CN105829234A - Method for installing an elevator system, and device - Google Patents
Method for installing an elevator system, and device Download PDFInfo
- Publication number
- CN105829234A CN105829234A CN201480068174.XA CN201480068174A CN105829234A CN 105829234 A CN105829234 A CN 105829234A CN 201480068174 A CN201480068174 A CN 201480068174A CN 105829234 A CN105829234 A CN 105829234A
- Authority
- CN
- China
- Prior art keywords
- lift well
- line
- fixed
- lift
- positioning framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 230000011218 segmentation Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 2
- 238000002372 labelling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/10—Plumb lines
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
- Elevator Door Apparatuses (AREA)
Abstract
Disclosed is a method for installing a component (10) of an elevator system (1) comprising an elevator shaft (2), said method involving the following steps: mounting a positioning frame (22) in the elevator shaft (2) in relation to a wall (4.1, 4.2, 4.3, 4.4, 6, 7) of the elevator shaft (2) delimiting the elevator shaft (2); attaching a guideline (28) in the elevator shaft (2) separately from the positioning frame (22); aligning the guideline (28) by means of the positioning frame (22); and aligning the component by means of the aligned guideline (28). Also disclosed is a device (20) for carrying out said method.
Description
Technical field
The present invention relates to a kind of method of parts for installing lift facility and relate to a kind of device for coming into line described parts.
Background technology
When installing the parts of lift facility in the elevator shaft, particularly when installing guide rail, use the device for coming into line these parts.Part is instructed in this device commonly referred to location.The positioning framework of described device is arranged and secured within the vertical shaft head of lift well.Positioning framework has labelling, and calibration rope can be arranged on labelling.Calibration rope is along lift well tensioning.The calibration rope come into line in this manner is for playing orientation when installing each guide rail or each parts.The usual each shaft door opening with lift well of alignment in other words that comes into line of positioning framework realizes relatively.Hereby it is possible to install the parts of shaft door by the calibration rope arranged according to definition mode.In order to guarantee the enough accuracy of calibration rope location, it is provided with rate of tension to this calibration rope.
Calibration rope such as can be by vertical counterweight tensioning.Relative to the tensioning by vertical counterweight alternatively, it is possible to the second positioning framework is arranged and secured within the vertical shaft hole of lift well.Second positioning framework colonel's criterion by with its fixed form of above first positioning framework mentioned identical fix.Disadvantageously, by the calibration rope needs being fixed on positioning framework: one or more positioning frameworks have higher stability.Thus, one or more positioning frameworks must be with enough Intensity Design, in order to do not deform owing to calibrating the effect of the power of rope.Thus, the corresponding device for coming into line these parts is relatively costly.
The most commonly, lift facility is installed along lift well with segmented mode.This such as means: guide rail, already installed in the lower area of lift well, additionally performs other and for coming into line the incoherent installment work of the device of parts in the described lower area of lift well.Thus, calibration rope removes in the described lower area of lift well.Thus, it is arranged only in the upper area of lift well for the device of guide rail being mounted above being arranged in lift well.Such as from overhung vertical counterweight in the elevator shaft, then personnel component for being in vertical shaft hole threatens.
Summary of the invention
Therefore, it is an object of the invention to, propose the device for coming into line lift facility parts of a kind of simplification, by the safety of the described device place of being able to ensure that personnel in the elevator shaft.
Described purpose realizes by a kind of method of parts for installing the lift facility including lift well, and described method includes following method step:
About the wall to lift well limited boundary of lift well positioning framework come into line and fixing in the elevator shaft,
High-ranking officers' criterion is fixing in the elevator shaft, and wherein, calibration rope is fixed in the elevator shaft independent of positioning framework,
Calibration rope is come into line by the positioning framework come into line and fix, and
By the calibration rope come into line to come into line parts.
Described purpose realizes by a kind of device for coming into line described parts when installing the parts of lift facility equally, and described device includes: positioning framework, and positioning framework can be fixing in the elevator shaft about the wall to lift well limited boundary of lift well;And calibration rope, calibration rope can be fixed in the elevator shaft independent of positioning framework, and wherein, positioning framework is for coming into line calibration rope in the elevator shaft.
Arrange that device in the elevator shaft is for coming into line described parts when installing the parts of lift facility.For this purpose it is proposed, positioning framework and the calibration rope come into line by positioning framework are fixed in the elevator shaft.Wire rod or rope that this calibration rope such as can be made by metal or synthetic material fiber are formed.In order to ensure that calibration rope extends straight in the elevator shaft, calibration rope must tensioning along its length.Additionally, in order to guarantee the sufficiently stable property of positioning framework, additionally it is possible to saving the material of positioning framework, calibration rope is not fixed on positioning framework itself, but fixes in the elevator shaft on the position be different from positioning framework.It means that the first end of calibration rope is fixed or is anchored on the wall of lift well, on top or on bottom.Thus, calibration rope coming into line in the elevator shaft is only achieved by positioning framework.It means that calibration rope is not suitable for coming into line parts at the calibration fixing point that is in lift well of rope and the subsection part realized between the positioning framework that calibration rope is neat.Thus, above-mentioned segmentation, without coming into line, does not namely come into line.Thus, the tension force that calibration rope is not necessarily required to the load produced is directly delivered to the structure of lift well, rather than is delivered to positioning framework.
In the improvement project of said method, calibration rope is fixing in the elevator shaft by fixed mechanism.This fixed mechanism achieves: after relevant parts are installed, and removes calibration rope in the case of not damaging calibration rope.
Fixed mechanism can construct as follows so that calibration rope can be loaded the tensile force of at least 300N.The tensile force of at least 300N of calibration rope achieves: calibration rope can be tensioned in the highest lift well.
Fixed mechanism can include base and the arm that can pivot on base, pivots described arm, in order to makes calibration rope be come into line about positioning framework.Base can be fixed in the elevator shaft.Thus, it is possible on calibration rope positioning framework itself move towards produce impact and be thus able to protection calibration rope.
In the improvement project of described method, the first end of calibration rope is fixed on the wall of lift well.Positioning framework can be arranged on a certain position of lift well.Thus, by calibration rope fixing on the wall of lift well, it is possible to, calibration rope can closely be fixed near positioning framework.
Generally, lift well has multiple elevator door opening.Thus, positioning framework and calibration rope can be above the shaft door openings of bottom and the lower section of shaft door opening of the top is fixing in the elevator shaft.In this manner it is achieved that lift facility can put into operation in segmentation.This is such as it is meant that in the lower area of lift well, lift facility has been installed and ready for running.Hereby it is achieved that, when installing lift facility at upper area, that applied, get involved with minimum degree for coming into line the device of parts in the lower area of lift facility.Additionally, it is possible to being provided for of high-ranking officers' criterion comes into line the step-by-step arrangement of parts above positioning framework.Being accomplished that by this arrangement, calibration rope is fixed as follows so that the unhurt risk of the personnel of operation on the device being disposed therein in the elevator shaft.
When the first end of not high-ranking officers' criterion is fixed on the wall of lift well in the manner described above, the first end of calibration rope can be fixed on the shaft top of lift well or be fixed on the silo bottom of lift well.Then, the installation of parts can start to perform from silo bottom, or carries out towards shaft top.
In the improvement project of described method, calibration rope is used for coming into line guide rail, and wherein, guide rail is arranged for guiding the lift car of lift facility or being used for guiding the counterweight of lift facility.
Accompanying drawing explanation
Below, the present invention is elaborated by accompanying drawing.Wherein:
Fig. 1 illustrate be arranged in lift well, for coming into line the device of the parts of lift facility;
Fig. 2 illustrates the sectional view of the device of the shaft door overthe openings being arranged in bottom;
Fig. 3 illustrates the fixed mechanism of the device shown in Fig. 2.
Detailed description of the invention
Fig. 1 is shown in the lift well 2 of the lift facility 1 of the erection stage of lift facility 1, and wherein, lift well 2 is shown in broken lines.Lift well 2 has at least one wall 4.1,4.2,4.3,4.4 and has silo bottom 7.Lift well 2 is by silo bottom 7 and at least one wall 4.1,4.2,4.3,4.4 limited boundary.Additionally, lift well 2 can be by shaft top 6 limited boundary.Lift well 2 has multiple shaft door opening.Only illustrating the shaft door opening 8a of bottom and the shaft door opening 8b of the top, this is corresponding with shaft door opening layout in lift well 2.
The device 20 of parts 10 for coming into line lift facility 1 it is disposed with in lift well 2.Described device 20 includes positioning framework 22 and at least one calibration rope 28.Calibration rope 28 is used for making the parts 10 of lift facility 1 come into line according to normal method vertical, parts e.g. guide rail.Positioning framework 22 is fixed about the wall 4.2 with shaft door opening 8.Positioning framework 22 such as has positioning aid 24.1,24.2,24.3,24.4,25.1,25.2.Shown the first couple 24.1,24.2 and second in positioning aid 24.1,24.2,24.3,24.4,25.1,25.2 is arranged for the guide rail coming into line to guide the lift car of lift facility 1 to 24.3,24.4.Shown the in positioning aid 24.1,24.2,24.3,24.4,25.1,25.2 the 3rd is arranged for the guide rail coming into line to guide the counterweight of lift facility 1 to 25.1,25.2.At least one calibration rope 28 is fixed on shaft top 6 by fixed mechanism 24.1,24.2,24.3,24.4.Each calibration rope 28 comes into line in lift well 2 by positioning aid 24.1,24.2,24.3,24.4,25.1,25.2.In the example shown, positioning aid 24.1,24.2,24.3,24.4,25.1,25.2 is formed by structure hole in positioning framework 22, and wherein, at least one calibration is restricted 28 corresponding with hole respectively and be directed across hole.Calibration rope 28 is respectively provided with vertical counterweight 30.Vertical counterweight 30 achieves calibration rope 28 orientations vertical in lift well 2 and comes into line in other words.
Fig. 2 illustrates two regions of lift well 2.Shown lower area illustrates the vertical shaft hole of the top being arranged in silo bottom 7 of lift well 2.Lift well 2 also by wall 4.1,4.2,4.3 along lift well 2 limited boundary.The shaft door opening 8a of the bottom being in the first wall 4.2 it is arranged above at silo bottom 7.
In the lower area of lift facility, it is possible to realize, by the device 20 being used for coming into line the parts 10 of lift facility, the parts 10 that come into line and installed.Include the device 20 of positioning framework 22 and at least one calibration rope 28 in shown upper area, illustrate at parts 10 upper section installed.Interchangeable unshowned modification is, this device 20 is arranged in the vicinity of next-door neighbour's silo bottom 7, in order to come into line whole guide rail 10 by calibration rope 28.
Positioning framework 22 is fixed in lift well 2.Positioning framework 22 is fixed about the wall 4.2 with shaft door opening 8a of lift well 2.This again means that, positioning framework 22 also has the wall 4.3 illustrated on the right to fix about lift well 2 at the wall 4.1 shown in the left side.
Include the implementing according to known prior art in fig. 2 of device 20 of positioning framework 22 in the details shown in right side.Thus, the first calibration rope 28.1 of device 20 is fixed by positioning framework 22 fixed part 31 itself.Owing to the first calibration rope 28.1 is directly anchored on positioning framework 22, so the higher bearing capacity of positioning framework 22 is necessary.Correspondingly, positioning framework 22 constructs with greater strength on fixed mechanism 31, and this thickness improved compared to the positioning framework 22 shown in left side by the positioning framework 22 shown in right side in fig. 2 is showed.
Include the implementing according to the embodiment of the present invention in fig. 2 of device 20 of positioning framework 22 in the details shown in left side.Second calibration rope 28.2 is fixed on wall 4.1 by fixed mechanism 32.Fixed mechanism 32 includes the base 41 being directly anchored on wall 4.1 and the arm 40 that can pivot on base 41.The arm 40 that can pivot can be pivotally supported on base 41 as follows so that the second calibration rope 28.2 being fixed on the arm 40 that can pivot can come into line about positioning framework 22.It means that the second calibration rope 28.2 only slightly turns near next-door neighbour's positioning aid 24.2 of positioning framework 22.Second calibration rope 28.2 is fixed on the arm 40 that can pivot on point 29.
The second segmentation B being provided for coming into line parts 10 calibrating rope 28.2 is arranged in the top of positioning framework 22.Accordingly, first also second calibration rope 28.1,28.2 another unshowned positioning framework by device 20 above positioning framework 22 come into line.
Fig. 3 illustrates the fixed mechanism shown in figure 2 32 of the second calibration rope 28.2 from the direction cheated by the vertical shaft above towards lift well.Arm 40 can pivot around axis S by pivoting action B.Calibration rope 28.2 guides towards positioning auxiliary mechanism 24.2 the most vertically from point 29.Calibration rope 28.2, from positioning auxiliary mechanism 24.2s, extends upward along segmentation B general vertical shown in figure 2.
Claims (10)
1. include the method for parts (10) for the lift facility (1) of lift well (2) for installation, described method includes following method step:
Positioning framework (22) is come into line and is fixed in lift well (2) by the wall to lift well (2) limited boundary (4.1,4.2,4.3,4.4,6,7) about lift well (2),
High-ranking officers' criterion (28) is fixed in lift well (2), and wherein, calibration rope (28) is fixed in lift well (2) independent of positioning framework (22),
Calibration rope (28) is come into line by the positioning framework (22) come into line and fix, and
Parts (10) are come into line by the calibration rope (28) come into line.
Method the most according to claim 1, wherein, calibration rope (28) is fixed in lift well (2) by fixed mechanism (32,32.1,32.2,32.3,32.4), wherein, the segmentation between fixed mechanism (32,32.1,32.2,32.3,32.4) and the positioning framework (22) having come into line and having fixed of calibration rope (28) does not come into line.
Method the most according to claim 2, wherein, the make of fixed mechanism (32,32.1,32.2,32.3,32.4) is, calibration rope (28) can be loaded the tensile force of at least 300N.
4. according to the method according to any one of Claims 2 or 3, wherein, fixed mechanism (32) includes base (41) and the arm (40) that can pivot on base (41), described arm (40) is pivoted, in order to make calibration rope (28) come into line about the detent mechanism (24.2) of positioning framework (22).
5. according to method in any one of the preceding claims wherein, wherein, the first end of calibration rope (28) is fixed on the wall (4.1,4.2,4.3,4.4) of lift well (2).
6. according to method in any one of the preceding claims wherein, wherein, lift well (2) has multiple shaft door opening (8), positioning framework (22) and calibration rope (28) and is fixed in lift well (2) in the lower section of the top of the shaft door opening (8) of bottom and the shaft door opening of the top.
Method the most according to claim 6, wherein, the segmentation (B) being provided for coming into line parts (10) calibrating rope (28) is arranged in the top of positioning framework (22).
Method the most according to any one of claim 1 to 4, wherein, the first end of calibration rope (28) is fixed on the shaft top (6) of lift well (2), or is fixed on the silo bottom (7) of lift well (2).
9. according to method in any one of the preceding claims wherein, wherein, calibration rope (28) is used for coming into line guide rail (10), guide rail (10) is arranged for guiding the lift car of lift facility (1), or is arranged for guiding the counterweight of lift facility (1).
10. the device (20) being used for coming into line described parts (10) when installing parts (10) of lift facility (1), including:
Positioning framework (22), described positioning framework can be fixed in lift well (2) about the wall to lift well (2) limited boundary (4.1,4.2,4.3,4.4,6,7) of the lift well (2) of lift facility (1), and
Calibration rope (28), described calibration rope can be fixed in lift well (2) independent of positioning framework (22), wherein, positioning framework (22) is used for the calibration rope (28) coming into line in lift well (2).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13198267.0 | 2013-12-19 | ||
EP13198267 | 2013-12-19 | ||
PCT/EP2014/077867 WO2015091419A1 (en) | 2013-12-19 | 2014-12-16 | Method for installing an elevator system, and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105829234A true CN105829234A (en) | 2016-08-03 |
CN105829234B CN105829234B (en) | 2018-02-16 |
Family
ID=49880453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201480068174.XA Active CN105829234B (en) | 2013-12-19 | 2014-12-16 | For installing the method and device of lift facility |
Country Status (11)
Country | Link |
---|---|
US (1) | US10065836B2 (en) |
EP (1) | EP3083479B1 (en) |
CN (1) | CN105829234B (en) |
AU (1) | AU2014364737B2 (en) |
CA (1) | CA2932954A1 (en) |
ES (1) | ES2669435T3 (en) |
HK (1) | HK1226047B (en) |
MY (1) | MY179172A (en) |
RU (1) | RU2672511C1 (en) |
TR (1) | TR201807533T4 (en) |
WO (1) | WO2015091419A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110652734A (en) * | 2019-10-24 | 2020-01-07 | 中国建筑第八工程局有限公司 | Vehicle-mounted positioning tool for track embedded part and positioning method thereof |
CN111148712A (en) * | 2017-09-27 | 2020-05-12 | 因温特奥股份公司 | Positioning system and method for determining the current position in an elevator shaft of an elevator installation |
CN111148711A (en) * | 2017-09-27 | 2020-05-12 | 因温特奥股份公司 | Alignment device and method for mounting guide rails in an elevator shaft of an elevator installation |
CN113165847A (en) * | 2018-11-20 | 2021-07-23 | 因温特奥股份公司 | Method and installation device for the automated determination of the drilling position of a borehole |
CN113727934A (en) * | 2019-05-21 | 2021-11-30 | 因温特奥股份公司 | Aligning device and method for aligning guide rails of an elevator installation by means of power pulses |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2955145B1 (en) * | 2014-06-13 | 2016-12-21 | KONE Corporation | Apparatus and method for alignment of elevator guide rails |
SG11201807545RA (en) * | 2016-03-31 | 2018-10-30 | Inventio Ag | Method and mounting device for carrying out an installation operation in a lift shaft of a lift system |
BR112019007154B1 (en) | 2016-11-24 | 2023-05-02 | Inventio Ag | PROCESS FOR ASSEMBLY AND ALIGNMENT DEVICE FOR ALIGNMENT OF A GUIDE RAIL OF AN ELEVATOR SYSTEM |
CN112689608B (en) | 2018-09-26 | 2023-02-21 | 因温特奥股份公司 | Method for planning and at least partially installing an elevator installation in an elevator shaft |
EP3766819B1 (en) * | 2019-07-16 | 2023-06-07 | KONE Corporation | A method and an arrangement for installing elevator guide rails into an elevator shaft |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001163546A (en) * | 1999-12-06 | 2001-06-19 | Otis Elevator Co | Construction method for installation work for machine- roomless elevator |
JP2005330064A (en) * | 2004-05-20 | 2005-12-02 | Hitachi Building Systems Co Ltd | Installation method of elevator bracket equipment. |
JP2010070268A (en) * | 2008-09-16 | 2010-04-02 | Mitsubishi Electric Corp | Method and device for installing elevator |
CN102963797A (en) * | 2011-08-30 | 2013-03-13 | 东芝电梯株式会社 | Center fixture of elevator guide rail |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1874057A (en) * | 1930-10-01 | 1932-08-30 | Edward J Murphy | Plumb bob hanger |
US2402888A (en) | 1944-08-02 | 1946-06-25 | Otis Elevator Co | Positioning apparatus for elevator guide rails |
US3335635A (en) | 1963-03-25 | 1967-08-15 | Sidler Bruno | Method and apparatus for adjusting vertical elevator guide rail |
SU492450A1 (en) * | 1973-12-24 | 1975-11-25 | Трест "Союзлифтмонтаж" | Device for installing lift guides |
US4495707A (en) * | 1984-02-16 | 1985-01-29 | Rousey James R | Bidirectional plumb bob level |
FR2603876B1 (en) * | 1986-09-11 | 1991-01-18 | Otis Elevator Co | PROCESS FOR THE INSTALLATION OF ELEVATOR DOORS |
US5003701A (en) * | 1988-03-28 | 1991-04-02 | Hughes Robert J | Masonry clip |
JPH0632556A (en) * | 1992-07-14 | 1994-02-08 | Mitsubishi Electric Corp | Upper templet device for installation of elevator |
JPH1087225A (en) * | 1996-07-26 | 1998-04-07 | Hitachi Building Syst Co Ltd | Elevator installation method |
JPH10218530A (en) * | 1997-01-31 | 1998-08-18 | Hitachi Building Syst Co Ltd | Elevator guide rail centering device |
FI109291B (en) * | 1997-03-07 | 2002-06-28 | Kone Corp | Method and apparatus for installing a lift |
US6976316B1 (en) * | 1999-12-27 | 2005-12-20 | Patterson James R | Magnetic plumb bob holder |
JP4454100B2 (en) * | 2000-05-16 | 2010-04-21 | 東芝エレベータ株式会社 | Elevator guide rail centering template and elevator guide rail centering method |
FI4662U1 (en) | 2000-06-08 | 2000-10-12 | Kone Corp | installation Tool |
JP2004256216A (en) * | 2003-02-25 | 2004-09-16 | Mitsubishi Electric Corp | Guide rail centering device for elevator car and its centering method |
US7055256B2 (en) * | 2004-03-04 | 2006-06-06 | Alecci Lavern | Plumb bob square bracket |
US7036235B1 (en) * | 2004-08-02 | 2006-05-02 | Lewis Cohen | Vertical alignment device |
US7730626B2 (en) * | 2005-08-05 | 2010-06-08 | Charpentier Design Inc. | Masonry guiding tool |
JP5040202B2 (en) | 2006-07-18 | 2012-10-03 | 三菱電機株式会社 | Elevator installation jig |
FI20080419L (en) * | 2008-06-27 | 2009-12-28 | Kone Corp | Arrangement and method for positioning the guide wires of elevator cables |
JP5476071B2 (en) | 2009-09-17 | 2014-04-23 | ロート製薬株式会社 | Pharmaceutical composition |
EP2993153B1 (en) * | 2014-09-03 | 2022-01-19 | KONE Corporation | Guide rail installation arrangement and a method for installing guide rails |
-
2014
- 2014-12-16 ES ES14821115.4T patent/ES2669435T3/en active Active
- 2014-12-16 MY MYPI2016702212A patent/MY179172A/en unknown
- 2014-12-16 TR TR2018/07533T patent/TR201807533T4/en unknown
- 2014-12-16 CA CA2932954A patent/CA2932954A1/en active Pending
- 2014-12-16 WO PCT/EP2014/077867 patent/WO2015091419A1/en active Application Filing
- 2014-12-16 AU AU2014364737A patent/AU2014364737B2/en active Active
- 2014-12-16 US US15/106,355 patent/US10065836B2/en active Active
- 2014-12-16 EP EP14821115.4A patent/EP3083479B1/en active Active
- 2014-12-16 RU RU2016129430A patent/RU2672511C1/en active
- 2014-12-16 CN CN201480068174.XA patent/CN105829234B/en active Active
-
2016
- 2016-12-20 HK HK16114480A patent/HK1226047B/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001163546A (en) * | 1999-12-06 | 2001-06-19 | Otis Elevator Co | Construction method for installation work for machine- roomless elevator |
JP2005330064A (en) * | 2004-05-20 | 2005-12-02 | Hitachi Building Systems Co Ltd | Installation method of elevator bracket equipment. |
JP2010070268A (en) * | 2008-09-16 | 2010-04-02 | Mitsubishi Electric Corp | Method and device for installing elevator |
CN102963797A (en) * | 2011-08-30 | 2013-03-13 | 东芝电梯株式会社 | Center fixture of elevator guide rail |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111148712A (en) * | 2017-09-27 | 2020-05-12 | 因温特奥股份公司 | Positioning system and method for determining the current position in an elevator shaft of an elevator installation |
CN111148711A (en) * | 2017-09-27 | 2020-05-12 | 因温特奥股份公司 | Alignment device and method for mounting guide rails in an elevator shaft of an elevator installation |
US11235954B2 (en) | 2017-09-27 | 2022-02-01 | Inventio Ag | Alignment device and method for mounting a guide rail in an elevator shaft of an elevator system |
US11480424B2 (en) | 2017-09-27 | 2022-10-25 | Inventio Ag | Locating system and method for determining a current position in an elevator shaft of an elevator system |
CN113165847A (en) * | 2018-11-20 | 2021-07-23 | 因温特奥股份公司 | Method and installation device for the automated determination of the drilling position of a borehole |
US11703823B2 (en) | 2018-11-20 | 2023-07-18 | Inventio Ag | Method and assembly device for the automated determination of a drilling position of a drill hole |
CN113727934A (en) * | 2019-05-21 | 2021-11-30 | 因温特奥股份公司 | Aligning device and method for aligning guide rails of an elevator installation by means of power pulses |
CN113727934B (en) * | 2019-05-21 | 2023-04-21 | 因温特奥股份公司 | Alignment device and method for aligning guide rails of an elevator installation by means of power pulses |
US11724917B2 (en) | 2019-05-21 | 2023-08-15 | Inventio Ag | Aligning device and method for aligning a guide rail of an elevator system by means of force pulses |
CN110652734A (en) * | 2019-10-24 | 2020-01-07 | 中国建筑第八工程局有限公司 | Vehicle-mounted positioning tool for track embedded part and positioning method thereof |
CN110652734B (en) * | 2019-10-24 | 2021-01-22 | 中国建筑第八工程局有限公司 | Vehicle-mounted positioning tool for track embedded part and positioning method thereof |
Also Published As
Publication number | Publication date |
---|---|
EP3083479A1 (en) | 2016-10-26 |
CA2932954A1 (en) | 2015-06-25 |
AU2014364737B2 (en) | 2017-04-20 |
ES2669435T3 (en) | 2018-05-25 |
MY179172A (en) | 2020-10-30 |
TR201807533T4 (en) | 2018-06-21 |
CN105829234B (en) | 2018-02-16 |
RU2672511C1 (en) | 2018-11-15 |
WO2015091419A1 (en) | 2015-06-25 |
US10065836B2 (en) | 2018-09-04 |
RU2016129430A (en) | 2018-01-24 |
AU2014364737A1 (en) | 2016-06-30 |
US20170001842A1 (en) | 2017-01-05 |
HK1226047B (en) | 2017-09-22 |
EP3083479B1 (en) | 2018-03-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105829234A (en) | Method for installing an elevator system, and device | |
CN101511718B (en) | Elevator apparatus | |
US10486943B2 (en) | Method for installing guide rails | |
CN107208444A (en) | Window regulator | |
US9284160B2 (en) | Stabilization devices | |
CN101387177A (en) | Window regulator system for a vehicle door assembly | |
EP2749518B2 (en) | An elevator guide rail arrangement and a bracket | |
US20170144861A1 (en) | Elevator comprising balance rope tensioning device | |
CN102616622B (en) | Elevator | |
KR20040017847A (en) | Handrail above cage of elevator | |
US20120305335A1 (en) | Drive frame for an elevator installation | |
US11104549B2 (en) | Machine mounting structure for elevator system | |
CN101284619A (en) | elevator car | |
JP5832676B2 (en) | Elevator door apparatus and elevator door installation method | |
JP2016056004A (en) | Elevator device | |
CN205419435U (en) | From elevator of taking bearing platform | |
JP6132757B2 (en) | Passenger conveyor equipment | |
JP5653226B2 (en) | Elevator equipment and installation method thereof | |
JP2012520221A (en) | Elevator system with guide rail bracket | |
JP4672380B2 (en) | Home fence equipment | |
KR101671573B1 (en) | a guide apparatus for temporary bridge | |
JP2020055660A (en) | Doorsill provided at elevator doorway and replacement method of doorsill | |
JP2002205888A (en) | Elevator device | |
KR20150000510U (en) | Traveling cable protecting apparatus for elevator | |
CN106224173A (en) | tower and tower system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1226047 Country of ref document: HK |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: GR Ref document number: 1226047 Country of ref document: HK |