CN105863591A - Preheating method and preheating well for fireflooding assisted gravity drainage - Google Patents

Preheating method and preheating well for fireflooding assisted gravity drainage Download PDF

Info

Publication number
CN105863591A
CN105863591A CN201610329255.1A CN201610329255A CN105863591A CN 105863591 A CN105863591 A CN 105863591A CN 201610329255 A CN201610329255 A CN 201610329255A CN 105863591 A CN105863591 A CN 105863591A
Authority
CN
China
Prior art keywords
well
straight
oil
horizontal
straight well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610329255.1A
Other languages
Chinese (zh)
Inventor
于晓聪
宫宇宁
王飞宇
李秀明
李晓漫
韩冰
周广兴
方新强
徐厚英
许静
刘凯
袁东旭
匡旭光
孟菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201610329255.1A priority Critical patent/CN105863591A/en
Publication of CN105863591A publication Critical patent/CN105863591A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The application provides a preheating method and a preheating well for fireflooding assisted gravity drainage, wherein the preheating method comprises the following steps: and acquiring the target oil reservoir and the oil layer thickness of the oil reservoir. And perforating the first vertical well and the second vertical well in the oil layer according to the thickness of the oil layer. And then performing steam throughout within a preset time, wherein the steam throughout the first vertical well, the second vertical well and the horizontal well in the oil reservoir so as to enable the first vertical well, the horizontal well and the second vertical well to establish preliminary thermal communication. After the first straight well, the horizontal well and the second straight well are communicated thermally, continuously injecting steam into the first straight well; and discharging liquid to the horizontal well and the second vertical well until the temperature among the first vertical well, the horizontal well and the second vertical well reaches a preset temperature, and finishing preheating. The preheating method and the preheating well can form an ideal oil drainage cavity which is approximately cylindrical in the preheating stage, so that the fire wire is far away from the shaft of the horizontal well, and the failure of fire flooding thickened oil caused by the fact that the fire wire breaks through the horizontal well can be avoided.

Description

The pre-heating mean of fireflood assisted gravity drainage and pre-hot well
Technical field
The application belongs to technical field of petroleum extraction, is specifically related to the pre-of a kind of fireflood assisted gravity drainage By the use of thermal means and pre-hot well.
Background technology
Fireflood assisted gravity drainage is generally on the basis of conventional straight well fireflood technology, by introducing level Producing well, utilizes gravity drainage effect to realize fireflood exploitation viscous crude.In fireflood assisted gravity drainage process In, the stage of oil reservoir preheating is most important.Oil reservoir pre-heat effect is good, and the exploitation effect of fireflood viscous crude is Can be more preferably.
But up to now, the circulation preheating of fireflood assisted gravity drainage the most commonly used horizontal production well, The preheating method of gas injection straight well steam soak preheating, sees shown in accompanying drawing 1.This preheating method is laid particular stress on Form thermal communication between injection-production well, between injection-production well, define the linear drain path of relatively narrower, see Shown in accompanying drawing 2 and accompanying drawing 3.Enter after the fireflood stage, live wire first based on this passage the most progressively Extension, easily causes live wire and extends near wellbore, and advance along pit shaft, and live wire spreading range is little, enters And be easily caused live wire and spread to horizontal well, ultimately causing horizontal well burns out, it is impossible to recover the oil.
Summary of the invention
In order to overcome the drawbacks described above of prior art, the technical problem to be solved is to provide one Plant the pre-heating mean of fireflood assisted gravity drainage and pre-hot well, drain path can be widened, and make live wire Away from horizontal well pit shaft, deduction and exemption live wire spreads to horizontal well.
The concrete technical scheme of the present invention is:
The present invention provides the pre-heating mean of a kind of fireflood assisted gravity drainage, comprises the steps:
Obtain target reservoir, and the core intersection of described target reservoir;
According to described core intersection, the first straight well in described oil reservoir and the second straight well are carried out perforation;
After perforation completes, in the given time, to described first straight well, described second straight well, with And the horizontal well in described oil reservoir carries out steam soak preheating, so that described first straight well, described water Horizontal well and described second straight well set up preliminary thermal communication;
After described first straight well, described horizontal well and described second straight well thermal communication, to institute It is continuously injected into steam in stating the first straight well, described horizontal well and described second straight well are carried out discharge opeing;
When between the well of described first straight well, described horizontal well and described second straight well, temperature reaches pre- If during temperature, stop injecting steam in described first straight well, and stop described horizontal well and institute State the second straight well and carry out discharge opeing.
In one embodiment, while being continuously injected into steam in described first straight well, according to The horizontal segment of described horizontal well and the variations in temperature of described second straight well determine the size of preheating cavity.
In one embodiment, the horizontal segment of described horizontal well is positioned at the end circle of described oil reservoir;Described First straight well is positioned at described horizontal well away from one end of well head and the top that is arranged on described horizontal well;Institute State the second straight well and be arranged in the both sides of described horizontal well along the horizontal segment of described horizontal well.
In one embodiment, the oil saturation of described target reservoir is more than 0.35;Porosity is big In 0.20;Permeability is more than 500md;Viscosity of crude is more than 50000mPa s.
In one embodiment, the perforation of described first straight well and described second straight well is positioned at described oil At the 1/3 of layer top.
In one embodiment, described first straight well, described second straight well and described horizontal well The speed carrying out steam soak preheating time institute's steam injection is identical.
In one embodiment, when steam soak preheats, the injection rate of steam is 150~200t/d; The described scheduled time is 15~20 days.
In one embodiment, when steam soak preheats, described first straight well, described second straight The lifting rate of well and described horizontal well is 10t/d.
In one embodiment, at described first straight well, described horizontal well and described second straight After well thermal communication, the speed being continuously injected into steam in described first straight well is 100t/d, injection length For 45d.
In one embodiment, described preset temperature is 110~120 DEG C.
It addition, the application also provides for the pre-hot well of a kind of fireflood assisted gravity drainage, it includes:
The horizontal well being arranged in oil reservoir, the horizontal segment of described horizontal well is positioned at the end circle of described oil reservoir;
First straight well, described first straight well is positioned at described horizontal well and away from one end of well head and is arranged on institute State the top of horizontal well;
At least one pair of second straight well, described second straight well is arranged in described along the horizontal segment of described horizontal well The both sides of horizontal well.
In one embodiment, described horizontal well is sieve tube completion, described first straight well and described Two straight wells are perforation completion, and wherein perforation is positioned at the 1/3 of described oil reservoir top.
In one embodiment, described horizontal well at steam soak warm-up phase, including: be located in The vertical section of described horizontal well and the first tubing string of horizontal segment, and it is arranged on the vertical section of described horizontal well Lifting tubing string;
Described first tubing string includes: be located in the vertical section of described horizontal well and at least part of horizontal segment First instlated tubular, described first instlated tubular connects the first screen casing away from one end of well head;Described first every Being arranged with the first oil pipe in heat pipe and described first screen casing, described first oil pipe is away from described well head One end is connected with the second screen casing and sealing member in turn;
Described lifting tubing string includes: be arranged on the second oil pipe of the vertical section of described horizontal well, described second Connect below oil pipe and have oil well pump, be equipped with, in described second oil pipe, the oil pumping being connected with described oil well pump Bar, is connected with the 3rd screen casing, tail pipe and sealing member in turn below described oil well pump.
In one embodiment, the length of described first screen casing accounts for described horizontal well horizontal segment 1/3-1/2。
In one embodiment, described horizontal well is at blowdown period, including lifting tubing string, described Lifting tubing string includes: be arranged on the second oil pipe of the vertical section of described horizontal well, below described second oil pipe Connect and have oil well pump, in described second oil pipe, be equipped with the sucker rod being connected with described oil well pump, described The 3rd screen casing, tail pipe and sealing member it is connected with in turn below oil well pump.
In one embodiment, described first straight well and described second straight well in the steam soak stage, Including: note adopts a tubing string, and described note is adopted tubing string and is connected with the in turn from well head to direction, shaft bottom Three oil pipes, note adopt integrated pump, the 4th screen casing, tail pipe and sealing member.
In one embodiment, described first straight well is at blowdown period, including gas injection tube column, institute State gas injection tube column and include the second instlated tubular and the horn mouth being connected with described second instlated tubular, described Horn mouth is arranged in described oil reservoir, is provided with packer in the oil jacket annular space of described first straight well, described Packer is arranged on described bell-mouthed top.
In one embodiment, described second straight well is at blowdown period, including lifting tubing string, institute State lifting tubing string to include: be arranged on the second oil pipe of the vertical section of described horizontal well, under described second oil pipe Side connects oil well pump, is equipped with the sucker rod being connected with described oil well pump, institute in described second oil pipe State and below oil well pump, be connected with the 3rd screen casing, tail pipe and sealing member in turn.
In one embodiment, the horizontal section length of described horizontal well is 200~350 meters.
In one embodiment, the distance between described second straight well and described horizontal well is 20 meters, Distance between adjacent described second straight well is 50~60 meters.
By above technical scheme, the application has the beneficial effects that: the present invention is by pre-timing In, the first straight well, the second straight well and horizontal well are carried out steam soak preheating, to set up oil Preliminary thermal communication between well.Then it is further continued for the first straight well is continuously injected into steam;Horizontal well, with And second straight well carry out discharge opeing, until temperature reaches pre-between the first straight well, horizontal well and the second straight well well If temperature, warm-up phase terminates.Can be formed at warm-up phase and approximate columned ideal letting out Oil cavity, make live wire away from horizontal well pit shaft, and then can avoid live wire break through horizontal well cause fireflood Viscous crude failure.Established solid foundation for the optimum extension of live wire of fireflood stage simultaneously.
With reference to explanation hereinafter and accompanying drawing, disclose in detail the particular implementation of the application, specify The principle of the application can be in adopted mode.It should be understood that presently filed embodiment is in scope It is not so limited.In the range of the spirit and terms of claims, the reality of the application The mode of executing includes many changes, revises and be equal to.
The feature described for a kind of embodiment and/or illustrate can be in same or similar mode one Individual or more other embodiment uses, combined with the feature in other embodiment, or replace For the feature in other embodiment.
It should be emphasized that term " includes/comprises " referring to when using feature, one integral piece, step or group herein The existence of part, but it is not precluded from the existence of one or more further feature, one integral piece, step or assembly Or it is additional.
Accompanying drawing explanation
Accompanying drawing described here is only used for task of explanation, and is not intended to limit by any way the application Scope of disclosure.It addition, the shape of each parts in figure and proportional sizes etc. are only schematically, use In helping the understanding to the application, it is not shape and the proportional sizes specifically limiting each parts of the application. Those skilled in the art, under teachings of the present application, can select various possible as the case may be Shape and proportional sizes implement the application.In the accompanying drawings:
Fig. 1 is the schematic diagram of oil well preheating after heat connected state in prior art;
Fig. 2 is the design sketch after oil well of the prior art preheating;
Fig. 3 be use prior art pre-heating mean after live wire involve view;
Fig. 4 is the schematic diagram of the oil well preheating after heat connected state of the application embodiment;
Fig. 5 is that after using the pre-heating mean in presently filed embodiment, live wire involves view;
Fig. 6 is the horizontal well tubular column structure schematic diagram at steam soak warm-up phase of the application;
Fig. 7 is first straight well tubular column structure schematic diagram at steam soak warm-up phase of the application;
Fig. 8 is second straight well tubular column structure schematic diagram at steam soak warm-up phase of the application;
Fig. 9 is the horizontal well tubular column structure schematic diagram at blowdown period of the application;
Figure 10 is first straight well tubular column structure schematic diagram at blowdown period of the application;
Figure 11 is second straight well tubular column structure schematic diagram at blowdown period of the application.
The reference of the figures above is expressed as: 1, horizontal well;2, the first straight well;3, the second straight well; 4, the first tubing string;41, the first instlated tubular;42, the first screen casing;43, the first oil pipe;44, second Screen casing;5, lifting tubing string;51, the second oil pipe;52, oil well pump;53, the 3rd screen casing;6, close Sealing;7, tail pipe;8, note adopts a tubing string;81, the 3rd oil pipe;82, note adopts integrated pump;83、 4th screen casing;9, gas injection tube column;91, the second instlated tubular;92, horn mouth;93, packer.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the application embodiment, to the technical side in the application embodiment Case is clearly and completely described, it is clear that described embodiment is only the application part Embodiment rather than whole embodiments.Based on the embodiment in the application, this area is general The every other embodiment that logical technical staff is obtained under not making creative work premise, all Belong to the scope of the application protection.
It should be noted that when element is referred to as " being arranged at " another element, and it can directly exist On another element or element placed in the middle can also be there is.When an element is considered as " connection " Another element, it can be directly to another element or may be simultaneously present centering elements. Term as used herein " vertical ", " level ", "left", "right" and similar statement are only The purpose illustrated that, being not offered as is unique embodiment.
Unless otherwise defined, all of technology used herein and scientific terminology with belong to the application's The implication that those skilled in the art are generally understood that is identical.Institute in the description of the present application herein The term used is intended merely to describe the purpose of specific embodiment, it is not intended that in limiting the application. Term as used herein "and/or" include the arbitrary of one or more relevant Listed Items and All of combination.
The present invention provides the pre-heating mean of a kind of fireflood assisted gravity drainage, comprises the steps:
S1: obtain target reservoir, and the core intersection of described target reservoir;
S2: according to described core intersection, the first straight well 2 in described oil reservoir and the second straight well 3 are entered Row perforation;
S3: after perforation completes, in the given time, to described first straight well 2, described second straight well 3 and described oil reservoir in horizontal well 1 carry out steam soak preheating so that described first straight well 2, Described horizontal well 1 and described second straight well 3 set up preliminary thermal communication;
S4: described first straight well 2, described horizontal well 1 and described second straight well 3 thermal communication it After, in described first straight well 2, it is continuously injected into steam, to described horizontal well 1 and described second straight Well 3 carries out discharge opeing;
S5: temperature when between the well of described first straight well 2, described horizontal well 1 and described second straight well 3 When degree reaches preset temperature, stop injecting steam in described first straight well 2, and stop described water Horizontal well 1 and described second straight well 3 carry out discharge opeing.
In the present embodiment, the horizontal segment of described horizontal well 1 is positioned at the end circle of described oil reservoir, described The vertical section of horizontal well 1 passes stratum.Described first straight well 2 is arranged in the end of described horizontal well 1 (away from one end of horizontal well 1 well head) and above described horizontal well 1.For the ease of viscous crude quilt Fireflood is caught up with and is flow to horizontal well 1, and usual first straight well 2 is positioned at above horizontal well 1, generally arranges It is about about at the 2/3 of core intersection.Described second straight well 3 arranges along the horizontal segment of described horizontal well 1 Both sides at described horizontal well 1.The quantity of the second straight well 3 can be one group, two groups or more Group, those skilled in the art can carry out appropriate design according to the length of horizontal well 1 horizontal segment.Citing For, the second straight well 3 of described horizontal well 1 homonymy can apart from described horizontal well 1 about 20 meters, Spacing between adjacent second straight well 3 of horizontal well 1 homonymy can be 50~60 meters.
For the ease of fireflood heavy crude producing, target reservoir generally can select the oil-containing of oil reservoir in oil reservoir to satisfy With degree more than 0.35;The porosity of oil reservoir is more than 0.20;The permeability of oil reservoir is more than 500md;Crude oil The viscosity oil reservoir more than 50000mPa s.After target reservoir acquisition is complete, determine target reservoir Core intersection.
According to described core intersection, the first straight well 2 in described oil reservoir and the second straight well 3 are penetrated Hole.Generally for the oil reservoir of different core intersections, perforating site is slightly different.But consider oil Reservoir parameter in Ceng, typically requires that the perforation of described first straight well 2 and described second straight well 3 is positioned at At the 1/3 of described oil reservoir top.So recovery ratio when can ensure that later stage heavy crude producing is set relatively High.Of course, this is not intended to be limited in any by the present invention, and those skilled in the art can be according to different oil The concrete condition hidden optimizes design further.
After perforation completes, in the given time, to described first straight well 2, described second straight well 3, And the horizontal well 1 in oil reservoir carries out steam soak preheating, so that described first straight well 2, described water Horizontal well 1 and described second straight well 3 set up thermal communication.The generally design parameter of steam injection in oil well It is referred to conventional steam handle up and rationally arrange.But because this stage main purpose is so that first is straight Preliminary thermal communication is set up between well 2, horizontal well 1 and the second straight well 3, it is therefore proposed that the first straight well 2, The steam injection rate of horizontal well 1 and the second straight well 3 is the most identical.Specifically, the injection speed of steam Degree can be 150~200t/d;The scheduled time required for steam injection can be 15~20 days.
After steam injects oil well, it is also possible to carry out stewing well, make the heat of steam gradually spread in oil well. The most stewing well time can be 5~10 days, keeps well head steam quality > 75%.Meanwhile, in the mistake of steam injection Journey strictly to control fluid production rate, described first straight well 2, described second straight well 3 and described water The lifting rate of horizontal well 1 typically 10t/d.
After described first straight well 2, described horizontal well 1 and described second straight well 3 thermal communication, still Described first straight well 2 is continuously injected into steam.Due to the steam soak stage the first straight well 2, Thermal communication is tentatively established between horizontal well 1 and the second straight well 3.Therefore, for preventing the first straight well Occurring vapour to alter between 2 and horizontal well 1, the injection rate at this stage the first straight well 2 can not be excessive.Logical Often for reaching ideal effect, it can be 100t/d that the first straight well 2 injects the speed of steam, injection Time can be about 45 days.Of course, those skilled in the art can be for different Oil Reservoir Types And the practical situation of oil property the most reasonably optimizes design, this is not appointed by the application What limits.
Warm-up phase at oil reservoir, it usually needs set up effective gas diffusion space in oil reservoir.This Sample can make oil reservoir preheating complete, and after entering fireflood mining phase, initial live wire is at the base of preheating cavity Extension is continued on plinth.If preheating cavity is less, then the first straight well 2 and horizontal well 1, horizontal well 1 and the Effective thermal communication will not be formed between two straight wells 3.And the crude oil between oil reservoir does not have mobility, no Horizontal well 1 can be flowed into because of action of gravity, i.e. not set up the migration pathway of crude oil, so can cause effect of recovering the oil The poorest.If preheating cavity is excessive, then in the fire flood stage, live wire can burn horizontal well 1, or heat Air enters horizontal well 1, and fireflood can be caused to proceed.Therefore based on requirements above, generally want In the first straight well 2 while steam injection, also will be according to the shaft bottom (level of horizontal well of horizontal well 1 Section) and the change of the second straight well temperature determine the size of preheating cavity.
Generally preheating cavity size can be determined jointly by numerical simulation and field monitoring data.In preheating Need synchronization to set up numerical reservoir model during beginning, and carry out oil reservoir data and on-the-spot test synchronized update. At the scene a number of observation well can be set in the range of well group simultaneously, and periodic detection down-hole is constantly The data such as temperature, pressure, the oil content field followed the tracks of in conjunction with reservoir numerical simulation, pressure field and saturated Field figure and the various curves such as degree field, comprehensively determine the size of preheating cavity.
Meanwhile, described horizontal well 1 and described second straight well 3 to be carried out discharge opeing.When described second When straight well 3 meets following condition simultaneously, preheating terminates.Specifically, when described first straight well 2, institute When stating that between the well of horizontal well 1 and described second straight well 3, temperature reaches preset temperature, namely reach When 110~120 DEG C, the warm of oil reservoir all terminates.Now, the first straight well 2 in oil reservoir, water Horizontal well 1 and the second straight well 3 have been set up preferable thermal communication.
The pre-heating mean of the fireflood assisted gravity drainage of the present invention, as shown in figures 4 and 5, Steam soak warm-up phase, the heated perimeter of oil reservoir is similar to a cylinder centered by all oil wells Body.And then the columned preferable draining cavity of approximation can be formed at steam soak warm-up phase.It addition, The perforating site of the first straight well 2 and the second straight well 3 is respectively positioned at the 1/3 of oil reservoir top, horizontal well 1 It is normally at the end circle (bottom) of oil reservoir.After using this kind of preheating method preheating, similar funnel can be formed The cavity of shape.But the bottom of cavity and horizontal well 1 still have certain longitudinal thickness.Generally at this thickness In the range of crude oil there is certain mobility, but oil saturation is apparently higher than inside cavity.Therefore The live wire in fireflood stage is affected because laterally being pulled effect by gas onlap effect and the second straight well, meeting Based on cavity after preheating, the most upwards and to direction, both sides expand.And with shape edge, obtuse angle Horizontal well direction pushes away well, make live wire away from horizontal well pit shaft, and then can avoid live wire break through horizontal well Cause the failure of fireflood viscous crude.Established solid foundation for the optimum extension of live wire of fireflood stage simultaneously.
It addition, the present invention also provides for the pre-hot well of a kind of fireflood assisted gravity drainage, it includes: level Well the 1, first straight well 2 and the second straight well 3.Horizontal well 1 is arranged in oil reservoir, described horizontal well The horizontal segment of 1 is positioned at the end circle of described oil reservoir.Described first straight well 2 is positioned at described horizontal well 1 away from well Mouthful one end and be arranged on the top of described horizontal well 1.At least one pair of second straight well 3 is along described level The horizontal segment of well 1 is arranged in the both sides of described horizontal well 1.The horizontal section length of described horizontal well 1 is Can be 200~350 meters.
In a specific embodiment, described horizontal well 1 is sieve tube completion, described first straight well 2 It is perforation completion with described second straight well 3.In order to the pre-heat effect making pre-hot well is good, wherein perforation can To be positioned at the 1/3 of described oil reservoir top.
When carrying out steam soak preheating, the first tubing string 4 generally can be equipped with in horizontal well 1.First Tubing string 4 is generally arranged at vertical section and the horizontal segment of horizontal well 1.First tubing string 4 can be to horizontal well 1 Interior injection steam.Meanwhile, lifting tubing string 5, lift tube can be also provided with in the described vertical section of horizontal well 1 Post 5 can be used to lift fluid.
Specifically, refer to the first tubing string 4 described in accompanying drawing 6 include: be located in described horizontal well 1 Vertically section and the first instlated tubular 41 of at least part of horizontal segment.First instlated tubular 41 is away from the one of well head End connects the first screen casing 42.It is arranged with in described first instlated tubular 41 and described first screen casing 42 One oil pipe 43, described first oil pipe 43 is connected with the second screen casing 44 in turn away from one end of described well head And sealing member 6, wherein sealing member 6 is preferably plug.First instlated tubular 41 can be used to isolate well Heat in Tong, it is to avoid burn out the first oil pipe 43 within the first instlated tubular 41.Steam can be by the First instlated tubular 41 of one tubing string 4 and the first oil pipe 43 inject, then by the first screen casing 42 He Second screen casing 44 is injected in oil reservoir.Wherein, the length of described first screen casing 42 accounts for described level The 1/3-1/2 of well 1 horizontal segment.So arrange and the steam that heat is high, mass dryness fraction is high can be made to be first poured into The posterior segment of oil reservoir.As for the leading portion of oil reservoir, then can be by the suction force effect of later stage oil well pump 52 The heat driving oil reservoir posterior segment spreads to the leading portion of oil reservoir, and then the leading portion of heating oil reservoir, so may be used To improve the injection efficiency of steam, strengthen the utilization rate of steam.
Described lifting tubing string 5 includes the second oil pipe 51 being arranged on the described vertical section of horizontal well 1, described Connect below second oil pipe 51 and have oil well pump 52, be equipped with and described oil pumping in described second oil pipe 51 The sucker rod (not shown) that pump 52 connects, is connected with the 3rd screen casing in turn below described oil well pump 53, tail pipe 7 and sealing member 6.After steam injects, in order to ensure that steam-energy more preferably heats oil reservoir, After generally can carrying out the stewing well a few days, recycling lifting tubing string 5 carries out lifting discharge opeing.
Meanwhile, at steam soak warm-up phase, as shown in accompanying drawing 7 and accompanying drawing 8, described first straight well 2 All including that note adopts a tubing string 8 with described second straight well 3, described note adopts tubing string 8 from well head to well Direction, the end be connected with in turn the 3rd oil pipe 81, note adopt integrated pump the 82, the 4th screen casing 83, tail pipe 7, with And sealing member 6, wherein sealing member 6 is preferably plug.First straight well 2 and the second straight well 3 use note to adopt One time tubing string 8 can be carried out the stewing well a few days after injecting steam in oil reservoir, and recycling note is adopted once Pump 82 carries out discharge opeing, need not change the tubing string in oil well.
At blowdown period, described first straight well 2, described horizontal well 1 and described second straight well 3 exist After carrying out steam soak thermal communication, described first straight well 2 can be continuously injected into steam, to described water Horizontal well 1 and described second straight well 3 carry out discharge opeing production.Refer to accompanying drawing 9, at this moment, horizontal well Owing to only carrying out discharge opeing production in 1, therefore can only retain lifting tubing string 5 and carry out discharge opeing and produce. Now, the structure of lifting tubing string 5 no longer can repeat at this with described previously.In like manner, please Seeing accompanying drawing 11, the second straight well 3 is owing to the most only need to carry out producing discharge opeing, therefore, this stage also only Tubing string 5 need to be lifted.
Refer to accompanying drawing 10, owing to the first straight well 2 persistently to inject steam at blowdown period, therefore, To enter down gas injection tube column 9 in blowdown period the first straight well 2, described gas injection tube column 9 includes that second is heat insulation Pipe 91 and the horn mouth 92 being connected with described second instlated tubular 91.Second instlated tubular 91 can be every The heat of oil reservoir, prevents gas injection tube column 9 from being burnt out by high temperature absolutely.Described horn mouth 92 is arranged on described oil So that oil reservoir is carried out steam injection in Ceng.It is provided with packer 93 in the oil jacket annular space of described first straight well 2, Described packer 93 is arranged on the top of described horn mouth 92.
It should be noted that the first straight well 2, horizontal well 1 and aerofluxus 3 well that the present embodiment provides All can select the existing structure of any appropriate.By being clearly briefly described the skill that the present embodiment is provided Art scheme, will no longer repeat above-mentioned part at this, and Figure of description has been also carried out corresponding simplification. However, it should be understood that the most therefore the present embodiment is restricted in scope.
Herein cited any digital value all includes between lower limit to higher limit with an incremented Lower value and all values of upper value, between any lower value and any much higher value, there is at least two unit Interval.For example, if elaborating quantity or process variable (the such as temperature of parts Degree, pressure, time etc.) value be from 1 to 90, preferably from 20 to 80, more preferably from 30 to 70, Such as 15 to 85,22 to 68,43 are listed the most clearly during then purpose illustrates that this description Equivalent to 51,30 to 32.For the value less than 1, suitably think unit be 0.0001, 0.001、0.01、0.1.These only want the example clearly expressed, it is believed that at minimum and Likely combining of the numerical value enumerated between peak is all in a similar manner in this description clearly Elaborate.
Except as otherwise noted, all scopes all include all numerals between end points and end points.With model Enclose " about " or " approximation " being used together and be suitable for two end points of this scope.Thus, " about 20 to 30 " it is intended to cover " about 20 to about 30 ", at least includes the end points indicated.
The all articles disclosed and reference material, including patent application and publication, for various purposes It is hereby incorporated by by quoting.Describe combination term " substantially by ... constitute " should include determined by Element, composition, parts or step and essentially without its of basic novel feature affecting this combination His element, composition, parts or step.Use term " to comprise " or " including " describes here The combination of element, composition, parts or step it is also contemplated that substantially by these elements, composition, parts or The embodiment that step is constituted.Here by use term " can ", it is intended to illustrate that " permissible " includes Described any attribute be all optional.
Multiple elements, composition, parts or step can be by single integrated component, composition, parts or steps Suddenly provide.Alternatively, single integrated component, composition, parts or step can be divided into separation Multiple elements, composition, parts or step.It is used for describing the disclosure of element, composition, parts or step "a" or "an" is not said to get rid of other element, composition, parts or step.
It should be understood that above description is to illustrate rather than to limit.Pass through Read foregoing description, the many embodiments outside the example provided and many application to this area All will be apparent from for technical staff.Therefore, the scope of this teaching should not retouched with reference to above-mentioned State and determine, but the equivalent should being had with reference to aforementioned claim and these claim Four corner determine.Patent application and public affairs are included for comprehensive purpose, all articles and reference The disclosure accused all is passed through with reference to being incorporated herein.Master disclosed herein is omitted in aforementioned claim Any aspect of topic is not intended to abandon this body matter, also should not be considered as applicant and should not Theme is thought of as a part for disclosed application theme.

Claims (20)

1. the pre-heating mean of a fireflood assisted gravity drainage, it is characterised in that comprise the steps:
Obtain target reservoir, and the core intersection of described target reservoir;
According to described core intersection, the first straight well in described oil reservoir and the second straight well are carried out perforation;
After perforation completes, in the given time, to described first straight well, described second straight well, with And the horizontal well in described oil reservoir carries out steam soak preheating, so that described first straight well, described water Horizontal well and described second straight well set up preliminary thermal communication;
After described first straight well, described horizontal well and described second straight well thermal communication, to institute It is continuously injected into steam in stating the first straight well, described horizontal well and described second straight well are carried out discharge opeing;
When between the well of described first straight well, described horizontal well and described second straight well, temperature reaches pre- If during temperature, stop injecting steam in described first straight well, and stop described horizontal well and institute State the second straight well and carry out discharge opeing.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, it is characterised in that While being continuously injected into steam in described first straight well, according to the horizontal segment of described horizontal well and The variations in temperature of described second straight well determines the size of preheating cavity.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, it is characterised in that The horizontal segment of described horizontal well is positioned at the end circle of described oil reservoir;Described first straight well is positioned at described horizontal well Away from one end of well head and be arranged on the top of described horizontal well;Described second straight well is along described horizontal well Horizontal segment be arranged in the both sides of described horizontal well.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, it is characterised in that The oil saturation of described target reservoir is more than 0.35;Porosity is more than 0.20;Permeability is more than 500md; Viscosity of crude is more than 50000mPa s.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, it is characterised in that The perforation of described first straight well and described second straight well is positioned at the 1/3 of described oil reservoir top.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, it is characterised in that Described first straight well, described second straight well and described horizontal well carry out being noted during steam soak preheating The speed of steam is identical.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 6, it is characterised in that When steam soak preheats, the injection rate of steam is 150~200t/d;The described scheduled time is 15~20 My god.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 6, it is characterised in that When steam soak preheats, described first straight well, described second straight well and the row of described horizontal well Liquid measure is 10t/d.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, it is characterised in that After described first straight well, described horizontal well and described second straight well thermal communication, to described The speed being continuously injected into steam in one straight well is 100t/d, and injection length is 45d.
The pre-heating mean of fireflood assisted gravity drainage the most according to claim 1, its feature exists In, described preset temperature is 110~120 DEG C.
The pre-hot well of 11. 1 kinds of fireflood assisted gravity drainages, it is characterised in that it includes:
The horizontal well being arranged in oil reservoir, the horizontal segment of described horizontal well is positioned at the end circle of described oil reservoir;
First straight well, described first straight well is positioned at described horizontal well and away from one end of well head and is arranged on institute State the top of horizontal well;
At least one pair of second straight well, described second straight well is arranged in described along the horizontal segment of described horizontal well The both sides of horizontal well.
The pre-hot well of 12. fireflood assisted gravity drainages according to claim 11, it is characterised in that Described horizontal well is sieve tube completion, and described first straight well and described second straight well are perforation completion, wherein Perforation is positioned at the 1/3 of described oil reservoir top.
The pre-hot well of 13. fireflood assisted gravity drainages according to claim 11, it is characterised in that Described horizontal well at steam soak warm-up phase, including: be located in the vertical section of described horizontal well and level First tubing string of section, and it is arranged on the lifting tubing string of the vertical section of described horizontal well;
Described first tubing string includes: be located in the vertical section of described horizontal well and at least part of horizontal segment First instlated tubular, described first instlated tubular connects the first screen casing away from one end of well head;Described first every Being arranged with the first oil pipe in heat pipe and described first screen casing, described first oil pipe is away from described well head One end is connected with the second screen casing and sealing member in turn;
Described lifting tubing string includes: be arranged on the second oil pipe of the vertical section of described horizontal well, described second Connect below oil pipe and have oil well pump, be equipped with, in described second oil pipe, the oil pumping being connected with described oil well pump Bar, is connected with the 3rd screen casing, tail pipe and sealing member in turn below described oil well pump.
The pre-hot well of 14. fireflood assisted gravity drainages according to claim 13, it is characterised in that The length of described first screen casing accounts for the 1/3-1/2 of described horizontal well horizontal segment.
The pre-hot well of 15. fireflood assisted gravity drainages according to claim 11, it is characterised in that Described horizontal well at blowdown period, including: lifting tubing string, described lifting tubing string includes: be arranged on institute Stating the second oil pipe of the vertical section of horizontal well, connecting below described second oil pipe has oil well pump, and described second It is equipped with the sucker rod being connected with described oil well pump in oil pipe, below described oil well pump, is connected with in turn Three screen casings, tail pipe and sealing member.
The pre-hot well of 16. fireflood assisted gravity drainages according to claim 11, it is characterised in that Described first straight well and described second straight well in the steam soak stage, including: note adopt a tubing string, institute State note adopt that tubing string is connected with the 3rd oil pipe in turn from well head to direction, shaft bottom, note adopts integrated pump, the Four screen casings, tail pipe and sealing member.
The pre-hot well of 17. fireflood assisted gravity drainages according to claim 11, it is characterised in that Described first straight well at blowdown period, including: gas injection tube column, described gas injection tube column includes that second is heat insulation Pipe and the horn mouth being connected with described second instlated tubular, described horn mouth is arranged in described oil reservoir, Being provided with packer in the oil jacket annular space of described first straight well, described packer is arranged on described bell-mouthed Top.
The pre-hot well of 18. fireflood assisted gravity drainages according to claim 11, it is characterised in that Described second straight well at blowdown period, including: lifting tubing string, described lifting tubing string includes: be arranged on Second oil pipe of the vertical section of described horizontal well, connects below described second oil pipe and has an oil well pump, and described the It is equipped with the sucker rod being connected with described oil well pump in two oil pipes, is connected with in turn below described oil well pump 3rd screen casing, tail pipe and sealing member.
The pre-hot well of 19. fireflood assisted gravity drainages according to claim 11, it is characterised in that The horizontal section length of described horizontal well is 200~350 meters.
The pre-hot well of 20. fireflood assisted gravity drainages according to claim 11, it is characterised in that Distance between described second straight well and described horizontal well is 20 meters, between adjacent described second straight well Distance is 50~60 meters.
CN201610329255.1A 2016-05-18 2016-05-18 Preheating method and preheating well for fireflooding assisted gravity drainage Pending CN105863591A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610329255.1A CN105863591A (en) 2016-05-18 2016-05-18 Preheating method and preheating well for fireflooding assisted gravity drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610329255.1A CN105863591A (en) 2016-05-18 2016-05-18 Preheating method and preheating well for fireflooding assisted gravity drainage

Publications (1)

Publication Number Publication Date
CN105863591A true CN105863591A (en) 2016-08-17

Family

ID=56635267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610329255.1A Pending CN105863591A (en) 2016-05-18 2016-05-18 Preheating method and preheating well for fireflooding assisted gravity drainage

Country Status (1)

Country Link
CN (1) CN105863591A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640012A (en) * 2016-12-01 2017-05-10 中国石油天然气股份有限公司 Fire flooding oil production method for exploiting bottom water ultra-heavy oil reservoir
CN107514250A (en) * 2016-06-15 2017-12-26 中国石油化工股份有限公司 A kind of method for SAGD
CN110847872A (en) * 2019-11-25 2020-02-28 西南石油大学 An experimental device for studying the effect of interlayer on SAGD production in double horizontal wells

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2783439A1 (en) * 2012-07-20 2014-01-20 Sunrise Oil Sands Partnership Water injection method for assisting in collection of oil in a sagd oil recovery application
CA2829008A1 (en) * 2012-10-04 2014-04-04 Geosierra, Llc Method of developing subsurface barriers
CN105178932A (en) * 2015-10-10 2015-12-23 中国石油天然气股份有限公司 Oil production well pattern for SAGD and fireflood
CN105221131A (en) * 2015-10-10 2016-01-06 中国石油天然气股份有限公司 Oil extraction method for combining SAGD and fireflood
CN205743866U (en) * 2016-05-18 2016-11-30 中国石油天然气股份有限公司 Fire flooding assisted gravity drainage preheating well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2783439A1 (en) * 2012-07-20 2014-01-20 Sunrise Oil Sands Partnership Water injection method for assisting in collection of oil in a sagd oil recovery application
CA2829008A1 (en) * 2012-10-04 2014-04-04 Geosierra, Llc Method of developing subsurface barriers
CN105178932A (en) * 2015-10-10 2015-12-23 中国石油天然气股份有限公司 Oil production well pattern for SAGD and fireflood
CN105221131A (en) * 2015-10-10 2016-01-06 中国石油天然气股份有限公司 Oil extraction method for combining SAGD and fireflood
CN205743866U (en) * 2016-05-18 2016-11-30 中国石油天然气股份有限公司 Fire flooding assisted gravity drainage preheating well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514250A (en) * 2016-06-15 2017-12-26 中国石油化工股份有限公司 A kind of method for SAGD
CN107514250B (en) * 2016-06-15 2019-07-30 中国石油化工股份有限公司 A method of for steam assisted gravity drainage
CN106640012A (en) * 2016-12-01 2017-05-10 中国石油天然气股份有限公司 Fire flooding oil production method for exploiting bottom water ultra-heavy oil reservoir
CN110847872A (en) * 2019-11-25 2020-02-28 西南石油大学 An experimental device for studying the effect of interlayer on SAGD production in double horizontal wells

Similar Documents

Publication Publication Date Title
CN102392625B (en) Gravity drainage assisted oil extraction method and oil extraction system
CN103615224B (en) Method for exploiting heavy oil reservoir by improving steam assisted gravity drainage through solvent and well pattern structure
CN102900415B (en) Deep and ultra-deep heavy oil reservoir double-horizontal well fire flooding oil drainage exploitation method
CN104963669B (en) Heavy oil thermal recovery method and well pattern thereof
CN101418679B (en) Method for pumping coalbed gas by heating coal bed
CN103939071B (en) Horizontal well steam flooding well pattern structure and steam flooding method
CN103615225A (en) Double-horizontal-well isothermal difference forced steam circulation preheating method for middle-deep layer oil reservoir
WO2016082188A1 (en) Hot dry rock multi-cycle heating system and production method therefor
CN106593397A (en) Heavy oil reservoir exploitation method
CN105625993B (en) Hot dry rock multi-cycle heating system and its production method
CN104832141B (en) Solvent-assisted horizontal inter-well communication method
CN203626779U (en) Well pattern structure for exploiting heavy oil reservoir by improving steam assisted gravity drainage through solvent
CN105649588A (en) The Method of Exploiting Heavy Oil Reservoir Using SAGD
RU2343276C1 (en) Method of development of high viscous oil deposit
CN102678096A (en) Method for exploiting high-pour-point oil reservoir through hot water assisted gravity drainage
RU2334098C1 (en) Method of high-viscosity oil pool development
CN104265258A (en) Fracture-assisted combustion of oil in-situ stimulation thickened oil exploiting method
CN109838224A (en) Method for exploiting super-thick oil by combining auxiliary oil production well and SAGD (steam assisted gravity drainage)
CN105863591A (en) Preheating method and preheating well for fireflooding assisted gravity drainage
US9115577B2 (en) Solvent injection recovery process
CN103867172B (en) Injection-production system and injection-production method
CN105221131B (en) Oil extraction method for combining SAGD and fireflood
CN204371284U (en) Well pattern structure for adjusting fire flooding auxiliary gravity drainage live wire form by utilizing exhaust well
CN205743866U (en) Fire flooding assisted gravity drainage preheating well
CN201236685Y (en) Horizontal production-injection well completion structure with flow control function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817