CN106088410A - A bathroom assembly structure and its installation method - Google Patents
A bathroom assembly structure and its installation method Download PDFInfo
- Publication number
- CN106088410A CN106088410A CN201610626073.0A CN201610626073A CN106088410A CN 106088410 A CN106088410 A CN 106088410A CN 201610626073 A CN201610626073 A CN 201610626073A CN 106088410 A CN106088410 A CN 106088410A
- Authority
- CN
- China
- Prior art keywords
- wall panel
- integrated wall
- bottom basin
- integrated
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
- E04B2/828—Connections between partitions and structural walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
- E04B2/825—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building the connection between the floor and the ceiling being achieved without any restraining forces acting in the plane of the partition
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
Abstract
Description
【技术领域】【Technical field】
本发明涉及一种卫生间的拼装结构,本发明还涉及一种卫生间的拼装结构的安装方法。The invention relates to an assembled structure of a toilet, and also relates to an installation method of the assembled structure of a toilet.
【背景技术】【Background technique】
在拼装卫生间时要将集成墙板在水平方向和竖直方向都调平,但是由于毛坯房自身的墙体和地面不平整的原因,使得将集成墙板调成水平状态和竖直状态这项工作比较费时,同时对施工人员的技术水平要求较高;而且当集成墙板的水平度达不到要求的时候会使相邻的集成墙板有比较的大间隙,影响美观和整体的质量。When assembling the bathroom, the integrated wall panels should be leveled in both the horizontal and vertical directions. However, due to the unevenness of the wall and the ground of the rough room itself, it is necessary to adjust the integrated wall panels to the horizontal and vertical states. The work is time-consuming, and at the same time requires a higher technical level of the construction personnel; and when the level of the integrated wall panels does not meet the requirements, there will be relatively large gaps between the adjacent integrated wall panels, which will affect the appearance and overall quality.
本发明即是针对现有技术的不足而研究提出的。The present invention researches and proposes aiming at the deficiencies in the prior art.
【发明内容】【Content of invention】
为了便于卫生间集成墙板的快速安装,本发明提供一种卫生间的拼装结构,包括水平设置的底盆以及连接在底盆边缘且竖直放置的集成墙板,所述的底盆和集成墙板的连接处设有连接结构,所述的集成墙板上设有将集成墙板固定在混凝土墙上的固定件。In order to facilitate the rapid installation of toilet integrated wall panels, the present invention provides a bathroom assembly structure, including a horizontally arranged bottom basin and an integrated wall panel connected to the edge of the bottom basin and placed vertically, the bottom basin and integrated wall panels A connection structure is provided at the joint of the integrated wall panel, and a fixing piece for fixing the integrated wall panel to the concrete wall is provided on the integrated wall panel.
如上所述的一种卫生间的拼装结构,所述的连接结构包含设置在底盆边缘上部的凹槽A,所述的集成墙板的底部设有与凹槽A相对应的凹槽B,所述的凹槽A和凹槽B之间卡接有密封凸榫。According to the assembled structure of the toilet as described above, the connection structure includes a groove A arranged on the upper part of the edge of the bottom basin, and the bottom of the integrated wall panel is provided with a groove B corresponding to the groove A, so A sealing tenon is clamped between the above-mentioned groove A and groove B.
如上所述的一种卫生间的拼装结构,所述凹槽B的横截面呈上窄下宽的梯形结构。According to the assembly structure of the toilet as described above, the cross section of the groove B is a trapezoidal structure with a narrow top and a wide bottom.
如上所述的一种卫生间的拼装结构,所述的连接结构包含固定设置在底盆边缘上部的密封凸榫,所述的集成墙板下端设有与密封凸榫配合连接的凹槽B。According to the assembled structure of the toilet as described above, the connection structure includes a sealing tenon fixedly arranged on the upper part of the edge of the bottom basin, and the lower end of the integrated wall panel is provided with a groove B that is mated and connected with the sealing tenon.
如上所述的一种卫生间的拼装结构,所述的连接结构包含固定设置在集成墙板下端的密封凸榫,所述底盆边缘上部设有与密封凸榫配合连接的凹槽A。As for the assembly structure of the toilet as described above, the connection structure includes a sealing tenon fixedly arranged at the lower end of the integrated wall panel, and a groove A is provided on the edge of the bottom basin to cooperate with the sealing tenon.
如上所述的一种卫生间的拼装结构,所述的固定件包含与混凝土墙连接的第一连接部和与集成墙板连接的第二连接部,所述第一连接部和第二连接部呈L形布置,所述的第一连接部上设有至少一个将固定件连接在混凝土墙上的安装孔A,所述的第二连接部上设有多个将固定件连接在集成墙板上的安装孔B。According to the assembled structure of the toilet as described above, the fixing part includes a first connecting part connected with the concrete wall and a second connecting part connected with the integrated wall panel, and the first connecting part and the second connecting part are in the form of L-shaped arrangement, the first connecting part is provided with at least one installation hole A for connecting the fixing part to the concrete wall, and the second connecting part is provided with a plurality of fixing parts connected to the integrated wallboard the mounting hole B.
如上所述的一种卫生间的拼装结构,所述的每一个安装孔B中心线与第一连接部的距离不同。According to the assembled structure of the toilet as described above, the distance between the center line of each installation hole B and the first connecting part is different.
如上所述的一种卫生间的拼装结构,所述的底盆、集成墙体和密封凸榫均可采用FRP材料或者SMC材料或者GRC材料制成。According to the assembled structure of the toilet as described above, the bottom basin, the integrated wall and the sealing tenon can all be made of FRP material, SMC material or GRC material.
本发明还提供一种卫生间拼装结构的安装方法,依次包括如下步骤:安装底盆、调水平度、安装密封凸榫、安装集成墙板、摆正、固定固定件以及固定集成墙板,采用上述方法可以快速地将集成墙板安装在底盆上,提高了集成墙板的安装效率和安装质量。The present invention also provides a method for installing a bathroom assembly structure, which includes the following steps in sequence: installing the bottom basin, adjusting the level, installing the sealing tenon, installing the integrated wall panel, aligning, fixing the fixing parts, and fixing the integrated wall panel. The method can quickly install the integrated wall panel on the bottom basin, which improves the installation efficiency and installation quality of the integrated wall panel.
本发明的一种卫生间拼装结构的安装方法,通过以下技术方案实现,包括如下步骤:The installation method of a toilet assembly structure of the present invention is realized through the following technical solutions, including the following steps:
a安装底盆:将底盆安装在卫生间的地板上;a Install the bottom basin: install the bottom basin on the floor of the bathroom;
b调水平:将安装在卫生间的地板上底盆调至水平状态;b Adjust the level: Adjust the bottom basin installed on the floor of the bathroom to a horizontal state;
c安装密封凸榫:将密封凸榫的一端插接到底盆的凹槽A内;c Install the sealing tenon: Insert one end of the sealing tenon into the groove A of the bottom basin;
d安装集成墙板:将集成墙板的凹槽B插接到密封凸榫的另一端并与底盆相连;d Install the integrated wall panel: insert the groove B of the integrated wall panel into the other end of the sealing tenon and connect it with the bottom basin;
e摆正:将集成墙板调整至竖直状态;eSquare: Adjust the integrated wall panel to a vertical state;
f固定固定件:将固定件的第一连接部和第二连接部分别紧贴混凝土墙和集成墙板的侧边,用螺钉通过安装孔A将固定件固定在混凝土墙上。f Fixing the fixture: place the first connecting part and the second connecting part of the fixture against the side of the concrete wall and the integrated wall panel respectively, and fix the fixture on the concrete wall through the installation hole A with screws.
g固定集成墙板:用螺钉通过安装孔B将集成墙板固定在固定件上,完成集成墙板的快速调平和固定。g Fixing the integrated wall panel: Use screws to fix the integrated wall panel on the fixing part through the installation hole B to complete the quick leveling and fixing of the integrated wall panel.
与现有技术相比,本发明所提供的一种卫生间拼装结构的安装方法,可以快速地安装集成墙板,提高了集成墙板的安装效率和安装质量;本发明所提供的一种卫生间的拼装结构具有如下优点:Compared with the prior art, the installation method of a toilet assembly structure provided by the present invention can quickly install the integrated wall panel, which improves the installation efficiency and quality of the integrated wall panel; the toilet provided by the present invention The assembly structure has the following advantages:
1、将集成墙板连接在水平设置的底盆的边缘,通过固定件将集成墙板固定在混凝土墙上,可以快速、高质量地将集成墙板安装在底盆上,提高了集成墙板的安装效率和安装质量,降低了劳动成本。1. Connect the integrated wall panel to the edge of the bottom basin set horizontally, and fix the integrated wall panel on the concrete wall through the fixing parts, so that the integrated wall panel can be installed on the bottom basin quickly and with high quality, which improves the integrated wall panel Excellent installation efficiency and installation quality, reducing labor costs.
2、底盆和集成墙板采用榫接的连接方式,能更稳固地将集成墙板安装在底盆边缘上。2. The bottom basin and the integrated wall panel are connected by tenon joint, which can more stably install the integrated wall panel on the edge of the bottom basin.
3、凹槽B的横截面呈上窄下宽的梯形结构,安装完成的之后,在集成墙板自身重力的作用下,集成墙板会卡得越来越紧,使底盆和集成墙板之间连接的更加紧密,密封效果更加好。3. The cross-section of the groove B is a trapezoidal structure with a narrow top and a wide bottom. After the installation is completed, under the action of the gravity of the integrated wall panel itself, the integrated wall panel will be stuck more and more tightly, making the bottom basin and the integrated wall panel The connection between them is tighter and the sealing effect is better.
4、固定件上的每一个安装孔B中心线与第一连接部的距离不同,能适应混凝土墙与集成墙板之间不同间隙的安装条件。4. The distance between the center line of each installation hole B on the fixture and the first connecting part is different, which can adapt to the installation conditions of different gaps between the concrete wall and the integrated wall panel.
【附图说明】【Description of drawings】
下面结合附图对本发明的具体实施方式作进一步详细说明,其中:The specific embodiment of the present invention is described in further detail below in conjunction with accompanying drawing, wherein:
图1为本发明安装之后的状态图;Fig. 1 is the state diagram after the present invention is installed;
图2为图1标记中A部的放大图;Fig. 2 is an enlarged view of part A in Fig. 1 mark;
图3为图1标记中B部的放大图。Fig. 3 is an enlarged view of part B marked in Fig. 1 .
【具体实施方式】【detailed description】
下面结合附图对本发明的实施方式作详细说明。Embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.
如图1~3所示,本实施例中的一种卫生间的拼装结构,包括水平设置的底盆1以及连接在底盆1边缘且竖直放置的集成墙板2,底盆1和集成墙板2的连接处设有连接结构3,集成墙板2上设有将集成墙板2固定在混凝土墙4上的固定件5;本发明将集成墙板2连接在水平设置的底盆1的边缘,通过固定件5将集成墙板2固定在混凝土墙4上,可以快速、高质量地安装集成墙板2,提高了集成墙板2的安装效率和安装质量,降低了劳动成本。As shown in Figures 1 to 3, the assembled structure of a bathroom in this embodiment includes a horizontally arranged bottom basin 1 and an integrated wall panel 2 connected to the edge of the bottom basin 1 and placed vertically, the bottom basin 1 and the integrated wall The joint of the board 2 is provided with a connecting structure 3, and the integrated wall board 2 is provided with a fixing member 5 for fixing the integrated wall board 2 on the concrete wall 4; Edge, the integrated wall panel 2 is fixed on the concrete wall 4 through the fixing part 5, the integrated wall panel 2 can be installed quickly and with high quality, the installation efficiency and quality of the integrated wall panel 2 are improved, and the labor cost is reduced.
为了更稳固地将集成墙板2安装在底盆1边缘上,底盆1和集成墙板2采用榫接的连接方式,为此,连接结构3包含设置在底盆1边缘上部的凹槽A31,集成墙板2的底部设有与凹槽A31相对应的凹槽B32,凹槽A31和凹槽B32之间卡接有密封凸榫33。In order to install the integrated wall panel 2 on the edge of the bottom basin 1 more stably, the bottom basin 1 and the integrated wall panel 2 are connected by mortise joints. For this reason, the connection structure 3 includes a groove A31 arranged on the upper part of the edge of the bottom basin 1 The bottom of the integrated wall panel 2 is provided with a groove B32 corresponding to the groove A31, and a sealing tenon 33 is clamped between the groove A31 and the groove B32.
凹槽B32的横截面呈上窄下宽的梯形结构,安装完成的之后,在集成墙板2自身重力的作用下,集成墙板2会卡得越来越紧,使得底盆1和集成墙板之间连接的更加紧密,密封效果好。The cross section of the groove B32 is a trapezoidal structure with a narrow top and a wide bottom. After the installation is completed, under the action of the gravity of the integrated wall panel 2 itself, the integrated wall panel 2 will be stuck more and more tightly, so that the bottom basin 1 and the integrated wall The connection between the boards is tighter and the sealing effect is good.
固定件5包含与混凝土墙4连接的第一连接部51和与集成墙板2连接的第二连接部52,所述第一连接部51和第二连接部52呈L形布置,第一连接部51上设有至少一个将固定件5连接在混凝土墙4上的安装孔A53,第二连接部52上设有多个将固定件5连接在集成墙板2上的安装孔B54且每一个安装孔B54中心线与第一连接部51的距离不同;固定件上的每一个安装孔B54中心线与第一连接部51的距离不同能适应混凝土墙4与集成墙板2之间不同间隙的安装条件。The fixing part 5 includes a first connection part 51 connected to the concrete wall 4 and a second connection part 52 connected to the integrated wall panel 2, the first connection part 51 and the second connection part 52 are arranged in an L shape, and the first connection part The part 51 is provided with at least one installation hole A53 for connecting the fixing part 5 on the concrete wall 4, and the second connecting part 52 is provided with a plurality of installation holes B54 for connecting the fixing part 5 on the integrated wall panel 2, and each The distance between the center line of the mounting hole B54 and the first connecting portion 51 is different; the distance between the center line of each mounting hole B54 on the fixture and the first connecting portion 51 is different, which can adapt to the different gaps between the concrete wall 4 and the integrated wall panel 2 installation conditions.
底盆1、集成墙体2和密封凸榫33均可采用FRP材料或者SMC材料或者GRC材料制成。The bottom basin 1, the integrated wall body 2 and the sealing tenon 33 can all be made of FRP material, SMC material or GRC material.
本实施例采用底盆1边缘上部和集成墙板2下端分别开有凹槽A31和凹槽B31,在凹槽A31和凹槽B31之间卡接有密封凸榫33的方式,同样采用下面这两种方案也在本发明的保护范围之内:In this embodiment, grooves A31 and B31 are formed on the upper edge of the bottom basin 1 and the lower end of the integrated wallboard 2 respectively, and a sealing tenon 33 is clamped between the grooves A31 and B31. The following method is also used Two kinds of schemes are also within the protection scope of the present invention:
1、连接结构3包含固定设置在底盆1边缘上部的密封凸榫33,集成墙板2下端设有与密封凸榫33配合连接的凹槽B32;1. The connection structure 3 includes a sealing tenon 33 fixedly arranged on the upper edge of the bottom basin 1, and the lower end of the integrated wall panel 2 is provided with a groove B32 that is connected with the sealing tenon 33;
2、连接结构3包含固定设置在集成墙板2下端的密封凸榫33,底盆1边缘上部设有与密封凸榫33配合连接的凹槽A31。2. The connection structure 3 includes a sealing tenon 33 fixedly arranged at the lower end of the integrated wall panel 2 , and a groove A31 is provided on the upper edge of the bottom basin 1 to cooperate with the sealing tenon 33 .
为了更好的将拼装卫生间快速、高质量地安装,本实施例还提供一种卫生间拼装结构的安装方法,包括如下步骤:In order to better install the assembled toilet quickly and with high quality, this embodiment also provides a method for installing the assembled toilet structure, including the following steps:
a安装底盆:将底盆1安装在卫生间的地板上;a install the bottom basin: install the bottom basin 1 on the floor of the bathroom;
b调水平:将安装在卫生间的地板上底盆1调至水平状态;b Adjust the level: adjust the bottom basin 1 installed on the floor of the bathroom to a horizontal state;
c安装密封凸榫33:将密封凸榫33的一端插接到底盆1的凹槽A31内;c Install the sealing tenon 33: Insert one end of the sealing tenon 33 into the groove A31 of the bottom basin 1;
d安装集成墙板2:将集成墙板2的凹槽B32插接到密封凸榫33的另一端并与底盆1相连;d Install the integrated wallboard 2: Insert the groove B32 of the integrated wallboard 2 into the other end of the sealing tenon 33 and connect it with the bottom basin 1;
e摆正:将集成墙板2调整至竖直状态;eSquare: Adjust the integrated wall panel 2 to a vertical state;
f固定固定件5:将固定件5的第一连接部51和第二连接部52分别紧贴混凝土墙4和集成墙板2的侧边,用螺钉通过安装孔A53将固定件5固定在混凝土墙4上。f Fixing the fixing part 5: the first connecting part 51 and the second connecting part 52 of the fixing part 5 are respectively close to the side of the concrete wall 4 and the integrated wall panel 2, and the fixing part 5 is fixed on the concrete through the installation hole A53 with screws on wall 4.
g固定集成墙板2:用螺钉通过安装孔B54将集成墙板2固定在固定件5上,完成集成墙板4的快速调平和固定。g Fixing the integrated wall panel 2: Use screws to fix the integrated wall panel 2 on the fixing part 5 through the installation hole B54 to complete the quick leveling and fixing of the integrated wall panel 4.
本发明所提供的一种卫生间拼装结构的安装方法,可以快速地安装集成墙板,提高了集成墙板的安装效率和安装质量。The installation method of the bathroom assembly structure provided by the present invention can quickly install the integrated wall panel, and improves the installation efficiency and installation quality of the integrated wall panel.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610626073.0A CN106088410A (en) | 2016-08-01 | 2016-08-01 | A bathroom assembly structure and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610626073.0A CN106088410A (en) | 2016-08-01 | 2016-08-01 | A bathroom assembly structure and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106088410A true CN106088410A (en) | 2016-11-09 |
Family
ID=57454422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610626073.0A Pending CN106088410A (en) | 2016-08-01 | 2016-08-01 | A bathroom assembly structure and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088410A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847433A (en) * | 2019-11-07 | 2020-02-28 | 莎丽科技股份有限公司 | Plate partition structure and manufacturing method thereof |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0642075A (en) * | 1992-07-24 | 1994-02-15 | Inax Corp | Horizontally stacked structure of extruded cement board |
JPH1122213A (en) * | 1997-07-01 | 1999-01-26 | Yamaha Living Tec Kk | Wall connection structure for unit bath |
JP2002038651A (en) * | 2000-07-28 | 2002-02-06 | Yamaha Livingtec Corp | Panel of unit room |
JP2006028835A (en) * | 2004-07-14 | 2006-02-02 | Toto Ltd | Wall panel of prefabricated room, its connection structure and connecting member thereof |
CN201148673Y (en) * | 2007-12-19 | 2008-11-12 | 杭州泰欣实业有限公司 | Metallic skin structure thermal insulation board |
CN201433570Y (en) * | 2009-07-06 | 2010-03-31 | 向伟昌 | A shower room with door hinged |
CN201521117U (en) * | 2009-07-28 | 2010-07-07 | 济南市住宅产业化发展中心 | Wall plate function modularized toilet |
CN202644913U (en) * | 2012-04-28 | 2013-01-02 | 圣戈班石膏建材(上海)有限公司 | Keel leveling wall system |
CN203821757U (en) * | 2014-03-07 | 2014-09-10 | 霍学朝 | Wall-mounted plate |
CN204282718U (en) * | 2014-11-22 | 2015-04-22 | 重庆市后皇嘉树木业有限公司 | Novel environment-friendly solid wood decorative panel log cabin |
CN204343604U (en) * | 2014-12-05 | 2015-05-20 | 智房科技股份有限公司 | Cladding panel |
US20160060878A1 (en) * | 2014-08-27 | 2016-03-03 | James Hardie Technology Limited | Cladding element |
CN205894388U (en) * | 2016-08-01 | 2017-01-18 | 莎丽科技股份有限公司 | A bathroom assembly structure |
-
2016
- 2016-08-01 CN CN201610626073.0A patent/CN106088410A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0642075A (en) * | 1992-07-24 | 1994-02-15 | Inax Corp | Horizontally stacked structure of extruded cement board |
JPH1122213A (en) * | 1997-07-01 | 1999-01-26 | Yamaha Living Tec Kk | Wall connection structure for unit bath |
JP2002038651A (en) * | 2000-07-28 | 2002-02-06 | Yamaha Livingtec Corp | Panel of unit room |
JP2006028835A (en) * | 2004-07-14 | 2006-02-02 | Toto Ltd | Wall panel of prefabricated room, its connection structure and connecting member thereof |
CN201148673Y (en) * | 2007-12-19 | 2008-11-12 | 杭州泰欣实业有限公司 | Metallic skin structure thermal insulation board |
CN201433570Y (en) * | 2009-07-06 | 2010-03-31 | 向伟昌 | A shower room with door hinged |
CN201521117U (en) * | 2009-07-28 | 2010-07-07 | 济南市住宅产业化发展中心 | Wall plate function modularized toilet |
CN202644913U (en) * | 2012-04-28 | 2013-01-02 | 圣戈班石膏建材(上海)有限公司 | Keel leveling wall system |
CN203821757U (en) * | 2014-03-07 | 2014-09-10 | 霍学朝 | Wall-mounted plate |
US20160060878A1 (en) * | 2014-08-27 | 2016-03-03 | James Hardie Technology Limited | Cladding element |
CN204282718U (en) * | 2014-11-22 | 2015-04-22 | 重庆市后皇嘉树木业有限公司 | Novel environment-friendly solid wood decorative panel log cabin |
CN204343604U (en) * | 2014-12-05 | 2015-05-20 | 智房科技股份有限公司 | Cladding panel |
CN205894388U (en) * | 2016-08-01 | 2017-01-18 | 莎丽科技股份有限公司 | A bathroom assembly structure |
Non-Patent Citations (1)
Title |
---|
齐家网: "装修扫盲之淋浴房安装及注意事项", 《HTTP://ZIXUN.JIA.COM/ARTICLE/332821.HTML》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847433A (en) * | 2019-11-07 | 2020-02-28 | 莎丽科技股份有限公司 | Plate partition structure and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8468765B1 (en) | Panel fixing device | |
CN204645336U (en) | A kind of mounting plug-in type aluminum facade | |
CN203669291U (en) | Movable raised floor installing structure | |
KR101129697B1 (en) | Device for fixing panels on the wall | |
CN207776110U (en) | A kind of dismountable steel house | |
CN103061544A (en) | Plug fast-installation auxiliary room for clean operating rooms and installation process thereof | |
CN203066412U (en) | Installing component of plug-in quickly-installed boards | |
CN205894388U (en) | A bathroom assembly structure | |
CN106088410A (en) | A bathroom assembly structure and its installation method | |
WO2019128292A1 (en) | Wall component and wall mounting method | |
CN203238991U (en) | Clean operating room auxiliary room capable of being quickly assembled in insertion mode | |
CN103850374B (en) | Element type curtain wall system | |
CN112443094A (en) | Wall internal corner ceramic tile installation structure and installation method | |
CN213710345U (en) | Plugging device between outer wall template layer | |
CN214602690U (en) | Welding leveling device | |
CN214272787U (en) | Raised Raised Floor Structure | |
CN216664830U (en) | A combined standard plate structure and ground overhead system | |
CN209975949U (en) | Frame type decoration structure | |
JP6782530B2 (en) | Construction structure using support for outer wall members | |
CN208054675U (en) | Adjustable rail bracket | |
CN112064947A (en) | Mounting structure of assembled modularization wallboard | |
CN210342730U (en) | Positioning piece for connecting prefabricated wall board and floor slab | |
CN205637443U (en) | Installation device of movable decorative board | |
CN111851903A (en) | Prefabricated wall panel installation structure | |
CN218028306U (en) | Prefabricated outer wall connection structure of assembled concrete building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161109 |