CN106592595A - Phc管桩孔口气囊封堵方法 - Google Patents

Phc管桩孔口气囊封堵方法 Download PDF

Info

Publication number
CN106592595A
CN106592595A CN201611082034.5A CN201611082034A CN106592595A CN 106592595 A CN106592595 A CN 106592595A CN 201611082034 A CN201611082034 A CN 201611082034A CN 106592595 A CN106592595 A CN 106592595A
Authority
CN
China
Prior art keywords
air bag
orifice
pipe pile
pore
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611082034.5A
Other languages
English (en)
Inventor
黄磊
余鹏程
陈勇
洪方君
李政
范文基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201611082034.5A priority Critical patent/CN106592595A/zh
Publication of CN106592595A publication Critical patent/CN106592595A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种PHC管桩孔口气囊封堵方法,具体步骤是:首先,将气囊放入管桩孔口,然后用打气筒向气囊内部注入空气使气囊膨胀,与管桩的管壁紧密贴合,从而封堵住管桩孔,防止水土流入管桩孔内;在混凝土填芯前,放气回收气囊。本发明的气囊封堵密封性好,防水土效果好,减小了后续清孔工作量,降低了清孔难度,节约了工程成本;气囊封堵时充气,清孔前放气,操作难度低,速度快,加快了工程进度;另外,气囊市场供应量足,成本低廉,相对钢板、海绵等材质耐腐,可回收反复利用,是理想的绿色工程材料。

Description

PHC管桩孔口气囊封堵方法
技术领域
本发明涉及一种PHC管桩孔口气囊封堵方法,尤其是一种补充完善PHC管桩孔口封堵方法。
背景技术
在PHC管桩施打完毕后,常规会采用薄钢板、海绵、砂袋等措施临时封堵孔口,防止水土流入。PHC管桩混凝土填芯前,须清理桩孔内部杂物,若大量水土落入,会增加清孔工作量,增大清孔工作难度。但临时薄钢板与管口接触性不够严实,且未与孔口位置固定,拦堵水土效果不理想;若在盖板下增垫海绵,海绵受气温因素影响大,且易腐烂,也不是理想的封堵材料;若采用砂袋封堵措施,则劳动强度大,编织袋老化后易破损,封堵效果差。本发明利用橡胶材质的气囊(例如球胆)放入孔口,注入空气达到适当压力后,气囊膨胀与管壁紧密贴合,防水土效果良好。PHC管桩混凝土填芯前,将气囊放气后取出即可。
发明内容
本发明是要提供一种PHC管桩孔口气囊封堵方法,该方法达到了封堵PHC管桩孔口,防止水土等杂物落入孔内的目的,解决了常规封堵技术方案防水土落入孔内效果不尽理想的难题,具有比较高的经济意义和社会价值。
为实现上述目的,本发明是通过以下技术方案实现:
一种PHC管桩孔口气囊封堵方法,具体步骤是:首先,将气囊放入管桩的管孔的孔口,然后用打气筒向气囊内部注入空气使气囊膨胀,与管桩的管壁紧密贴合,从而封堵住管桩的管孔,防止水土流入管桩的管孔内;在混凝土填芯前,放气回收气囊。
所述气囊的材料为橡胶材质;所述气囊放置于管桩的管孔的孔口附近,低于孔口,防止被破坏,气囊充气后直径大于管孔的孔口直径,并预留进、出气管至管桩的管孔的孔口外。
本发明的有益效果:
1、气囊柔度大,密封性好,防水土落入桩孔内效果好,减小了后续清孔工作量,降低了清孔难度,节约了工程成本。
2、气囊封堵时放入充气,灌芯前放气取出,操作难度低,速度快,加快了工程进度。
3、气囊市场供应量足,成本低廉,相对钢板、海绵等材质耐腐,可回收反复利用。
附图说明
图1 为PHC气囊放入孔口附近示意图;
图2为向气囊注入空气示意图;
图3 为放气回收气囊示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
本发明的PHC管桩孔口气囊封堵方法,具体步骤是:
首先,选取合适的橡胶材质的气囊1(例如球胆),将气囊1放入管桩3的管孔4的孔口,气管2朝上(图1所示);
然后使用打气筒向气囊注入空气5,使其体积膨胀,从而与管桩3的管壁紧密贴合(图2所示),从而封堵住管桩3的管孔4,防止水土流入管桩3的管孔4内;
在混凝土填芯前,放气6回收气囊1(图3所示)。
气囊的1材料为橡胶材质。气囊1放置于管桩3的管孔4的孔口附近,低于孔口,防止被破坏,气囊1充气后直径大于管孔4的孔口直径,并预留进、出气管至管桩3的管孔4的孔口外。

Claims (2)

1.一种PHC管桩孔口气囊封堵方法,其特征在于,具体步骤是:首先,将气囊(1)放入管桩(3)的管孔(4)的孔口,然后用打气筒向气囊(1)内部注入空气使气囊(1)膨胀,与管桩(3)的管壁紧密贴合,从而封堵住管桩(3)的管孔(4),防止水土流入管桩(3)的管孔(4)内;在混凝土填芯前,放气回收气囊(1)。
2.根据权利要求1所述的PHC管桩孔口气囊封堵方法,其特征在于:所述气囊(1)的材料为橡胶材质;所述气囊(1)放置于管桩(3)的管孔(4)的孔口附近,低于孔口,防止被破坏,气囊(1)充气后直径大于管孔(4)的孔口直径,并预留进、出气管至管桩(3)的管孔(4)的孔口外。
CN201611082034.5A 2016-11-30 2016-11-30 Phc管桩孔口气囊封堵方法 Pending CN106592595A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611082034.5A CN106592595A (zh) 2016-11-30 2016-11-30 Phc管桩孔口气囊封堵方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611082034.5A CN106592595A (zh) 2016-11-30 2016-11-30 Phc管桩孔口气囊封堵方法

Publications (1)

Publication Number Publication Date
CN106592595A true CN106592595A (zh) 2017-04-26

Family

ID=58594121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611082034.5A Pending CN106592595A (zh) 2016-11-30 2016-11-30 Phc管桩孔口气囊封堵方法

Country Status (1)

Country Link
CN (1) CN106592595A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204213A (zh) * 2018-01-15 2018-06-26 赵耀耀 一种充气式钻孔封孔段残渣清理装置及其使用方法
CN111364468A (zh) * 2020-03-18 2020-07-03 重庆交通建设(集团)有限责任公司 应用于积水区的桥梁桩基混凝土灌注设备及工艺
CN111905177A (zh) * 2020-07-31 2020-11-10 南阳市中心医院 泌尿外科用膀胱冲洗器
CN112281879A (zh) * 2020-10-30 2021-01-29 中煤科工集团西安研究院有限公司 用于截水帷幕的防渗膜连接装置及其截水帷幕施工方法
CN112482869A (zh) * 2020-11-09 2021-03-12 济南双纳商贸有限公司 一种避免水分渗透的移动基站建设用节能环保型辅助装置
CN112942332A (zh) * 2021-01-28 2021-06-11 江苏地基工程有限公司 一种管桩端部封堵结构及方法
CN115839085A (zh) * 2023-02-22 2023-03-24 广州市海珠工程建设有限公司 一种建筑施工管桩截除施工装置
CN118220994A (zh) * 2024-05-23 2024-06-21 山东建科管桩有限公司 一种phc管桩吊运装置
TWI860524B (zh) * 2022-06-06 2024-11-01 蘇献淳 乾式截水牆施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4029128A (en) * 1973-08-10 1977-06-14 Shigeharu Yamagishi Device for plugging a hollow of a concrete pile
CN2828519Y (zh) * 2005-08-01 2006-10-18 江西泰达长林特种设备有限公司 封堵气囊
CN105544550A (zh) * 2016-02-07 2016-05-04 北京市勘察设计研究院有限公司 一种通过利用气囊封堵装置的反重力加压注浆方法
CN105696599A (zh) * 2016-02-06 2016-06-22 北京市勘察设计研究院有限公司 一种通过利用气囊封堵装置的加压注浆方法
CN205712093U (zh) * 2016-02-06 2016-11-23 北京市勘察设计研究院有限公司 一种对土钉及锚杆进行加压注浆的气囊封堵装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4029128A (en) * 1973-08-10 1977-06-14 Shigeharu Yamagishi Device for plugging a hollow of a concrete pile
CN2828519Y (zh) * 2005-08-01 2006-10-18 江西泰达长林特种设备有限公司 封堵气囊
CN105696599A (zh) * 2016-02-06 2016-06-22 北京市勘察设计研究院有限公司 一种通过利用气囊封堵装置的加压注浆方法
CN205712093U (zh) * 2016-02-06 2016-11-23 北京市勘察设计研究院有限公司 一种对土钉及锚杆进行加压注浆的气囊封堵装置
CN105544550A (zh) * 2016-02-07 2016-05-04 北京市勘察设计研究院有限公司 一种通过利用气囊封堵装置的反重力加压注浆方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204213A (zh) * 2018-01-15 2018-06-26 赵耀耀 一种充气式钻孔封孔段残渣清理装置及其使用方法
CN111364468A (zh) * 2020-03-18 2020-07-03 重庆交通建设(集团)有限责任公司 应用于积水区的桥梁桩基混凝土灌注设备及工艺
CN111905177A (zh) * 2020-07-31 2020-11-10 南阳市中心医院 泌尿外科用膀胱冲洗器
CN112281879A (zh) * 2020-10-30 2021-01-29 中煤科工集团西安研究院有限公司 用于截水帷幕的防渗膜连接装置及其截水帷幕施工方法
CN112281879B (zh) * 2020-10-30 2022-04-15 中煤科工集团西安研究院有限公司 用于截水帷幕的防渗膜连接装置及其截水帷幕施工方法
CN112482869A (zh) * 2020-11-09 2021-03-12 济南双纳商贸有限公司 一种避免水分渗透的移动基站建设用节能环保型辅助装置
CN112942332A (zh) * 2021-01-28 2021-06-11 江苏地基工程有限公司 一种管桩端部封堵结构及方法
CN112942332B (zh) * 2021-01-28 2022-06-10 江苏地基工程有限公司 一种管桩端部封堵结构及方法
TWI860524B (zh) * 2022-06-06 2024-11-01 蘇献淳 乾式截水牆施工方法
CN115839085A (zh) * 2023-02-22 2023-03-24 广州市海珠工程建设有限公司 一种建筑施工管桩截除施工装置
CN118220994A (zh) * 2024-05-23 2024-06-21 山东建科管桩有限公司 一种phc管桩吊运装置
CN118220994B (zh) * 2024-05-23 2024-07-23 山东建科管桩有限公司 一种phc管桩吊运装置

Similar Documents

Publication Publication Date Title
CN106592595A (zh) Phc管桩孔口气囊封堵方法
CN113250200B (zh) 一种新型环保纤维水泥分层注浆装置
CN206016824U (zh) 一种防止盾构空推管片位移的限位装置
CN103485820B (zh) 无煤柱充填开采柔性让压护巷充填墙体及其施工方法
CN105908744B (zh) 孔压反力施工方法
CN110107353B (zh) 一种突水应急堵水方法及其堵水装置
CN105937407B (zh) 一种沿空留巷混凝土充填墙环形气囊的施工方法
CN107939333A (zh) 多级承压式渗透型封孔方法及装置
CN106152887A (zh) 用于隧道深孔爆破的自充气胀式炮眼堵塞装置
CN212612486U (zh) 一种用于易坍塌地层钻孔护壁的侧壁注浆装置
CN105926579B (zh) 一种加压式套管冲击排水固结系统及方法
CN108005058A (zh) 软土地基挤压振动固结方法
CN114278252A (zh) 一种用于地质抽水试验的止水设备及使用方法
CN213841923U (zh) 一种用于水孔爆破的辅助填塞装置
KR102028526B1 (ko) 지반침하 보강 및 방지를 위한 충전재 주입 구조체 및 이를 이용한 지반침하 보강 및 방지방법
CN212337290U (zh) 一种针对运营地铁隧道位移纠偏的充气囊结构
JP2782034B2 (ja) 地盤圧密強化工法
CN212248298U (zh) 一种可供快速拆卸的河道暗涵临时挡水结构
CN213540448U (zh) 一种锚杆的封孔装置
CN112832273B (zh) 一种可供快速拆卸的河道暗涵临时挡水结构、搭建方法及快速拆卸和复建方法
CN113373859A (zh) 一种水利工程施工用支撑保护装置及其使用方法
CN114941340A (zh) 一种用于污染地块修复的止水装置
CN107587883A (zh) 一种护盾式tbm管片回填灌浆膨胀式封闭装置及施工方法
CN112030977A (zh) 一种用于易坍塌地层钻孔护壁的侧壁注浆工法和装置
CN222615308U (zh) 一种瓦斯抽采封孔器

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426