CN106428440A - Hinged truss type twin-hull floating crane - Google Patents

Hinged truss type twin-hull floating crane Download PDF

Info

Publication number
CN106428440A
CN106428440A CN201611088324.0A CN201611088324A CN106428440A CN 106428440 A CN106428440 A CN 106428440A CN 201611088324 A CN201611088324 A CN 201611088324A CN 106428440 A CN106428440 A CN 106428440A
Authority
CN
China
Prior art keywords
hull
hanger
pulley
crane ship
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611088324.0A
Other languages
Chinese (zh)
Inventor
谷家扬
陶延武
朱新耀
徐博钧
李天佑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu University of Science and Technology
Original Assignee
Jiangsu University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University of Science and Technology filed Critical Jiangsu University of Science and Technology
Priority to CN201611088324.0A priority Critical patent/CN106428440A/en
Publication of CN106428440A publication Critical patent/CN106428440A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/125Chain-type slings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/16Arrangement of ship-based loading or unloading equipment for cargo or passengers of lifts or hoists
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/02Devices for facilitating retrieval of floating objects, e.g. for recovering crafts from water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

本发明公开了一种铰接桁架式双体起重船,包括左船体和右船体,所述左船体和右船体上均设有吊架平台,在吊架平台上安装有铰支座,在左船体和右船体的铰支座上通过门架脚趾铰接有前吊架和后吊架,前吊架和后吊架均包含门架,在左右两个吊架平台上均安装有绞车,在门架的上端安装有滑轮组,滑轮组通过缆绳分别与绞车连接。本发明的铰接桁架式双体起重船,吊架下端与左右船体铰接,在船体发生较大横摇时,仍可保证吊架平稳,避免吊架下端与船体连接处产生较大扭矩;吊架下方空间大,配备多个吊钩,多点起吊,易于起重大型模块,吊架下方可以方便改装为工作平台,用于立管和张力筋腱安装和维修、打桩等作业。

The invention discloses a articulated truss type catamaran crane ship, which comprises a left hull and a right hull. Both the left hull and the right hull are provided with a hanger platform, and a hinge support is installed on the hanger platform. The hinge support of the hull and the right hull is hinged with the front hanger and the rear hanger through the toe of the door frame. A block of pulleys is installed on the upper end of the frame, and the block of pulleys is respectively connected with the winch by cables. In the articulated truss type catamaran crane ship of the present invention, the lower end of the hanger is hinged with the left and right hulls, so that when the hull rolls greatly, the hanger can still be kept stable, and large torque can be avoided at the connection between the lower end of the hanger and the hull; There is a large space under the frame, equipped with multiple hooks, multi-point lifting, easy to lift large modules, and the bottom of the hanger can be easily converted into a working platform for installation and maintenance of risers and tendons, piling and other operations.

Description

一种铰接桁架式双体起重船An articulated truss catamaran

技术领域technical field

本发明涉及铰接桁架式双体起重船,属于船舶领域。The invention relates to an articulated truss type catamaran crane ship, which belongs to the field of ships.

背景技术Background technique

随着早期服役的导管架平台和水下生产系统进入退役期,这些已经退役的导管架平台和水下生产系统需要进行拆除。导管架平台的上层建筑通常较高,重量较大,拆除比较困难。另外大型水上结构逐渐采用模块化建造,最终在码头或者海上对模块进行总装。这些模块重量通常达到几千吨,而且形状差异较大。在这些结构进行拆除、安装作业中需要一种能够作业平稳、起重能力强、作业范围广的操作平台。现有起重船多为单船体结构,亦有采用单体与边浮箱形成组合结构。为了增大起吊半径,起重船会将吊臂布置在船艏端或者艉端,这种起重船在起吊大型重物时,会引起较大的纵倾或横倾力矩。为了使船体平衡,必须调整船体内的压载水分布。起吊过程中,吊臂与船体连接处会产生较大的应力集中,因此吊臂下端与船体连接处需要进行结构加强。As the jacket platforms and subsea production systems in early service enter the decommissioning period, these decommissioned jacket platforms and subsea production systems need to be dismantled. The superstructure of the jacket platform is usually high and heavy, and it is difficult to dismantle it. In addition, large-scale water structures are gradually constructed in modules, and the modules are finally assembled at the dock or at sea. These modules typically weigh several thousand tons and vary widely in shape. A kind of operation platform capable of stable operation, strong lifting capacity and wide operation range is needed in the dismantling and installation operations of these structures. Most of the existing crane ships are single-hull structures, and some of them use single hulls and side pontoons to form a combined structure. In order to increase the lifting radius, the crane ship will arrange the boom at the bow or stern of the ship. When this kind of crane ship lifts large heavy objects, it will cause a large pitch or heel moment. In order to balance the hull, the ballast water distribution in the hull must be adjusted. During the lifting process, there will be a large stress concentration at the connection between the boom and the hull, so the connection between the lower end of the boom and the hull needs to be structurally strengthened.

双体船通常具有好的耐波性,双体布置在耐波性要求较高的船舶上得到广泛应用,如双体客船,双体测量船等。现有起重船亦有采用双体布置或类似双体布置方式。Catamarans usually have good seakeeping, and catamaran arrangements are widely used on ships with high seakeeping requirements, such as catamaran passenger ships and catamaran survey ships. Existing crane ships also adopt double-hull arrangement or similar double-hull arrangement.

经检索发现,公开号为CN 102642601B的专利文件中公开的双体可移动全回转式起重船,采用双体结构,利用位于船体端部的固定式甲板连接两船体,左右船体上各安装一台全回转式起重吊机,起重吊机利用液压爬行式的机构可沿左右甲板上吊机运行轨道移动。此方案采用两台起重机,仅能提供两个起吊点,不宜起吊大型模块;另外在两船内部起吊重物时,会在甲板上产生较大的弯矩,对甲板的强度不利。公开号为CN102530189A的专利文件中公开的用于海洋工程的双体船采用两平行且具有可调间距的船体作为主体,两船体甲板后部设置滑道,两平行箱体在船体上方横跨两船体,可沿轨道前后滑动。此方案两箱体水平放置基座上,两船间距较大时形成大跨度简支梁,若起吊超重型模块时,箱体需要较高的强度,造成箱体结构用料较多,结构过重;另外在船体发生较大横摇时,会造成箱体下方支架单侧受力过大,容易造成结构破坏。After retrieval, it was found that the double-hull movable full-rotation crane disclosed in the patent document with the publication number CN 102642601B adopts a double-hull structure, and uses a fixed deck at the end of the hull to connect the two hulls. A full-slewing crane, the crane uses a hydraulic crawling mechanism to move along the running track of the crane on the left and right decks. This solution uses two cranes, which can only provide two lifting points, and it is not suitable for lifting large modules. In addition, when lifting heavy objects inside the two ships, a large bending moment will be generated on the deck, which is not good for the strength of the deck. The catamaran used for marine engineering disclosed in the patent document with the publication number CN102530189A adopts two parallel hulls with adjustable spacing as the main body, slideways are set at the rear of the decks of the two hulls, and two parallel boxes span the two hulls above the hulls. The hull can slide back and forth along the track. In this scheme, the two boxes are placed horizontally on the base. When the distance between the two ships is large, a large-span simply supported beam is formed. If the super-heavy module is lifted, the box needs higher strength, resulting in more materials for the box structure and excessive structure. In addition, when the hull rolls greatly, it will cause excessive force on one side of the bracket below the box, which is likely to cause structural damage.

发明内容Contents of the invention

发明目的:为了克服现有技术中存在的不足,本发明提供一种铰接桁架式双体起重船,该起重船起重能力强,结构用钢少,天气适应性好,作业平稳,功能多。Purpose of the invention: In order to overcome the deficiencies in the prior art, the present invention provides a articulated truss type catamaran crane ship, which has strong lifting capacity, less structural steel, good weather adaptability, stable operation, and high performance. many.

技术方案:为解决上述技术问题,本发明的一种铰接桁架式双体起重船,包括左船体和右船体,所述左船体和右船体上均设有吊架平台,在吊架平台上安装有铰支座,在左船体和右船体的铰支座上通过门架脚趾铰接有前吊架和后吊架,前吊架和后吊架均包含门架,在左右两个吊架平台上均安装有绞车,在门架的上端安装有滑轮组,滑轮组通过缆绳分别与绞车连接。Technical solution: In order to solve the above technical problems, an articulated truss type catamaran crane ship of the present invention includes a left hull and a right hull, both of which are provided with a hanger platform, and on the hanger platform Hinged support is installed, and the front hanger and rear hanger are hinged on the hinge support of the left and right hulls through the toe of the mast. Both the front hanger and the rear hanger include the mast. A winch is installed on the top, and a pulley block is installed on the upper end of the door frame, and the pulley block is respectively connected with the winch through cables.

作为优选,所述门架有两种不同管径的钢管焊接而成,门架上设置多个水平支撑和斜支撑,形成多个三角形。Preferably, the portal frame is welded by two kinds of steel pipes with different pipe diameters, and multiple horizontal supports and oblique supports are arranged on the portal frame to form multiple triangles.

作为优选,所述左船体和右船体的内侧均设有立式护舷。Preferably, vertical fenders are provided on the inner sides of the left hull and the right hull.

作为优选,所述立式护舷包含二十个圆柱形立式橡胶护舷,圆柱形立式橡胶护舷由螺栓依次固定在舷侧。Preferably, the vertical fenders include twenty cylindrical vertical rubber fenders, and the cylindrical vertical rubber fenders are sequentially fixed on the sides by bolts.

作为优选,所述铰支座上方焊接铰链双耳,单耳插头下端扁平,上面带有圆孔,与铰链双耳上的圆孔同轴心、同直径,铰链销穿过铰链双耳和单耳插头,铰链销为钉子形结构,钉帽直径大于上述开孔直径,钉尖穿过铰链双耳后由销钉进行限位,单耳插头上端为圆管,其外径与门架脚趾内径相同,圆管下方带有台阶。As a preference, the hinge ears are welded above the hinge support, the lower end of the single ear plug is flat, and there is a round hole on it, which is coaxial and of the same diameter as the round hole on the hinge ears, and the hinge pin passes through the hinge ears and the single ear. Ear plug, the hinge pin is a nail-shaped structure, the diameter of the nail cap is larger than the diameter of the above-mentioned opening, the nail point is limited by the pin after passing through the ears of the hinge, the upper end of the single-ear plug is a round tube, and its outer diameter is the same as the inner diameter of the mast toe , with a step below the round tube.

作为优选,所述滑轮组包含滑轮吊耳,滑轮吊耳焊接在门架,纵向居中,滑轮吊耳下方连接上滑轮,下滑轮与上滑轮通过起重钢缆连接,起重钢缆在下滑轮和上滑轮上的滑轮间绕3-4圈,起重钢缆一端固定在上滑轮上,另一端连接至绞车,下滑轮下方安装吊钩,吊钩由上端螺栓紧固。Preferably, the pulley block includes a pulley lug, the pulley lug is welded to the mast, and is longitudinally centered, the upper pulley is connected under the pulley lug, the lower pulley is connected to the upper pulley through a lifting cable, and the lifting cable is connected between the lower pulley and the upper pulley. There are 3-4 circles between the pulleys on the pulley, one end of the lifting steel cable is fixed on the upper pulley, the other end is connected to the winch, and a hook is installed under the lower pulley, and the hook is fastened by the upper bolt.

作为优选,所述左船体和右船体的艏艉端为倾斜状。Preferably, the fore and aft ends of the left hull and the right hull are inclined.

有益效果:本发明的铰接桁架式双体起重船,具有以下优点:Beneficial effects: the articulated truss catamaran crane ship of the present invention has the following advantages:

1、吊架下端与左右船体铰接,在船体发生较大横摇时,仍可保证吊架平稳,避免吊架下端与船体连接处产生较大扭矩。1. The lower end of the hanger is hinged with the left and right hulls. When the hull rolls greatly, the hanger can still be stable and avoid a large torque at the connection between the lower end of the hanger and the hull.

2、左船体和右船体的主船体艏艉端倾斜,有利于减小拖航时的阻力。2. The bow and stern of the main hull of the left hull and the right hull are inclined, which is beneficial to reduce the resistance during towing.

3、前吊架和后吊架采用桁架式结构,结构强度大,用料少,起重能力强。3. The front hanger and rear hanger adopt truss structure, which has high structural strength, less material and strong lifting capacity.

4、采用双体布置,耐波性优良,另外两侧船体对横浪起到一定的屏障作用,降低两船间月池内的浪高,利于开展作业。4. The double-hull arrangement is adopted, which has excellent seakeeping performance. In addition, the hulls on both sides play a certain role as a barrier to transverse waves, reducing the wave height in the moon pool between the two ships, which is conducive to carrying out operations.

5、吊架下方空间大,配备多个吊钩,多点起吊,易于起重大型模块,吊架下方可以方便改装为工作平台,用于立管和张力筋腱安装和维修、打桩等作业。5. The space under the hanger is large, equipped with multiple hooks, multi-point lifting, easy to lift large modules, and the bottom of the hanger can be easily converted into a working platform for installation and maintenance of risers and tendons, piling and other operations.

6、采用前后分离的两个吊架,方便吊架安装。6. Two hangers separated from the front and back are used to facilitate the installation of hangers.

附图说明Description of drawings

图1是本发明的整体结构图。Fig. 1 is the overall structure diagram of the present invention.

图2是本发明的俯视图。Figure 2 is a top view of the present invention.

图3是本发明的后视图。Figure 3 is a rear view of the present invention.

图4是本发明的侧视图。Figure 4 is a side view of the present invention.

图5是左右船体结构图。Fig. 5 is a structural diagram of the left and right hulls.

图6是后吊架结构图。Figure 6 is a structural diagram of the rear hanger.

图7是铰支座结构图。Figure 7 is a structural diagram of the hinge support.

图8是滑轮组结构图。Fig. 8 is a block diagram of a pulley.

图中:左船体1、右船体2、前吊架3、后吊架4、左船体主船体11、左船体甲板室12、左船体吊架平台、左船体立式护舷、右船体主船体21、右船体甲板室22、门架31、铰支座32、门架脚趾33、第一绞车平台34、第一绞车35、滑轮组36、第二绞车平台37、第二绞车38、铰链双耳322、单耳插头324、铰链销323、销钉325、滑轮吊耳361、上滑轮362、起重钢缆363、下滑轮364、吊钩365。In the figure: left hull 1, right hull 2, front hanger 3, rear hanger 4, left hull main hull 11, left hull deckhouse 12, left hull hanger platform, left hull vertical fender, right hull main hull 21. Right hull deckhouse 22, mast 31, hinge support 32, mast toe 33, first winch platform 34, first winch 35, pulley block 36, second winch platform 37, second winch 38, hinge ears 322, single-ear plug 324, hinge pin 323, pin 325, pulley lug 361, upper pulley 362, lifting steel cable 363, lower pulley 364, suspension hook 365.

具体实施方式detailed description

如图1至图8所示,本发明的一种铰接桁架式双体起重船,包括左船体1和右船体2,所述左船体1和右船体2上均设有吊架平台13,在吊架平台13上安装有铰支座32,在左船体1和右船体2的铰支座32上通过门架脚趾33铰接有前吊架3和后吊架4,前吊架3和后吊架4均包含门架31,在左右两个吊架平台13上均安装有绞车,在门架31的上端安装有两个滑轮组36,每个滑轮组36通过缆绳分别与绞车连接,缆绳为起重钢缆363。左船体1与右船体2沿船体纵向平行放置,所述左船体1和右船体2的艏艉端为倾斜状,两船体间具有一定间距,形成前后开口的矩形月池,所述左船体1和右船体2的内侧均设有立式护舷14,所述立式护舷14包含二十个圆柱形立式橡胶护舷14,圆柱形立式橡胶护舷14由螺栓依次固定在舷侧;前吊架3和后吊架4安装在左船体1和右船体2上方,沿左船体1和右船体2横向平行放置,横跨左船体1和右船体2,前吊架3在左船体1和右船体2中前部,后吊架4在左船体1和右船体2中后部;前吊架3与后吊架4结构相同,安装方向不同,前吊架3大端在左船体1上,小端在右船体2上;后吊架4大端在右船体2上,小端在左船体1上;前吊架3与后吊架4在船体纵向有一定间距,间距为1.5倍前吊架3小端宽度。As shown in Figures 1 to 8, a articulated truss type catamaran crane ship of the present invention includes a left hull 1 and a right hull 2, and a hanger platform 13 is provided on the left hull 1 and the right hull 2, On the hanger platform 13, a hinge support 32 is installed, and on the hinge support 32 of the left hull 1 and the right hull 2, the front hanger 3 and the rear hanger 4 are hinged by the door frame toe 33, and the front hanger 3 and the rear hanger 3 are hinged. Hanger 4 all comprises door frame 31, and winch is all installed on two hanger platforms 13, left and right, and two block pulleys 36 are installed on the upper end of door frame 31, and each block pulley 36 is connected with winch respectively by cable, and cable is Heavy Steel Cable 363. The left hull 1 and the right hull 2 are placed parallel to the longitudinal direction of the hull. The bow and stern ends of the left hull 1 and the right hull 2 are inclined, and there is a certain distance between the two hulls to form a rectangular moon pool with front and rear openings. The left hull 1 and the inner side of the starboard hull 2 are provided with vertical fenders 14, the vertical fenders 14 include twenty cylindrical vertical rubber fenders 14, and the cylindrical vertical rubber fenders 14 are sequentially fixed on the side by bolts The front hanger 3 and the rear hanger 4 are installed above the left hull 1 and the right hull 2, placed in parallel along the left hull 1 and the right hull 2, across the left hull 1 and the right hull 2, and the front hanger 3 is on the left hull 1 and the middle front of the right hull 2, and the rear hanger 4 is at the middle and rear of the left hull 1 and the right hull 2; the front hanger 3 has the same structure as the rear hanger 4, but the installation directions are different, and the large end of the front hanger 3 is on the left hull 1, the small end is on the right hull 2; the large end of the rear hanger 4 is on the right hull 2, and the small end is on the left hull 1; there is a certain distance between the front hanger 3 and the rear hanger 4 in the longitudinal direction of the hull, and the distance is 1.5 Times front hanger 3 small end width.

在本发明中,所述门架31有两种不同管径的钢管焊接而成,门架31上设置多个水平支撑和斜支撑,形成多个三角形,水平支撑除绞车平台支撑杆外均为大直径钢管,门架31内外侧斜撑以及与脚趾连接的水平和竖直杆为大直径钢管;所述门架31大端前后各安装一个脚趾,与这两个脚趾相连的斜撑为大直径钢管;安装滑轮组36的横杆下方斜撑为大直径钢管,其余斜撑为小直径钢管,所述绞车平台上方通过两道斜撑与门架31连接。In the present invention, the gantry 31 is welded by two kinds of steel pipes with different pipe diameters. A plurality of horizontal supports and oblique supports are arranged on the gantry 31 to form a plurality of triangles. The horizontal supports are Large-diameter steel pipes, the inner and outer diagonal braces of the door frame 31 and the horizontal and vertical rods connected with the toes are large-diameter steel pipes; a toe is respectively installed at the front and back of the large end of the door frame 31, and the diagonal braces connected with these two toes are large diameter steel pipes. Diameter steel pipes; the diagonal braces below the crossbars of the pulley block 36 are large diameter steel pipes, and the remaining diagonal braces are small diameter steel pipes. The upper part of the winch platform is connected with the door frame 31 by two diagonal braces.

如图5所示,左船体主船体11甲板上设置左船体吊架平台,左船体吊架平台中心与左船体主船体11甲板中心重合,左船体甲板室12位于左船体主船体11末端,左船体主船体11靠近月池的舷侧安装左船体立式护舷;左船体立式护舷由二十个圆柱形立式橡胶护舷构成,由螺栓固定在舷侧;左船体1与右船体2布置基本相同,不同的是右船体甲板室22安装在右船体主船体21前端;左船体主船体11和右船体主船体21为驳船样式,首尾段倾斜船底倾斜。As shown in Figure 5, the left hull hanger platform is set on the deck of the left hull main hull 11, the center of the left hull hanger platform coincides with the center of the left hull main hull 11 decks, and the left hull deckhouse 12 is positioned at the end of the left hull main hull 11. The main hull 11 of the hull is installed with the left hull vertical fender near the side of the moon pool; the left hull vertical fender is composed of twenty cylindrical vertical rubber fenders, which are fixed on the side by bolts; the left hull 1 and the right hull 2 layout is basically the same, the difference is that the right hull deckhouse 22 is installed in the front end of the right hull main hull 21;

如图6所示,门架31为桁架式门型结构,门架31上部设置三道水平横梁,门架31下部各设置三道水平框架,门架31两下部大小不同,大端下方与四个门架脚趾33连接,小端下方与两个门架脚趾33连接,每个脚趾33安装在铰支座32上;每个铰支座32安装在吊架平台13上,横向居中。门架31大端中下方设置第一绞车平台34,由斜撑和水平撑支撑,第一绞车35安装在第一绞车平台34中部;门架31小端中下方设置第二绞车平台37,由斜撑和水平撑支撑,第二绞车38安装在第二绞车平台34中部;门架31大端下方外侧的两个门架脚趾32由两根斜撑支撑;门架31大端下方四个门架脚趾33以及门架31小端下方两个门架脚趾33均用一个大直径钢管沿船长方向连接,以保持门架脚趾33间的间距;滑轮组36安装在门架31顶端纵向水平管下方。As shown in Figure 6, the gantry 31 is a truss-type gantry structure, three horizontal beams are arranged on the upper part of the gantry 31, and three horizontal frames are respectively arranged on the lower part of the gantry 31. A gantry toe 33 is connected, and the small end below is connected with two gantry toes 33, and each toe 33 is installed on the hinge support 32; Each hinge support 32 is installed on the hanger platform 13, and is horizontally centered. The first winch platform 34 is arranged in the middle and lower part of the large end of the portal frame 31, which is supported by diagonal braces and horizontal braces. The first winch 35 is installed in the middle part of the first winch platform 34; Supported by diagonal braces and horizontal braces, the second winch 38 is installed in the middle of the second winch platform 34; the two portal toes 32 on the outer side below the large end of the portal frame 31 are supported by two diagonal braces; the four doors below the large end of the portal frame 31 Frame toe 33 and two gantry toes 33 below the door frame 31 small ends are all connected along the ship's length direction with a large-diameter steel pipe, to keep the spacing between door frame toes 33;

如图7所示,铰支座32上方焊接铰链双耳322,单耳插头324下端扁平,上面带有圆孔,铰链双耳322和单耳插头324均为连接件,与铰链双耳322上的圆孔同轴心、同直径,铰链销323穿过上述两孔,铰链销323为钉子形结构,钉帽直径大于上述开孔直径,钉尖穿过铰链双耳322后由销钉325进行限位,防止铰链销323滑落;单耳插头324上端为圆管,其外径与门架脚趾33内径相同,圆管下方带有台阶。As shown in Figure 7, the hinge double ear 322 is welded on the top of the hinge support 32, and the lower end of the single ear plug 324 is flat with a round hole above. The circular holes are coaxial and have the same diameter. The hinge pin 323 passes through the above two holes. The hinge pin 323 is a nail-shaped structure. The diameter of the nail cap is greater than the diameter of the above-mentioned opening. position, to prevent the hinge pin 323 from slipping; the upper end of the single-ear plug 324 is a round tube, the outer diameter of which is the same as the inner diameter of the mast toe 33, and there is a step below the round tube.

如图8所示,滑轮吊耳361焊接在门架31顶端纵向水平管下方,纵向居中,滑轮吊耳361下方连接上滑轮362,下滑轮364与上滑轮362通过起重钢缆363连接,起重钢缆363在下滑轮364和上滑轮362上的滑轮间绕3-4圈,起重钢缆363一端固定在上滑轮362上,另一端连接至绞车,下滑轮364下方安装吊钩365,吊钩365由上端螺栓紧固,可拆卸。As shown in Figure 8, the pulley lug 361 is welded below the vertical horizontal pipe at the top of the door frame 31, and is centered longitudinally. The heavy steel cable 363 winds 3-4 turns between the pulleys on the lower pulley 364 and the upper pulley 362. One end of the lifting steel cable 363 is fixed on the upper pulley 362, and the other end is connected to the winch. A suspension hook 365 is installed below the lower pulley 364 to hang The hook 365 is fastened by the upper end bolt and is detachable.

本发明的一个实施案例:左船体1与右船体2以一定间距平行放置,内部形成前后开口的矩形月池,前吊架3和后吊架4横跨左船体1与右船体2,前吊架3和后吊架4平行。左船体主船体11与右船体主船体21结构相同,左船体甲板室12在左船体1后部,右船体甲板室22在右船体2前部。与右船体相同,左船体1甲板上设置吊架平台13,在靠近月池的舷侧设置多道立式护舷14。前吊架3和后吊架4结构相同,为门型结构,两“门框”大小不同,前吊架3和后吊架4安装方向相反:前吊架3大端和后吊架4小端在左船体1上,前吊架3小端和后吊架4大端在右船体2上。后吊架3的主框架为门架31,门架31下端连接多个门架脚趾33,门架脚趾33下方安装在铰支座32上,门架31大端下方有四个同轴心铰支座32,门架31小端下方有两个同轴心铰支座32。门架31大端设置第一绞车平台34,第一绞车平台34上居中安装第一绞车35;门架31小端设置第二绞车平台37,第二绞车平台37上居中安装第二绞车38。铰支座32底部为长方体基座321,长方体基座321上方焊接铰链双耳322,单耳插头324下端嵌入铰链双耳322,可绕铰链销323相对转动,销钉325插入铰链销323小端。滑轮组36安装在门架31顶端纵向水平杆下方,滑轮吊耳361上端焊接在门架31顶端纵向水平杆上,下端连接上滑轮362,上滑轮362通过起重钢缆363连接下滑轮364,下滑轮364下方安装吊钩365。An implementation example of the present invention: the left hull 1 and the right hull 2 are placed in parallel at a certain distance, and a rectangular moon pool with front and rear openings is formed inside, the front hanger 3 and the rear hanger 4 span the left hull 1 and the right hull 2, and the front hanger Frame 3 and rear hanger 4 are parallel. Left hull main hull 11 is identical with right hull main hull 21 structures, and left hull deckhouse 12 is at left hull 1 rear portion, and right hull deckhouse 22 is at right hull 2 fronts. Same as the right hull, a hanger platform 13 is set on the deck of the left hull 1, and multiple vertical fenders 14 are set on the side near the moon pool. The front hanger 3 and the rear hanger 4 have the same structure, which is a door-shaped structure. The two "door frames" are different in size. The installation directions of the front hanger 3 and the rear hanger 4 are opposite: the big end of the front hanger 3 and the small end of the rear hanger 4 On the left hull 1, 3 small ends of the front hanger and 4 large ends of the rear hanger are on the right hull 2. The main frame of the rear hanger 3 is a door frame 31, the lower end of the door frame 31 is connected with a plurality of door frame toes 33, the bottom of the door frame toes 33 is installed on the hinge support 32, and there are four coaxial hinges below the big end of the door frame 31. Bearing 32, there are two coaxial hinge bearings 32 below the door frame 31 small end. The first winch platform 34 is arranged at the large end of the door frame 31, and the first winch 35 is installed in the center on the first winch platform 34; Hinge bearing 32 bottoms are rectangular parallelepiped base 321, and above rectangular parallelepiped base 321 welding hinge ear 322, single ear plug 324 lower ends embed hinge ear 322, can rotate relatively around hinge pin 323, and pin 325 inserts hinge pin 323 little ends. The pulley block 36 is installed below the vertical horizontal bar at the top of the door frame 31. The upper end of the pulley lug 361 is welded on the vertical horizontal bar at the top of the door frame 31, and the lower end is connected to the upper pulley 362. The upper pulley 362 is connected to the lower pulley 364 through the hoisting cable 363, and slides down A suspension hook 365 is installed below the wheel 364 .

进行海上大型模块安装时,首先将本起重船拖到驳船上方,将本起重船上方的四个吊钩365与驳船上的大型模块绑扎牢固,启动后吊架4上的第一绞车35和第二绞车35以及前吊架3上的另外两台绞车,收紧滑轮组36上的起重缆索363,将大型模块吊起至足够高度,然后将本起重船拖到安装位置上方,定位准确后,启动四台绞车,放松起重钢缆363,将大型模块放下至目标位置,安装成后,将本起重船拖离。进行海上大型模块拆除时作业顺序与安装过程相反。在作业过程中,左船体1、右船体2会产生一定的横摇运动,此时前吊架3和后吊架4会绕铰支座32轴心与左船体1和右船体2发生相对转动,减小前吊架3和后吊架4下端扭矩,防止前吊架3和后吊架4因扭转受损。When installing a large-scale module at sea, first drag the lifting vessel to the top of the barge, bind the four hooks 365 above the lifting vessel to the large-scale module on the barge firmly, and start the first winch 35 on the hanger 4 after starting And the other two winches on the second winch 35 and the front hanger 3, tighten the hoisting cables 363 on the pulley block 36, the large module is hoisted to a sufficient height, then this hoisting ship is dragged to the top of the installation position, positioned Accurately after, start four winches, loosen hoisting cable 363, large-scale module is put down to target position, after being installed, this hoisting ship is towed away. The operation sequence is opposite to the installation process when the offshore large-scale module is dismantled. During the operation, the left hull 1 and the right hull 2 will produce a certain rolling motion. At this time, the front hanger 3 and the rear hanger 4 will rotate relative to the left hull 1 and the right hull 2 around the axis of the hinge support 32 , reduce the front hanger 3 and the rear hanger 4 lower end torque, prevent the front hanger 3 and the rear hanger 4 from being damaged due to torsion.

以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also possible. It should be regarded as the protection scope of the present invention.

Claims (7)

1.一种铰接桁架式双体起重船,其特征在于:包括左船体和右船体,所述左船体和右船体上均设有吊架平台,在吊架平台上安装有铰支座,在左船体和右船体的铰支座上通过门架脚趾铰接有前吊架和后吊架,前吊架和后吊架均包含门架,在左右两个吊架平台上均安装有绞车,在门架的上端安装有滑轮组,滑轮组通过缆绳分别与绞车连接。1. A articulated truss type catamaran crane ship is characterized in that: it comprises a left hull and a right hull, the left hull and the right hull are all provided with a hanger platform, and a hinged support is installed on the hanger platform, On the hinge support of the left hull and the right hull, the front hanger and the rear hanger are hinged through the toe of the door frame. Both the front hanger and the rear hanger include the door frame, and winches are installed on the left and right hanger platforms. A block of pulleys is installed on the upper end of the door frame, and the block of pulleys is respectively connected with the winch through cables. 2.根据权利要求1所述的铰接桁架式双体起重船,其特征在于:所述门架有两种不同管径的钢管焊接而成,门架上设置多个水平支撑和斜支撑,形成多个三角形。2. The articulated truss type catamaran crane ship according to claim 1, characterized in that: the portal frame is welded by steel pipes of two different pipe diameters, and a plurality of horizontal supports and oblique supports are arranged on the portal frame, Form multiple triangles. 3.根据权利要求1所述的铰接桁架式双体起重船,其特征在于:所述左船体和右船体的内侧均设有立式护舷。3. The articulated truss catamaran crane ship according to claim 1, characterized in that vertical fenders are provided on the inner sides of the left hull and the right hull. 4.根据权利要求3所述的铰接桁架式双体起重船,其特征在于:所述立式护舷包含二十个圆柱形立式橡胶护舷,圆柱形立式橡胶护舷由螺栓依次固定在舷侧。4. The articulated truss catamaran crane ship according to claim 3, characterized in that: the vertical fenders include twenty cylindrical vertical rubber fenders, and the cylindrical vertical rubber fenders are sequentially formed by bolts. fixed on the side. 5.根据权利要求1所述的铰接桁架式双体起重船,其特征在于:所述铰支座上方焊接铰链双耳,单耳插头下端扁平,上面带有圆孔,与铰链双耳上的圆孔同轴心、同直径,铰链销穿过铰链双耳和单耳插头,铰链销为钉子形结构,钉帽直径大于上述开孔直径,钉尖穿过铰链双耳后由销钉进行限位,单耳插头上端为圆管,其外径与门架脚趾内径相同,圆管下方带有台阶。5. The articulated truss type catamaran crane ship according to claim 1, characterized in that: the hinge ears are welded above the hinge support, and the lower end of the single ear plug is flat with a round hole on it, which is connected to the hinge ears. The round holes are concentric and have the same diameter. The hinge pin passes through the hinge ears and the single ear plug. The hinge pin is a nail-shaped structure. The diameter of the nail cap is larger than the diameter of the above-mentioned opening. The upper end of the single-ear plug is a round tube whose outer diameter is the same as the inner diameter of the mast toe, and there is a step below the round tube. 6.根据权利要求1所述的铰接桁架式双体起重船,其特征在于:所述滑轮组包含滑轮吊耳,滑轮吊耳焊接在门架,纵向居中,滑轮吊耳下方连接上滑轮,下滑轮与上滑轮通过起重钢缆连接,起重钢缆在下滑轮和上滑轮上的滑轮间绕3-4圈,起重钢缆一端固定在上滑轮上,另一端连接至绞车,下滑轮下方安装吊钩,吊钩由上端螺栓紧固。6. The articulated truss type catamaran crane ship according to claim 1, characterized in that: the pulley block includes pulley lugs, the pulley lugs are welded to the mast, centered in the longitudinal direction, the upper pulley is connected to the lower part of the pulley lugs, and the sliding The wheel and the upper pulley are connected by a lifting cable. The lifting cable is wound 3-4 times between the pulleys on the lower pulley and the upper pulley. One end of the lifting cable is fixed on the upper pulley, and the other end is connected to the winch. Install the hook, and the hook is fastened by the upper end bolt. 7.根据权利要求1所述的铰接桁架式双体起重船,其特征在于:所述左船体和右船体的艏艉端为倾斜状。7. The articulated truss type catamaran crane ship according to claim 1, characterized in that: the bow and stern ends of the left hull and the right hull are inclined.
CN201611088324.0A 2016-12-01 2016-12-01 Hinged truss type twin-hull floating crane Pending CN106428440A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611088324.0A CN106428440A (en) 2016-12-01 2016-12-01 Hinged truss type twin-hull floating crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611088324.0A CN106428440A (en) 2016-12-01 2016-12-01 Hinged truss type twin-hull floating crane

Publications (1)

Publication Number Publication Date
CN106428440A true CN106428440A (en) 2017-02-22

Family

ID=58222582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611088324.0A Pending CN106428440A (en) 2016-12-01 2016-12-01 Hinged truss type twin-hull floating crane

Country Status (1)

Country Link
CN (1) CN106428440A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108455460A (en) * 2018-02-28 2018-08-28 平湖市华海造船有限公司 A kind of submarine afloat repair platform
CN112079270A (en) * 2020-08-27 2020-12-15 中核华泰建设有限公司 Water surface hoisting equipment
CN112810761A (en) * 2019-11-15 2021-05-18 上海交通大学 Wind power installation and dismantling ship
CN115218038A (en) * 2022-07-06 2022-10-21 山东中铁路桥工程有限公司 Deep-buried oil pipeline dismantling method and spliced floating gantry ship
WO2024108816A1 (en) * 2022-11-25 2024-05-30 华能国际电力股份有限公司德州电厂 Method for throwing anchor blocks for floating-type water photovoltaic power station

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1063703A1 (en) * 1982-08-06 1983-12-30 Samojlovich Valerij G Rail train ferry
GB2163393A (en) * 1984-06-26 1986-02-26 Brown & Root Const A semi-submersible vessel
CN2615042Y (en) * 2003-04-25 2004-05-12 中铁大桥局集团有限公司 Special crane ship for transporting & erecting bridges on sea
CN1631729A (en) * 2004-12-29 2005-06-29 大连理工大学 Quick disassembly catamaran salvage boat
CN202169997U (en) * 2011-07-27 2012-03-21 天津德赛海洋船舶工程技术有限公司 Heavy lift vessel with door-shaped trusses
CN102530189A (en) * 2012-03-08 2012-07-04 中国海洋石油总公司 Catamaran for ocean engineering
CN102642601A (en) * 2012-04-28 2012-08-22 上海利策科技股份有限公司 Movable full-rotation type hoisting catamaran
CN102659028A (en) * 2012-04-28 2012-09-12 上海利策科技股份有限公司 Double-body movable self-elevating crane ship
CN203845721U (en) * 2014-05-22 2014-09-24 中国石油大学(华东) Novel two-body crane ship
US8960116B2 (en) * 2005-12-14 2015-02-24 Gustomsc Resources B.V. Dual draft crane vessel

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1063703A1 (en) * 1982-08-06 1983-12-30 Samojlovich Valerij G Rail train ferry
GB2163393A (en) * 1984-06-26 1986-02-26 Brown & Root Const A semi-submersible vessel
CN2615042Y (en) * 2003-04-25 2004-05-12 中铁大桥局集团有限公司 Special crane ship for transporting & erecting bridges on sea
CN1631729A (en) * 2004-12-29 2005-06-29 大连理工大学 Quick disassembly catamaran salvage boat
US8960116B2 (en) * 2005-12-14 2015-02-24 Gustomsc Resources B.V. Dual draft crane vessel
CN202169997U (en) * 2011-07-27 2012-03-21 天津德赛海洋船舶工程技术有限公司 Heavy lift vessel with door-shaped trusses
CN102530189A (en) * 2012-03-08 2012-07-04 中国海洋石油总公司 Catamaran for ocean engineering
CN102642601A (en) * 2012-04-28 2012-08-22 上海利策科技股份有限公司 Movable full-rotation type hoisting catamaran
CN102659028A (en) * 2012-04-28 2012-09-12 上海利策科技股份有限公司 Double-body movable self-elevating crane ship
CN203845721U (en) * 2014-05-22 2014-09-24 中国石油大学(华东) Novel two-body crane ship

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108455460A (en) * 2018-02-28 2018-08-28 平湖市华海造船有限公司 A kind of submarine afloat repair platform
CN108455460B (en) * 2018-02-28 2023-12-29 平湖市华海造船有限公司 Submarine water overhaul platform
CN112810761A (en) * 2019-11-15 2021-05-18 上海交通大学 Wind power installation and dismantling ship
CN112079270A (en) * 2020-08-27 2020-12-15 中核华泰建设有限公司 Water surface hoisting equipment
CN115218038A (en) * 2022-07-06 2022-10-21 山东中铁路桥工程有限公司 Deep-buried oil pipeline dismantling method and spliced floating gantry ship
CN115218038B (en) * 2022-07-06 2023-11-24 山东中铁路桥工程有限公司 Deep buried oil pipeline dismantling method and spliced floating gantry ship
WO2024108816A1 (en) * 2022-11-25 2024-05-30 华能国际电力股份有限公司德州电厂 Method for throwing anchor blocks for floating-type water photovoltaic power station

Similar Documents

Publication Publication Date Title
EP2952426B1 (en) Twin hull vessel with roll and pitch damping devices
US7845296B1 (en) Marine lifting apparatus
CN106428440A (en) Hinged truss type twin-hull floating crane
CN110099845B (en) Self-propelled self-elevating ship
CN101492140B (en) Aluminum alloy catamaran whole-boat afloat process
NL2024562B1 (en) A feeder vessel
US11168666B1 (en) Jack-up platform with receiving space for a barge and method for offshore installation of a wind turbine
WO2018090875A1 (en) Self-sailing integrated vessel for carrying and mounting submerged tubes of underwater tunnel
CN101100217A (en) Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same
CN106828812B (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform and its wind power generating set integral installation method
CN104608883B (en) Ship floating maintenance platform
CN202911923U (en) Combined energy source boat
CN103213654B (en) A kind of method of construction of platform
CN101870435B (en) Overturned hoisting method for helicopter platform
CN206634171U (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform
CN211281408U (en) A assistance-localization real-time frock that is used for different positions of engineering ship to fall mound
US20020092455A1 (en) Semi-submersible vessel
WO2013006041A1 (en) Shear leg crane and transportation vessel
CN212149193U (en) Ship reversible radar mast
CN108674597A (en) A kind of jack up wind-powered electricity generation mounting platform
GB2567218A (en) A semi submersible vessel
AU2017256254A1 (en) Hinge module for connecting catamaran-type vessel's platform and hull
CN215860611U (en) Floating type offshore wind turbine foundation
HK1218641A1 (en) A specified crane barge for cellular sheet pile main cells installation.
CN216918395U (en) Semi-submersible type marine hoisting platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222

RJ01 Rejection of invention patent application after publication