foundation pit construction scene | |
CN105205970A (en) | Fire alarm system based on aerial photography | |
CN103647936A (en) | Environmental monitoring system | |
CN104158117A (en) | Robot system for inspection of overhead power line | |
CN109711348A (en) | Intelligent monitoring method and system based on the long-term real-time architecture against regulations in hollow panel | |
KR20180001057A (en) | Fire suppression system and method of using drones, Disaster information acquisition system | |
CN113988647A (en) | Municipal works wisdom building site management system based on BIM | |
CN103761827A (en) | Fire monitor system | |
CN203800707U (en) | Substation overhauling electric shock preventing digital stereoscopic safety deployment device | |
CN206775646U (en) | A kind of engineering construction safety mechanism for monitoring | |
CN106686354A (en) | Drone patrol measuring system and measuring method thereof | |
CN206192397U (en) | A kind of wireless Reconnaissance system of oil field fire protection | |
US20240002079A1 (en) | Uav having multifunctional leg assembly and its charging system | |
CN118196624A (en) | Intelligent safety helmet identification system and method for construction site | |
CN109902647B (en) | Portable online bird nest intelligent identification method and system | |
CN114049573B (en) | Safety construction supervision method for rural residential building | |
CN218214363U (en) | Smart pile terminal equipment of smart multipurpose |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |