CN106592595A - Phc管桩孔口气囊封堵方法 - Google Patents
Phc管桩孔口气囊封堵方法 Download PDFInfo
- Publication number
- CN106592595A CN106592595A CN201611082034.5A CN201611082034A CN106592595A CN 106592595 A CN106592595 A CN 106592595A CN 201611082034 A CN201611082034 A CN 201611082034A CN 106592595 A CN106592595 A CN 106592595A
- Authority
- CN
- China
- Prior art keywords
- air bag
- orifice
- pipe pile
- pore
- sealing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/08—Removing obstacles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/16—Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种PHC管桩孔口气囊封堵方法,具体步骤是:首先,将气囊放入管桩孔口,然后用打气筒向气囊内部注入空气使气囊膨胀,与管桩的管壁紧密贴合,从而封堵住管桩孔,防止水土流入管桩孔内;在混凝土填芯前,放气回收气囊。本发明的气囊封堵密封性好,防水土效果好,减小了后续清孔工作量,降低了清孔难度,节约了工程成本;气囊封堵时充气,清孔前放气,操作难度低,速度快,加快了工程进度;另外,气囊市场供应量足,成本低廉,相对钢板、海绵等材质耐腐,可回收反复利用,是理想的绿色工程材料。
Description
技术领域
本发明涉及一种PHC管桩孔口气囊封堵方法,尤其是一种补充完善PHC管桩孔口封堵方法。
背景技术
在PHC管桩施打完毕后,常规会采用薄钢板、海绵、砂袋等措施临时封堵孔口,防止水土流入。PHC管桩混凝土填芯前,须清理桩孔内部杂物,若大量水土落入,会增加清孔工作量,增大清孔工作难度。但临时薄钢板与管口接触性不够严实,且未与孔口位置固定,拦堵水土效果不理想;若在盖板下增垫海绵,海绵受气温因素影响大,且易腐烂,也不是理想的封堵材料;若采用砂袋封堵措施,则劳动强度大,编织袋老化后易破损,封堵效果差。本发明利用橡胶材质的气囊(例如球胆)放入孔口,注入空气达到适当压力后,气囊膨胀与管壁紧密贴合,防水土效果良好。PHC管桩混凝土填芯前,将气囊放气后取出即可。
发明内容
本发明是要提供一种PHC管桩孔口气囊封堵方法,该方法达到了封堵PHC管桩孔口,防止水土等杂物落入孔内的目的,解决了常规封堵技术方案防水土落入孔内效果不尽理想的难题,具有比较高的经济意义和社会价值。
为实现上述目的,本发明是通过以下技术方案实现:
一种PHC管桩孔口气囊封堵方法,具体步骤是:首先,将气囊放入管桩的管孔的孔口,然后用打气筒向气囊内部注入空气使气囊膨胀,与管桩的管壁紧密贴合,从而封堵住管桩的管孔,防止水土流入管桩的管孔内;在混凝土填芯前,放气回收气囊。
所述气囊的材料为橡胶材质;所述气囊放置于管桩的管孔的孔口附近,低于孔口,防止被破坏,气囊充气后直径大于管孔的孔口直径,并预留进、出气管至管桩的管孔的孔口外。
本发明的有益效果:
1、气囊柔度大,密封性好,防水土落入桩孔内效果好,减小了后续清孔工作量,降低了清孔难度,节约了工程成本。
2、气囊封堵时放入充气,灌芯前放气取出,操作难度低,速度快,加快了工程进度。
3、气囊市场供应量足,成本低廉,相对钢板、海绵等材质耐腐,可回收反复利用。
附图说明
图1 为PHC气囊放入孔口附近示意图;
图2为向气囊注入空气示意图;
图3 为放气回收气囊示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
本发明的PHC管桩孔口气囊封堵方法,具体步骤是:
首先,选取合适的橡胶材质的气囊1(例如球胆),将气囊1放入管桩3的管孔4的孔口,气管2朝上(图1所示);
然后使用打气筒向气囊注入空气5,使其体积膨胀,从而与管桩3的管壁紧密贴合(图2所示),从而封堵住管桩3的管孔4,防止水土流入管桩3的管孔4内;
在混凝土填芯前,放气6回收气囊1(图3所示)。
气囊的1材料为橡胶材质。气囊1放置于管桩3的管孔4的孔口附近,低于孔口,防止被破坏,气囊1充气后直径大于管孔4的孔口直径,并预留进、出气管至管桩3的管孔4的孔口外。
Claims (2)
1.一种PHC管桩孔口气囊封堵方法,其特征在于,具体步骤是:首先,将气囊(1)放入管桩(3)的管孔(4)的孔口,然后用打气筒向气囊(1)内部注入空气使气囊(1)膨胀,与管桩(3)的管壁紧密贴合,从而封堵住管桩(3)的管孔(4),防止水土流入管桩(3)的管孔(4)内;在混凝土填芯前,放气回收气囊(1)。
2.根据权利要求1所述的PHC管桩孔口气囊封堵方法,其特征在于:所述气囊(1)的材料为橡胶材质;所述气囊(1)放置于管桩(3)的管孔(4)的孔口附近,低于孔口,防止被破坏,气囊(1)充气后直径大于管孔(4)的孔口直径,并预留进、出气管至管桩(3)的管孔(4)的孔口外。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611082034.5A CN106592595A (zh) | 2016-11-30 | 2016-11-30 | Phc管桩孔口气囊封堵方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611082034.5A CN106592595A (zh) | 2016-11-30 | 2016-11-30 | Phc管桩孔口气囊封堵方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106592595A true CN106592595A (zh) | 2017-04-26 |
Family
ID=58594121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611082034.5A Pending CN106592595A (zh) | 2016-11-30 | 2016-11-30 | Phc管桩孔口气囊封堵方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592595A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108204213A (zh) * | 2018-01-15 | 2018-06-26 | 赵耀耀 | 一种充气式钻孔封孔段残渣清理装置及其使用方法 |
CN111364468A (zh) * | 2020-03-18 | 2020-07-03 | 重庆交通建设(集团)有限责任公司 | 应用于积水区的桥梁桩基混凝土灌注设备及工艺 |
CN111905177A (zh) * | 2020-07-31 | 2020-11-10 | 南阳市中心医院 | 泌尿外科用膀胱冲洗器 |
CN112281879A (zh) * | 2020-10-30 | 2021-01-29 | 中煤科工集团西安研究院有限公司 | 用于截水帷幕的防渗膜连接装置及其截水帷幕施工方法 |
CN112482869A (zh) * | 2020-11-09 | 2021-03-12 | 济南双纳商贸有限公司 | 一种避免水分渗透的移动基站建设用节能环保型辅助装置 |
CN112942332A (zh) * | 2021-01-28 | 2021-06-11 | 江苏地基工程有限公司 | 一种管桩端部封堵结构及方法 |
CN115839085A (zh) * | 2023-02-22 | 2023-03-24 | 广州市海珠工程建设有限公司 | 一种建筑施工管桩截除施工装置 |
CN118220994A (zh) * | 2024-05-23 | 2024-06-21 | 山东建科管桩有限公司 | 一种phc管桩吊运装置 |
TWI860524B (zh) * | 2022-06-06 | 2024-11-01 | 蘇献淳 | 乾式截水牆施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4029128A (en) * | 1973-08-10 | 1977-06-14 | Shigeharu Yamagishi | Device for plugging a hollow of a concrete pile |
CN2828519Y (zh) * | 2005-08-01 | 2006-10-18 | 江西泰达长林特种设备有限公司 | 封堵气囊 |
CN105544550A (zh) * | 2016-02-07 | 2016-05-04 | 北京市勘察设计研究院有限公司 | 一种通过利用气囊封堵装置的反重力加压注浆方法 |
CN105696599A (zh) * | 2016-02-06 | 2016-06-22 | 北京市勘察设计研究院有限公司 | 一种通过利用气囊封堵装置的加压注浆方法 |
CN205712093U (zh) * | 2016-02-06 | 2016-11-23 | 北京市勘察设计研究院有限公司 | 一种对土钉及锚杆进行加压注浆的气囊封堵装置 |
-
2016
- 2016-11-30 CN CN201611082034.5A patent/CN106592595A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4029128A (en) * | 1973-08-10 | 1977-06-14 | Shigeharu Yamagishi | Device for plugging a hollow of a concrete pile |
CN2828519Y (zh) * | 2005-08-01 | 2006-10-18 | 江西泰达长林特种设备有限公司 | 封堵气囊 |
CN105696599A (zh) * | 2016-02-06 | 2016-06-22 | 北京市勘察设计研究院有限公司 | 一种通过利用气囊封堵装置的加压注浆方法 |
CN205712093U (zh) * | 2016-02-06 | 2016-11-23 | 北京市勘察设计研究院有限公司 | 一种对土钉及锚杆进行加压注浆的气囊封堵装置 |
CN105544550A (zh) * | 2016-02-07 | 2016-05-04 | 北京市勘察设计研究院有限公司 | 一种通过利用气囊封堵装置的反重力加压注浆方法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108204213A (zh) * | 2018-01-15 | 2018-06-26 | 赵耀耀 | 一种充气式钻孔封孔段残渣清理装置及其使用方法 |
CN111364468A (zh) * | 2020-03-18 | 2020-07-03 | 重庆交通建设(集团)有限责任公司 | 应用于积水区的桥梁桩基混凝土灌注设备及工艺 |
CN111905177A (zh) * | 2020-07-31 | 2020-11-10 | 南阳市中心医院 | 泌尿外科用膀胱冲洗器 |
CN112281879A (zh) * | 2020-10-30 | 2021-01-29 | 中煤科工集团西安研究院有限公司 | 用于截水帷幕的防渗膜连接装置及其截水帷幕施工方法 |
CN112281879B (zh) * | 2020-10-30 | 2022-04-15 | 中煤科工集团西安研究院有限公司 | 用于截水帷幕的防渗膜连接装置及其截水帷幕施工方法 |
CN112482869A (zh) * | 2020-11-09 | 2021-03-12 | 济南双纳商贸有限公司 | 一种避免水分渗透的移动基站建设用节能环保型辅助装置 |
CN112942332A (zh) * | 2021-01-28 | 2021-06-11 | 江苏地基工程有限公司 | 一种管桩端部封堵结构及方法 |
CN112942332B (zh) * | 2021-01-28 | 2022-06-10 | 江苏地基工程有限公司 | 一种管桩端部封堵结构及方法 |
TWI860524B (zh) * | 2022-06-06 | 2024-11-01 | 蘇献淳 | 乾式截水牆施工方法 |
CN115839085A (zh) * | 2023-02-22 | 2023-03-24 | 广州市海珠工程建设有限公司 | 一种建筑施工管桩截除施工装置 |
CN118220994A (zh) * | 2024-05-23 | 2024-06-21 | 山东建科管桩有限公司 | 一种phc管桩吊运装置 |
CN118220994B (zh) * | 2024-05-23 | 2024-07-23 | 山东建科管桩有限公司 | 一种phc管桩吊运装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592595A (zh) | Phc管桩孔口气囊封堵方法 | |
CN113250200B (zh) | 一种新型环保纤维水泥分层注浆装置 | |
CN206016824U (zh) | 一种防止盾构空推管片位移的限位装置 | |
CN103485820B (zh) | 无煤柱充填开采柔性让压护巷充填墙体及其施工方法 | |
CN105908744B (zh) | 孔压反力施工方法 | |
CN110107353B (zh) | 一种突水应急堵水方法及其堵水装置 | |
CN105937407B (zh) | 一种沿空留巷混凝土充填墙环形气囊的施工方法 | |
CN107939333A (zh) | 多级承压式渗透型封孔方法及装置 | |
CN106152887A (zh) | 用于隧道深孔爆破的自充气胀式炮眼堵塞装置 | |
CN212612486U (zh) | 一种用于易坍塌地层钻孔护壁的侧壁注浆装置 | |
CN105926579B (zh) | 一种加压式套管冲击排水固结系统及方法 | |
CN108005058A (zh) | 软土地基挤压振动固结方法 | |
CN114278252A (zh) | 一种用于地质抽水试验的止水设备及使用方法 | |
CN213841923U (zh) | 一种用于水孔爆破的辅助填塞装置 | |
KR102028526B1 (ko) | 지반침하 보강 및 방지를 위한 충전재 주입 구조체 및 이를 이용한 지반침하 보강 및 방지방법 | |
CN212337290U (zh) | 一种针对运营地铁隧道位移纠偏的充气囊结构 | |
JP2782034B2 (ja) | 地盤圧密強化工法 | |
CN212248298U (zh) | 一种可供快速拆卸的河道暗涵临时挡水结构 | |
CN213540448U (zh) | 一种锚杆的封孔装置 | |
CN112832273B (zh) | 一种可供快速拆卸的河道暗涵临时挡水结构、搭建方法及快速拆卸和复建方法 | |
CN113373859A (zh) | 一种水利工程施工用支撑保护装置及其使用方法 | |
CN114941340A (zh) | 一种用于污染地块修复的止水装置 | |
CN107587883A (zh) | 一种护盾式tbm管片回填灌浆膨胀式封闭装置及施工方法 | |
CN112030977A (zh) | 一种用于易坍塌地层钻孔护壁的侧壁注浆工法和装置 | |
CN222615308U (zh) | 一种瓦斯抽采封孔器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |