CN106549493A - Transformer station's error-unlocking prevention control device and control method - Google Patents

Transformer station's error-unlocking prevention control device and control method Download PDF

Info

Publication number
CN106549493A
CN106549493A CN201510613645.7A CN201510613645A CN106549493A CN 106549493 A CN106549493 A CN 106549493A CN 201510613645 A CN201510613645 A CN 201510613645A CN 106549493 A CN106549493 A CN 106549493A
Authority
CN
China
Prior art keywords
station
remote control
transformer station
sent
error
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510613645.7A
Other languages
Chinese (zh)
Other versions
CN106549493B (en
Inventor
杨冬茜
钟振新
岑积利
田克岩
陈雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Unitech Power Technology Co Ltd
Original Assignee
Zhuhai Unitech Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Unitech Power Technology Co Ltd filed Critical Zhuhai Unitech Power Technology Co Ltd
Priority to CN201510613645.7A priority Critical patent/CN106549493B/en
Publication of CN106549493A publication Critical patent/CN106549493A/en
Application granted granted Critical
Publication of CN106549493B publication Critical patent/CN106549493B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Selective Calling Equipment (AREA)
  • Telephonic Communication Services (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of transformer station's error-unlocking prevention control device and control method.Wherein, the control device includes tele-control communication module, remote control command process unit, interior unblock processing unit of standing, stand interior remote processing unit and station communication unit;The remote control request is controlled by power transformation station equipment sent outside tele-control communication module receiving station, and remote control request is sent to into remote control command process unit;The unlocking request of the anti-error system that remote control request is mapped as being sent to transformer station by remote control command process unit and the guidance command of the measure and control device for being sent to transformer station;In standing, unblock processing unit sends unlocking request to anti-error system by station communication unit;In standing, guidance command is sent to the measure and control device of transformer station by station communication unit after anti-error system unblock success for remote processing unit.Which makes, and outside will be judged through the unblock of anti-error system to the remote pilot inside transformer station and control can just be carried out, and effectively prevent electric misoperation.

Description

Transformer station's error-unlocking prevention control device and control method
Technical field
The present invention relates to intelligent substation control technology field, more particularly to a kind of control of transformer station's error-unlocking prevention Device and control method.
Background technology
By CHINA SOUTHERN POWER company《Automation Technology of Digitized Transformer specification》, intelligent terminal refer to and tradition one Secondary device is installed nearby, realizes information gathering, transmission, process, the intelligent electric sub-device of control.
By CHINA SOUTHERN POWER company《Automation Technology of Digitized Transformer specification》, digital transformer substation refer to according to DL/T860, wall, process layer building, process layer have number using electronic mutual inductor, intelligent terminal etc. The intelligent primary equipment of word interface, based on network communication platform, using DL/T860 data modeling and Communication service agreement, realizes electrical substation monitoring signal, control command, the digitized of trip protection order and adopts Collection, transmission, process and data sharing, are capable of achieving networking secondary function, programming operations, intelligent work( The transformer station of energy etc..
According to State Grid Corporation of China《Intelligent substation fire protection technology》, intelligent substation refer to using it is advanced, Reliable, integrated, low-carbon (LC), environmental protection smart machine, with whole station information digitalization, communications platform networking, Information sharing is standardized as basic demand, be automatically performed information gathering, measurement, control, protection, metering and Monitoring etc. basic function, and electrical network can be supported as needed to automatically control in real time, Intelligent adjustment, on-line analyses The transformer station of the Premium Features such as decision-making, collaboration interaction.
In digital transformer substation and intelligent substation, one is Jing telemechanicals from transformer station's external remote control operation Device, measure and control device arrive intelligent terminal again, and the control of primary equipment is finally realized by intelligent terminal.But The operation is an off what the anti-error system in transformer station was carried out, thus can not effectively be prevented by anti-error system Only electric misoperation, greatly threatens so as to bring for the safe operation of power system.
The content of the invention
Based on this, it is necessary to there is potential safety hazard for transformer station's external remote control operation in conventional art, A kind of new, transformer station's error-unlocking prevention control device that safety is higher and the control of corresponding error-unlocking prevention are provided Method.
To realize transformer station's error-unlocking prevention control device that the object of the invention is provided, including tele-control communication module, Remote control command process unit, interior unblock processing unit of standing, stand interior remote processing unit and station communication list Unit;
The tele-control communication module is used for the remote control being controlled to power transformation station equipment send outside receiving station Request, and remote control request is sent to into the remote control command process unit;
The remote control command process unit for by the remote control request be mapped as being sent to the anti-error of transformer station The unlocking request of system and be sent to transformer station measure and control device guidance command;
Processing unit is unlocked in the station to be used to send the unlocking request to institute by the station communication unit State anti-error system;
In the station remote processing unit for the anti-error system unblock success after, by the station lead to The guidance command is sent to the measure and control device of transformer station and waits remote control result by letter unit.
As a kind of embodiment of transformer station's error-unlocking prevention control device,
In the station, remote processing unit is additionally operable to the remote control result for receiving the measure and control device in transformer station, And the remote control result is sent to into the remote control command process unit;
After the remote control command process unit is additionally operable to receive the remote control result, by the telemechanical Communication unit sends remote control answer signal to outside transformer station.
As a kind of embodiment of transformer station's error-unlocking prevention control device, the remote control command process Unit is additionally operable to after the remote control result is received, and remote control request is mapped as being sent to the anti-of transformer station The locking request of error system;
Unlock processing unit to be additionally operable to after the interior remote control in station terminates, by the station communication unit in the station Locking request is sent to the anti-error system.
As a kind of embodiment of transformer station's error-unlocking prevention control device, processing unit in the station, is unlocked It is additionally operable to receive the unblock result of the anti-error system, and the unblock result is sent to into the remote control Command process unit;
The remote control command process unit is additionally operable to be mapped as being sent to transformer station by remote control request first Anti-error system unlocking request, and judge anti-error system unblock whether success, if so, then will be described Guidance command is mapped as the guidance command of the measure and control device for being sent to transformer station, if it is not, then passing through telemechanical communication unit Unit sends remote control and unsuccessfully replys.
Used as a kind of embodiment of transformer station's error-unlocking prevention control device, the station communication unit is by net Card and IEC61850 protocol processing units are constituted.
Based on a kind of transformer station's error-unlocking prevention control method of same inventive concept, comprise the following steps:
Receive the remote control request being controlled to power transformation station equipment sent outside transformer station;
Remote control request is mapped as into the unlocking request of anti-error system that is sent in transformer station and the change is sent to The guidance command of the measure and control device in power station;
The unlocking request is sent to into the anti-error system;
After anti-error system unblock success, then the guidance command is sent to into the measure and control device.
It is as a kind of embodiment of transformer station's error-unlocking prevention control method, further comprising the steps of:
After completing the remote manipulation to the measure and control device, locking request is sent to the anti-error system.
It is as a kind of embodiment of transformer station's error-unlocking prevention control method, further comprising the steps of:
Judge whether the remote manipulation to the measure and control device is successful, if so, then sends out to the outside of the transformer station Send remote control successful respond information;If it is not, then to the outside of the transformer station send remote control failure response message.
It is as a kind of embodiment of transformer station's error-unlocking prevention control method, further comprising the steps of:
Judge anti-error system unblock whether success, described the guidance command is sent to if then performing The step of measure and control device;If it is not, then send to the outside of the transformer station unlocking failure information.
Used as a kind of embodiment of transformer station's error-unlocking prevention control method, transformer station is passed through with PERCOM peripheral communication First network interface card and IEC60870-101 agreements are carried out;
Communication between transformer station inside is carried out by the second network interface card and IEC61850 agreements.
Beneficial effects of the present invention include:A kind of transformer station's error-unlocking prevention control device that the present invention is provided, its After receiving remote control request, it is not that remote control request is sent to into the relevant device in intelligent substation directly, But unlocking request is generated first against the equipment to be remotely controlled being related to.And unlocking request is sent to into change The anti-error system in power station, and real guidance command is only after the unblock successful information for receiving anti-error system Just measure and control device can be sent to by station communication unit by remote processing unit in station.Thus, making outside right Remote pilot inside transformer station will judge through the unblock of anti-error system and control can just be carried out.Effectively can prevent Only electric misoperation, it is ensured that the safe operation of power system.And use transformer station's error-unlocking prevention control of the system Method processed equally also has the beneficial effect for preventing electric misoperation.
Description of the drawings
Fig. 1 is that a kind of system structure of a specific embodiment of transformer station's error-unlocking prevention control device of the invention is shown It is intended to;
Fig. 2 is a kind of system structure of the another specific embodiment of transformer station's error-unlocking prevention control device of the invention Schematic diagram;
Fig. 3 is a kind of flow chart of a specific embodiment of transformer station's error-unlocking prevention control method of the invention;
Fig. 4 is a kind of flow chart of an instantiation of transformer station's error-unlocking prevention control method of the invention.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, below in conjunction with accompanying drawing to this The specific embodiment of transformer station's error-unlocking prevention control device of invention is illustrated.It should be appreciated that this place The specific embodiment of description only to explain the present invention, is not intended to limit the present invention.
Transformer station's error-unlocking prevention control device of one embodiment of the invention, as shown in figure 1, communicating including telemechanical Unit 100, remote control command process unit 200, interior unblock processing unit 300 of standing, interior remote processing of standing Unit 400 and station communication unit 500.
Wherein, tele-control communication module 100 is controlled to power transformation station equipment for what is sent outside receiving station Remote control request, and by remote control request be sent to remote control command process unit 200.And it is sent to transformer station The remote control request remote control or remote control equipment that can come from dedicated for being controlled to transformer station, also may be used From long-range control terminal, to be such as used for computer of control etc..Tele-control communication module 100 is mainly used In remote signal is received, outside signal is received behind transformer station inside, then it is single by other internal process Unit is processed to signal, and the equipment inside transformer station is controlled accordingly according to remote signal.
The signal that tele-control communication module 100 is received is sent initially to remote control command process unit 200, institute Remote control command process unit 200 is stated for parsing remote control request, acquisition needs to be sent to the anti-error of transformer station The unlocking request of system and be sent to transformer station measure and control device guidance command.This is very crucial part, After which receives remote signal, remote signal can be parsed, will be controlled in parsing remote signal , specific station equipment.It is determined that after the equipment that specifically will be controlled, having determined that and be unlocked Lockset, so as to remote control command process unit 200 can just generate it is corresponding with remote signal anti-error The unlocking request of system, it is also possible to generate will be controlled to concrete equipment in station included in remote signal Guidance command.The unlocking request of generation simultaneously can be sent to solution in station by remote control command process unit 200 Lock processing unit 300;Guidance command is sent to into remote processing unit 400 in station.
In standing unblock processing unit 300 receive unblock that remote control command process unit 200 parses please After asking, unlocking request can be sent to the anti-error system of transformer station.The anti-error system of transformer station can be according to reception To unlocking request corresponding lockset in station is unlocked.Certainly, the unblock of anti-error system may success May failure.Specifically, after anti-error system receives unlocking request, it is related to during unlocking request can be judged Lockset whether in controllable state, such as some locksets due to the reasons such as product bug by the restriction of high authority not Can open, then these locksets are in uncontrollable state, in addition, if the lock that unlocking request is related to Tool itself fail, intelligent electronic device can not be unlocked the same, then the lockset of failure is also in not Controllable state.Anti-error system if it is judged that the lockset that is related in unlocking request is in controllable state, Normal unblock operation can be then carried out, can be unlocked successfully.But if during anti-error system judges unlocking request The lockset being related to is in uncontrollable state, and this anti-error system can unlock failure.Now, anti-error system Unblock failure information can be returned.
More preferably, when lockset arbitrarily can not be unlocked as some failures are defined, one embodiment wherein In, anti-error system also has the function that lockset fault level judges, which can be sentenced after the unlocking request for receiving The fault level of disconnected lockset, when the fault level exceedes pre-set level, then can return unblock failure information, Lockset is not unlocked.And when the fault level is not above pre-set level, then can cross failure power Limit is arranged, and forces the lockset to being related in unlocking request to be unlocked, and now, anti-error system can still be solved Lock successfully.
In the present embodiment control system, remote control command process unit 200 can be solved according to the order for receiving Lock out two requests, one has been issued unblock processing unit 300 in station, for send unlocking request arrive at a station in Anti-error system, and another request then sends and gives remote processing unit 400 in station.But remote processing list in standing Unit 400 is not the measure and control device being directly sent to guidance command in transformer station upon receiving a request, and It is to wait for the unblock feedback information of anti-error system.Only after anti-error system unblock success, interior remote processing list of standing The guidance command that remote control command process unit 200 is parsed just can be sent to measure and control device by unit 400.
More preferably, in standing, unblock processing unit 300 is additionally operable to receive the unblock result of the anti-error system, and The unblock result for receiving is sent to into remote control command process unit 200.Remote control command process unit 200 when processing to remote control request, and the remote control for receiving request is mapped as being sent to transformer station by first The unlocking request of anti-error system.In waiting station, unblock processing unit 300 returns unblock result afterwards.A distant place is distant Control command process unit is after anti-error system unblock success, then guidance command is mapped as being sent to transformer station Measure and control device guidance command.And when anti-error system unblock failure, remote control command process unit 200 Then remote control can be sent by tele-control communication module 100 unsuccessfully to reply to outside station.Or directly transmit unblock failure Response.
Wherein, in standing, unblock processing unit 300 and interior remote processing unit 400 of standing pass through station communication list Unit 500 is communicated with relevant device in transformer station, the transmission and relevant device implementing result including request Feedback.Such as, in standing, unblock processing unit 300 can be led to anti-error system in station by station communication unit 500 Letter;In standing, remote processing unit 400 can pass through station communication unit 500 and the measure and control device in transformer station leads to Letter.
From description above, transformer station's error-unlocking prevention control device of the embodiment of the present invention, which receives After remote control request, it is not that remote control request is sent to into the relevant device in intelligent substation directly, but it is first First the equipment to be remotely controlled for being related to generates unlocking request.This unlocking request is destined to transformer station Anti-error system, and real guidance command only after the unblock successful information for receiving anti-error system Measure and control device can be sent to by station communication unit 500 by remote processing unit 400 in station.Thus, making It is outside remote pilot inside transformer station to be judged through the unblock of anti-error system and controls just carry out.This Sample can effectively prevent electric misoperation, it is ensured that the safe operation of power system.
Also, it should be noted that in transformer station's error-unlocking prevention control device of the embodiment of the present invention, transformer station Anti-error system can feed back whether unlock successful information.General anti-error system is by unblock success or failure information Interior unlocking request unit 300 of standing is fed directly to, the unblock result that interior unlocking request unit 300 of standing can feed back It is sent to remote control command process unit 200.Remote control command process unit 200 receives unblock result Afterwards, determine whether to unlock successful information, and guidance command is sent after unblock success to measure and control device;When So, if it is judged that being unblock failure information, then guidance command is not sent to measure and control device, that is, interrupted to becoming The remote pilot of power station internal unit, now which can be by the transmission unblock failure information of tele-control communication module 100 Or the outer remote control equipment that arrives at a station unsuccessfully is replied in remote control.
Certainly, as a kind of embodiment, remote control also directly can be asked by remote control command process unit Unlocking request and guidance command are mapped as, and in standing, unlock the anti-error system that processing unit 300 will can be received Unblock result directly transmits the interior remote processing unit 400 that arrives at a station, and interior remote processing unit of standing can unlocked successfully When, guidance command is directly transmitted to the measure and control device of transformer station, and wait remote control result.
More preferably, in standing, remote processing unit 400 is additionally operable to the remote control knot for receiving the measure and control device in transformer station Really, and by the remote control result it is sent to the remote control command process unit 200.At remote control order Reason unit 200, can be by the tele-control communication module to transformer station's outgoing after the remote control result is received Send remote control answer signal.And remote control command process unit 200 can also receive the remote control result Afterwards, the locking request of the anti-error system for remote control request being mapped as being sent to transformer station, and send locking please Unblock processing unit 300 interior to station is sought, after interior unblock processing unit 300 of standing can be asked the locking is received, Locking request is sent to anti-error system by station communication unit 500.Herein, remote processing unit 400 in standing The remote control result of the measure and control device of reception refers to that interior remote processing unit 400 of standing sends telecommand to observing and controlling After device, the result of the primary equipment control that Jing measure and control devices are completed to intelligent terminal again.Certainly, this sets It is also likely to be successfully equipment remote-control failure that the result of standby control is probably equipment remote-control.But, in order to ensure to become The safety of power station internal electric operation, either equipment remote-control success or remote control failure, complete a remote control After control, the anti-error system of transformer station will carry out lock operation to the lockset being related to.This latching process, Locking request is sent by interior unblock processing unit 300 of standing in the control system of the embodiment of the present invention and arrives anti-error System realizes that anti-error system can carry out lock-in control to corresponding lockset after receiving locking request.
It will be understood by those skilled in the art that herein stand in unblock processing unit 300 send locking request with The unlocking request for sending before should be mutually corresponding, i.e. the lockset that locking request is related to please with unblock The lockset being related to is asked to be usually identical.
From description above, interior remote processing unit 400 of standing can receive the remote control knot of measure and control device feedback Really.Above also it is described, the remote control result is probably remote control success, it is also possible to which remote control fails, either Remote control success or remote control failure, it is distant that remote control result all can be sent to a distant place by interior remote processing unit 400 of standing Control command process unit 200.And remote control command process unit 200 can enter after remote control result is received One step sends remote control answer signal to outside transformer station by tele-control communication module 100.Certainly, send to outside station Remote control answer signal be typically sent to send remote control request equipment, i.e. outside transformer station remote control dress Put transmission remote control to ask to receive the remote control result of transformer station's return to after transformer station after a period of time, Can from the remote control result clearly know to the remote control of transformer station's internal unit be successfully or failure.And become Being communicated between power station and its external equipment all realized by tele-control communication module 100.
In the embodiment of a specific transformer station error-unlocking prevention control device, as shown in Fig. 2 telemechanical is logical Letter unit 100 is that (" first " is only used as the next network interface card of differentiation herein, does not have spy by the first network interface card 110 Different implication, namely " the first network interface card 110 " only represent which is a network interface card) and 101 protocol processing units 120 The IEC60870-101 tele-control communication modules 100 of composition.Wherein, 101 protocol processing units 120 are one Software module.Accordingly, remote control command process unit 200, stand in remote processing unit 400 and station Unblock processing unit 300 is also respectively a software module.And station communication unit 500 and telemechanical communication unit Unit 100 is similar to, and which is that (" second " is only as differentiation tele-control communication module 100 herein by the second network interface card 510 The first network interface card 110 use, no particular meaning, namely " the second network interface card 510 " only represent which is a net Card) and IEC61850 protocol processing units 520 composition IEC61850 communication units.Wherein, IEC61850 Protocol processing unit 520 is also arranged to software module.Wherein, the software module in control system, such as IEC61850 protocol processing units 520 etc., are storable in the memorizer in control system.
It will be understood by those skilled in the art that the first network interface card 110 and station in tele-control communication module 100 are interior logical The second network interface card 510 in letter unit 500 can select the network interface card of same model also dependent on performance when selecting Demand each selects the network interface card of different model.
The first network interface card in this instantiation, when there is external remote control to ask, in tele-control communication module 100 IEC60870-101 remote controls message outside 110 receiving stations, 101 protocol processing units 120 pass through IEC60870-101 Agreement is decoded to the IEC60870-101 remote control messages that the first network interface card 110 is received, will be decoded distant Control request is sent to remote control command process unit 200.Remote control command process unit 200 is by the remote control Request is mapped as being sent to the unlocking request of anti-error system.In standing, unblock processing unit 300 is logical by IEC61850 Unlocking command is issued anti-error system by letter unit;And unblock successful result is sent to into remote control command process Unit 200.After remote control command process unit 200 receives unblock successful result, the remote control request is reflected Penetrate to be sent to the guidance command of measure and control device, and the guidance command be sent to into remote processing unit 400 in station, In standing, guidance command is issued measure and control device by IEC61850 communication units by remote processing unit 400;And will Remote control result is sent to remote control command process unit 200.Remote control command process unit 200 is received After remote control arrangement, the remote control being initially received request is mapped as into locking request, and locking request is sent to Unblock processing unit 300 in standing.After in standing, unblock processing unit 300 receives locking request, by logical in station Locking request is issued anti-error system by letter unit 500.And remote control command process unit 200 receive it is distant After control result, remote control result is transferred to into IEC60870-101 tele-control communication modules 100, IEC60870-101 Remote control encoding the response is IEC60870-101 by 101 protocol processing units 120 in tele-control communication module 100 Remote control response message, and ask to send IEC60870-101 remote control response reports to outside station by the first network interface card 110 Text.
Based on same inventive concept, a kind of transformer station's error-unlocking prevention control method of the embodiment of the present invention, due to this The principle of method solve problem and a kind of aforementioned transformer station's error-unlocking prevention control device functional similarity, therefore, should The unit for implementing to pass through aforementioned system of method is realized, repeats part and repeat no more.
Transformer station's error-unlocking prevention control method of one embodiment of the invention, as shown in figure 3, comprising the following steps:
S100, receives the remote control request being controlled to power transformation station equipment sent outside transformer station.
S200, by unlocking request that remote control request analysis are the anti-error system being sent in transformer station and is sent to power transformation The guidance command of the measure and control device in standing.
Unlocking request is sent to anti-error system by S300.
Guidance command after anti-error system unblock success, then is sent to measure and control device by S400.
Transformer station's error-unlocking prevention control method of the embodiment of the present invention, which is receiving the remote control outside transformer station After request, it is for the unlocking request of anti-error system and for the distant of measure and control device first by remote control request analysis Control order, and be first to send the anti-error system inside unlocking request to transformer station, only anti-error system unblock After success, can just send guidance command and the equipment inside transformer station is controlled to measure and control device.Thus, When being controlled to the equipment inside transformer station by external remote control, first have to inside transformer station Anti-error system is unlocked control to the lockset being related to, and realizes transformer station's external remote control operation by the method With the interface operation of anti-error system inside transformer station, so ensure that the protection of the transformer station of anti-error system is made Do not stood interior anti-error system supervision with, the outer remote manipulation that prevents from standing, directly by transformer station's station level bus Order lose one's life to measure and control device, transformer station's internal unit electric misoperation is effectively prevented, it is ensured that power system security Operation.
Specifically, in implementation process, the communication inside transformer station and external remote control between can for the method Realized by the tele-control communication module 100 inside transformer station, such as by the first network interface card 110 and IEC60870-101 agreements or IEC60870-104 agreements are carried out;And the communication between internal and measure and control device Internal station communication unit 500 can be passed through to realize, such as by the second network interface card 510 and IEC61850 agreements Carry out.And other correlation steps can be realized by corresponding software module is arranged inside transformer station.
Further, after anti-error system receives unlocking request, operation can be unlocked to corresponding lockset, But the situation of unblock failure also occurs.Once unblock failure, then remote manipulation can stop.Now, may be used To send unblock failure information to outside remote control equipment, this remote manipulation also just have failed certainly, also can be straight Receive and send remote control failure information.But it can be definitely which step there occurs and ask to send unblock failure information Topic, lookup reason of being more convenient for are remotely controlled operation again.
More preferably, after completing the remote manipulation to measure and control device, can also further send locking request and arrive anti- Error system.So, the anti-error system inside transformer station just can carry out locking behaviour to the lockset for unlocking before again Make, it is ensured that the safety of transformer station's internal unit.
It should be noted that measure and control device remote manipulation complete include remote control success also include remote control failure, In a word, guidance command is sent to after measure and control device, can wait the return information of measure and control device to be received.If by Operation can not be completed by guidance command in some reasons (such as equipment fault) measure and control device, then measure and control device The information of remote control failure is returned within a certain period of time can.After receiving the information of remote control failure, also calculate and complete one Secondary remote manipulation, now will also send locking request to anti-error system, cut out in time and beat because of remote manipulation The lockset opened.Ensure transformer station's internal unit safety.
Because failure may be successfully likely to the remote manipulation of measure and control device, therefore, in one embodiment Also include judging the whether successful step of the remote manipulation to measure and control device, if so, then send out to the outside of transformer station Send remote control successful respond information;If it is not, then to the outside of transformer station send remote control failure response message.Such energy Enough make external remote control equipment clearly know remote control result, be easy to take further operation.
As shown in figure 4, being transformer station to be remotely controlled using transformer station's error-unlocking prevention control method of the present invention One instantiation of operation.Specifically include following steps:
S101, receives remote control request.
S102, remote control request is mapped as being sent to the unlocking request of the first intelligent electronic device and observing and controlling dress is sent to The guidance command put.Wherein the first intelligent electronic device is the part of intelligent substation control, in transformer station The Based Intelligent Control of portion's equipment is realized by intelligent electronic device.In this step, it is distant during enforcement The anti-error system that control request is sent initially in transformer station, and anti-error system lockset is controlled (unblock, Locking) when, it is to be realized by the first intelligent electronic device.
Unlocking command is issued the first intelligent electronic device by S103.The unlocking command is according to step S102 The unlocking command for corresponding lockset that the unlocking request of middle generation is generated.
S104, detects or judges whether anti-error system unblock is successful, and when unlocking successfully, execution step S105;In unblock failure, execution step S109.
S105, measure and control device guidance command being sent in transformer station.
S106, detects or judges whether measure and control device remote control is successful, if then execution step S107;If it is not, Then execution step S107 '.
Locking order is issued the first intelligent electronic device by S107.
S108, sends remote control successful respond to outside station.
Locking order is issued the first intelligent electronic device by S107 '.
S108 ', to outside station sends remote control and unsuccessfully replys.
S109, to outside station sends remote control and unsuccessfully replys.
It will appreciated by the skilled person that all or part of flow process in realizing above-described embodiment method Related hardware can be instructed to complete by computer program, described program can be stored in a computer In read/write memory medium, the program is upon execution, it may include such as the flow process of the embodiment of above-mentioned each method. Wherein, described storage medium can be magnetic disc, read-only memory (Read-Only Memory, ROM) Or random access memory (Random Access Memory, RAM) etc..
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for this area Those of ordinary skill for, without departing from the inventive concept of the premise, can also make it is some deformation and Improve, these belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended Claim is defined.

Claims (10)

1. a kind of transformer station's error-unlocking prevention control device, it is characterised in that including tele-control communication module, a distant place Guidance command processing unit, interior unblock processing unit of standing, stand interior remote processing unit and station communication unit;
The tele-control communication module is used for the remote control being controlled to power transformation station equipment send outside receiving station Request, and remote control request is sent to into the remote control command process unit;
The remote control command process unit for by the remote control request be mapped as being sent to the anti-error of transformer station The unlocking request of system and be sent to transformer station measure and control device guidance command;
Processing unit is unlocked in the station to be used to send the unlocking request to institute by the station communication unit State anti-error system;
In the station remote processing unit for the anti-error system unblock success after, by the station lead to The guidance command is sent to letter unit the measure and control device of transformer station, and waits remote control result.
2. transformer station's error-unlocking prevention control device according to claim 1, it is characterised in that the station Interior remote processing unit is additionally operable to the remote control result for receiving the measure and control device in transformer station, and will be described distant Control result is sent to the remote control command process unit;
After the remote control command process unit is additionally operable to receive the remote control result, by the telemechanical Communication unit sends remote control answer signal to outside transformer station.
3. transformer station's error-unlocking prevention control device according to claim 2, it is characterised in that;
The remote control command process unit is additionally operable to after the remote control result is received, by the remote control Request is mapped as the locking request of the anti-error system for being sent to transformer station;
Unlock processing unit to be additionally operable to after the interior remote control in station terminates, by the station communication unit in the station Locking request is sent to the anti-error system.
4. transformer station's error-unlocking prevention control device according to claim 1, it is characterised in that the station Interior unblock processing unit is additionally operable to receive the unblock result of the anti-error system, and the unblock result is sent To the remote control command process unit;
The remote control command process unit is additionally operable to be mapped as being sent to transformer station by remote control request first Anti-error system unlocking request, and judge anti-error system unblock whether success, if so, then will be described Guidance command is mapped as the guidance command of the measure and control device for being sent to transformer station, if it is not, then passing through telemechanical communication unit Unit sends remote control and unsuccessfully replys.
5. transformer station's error-unlocking prevention control device according to claim 1, it is characterised in that the station Interior communication unit is made up of network interface card and IEC61850 protocol processing units.
6. a kind of transformer station's error-unlocking prevention control method, it is characterised in that comprise the following steps:
Receive the remote control request being controlled to power transformation station equipment sent outside transformer station;
Remote control request is mapped as into the unlocking request of anti-error system that is sent in transformer station and the change is sent to The guidance command of the measure and control device in power station;
The unlocking request is sent to into the anti-error system;
After anti-error system unblock success, then the guidance command is sent to into the measure and control device.
7. transformer station's error-unlocking prevention control method according to claim 6, it is characterised in that also include Following steps:
After completing the remote manipulation to the measure and control device, locking request is sent to the anti-error system.
8. transformer station's error-unlocking prevention control method according to claim 6, it is characterised in that also include Following steps:
Judge whether the remote manipulation to the measure and control device is successful, if so, then sends out to the outside of the transformer station Send remote control successful respond information;If it is not, then to the outside of the transformer station send remote control failure response message.
9. transformer station's error-unlocking prevention control method according to claim 6, it is characterised in that also include Following steps:
Judge anti-error system unblock whether success, described the guidance command is sent to if then performing The step of measure and control device;If it is not, then send to the outside of the transformer station unlocking failure information.
10. the transformer station's error-unlocking prevention control method according to any one of claim 6 to 9, its feature It is that transformer station is carried out by the first network interface card and IEC60870-101 agreements with PERCOM peripheral communication;
Communication between transformer station inside is carried out by the second network interface card and IEC61850 agreements.
CN201510613645.7A 2015-09-23 2015-09-23 Transformer substation anti-misoperation unlocking control device and control method Active CN106549493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510613645.7A CN106549493B (en) 2015-09-23 2015-09-23 Transformer substation anti-misoperation unlocking control device and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510613645.7A CN106549493B (en) 2015-09-23 2015-09-23 Transformer substation anti-misoperation unlocking control device and control method

Publications (2)

Publication Number Publication Date
CN106549493A true CN106549493A (en) 2017-03-29
CN106549493B CN106549493B (en) 2020-08-04

Family

ID=58365633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510613645.7A Active CN106549493B (en) 2015-09-23 2015-09-23 Transformer substation anti-misoperation unlocking control device and control method

Country Status (1)

Country Link
CN (1) CN106549493B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107623312A (en) * 2017-10-27 2018-01-23 国网福建省电力有限公司 A kind of protective relaying device remote control safety measure performs method
CN107844090A (en) * 2017-11-03 2018-03-27 许继集团有限公司 A kind of interlock method and device of the shutdown of substation data communication network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458505A (en) * 2008-12-17 2009-06-17 国电南京自动化股份有限公司 Full-station anti-mistaking closedown design method based on IEC61850 standard
CN101951032A (en) * 2010-10-14 2011-01-19 北京四方继保自动化股份有限公司 Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN104158294A (en) * 2014-08-27 2014-11-19 凯里供电局 Dispatching anti-misoperation control method
CN104600849A (en) * 2015-02-25 2015-05-06 国电南瑞科技股份有限公司 Smart power grid master station and substation depth anti-misoperation system implementation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458505A (en) * 2008-12-17 2009-06-17 国电南京自动化股份有限公司 Full-station anti-mistaking closedown design method based on IEC61850 standard
CN101951032A (en) * 2010-10-14 2011-01-19 北京四方继保自动化股份有限公司 Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN104158294A (en) * 2014-08-27 2014-11-19 凯里供电局 Dispatching anti-misoperation control method
CN104600849A (en) * 2015-02-25 2015-05-06 国电南瑞科技股份有限公司 Smart power grid master station and substation depth anti-misoperation system implementation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107623312A (en) * 2017-10-27 2018-01-23 国网福建省电力有限公司 A kind of protective relaying device remote control safety measure performs method
CN107844090A (en) * 2017-11-03 2018-03-27 许继集团有限公司 A kind of interlock method and device of the shutdown of substation data communication network

Also Published As

Publication number Publication date
CN106549493B (en) 2020-08-04

Similar Documents

Publication Publication Date Title
CN104600849B (en) Intelligent grid boss stands Layered Security anti-error system implementation method
CN101692524B (en) Anti-misoperation method and device for power system based on wireless communication
CN109191082A (en) A kind of method for programming of dispatching platform, system and computer readable storage medium
CN101387884A (en) Apparatus and methods for intrusion protection in safety instrumented process control systems
CN106712300A (en) Intelligent master station and sub-station multi-level anti-misoperation locking system
CN106302535A (en) Attack simulation method and device for power system and attack simulation equipment
CN201498885U (en) Electric power system faulty operation preventing device based on wireless communication
CN109787356A (en) A kind of transformer substation remote-control method for preventing misoperation and system based on IEC61850 specification
CN107591892A (en) A kind of intelligent substation O&M method and system
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN102573003A (en) Instant communication system, access equipment and communication equipment
CN105843094A (en) Garage control method, garage control device and garage control system
CN105978147A (en) File interaction based remote constant value amending system for automatic safety devices
CN106549493A (en) Transformer station's error-unlocking prevention control device and control method
CN107147715A (en) The Internet of Things smart lock tdm communication method and Internet of Things smart lock of multi-communication standard
CN104158294B (en) One kind scheduling anti-misoperation control method
CN101958577A (en) Method for overhauling GOOSE in digital substation
CN108648318A (en) It is online to authorize Interlocking Methods and system
CN106504370B (en) Plant stand security management and control system and control method
CN106953840A (en) A kind of water power far controls platform method for preventing misoperation and system
CN109272626A (en) Key safety management system and method
CN112421766A (en) Construction method of integrated anti-misoperation safety management and control platform for substations
CN117955230A (en) Global anti-misoperation method, system, device and storage medium for power distribution network
CN115102289B (en) Control method, system, computer readable storage medium and computing device for realizing unique remote control right of intelligent substation
CN114094551B (en) Protection system smooth access method based on intelligent multiport controller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant