CN105909477B - 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 - Google Patents
一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 Download PDFInfo
- Publication number
- CN105909477B CN105909477B CN201610246865.5A CN201610246865A CN105909477B CN 105909477 B CN105909477 B CN 105909477B CN 201610246865 A CN201610246865 A CN 201610246865A CN 105909477 B CN105909477 B CN 105909477B
- Authority
- CN
- China
- Prior art keywords
- concrete
- annular
- flange
- backup pad
- prestressing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 71
- 239000010959 steel Substances 0.000 title claims abstract description 71
- 239000011513 prestressed concrete Substances 0.000 title claims abstract description 12
- 230000007704 transition Effects 0.000 title claims abstract description 12
- 239000004567 concrete Substances 0.000 claims abstract description 78
- 210000003205 muscle Anatomy 0.000 claims abstract description 32
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 9
- 238000004873 anchoring Methods 0.000 claims description 8
- 210000002435 tendon Anatomy 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 3
- 241000233855 Orchidaceae Species 0.000 claims 1
- 238000000338 in vitro Methods 0.000 claims 1
- 238000000034 method Methods 0.000 claims 1
- 238000012423 maintenance Methods 0.000 abstract description 4
- 238000005336 cracking Methods 0.000 abstract description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 7
- 238000001727 in vivo Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610246865.5A CN105909477B (zh) | 2016-04-20 | 2016-04-20 | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610246865.5A CN105909477B (zh) | 2016-04-20 | 2016-04-20 | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105909477A CN105909477A (zh) | 2016-08-31 |
CN105909477B true CN105909477B (zh) | 2018-08-14 |
Family
ID=56746545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610246865.5A Active CN105909477B (zh) | 2016-04-20 | 2016-04-20 | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105909477B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106640542A (zh) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | 混凝土塔筒组件及其粘接方法 |
CN106481515A (zh) * | 2016-10-08 | 2017-03-08 | 霍尔果斯新国金新能源科技有限公司 | 混凝土塔筒组件及其张拉方法 |
CN113914700B (zh) * | 2021-10-21 | 2022-11-01 | 重庆大学 | 一种用于风电机组混凝土转接段的加固结构及施工方法 |
CN116906273B (zh) * | 2023-07-24 | 2024-06-18 | 湖南大学 | 一种混凝土-钢混合塔筒过渡段连接装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005330675A (ja) * | 2004-05-19 | 2005-12-02 | Sumitomo Mitsui Construction Co Ltd | 塔状構造物 |
DE102011001250A1 (de) * | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Vorrichtung und Verfahren für den Übergang zwischen einem Stahlturmabschnitt und einem vorgespannten Betonturmabschnitt |
CN202493386U (zh) * | 2012-02-22 | 2012-10-17 | 阜新金胤新能源技术咨询有限公司 | 体外预应力钢-混凝土风电塔架 |
CN202500731U (zh) * | 2012-02-22 | 2012-10-24 | 阜新金胤新能源技术咨询有限公司 | 体内预应力钢-混凝土风电塔架 |
CN202545137U (zh) * | 2012-04-24 | 2012-11-21 | 阜新金胤新能源技术咨询有限公司 | 体内预应力植筋连接式混凝土风电塔架 |
CN103994034A (zh) * | 2014-06-13 | 2014-08-20 | 湖南大学 | 一种预应力混凝土-钢组合风力发电塔架连接装置 |
CN205638803U (zh) * | 2016-04-20 | 2016-10-12 | 广东明阳风电产业集团有限公司 | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 |
-
2016
- 2016-04-20 CN CN201610246865.5A patent/CN105909477B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005330675A (ja) * | 2004-05-19 | 2005-12-02 | Sumitomo Mitsui Construction Co Ltd | 塔状構造物 |
DE102011001250A1 (de) * | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Vorrichtung und Verfahren für den Übergang zwischen einem Stahlturmabschnitt und einem vorgespannten Betonturmabschnitt |
CN202493386U (zh) * | 2012-02-22 | 2012-10-17 | 阜新金胤新能源技术咨询有限公司 | 体外预应力钢-混凝土风电塔架 |
CN202500731U (zh) * | 2012-02-22 | 2012-10-24 | 阜新金胤新能源技术咨询有限公司 | 体内预应力钢-混凝土风电塔架 |
CN202545137U (zh) * | 2012-04-24 | 2012-11-21 | 阜新金胤新能源技术咨询有限公司 | 体内预应力植筋连接式混凝土风电塔架 |
CN103994034A (zh) * | 2014-06-13 | 2014-08-20 | 湖南大学 | 一种预应力混凝土-钢组合风力发电塔架连接装置 |
CN205638803U (zh) * | 2016-04-20 | 2016-10-12 | 广东明阳风电产业集团有限公司 | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 |
Also Published As
Publication number | Publication date |
---|---|
CN105909477A (zh) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101812842B (zh) | 无张力灌注桩结构 | |
CN105909477B (zh) | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 | |
JP4242445B1 (ja) | 塔状構造物の基礎構造 | |
CN108266330A (zh) | 一种风电机组预应力钢混塔筒 | |
EP2918751B1 (en) | Support structure for wind turbines and mould for manufacturing such structures | |
CN206917805U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
CN203809220U (zh) | 一种风力发电机塔架 | |
CN206220358U (zh) | 用于混凝土塔筒的锚固装置 | |
CN103899499A (zh) | 一种风力发电机塔架 | |
CN106978818A (zh) | 连接组件、风力发电机组基础及其制造方法 | |
CN105155572A (zh) | 现浇式预应力锚索风机基础系统及其施工方法 | |
CN205638803U (zh) | 一种连接钢塔筒和预应力混凝土塔筒的过渡段结构 | |
CN114775676B (zh) | 一种适用于已建老旧风电场风机基础的改造方法及应用 | |
CN102493476A (zh) | 一种后张法预应力墩基础结构 | |
JP2017133247A (ja) | 塔状構造物の基礎構造 | |
CN208587257U (zh) | 混合塔筒、转换装置及其模具 | |
CN105715463B (zh) | 一种钢混结构风机塔筒 | |
CN205502710U (zh) | 一种分离式电杆 | |
CN208633991U (zh) | 一种装配式预应力格构式钢管混凝土混合式风机塔架 | |
CN208252281U (zh) | 一种风力发电机组钢混塔架 | |
CN204080849U (zh) | 一种承台锚固式风机基础 | |
CN205502709U (zh) | 一种带基座的电杆 | |
CN209212031U (zh) | 一种新型的设有伸缩机构的钢管杆 | |
CN104532871B (zh) | 一种风机基础 | |
CN202031370U (zh) | 一种混凝土-钢结构复合风电塔架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 528437 Guangdong torch hi tech Industrial Development Zone, Torch Road, No. 22, Ming Yang Industrial Park, Zhongshan Applicant after: MING YANG SMART ENERGY GROUP Co.,Ltd. Address before: 528437 Guangdong torch hi tech Industrial Development Zone, Torch Road, No. 22, Ming Yang Industrial Park, Zhongshan Applicant before: GUANGDONG MINGYANG WIND POWER INDUSTRY GROUP Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230703 Address after: No. 1, Xingfu Avenue, Advanced Manufacturing Development Zone, Shangcheng County, Xinyang City, Henan Province 465246 Patentee after: Henan Mingyang New Material Technology Engineering Co.,Ltd. Address before: 528437 Mingyang Industrial Park, No. 22 Torch Road, Torch High-tech Industrial Development Zone, Zhongshan City, Guangdong Province Patentee before: MING YANG SMART ENERGY GROUP Co.,Ltd. |