CN1056432C - 喷翼沉管成桩法 - Google Patents
喷翼沉管成桩法 Download PDFInfo
- Publication number
- CN1056432C CN1056432C CN 96109873 CN96109873A CN1056432C CN 1056432 C CN1056432 C CN 1056432C CN 96109873 CN96109873 CN 96109873 CN 96109873 A CN96109873 A CN 96109873A CN 1056432 C CN1056432 C CN 1056432C
- Authority
- CN
- China
- Prior art keywords
- pipe
- pile
- stake
- pipes
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明的步骤为:采用外壁连接若干根喷浆管的桩管,喷浆管的底端开有方向朝外的喷嘴;采用活瓣沉管桩机将桩管打入地下;将钢筋笼、压浆管下入桩管内;在桩管内填入级配骨料;通过桩管内的压浆管压入砂浆或灰浆;接通桩管外壁的喷浆管;在提升桩管的同时,用高压注浆泵向桩管外壁的喷浆管灌注高压水泥浆,至桩管提升到地面为止。采用沉管灌注与高压喷射两种工艺同时作业成桩,使桩不但有很高的强度,而且有很高的承载力。
Description
本发明涉及一种侧翼结构桩的制作方法,属于地基基础领域。
桩基础在建筑施工中得到广泛的应用,世界上有许多制桩方法,但无论那一种制桩方法,都力求降低制桩成本,提高桩的负荷能力。现有的沉管灌注桩存在以下缺点:桩体强度大而本身所具有的摩阻力小;桩的体积大而表面积小,所以属于低效型桩,其桩周摩阻力小。
基础桩除桩端支撑在硬岩层的端承桩外,桩的承载力由两部分组成:一是桩周摩阻力,二是桩端端承力。而桩周摩阻力在桩的总承载力中占80%以上,所以要使桩具有很高的承载力,增加桩周摩阻力是关键。
要提高桩的摩阻力,必须采取两项措施:一是使桩与桩周土紧密结合起来;二是挤密桩周土或改造桩周土,提高桩周土的强度,增大摩擦系数。
EP151389A号欧洲专利公开了一种带加固喷射管的桩的制作方法:它是在地基中首先采用泥浆护壁的方法钻一个桩孔,在桩孔内下入喷射管,在喷射管内又下入导管进行混凝土灌注,在处理完环状空间的悬浮物后,实施摆喷提升。此工艺显然有着工艺繁琐、制桩速度慢、比表面积小、效率低、制桩成本高、泥浆流溢造成环境污染等缺陷。
本发明的目的是针对上述灌注桩存在的问题,提出一种可增加桩周摩阻力进而使桩的承载力大大提高的喷翼沉管成桩法。
为达上述目的,本发明采用以下沉管灌注与高压定喷相结合的制桩方法-喷翼沉管成桩法,其步骤为:
采用外壁连接若干根喷浆管的桩管,该喷浆管的底端开有方向朝外的喷嘴;
采用活瓣沉管桩机,将该桩管打入地下;
将钢筋笼、压浆管下入桩管内;
在桩管内填入级配骨料;
通过桩管内的压浆管压入砂浆或灰浆;
接通桩管外壁的喷浆管;
在提升桩管的同时,用高压注浆泵向桩管外壁的喷浆管灌注高压水泥浆,直至桩管提升到地面为止。
注入桩管内的水泥浆或砂浆填实了沉管内骨料间的空隙,制成混凝土主桩体,而从桩管外壁喷浆管喷出的水泥浆一方面挤压桩周土,使桩周土的密度加大,另一方面与形成的主桩体连成一体,从而在提升沉管的过程中自下而上地逐渐形成一根带翼翅的多翼状非均质桩体,其桩中心部分具有灌注桩一样的高强度,其翼翅部分的强度则从根部到梢部逐渐减小。
由于多翼桩带有向外突出的翼部,故可使桩与桩周土的结合力提高;由于在形成翼部的过程中,高压水泥浆对桩周土有挤压作用,故而提高了桩周土的强度,也增大了桩周土的摩擦系数;由于桩周土的摩擦系数及桩与桩周土的结合力均得到了提高,使得桩周摩擦力大大提高,故使得桩的承载能力大大提高。
本方法所需施工机具简单,机械化程度高,可以节约大量的人工费,成桩速度快、效率高。
下面结合实施例对本发明进行详细描述。
本方法步骤为:
采用外壁对称焊接4根喷浆管的桩管,每根喷浆管的底端开有方向朝外的喷嘴;
采用活瓣沉管桩机,将该桩管打入地下;
将钢筋笼、压浆管下入桩管内;
在桩管内填入级配骨料;
通过桩管内的压浆管压入砂浆或灰浆;
接通桩管外壁的喷浆管;
在提升桩管的同时,用高压注浆泵向桩管外壁的喷浆管内灌注压力为20MPa的高压水泥浆,直至桩管提升到地面为止。
这样将制成一根Φ400的多翼桩。
桩管外壁的喷浆管的数量可根据制桩的直径来确定,一般为2~10根。喷浆管内灌注压力应根据制桩的直径和地层土质情况来确定,一般为10MPa~40MPa。
本发明方法的效益分析:
以Φ400,深8米的一根桩进行成本分析表明,单一的沉管混凝土灌注桩的材料成本约200元。而增加喷翼后,材料成本增加50元,如果桩承载力增加一倍,那么每百元材料所承担的荷载效率将提高60%。不用增加设备,还可以克服原沉管方法不能通过砂层的缺陷。
喷翼沉管成桩法采用沉管灌注与高压喷射两种工艺同时作业成桩,使桩不但有很高的强度,而且有很高的承载力。在同样的地质条件下,按每百元所负担的荷载计算,与其它成桩方法比较,无疑属高效型桩。
Claims (2)
1.喷翼沉管成桩法,其步骤为:
采用外壁连接若干根喷浆管的桩管,该喷浆管的底端开有方向朝外的喷嘴;
采用活瓣沉管桩机,将该桩管打入地下;
将钢筋笼、压浆管下入桩管内;
在桩管内填入级配骨料;
通过桩管内的压浆管压入砂浆或灰浆;
接通桩管外壁的喷浆管;
在提升桩管的同时,用高压注浆泵向桩管外壁的喷浆管灌注高压水泥浆,直至桩管提升到地面为止。
2.如权利要求1所述的喷翼沉管成桩法,其特征在于:用高压注浆泵向桩管外壁的喷浆管灌注水泥浆时,灌注压力为10MPa~40MPa。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96109873 CN1056432C (zh) | 1996-09-26 | 1996-09-26 | 喷翼沉管成桩法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96109873 CN1056432C (zh) | 1996-09-26 | 1996-09-26 | 喷翼沉管成桩法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1150201A CN1150201A (zh) | 1997-05-21 |
CN1056432C true CN1056432C (zh) | 2000-09-13 |
Family
ID=5120682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96109873 Expired - Fee Related CN1056432C (zh) | 1996-09-26 | 1996-09-26 | 喷翼沉管成桩法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1056432C (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100494581C (zh) * | 2006-09-26 | 2009-06-03 | 华北建设集团有限公司 | 混凝土封底和带桩翼的筒桩成孔器及施工工艺 |
-
1996
- 1996-09-26 CN CN 96109873 patent/CN1056432C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1150201A (zh) | 1997-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101812843B (zh) | 中心灌注后压浆桩施工方法及其使用的灌注器和注浆器 | |
CN206784372U (zh) | 注浆成型扩底桩 | |
CN111519618A (zh) | 一种预应力管桩后注浆装置及其施工方法 | |
CN1067453C (zh) | 基坑边坡平锚喷网支护方法 | |
CN102808407B (zh) | 软土地基钢筋混凝土灌注桩施工方法 | |
CN1621626A (zh) | 混凝土桩的施工方法 | |
CN111455973A (zh) | 预制型实心cfg桩的复合地基结构及其施工方法 | |
CN113863294B (zh) | 一种内部预置桩端压浆装置的phc管桩及其施工工艺 | |
CN1182301C (zh) | 一种建筑基础用的成孔预制注浆桩的施工方法 | |
CN103603345B (zh) | 水泥搅拌注浆桩基及成形方法 | |
CN102828534A (zh) | 灾损病害深桩基础建筑物纠倾加固方法 | |
CN108914947A (zh) | 基坑锚定墙拉锚支护的施工方法及其钻具和形成的支护结构 | |
CN1056432C (zh) | 喷翼沉管成桩法 | |
CN218597130U (zh) | 侧扩注浆结合的抗拔碎石桩地基结构 | |
CN212223839U (zh) | 一种预制型实心cfg桩的复合地基结构 | |
CN1259604A (zh) | 水泥土加强组合桩工法 | |
CN1461857A (zh) | 一种建造方法及其用途 | |
CN1243184A (zh) | 高压旋喷扩底桩的施工方法 | |
CN217500224U (zh) | 提高桩基承载力的注浆装置 | |
CN219060055U (zh) | 一种用于预制实心桩的桩端联合挤密注浆系统 | |
CN2538850Y (zh) | 长螺旋钻孔灌注桩、cfg桩的桩端预压浆装置 | |
CN2716338Y (zh) | 桩基施工混凝土灌注围护装置 | |
CN220486413U (zh) | 一种光伏电站的微孔灌注桩岩石锚杆复合基础 | |
CN111074936A (zh) | 一种用于抑制滑坡发育的新型挡土墙及施工方法 | |
CN215105252U (zh) | 一种可分节施工的桩底后压浆钢筋混凝土先张法预应力空心方桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |