CN1621626A - 混凝土桩的施工方法 - Google Patents
混凝土桩的施工方法 Download PDFInfo
- Publication number
- CN1621626A CN1621626A CN 200410102711 CN200410102711A CN1621626A CN 1621626 A CN1621626 A CN 1621626A CN 200410102711 CN200410102711 CN 200410102711 CN 200410102711 A CN200410102711 A CN 200410102711A CN 1621626 A CN1621626 A CN 1621626A
- Authority
- CN
- China
- Prior art keywords
- pile
- mentioned
- concrete
- pipe
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 43
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 239000002689 soil Substances 0.000 claims abstract description 27
- 239000000945 filler Substances 0.000 claims abstract description 7
- 238000005056 compaction Methods 0.000 claims abstract description 6
- 239000002131 composite material Substances 0.000 claims abstract 3
- 230000002787 reinforcement Effects 0.000 claims abstract 2
- 230000035515 penetration Effects 0.000 claims description 11
- 238000000034 method Methods 0.000 claims description 4
- 230000003068 static effect Effects 0.000 claims description 3
- 238000009792 diffusion process Methods 0.000 claims description 2
- -1 etc. Substances 0.000 claims description 2
- 239000002893 slag Substances 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 claims 1
- 239000011449 brick Substances 0.000 claims 1
- 239000004615 ingredient Substances 0.000 claims 1
- 239000000463 material Substances 0.000 claims 1
- 239000000203 mixture Substances 0.000 claims 1
- 239000010959 steel Substances 0.000 claims 1
- 239000002699 waste material Substances 0.000 claims 1
- 238000012856 packing Methods 0.000 abstract 1
- 238000002347 injection Methods 0.000 description 11
- 239000007924 injection Substances 0.000 description 11
- 230000003014 reinforcing effect Effects 0.000 description 7
- 230000010412 perfusion Effects 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000005755 formation reaction Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000010009 beating Methods 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明的目的在于提供一种混凝土桩的施工方法,桩身采用预应力管桩,在管桩的中孔内直接进行填料挤密、灌注混凝土等操作,在有效形成复合载体的同时可确实地保证桩端结合部质量,提高桩的合格率,减小桩的沉降量。施工方法包括下述步骤:1)选择较好地基土作为桩端持力层;2)在预定桩位处,通过动力装置将预应力管桩沉至设计标高处;3)向预应力管桩的中孔内填入散体填充料并进行夯实,反复进行该填充和夯实操作,直至形成满足所需要求的最优的挤密土体;4)向桩管底端填充预定量的低流态混凝土,并以小能量低落距扩出桩管底端;5)向桩管内下钢筋笼;6)向桩管内灌注混凝土并振捣密实,完成桩身施工。
Description
技术领域
本发明涉及土木工程领域,特别是涉及桩的施工技术。
背景技术
在专利号ZL98101041.5专利文献中,公开了一种混凝土桩的施工技术——复合载体夯扩桩,该桩包括复合载体和混凝土桩身,该工艺的特点在于不对桩本身的变化进行研究,而是注重对桩端下土体最大最优的加固挤密,并通过三击贯入度标准有效地形成复合载体,让上部荷载有效地通过桩和桩下面的复合载体,传递到较好持力层上,从而大大提高了桩的承载力,因此具有单桩承载力高、造价经济等优点。但是这种施工方法在质量检测中发现有时桩的沉降量过大,而复合载体还远未达到破坏的程度,其原因是桩身和桩端结合部的质量易出现问题,特别是在淤泥质土或含水量较高的土层中施工,虽然采取了护筒护壁等措施,但在灌注混凝土和提出护筒的过程中,淤泥或水易进入桩身与复合载体的结合部,影响桩端结合部质量,造成桩的沉降量过大。
发明内容
本发明是为了解决上述的问题而提出的,目的在于提供一种混凝土桩的施工方法,桩身采用预应力管桩,在管桩的中孔内直接进行填料挤密、灌注混凝土等操作,在有效形成复合载体的同时可确实地保证桩端结合部质量,提高桩的合格率,减小桩的沉降量。
为了实现上述目的,本发明的混凝土桩的施工方法包括下述步骤:
1)根据地质勘探报告和建筑物上部荷载,选择较好地基土作为桩端持力层;
2)在地基中的预定桩位处,通过动力装置将预应力管桩沉至设计标高处;
3)通过上述预应力管桩的中孔,一边向桩管底端填入散体填充料,一边通过夯锤,对上述填入的散体填充料进行夯实,反复进行该填充和夯实操作,对上述桩管底端,即桩端下方的一定深度和范围的地基土体进行密实加固,直至形成满足所需要求的最优的挤密土体;
4)通过上述预应力管桩的中孔,向桩管底端填充预定量的低流态混凝土,通过上述夯锤,以小能量,低落距轻轻将上述低流态混凝土挤扩出桩管底端;
5)通过上述预应力管桩的中孔,向桩管内下钢筋笼;
6)通过上述预应力管桩的中孔,向桩管内灌注混凝土,对混凝土进行振捣密实,完成桩身施工。
最好,在上述的混凝土桩的施工方法中,上述步骤1)中较好地基土是指能够满足上部荷载的强度和变形要求,同时能够进行加固挤密的土层。
最好,在上述的混凝土桩的施工方法中,上述步骤2)中预应力管桩的沉入方式是通过静压、锤击和振动的方式实现的。
最好,在上述的混凝土桩的施工方法中,上述步骤2)中在预应力管桩的底端设置预制桩尖。
最好,在上述的混凝土桩的施工方法中,上述步骤3)中满足所需要求的最优的挤密土体是指符合下述条件a),同时地基没有隆起,不对相邻桩已形成的挤密土体造成影响时,在桩端形成由夯实的散体填充料,挤密土体和影响土体构成的复合载体,由此获得桩端的最大扩散面积Ae,以获得最大的承载能力;该条件a)指上述填充料的最终填充夯实程度由三击总贯入量控制,即在不投料的情况下,以预定的锤重、落距,测试夯锤连续空打三击的贯入量,其中前一次的贯入量大于后一次的贯入量,即第二击空打贯入量小于第一击空打贯入量,第三击空打贯入量小于第二击空打贯入量或与第二击的空打贯入量持平,并且上述三击总贯入量应小于三击贯入量的设计值。
最好,在上述的混凝土桩的施工方法中,上述步骤3)中反复进行该填充和夯实操作是在预应力管桩的中孔内进行的。
最好,在上述的混凝土桩的施工方法中,上述步骤3)中散体填充料指碎砖烂瓦,干硬性混凝土,混凝土块,各种废弃骨料,卵石,钢渣等,或上述成分的混合料。
通过以上方法形成的混凝土桩的特点和优势在于:
①桩身质量可靠。由于采用了预应力管桩作桩身,又在桩身内设钢筋笼和灌注混凝土,其桩身质量比一般现浇混凝土桩身大大提高。
②桩端结合部质量提高。由于在预应力管桩的中孔内直接进行填料夯扩挤密和下钢筋笼、灌注桩身混凝土等操作,避免了淤泥或水进入桩身与复合载体的结合部的可能,大大提高桩端结合部质量,上部荷载更有效地直接传递到复合载体,显著减小桩的沉降量。
③桩的承载力高。相对一般的预应力管桩、沉管灌注桩、静压桩等桩形,由于在桩端形成有效的复合载体,显著提高桩的承载力,同时桩端复合载体可设在粉质粘土、粉土、砂土等相对较好的土层,因此可缩短桩的长度。
附图说明
图1作为本发明的一个实施例的混凝土桩的施工方法的工序图。
具体实施方式
作为本发明的一个实施例的混凝土桩的施工方法,其包括下述步骤,首先,如图1a所示,在地基中的预定桩位处,在预应力管桩1的底端设置预制桩尖,通过动力装置将预应力管桩1沉至设计标高处;接着,如图1b所示,通过夯锤2将预制桩尖击出预应力管桩1一定距离;然后,如图1c所示,一边向上述预应力管桩1的中孔内填入散体填充料3,一边通过夯锤2,对填入的散体填充料3进行夯实,反复进行该填充和夯实操作,对上述预应力管桩1底端,即桩端下一定深度、范围和体积的地基土体进行密实加固,直至形成满足所需要求的承载体;该承载体由夯实的散体填充料3,挤密土体4和影响土体5构成,如图1d所示;然后,如图1e所示,通过上述预应力管桩1的中孔,向桩管底端填充预定量的低流态混凝土6,通过上述夯锤,以小能量,低落距轻轻将上述低流态混凝土6挤扩出桩管底端;然后,如图1f所示,通过上述预应力管桩1的中孔,向桩管内下钢筋7,之后,如图1g所示,通过上述预应力管桩的中孔,向桩管内灌注混凝土8,对混凝土8进行振捣密实,完成桩身施工。
Claims (7)
1、一种混凝土桩的施工方法,该方法包括下述步骤:
1)根据地质勘探报告和建筑物上部荷载,选择较好地基土作为桩端持力层;
2)在地基中的预定桩位处,通过动力装置将预应力管桩沉至设计标高处;
3)通过上述预应力管桩的中孔,一边向桩管底端填入散体填充料,一边通过夯锤,对上述填入的散体填充料进行夯实,反复进行该填充和夯实操作,对上述桩管底端,即桩端下方的一定深度和范围的地基土体进行密实加固,直至形成满足所需要求的最优的挤密土体;
4)通过上述预应力管桩的中孔,向桩管底端填充预定量的低流态混凝土,通过上述夯锤,以小能量,低落距轻轻将上述低流态混凝土挤扩出桩管底端;
5)通过上述预应力管桩的中孔,向桩管内下钢筋笼;
6)通过上述预应力管桩的中孔,向桩管内灌注混凝土,对混凝土进行振捣密实,完成桩身施工。
2、根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤1)中,较好地基土是指能够满足上部荷载的强度和变形要求,同时能够进行加固挤密的土层。
3、根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤2)中,上述预应力管桩的沉入方式是通过静压、锤击和振动的方式实现的。
4、根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤2)中,在上述预应力管桩的底端设置预制桩尖。
5、根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述满足所需要求的最优的挤密土体是指符合下述条件a),同时地基没有隆起,不对相邻桩已形成的挤密土体造成影响时,在桩端形成由夯实的散体填充料,挤密土体和影响土体构成的复合载体,由此获得桩端的最大扩散面积Ae,以获得最大的承载能力;该条件a)指上述填充料的最终填充夯实程度由三击总贯入量控制,即在不投料的情况下,以预定的锤重、落距,测试夯锤连续空打三击的贯入量,其中前一次的贯入量大于后一次的贯入量,即第二击空打贯入量小于第一击空打贯入量,第三击空打贯入量小于第二击空打贯入量或与第二击的空打贯入量持平,并且上述三击总贯入量应小于三击贯入量的设计值。
6、根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述反复进行该填充和夯实操作是在预应力管桩的中孔内进行的。
7、根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述散体填充料指碎砖烂瓦,干硬性混凝土,混凝土块,各种废弃骨料,卵石,钢渣等,或上述成分的混合料。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004101027116A CN100375820C (zh) | 2004-12-28 | 2004-12-28 | 混凝土桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004101027116A CN100375820C (zh) | 2004-12-28 | 2004-12-28 | 混凝土桩的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1621626A true CN1621626A (zh) | 2005-06-01 |
CN100375820C CN100375820C (zh) | 2008-03-19 |
Family
ID=34766834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2004101027116A Expired - Lifetime CN100375820C (zh) | 2004-12-28 | 2004-12-28 | 混凝土桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100375820C (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046529A (zh) * | 2012-12-31 | 2013-04-17 | 中国建筑西南勘察设计研究院有限公司 | 夯扩干硬性素混凝土桩复合地基 |
CN104404958A (zh) * | 2014-11-20 | 2015-03-11 | 上海智岛建筑科技有限公司 | 一种扩底预制空心桩的施工方法 |
CN104727309A (zh) * | 2015-02-02 | 2015-06-24 | 中国电力工程顾问集团中南电力设计院有限公司 | 挤入式扩底型管桩施工工艺 |
CN104988896A (zh) * | 2015-05-13 | 2015-10-21 | 刘闯 | 一种微型摩擦短管桩的复合地基结构及其施工方法 |
CN105040692A (zh) * | 2015-06-27 | 2015-11-11 | 王继忠 | 一种预制混凝土桩身载体桩的施工方法 |
CN105714773A (zh) * | 2016-03-01 | 2016-06-29 | 江苏东合南岩土科技股份有限公司 | 一种地基处理方法 |
CN105821836A (zh) * | 2016-02-18 | 2016-08-03 | 王继忠 | 一种载体桩的施工方法 |
CN105926595A (zh) * | 2016-04-21 | 2016-09-07 | 化学工业岩土工程有限公司 | 一种夯扩预应力空心管桩的施工方法 |
CN106812149A (zh) * | 2017-03-03 | 2017-06-09 | 王继忠 | 一种桩基的施工方法 |
CN106884429A (zh) * | 2017-04-10 | 2017-06-23 | 浙江省现代建筑设计研究院有限公司 | 一种预制桩施工方法及辅助支架 |
CN112144522A (zh) * | 2020-10-20 | 2020-12-29 | 王继忠 | 一种预应力管桩的施工方法及其特制预应力管桩 |
CN112854177A (zh) * | 2021-01-14 | 2021-05-28 | 中国铁建港航局集团有限公司 | 一种海相泥层加固处理方法 |
CN113083129A (zh) * | 2021-05-07 | 2021-07-09 | 马鞍山市北益环保科技有限责任公司 | 一种多层复合岩棉板生产用填料装置及其填料方法 |
CN113235636A (zh) * | 2021-05-22 | 2021-08-10 | 宁波市明森建筑设计院有限公司 | 高强度软土地层桩基 |
WO2021237766A1 (zh) * | 2020-05-27 | 2021-12-02 | 刘清洁 | 一种提高混凝土灌注桩承载力的施工方法 |
CN115305912A (zh) * | 2022-02-14 | 2022-11-08 | 高云飞 | 一种管桩灌浆夯振扩底施工方法 |
CN116220006A (zh) * | 2023-03-07 | 2023-06-06 | 广州市市政工程试验检测有限公司 | 一种后张缓粘结预应力组合夯扩桩及其施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2261456B (en) * | 1991-11-12 | 1995-08-02 | Bing Wing Choy | Concrete pile |
CN1104280A (zh) * | 1993-10-19 | 1995-06-28 | 俞晓 | 预制灌注复合管桩及其成桩工艺和设备 |
CN1052284C (zh) * | 1998-03-20 | 2000-05-10 | 王继忠 | 混凝土桩的施工方法 |
CN1137314C (zh) * | 2001-12-28 | 2004-02-04 | 王继忠 | 混凝土桩的施工方法 |
-
2004
- 2004-12-28 CN CNB2004101027116A patent/CN100375820C/zh not_active Expired - Lifetime
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046529A (zh) * | 2012-12-31 | 2013-04-17 | 中国建筑西南勘察设计研究院有限公司 | 夯扩干硬性素混凝土桩复合地基 |
CN104404958A (zh) * | 2014-11-20 | 2015-03-11 | 上海智岛建筑科技有限公司 | 一种扩底预制空心桩的施工方法 |
CN104727309A (zh) * | 2015-02-02 | 2015-06-24 | 中国电力工程顾问集团中南电力设计院有限公司 | 挤入式扩底型管桩施工工艺 |
CN104988896A (zh) * | 2015-05-13 | 2015-10-21 | 刘闯 | 一种微型摩擦短管桩的复合地基结构及其施工方法 |
CN105040692A (zh) * | 2015-06-27 | 2015-11-11 | 王继忠 | 一种预制混凝土桩身载体桩的施工方法 |
CN105040692B (zh) * | 2015-06-27 | 2018-01-19 | 王继忠 | 一种预制混凝土桩身载体桩的施工方法 |
CN105821836B (zh) * | 2016-02-18 | 2017-08-04 | 王继忠 | 一种载体桩的施工方法 |
CN105821836A (zh) * | 2016-02-18 | 2016-08-03 | 王继忠 | 一种载体桩的施工方法 |
CN105714773A (zh) * | 2016-03-01 | 2016-06-29 | 江苏东合南岩土科技股份有限公司 | 一种地基处理方法 |
CN105926595A (zh) * | 2016-04-21 | 2016-09-07 | 化学工业岩土工程有限公司 | 一种夯扩预应力空心管桩的施工方法 |
CN106812149A (zh) * | 2017-03-03 | 2017-06-09 | 王继忠 | 一种桩基的施工方法 |
CN106884429A (zh) * | 2017-04-10 | 2017-06-23 | 浙江省现代建筑设计研究院有限公司 | 一种预制桩施工方法及辅助支架 |
WO2021237766A1 (zh) * | 2020-05-27 | 2021-12-02 | 刘清洁 | 一种提高混凝土灌注桩承载力的施工方法 |
CN112144522A (zh) * | 2020-10-20 | 2020-12-29 | 王继忠 | 一种预应力管桩的施工方法及其特制预应力管桩 |
CN112854177A (zh) * | 2021-01-14 | 2021-05-28 | 中国铁建港航局集团有限公司 | 一种海相泥层加固处理方法 |
CN113083129A (zh) * | 2021-05-07 | 2021-07-09 | 马鞍山市北益环保科技有限责任公司 | 一种多层复合岩棉板生产用填料装置及其填料方法 |
CN113235636A (zh) * | 2021-05-22 | 2021-08-10 | 宁波市明森建筑设计院有限公司 | 高强度软土地层桩基 |
CN115305912A (zh) * | 2022-02-14 | 2022-11-08 | 高云飞 | 一种管桩灌浆夯振扩底施工方法 |
CN116220006A (zh) * | 2023-03-07 | 2023-06-06 | 广州市市政工程试验检测有限公司 | 一种后张缓粘结预应力组合夯扩桩及其施工方法 |
CN116220006B (zh) * | 2023-03-07 | 2024-09-17 | 广州市市政工程试验检测有限公司 | 一种后张缓粘结预应力组合夯扩桩及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100375820C (zh) | 2008-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7326004B2 (en) | Apparatus for providing a rammed aggregate pier | |
CN102733378B (zh) | 混凝土桩的施工方法 | |
CN1621626A (zh) | 混凝土桩的施工方法 | |
US8043028B2 (en) | Apparatus for providing a support column | |
US7201540B2 (en) | Construction process for composite pile foundation | |
CN102733377B (zh) | 混凝土桩的施工方法 | |
CN103821139B (zh) | 一种夯扩载体劲芯多元复合桩及软土地基加固施工方法 | |
US9243379B2 (en) | Method of providing a support column | |
CN100441781C (zh) | 盐渍土地区强夯加排水桩地基处理方法 | |
CN114517472B (zh) | 一种载体桩的施工方法 | |
CN110965416B (zh) | 一种针对山区高填方路基加固的竹材加筋体系及施工方法 | |
CN106192999A (zh) | 抗拔桩的施工方法 | |
CN105040692B (zh) | 一种预制混凝土桩身载体桩的施工方法 | |
CN1052284C (zh) | 混凝土桩的施工方法 | |
CN101575852A (zh) | 护壁式扩底沉管灌注桩施工方法 | |
CN1137314C (zh) | 混凝土桩的施工方法 | |
CN1202319C (zh) | 复合地基的施工方法 | |
CN1563604A (zh) | 混凝土桩的施工方法 | |
CN1095517C (zh) | 加固地基的施工方法 | |
CN203741824U (zh) | 一种夯扩载体劲芯多元复合桩 | |
CN1364961A (zh) | 一种地基加固方式 | |
CN105970919B (zh) | 一种取土压灌混凝土桩的施工方法 | |
CN100360745C (zh) | 混凝土桩的施工方法 | |
CN100387789C (zh) | 混凝土桩的施工方法 | |
CN205712060U (zh) | 预成孔侧向约束桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: BEIJING PUISSANT GEOTECHNICAL ENGINEERING Co.,Ltd. Assignor: Wang Jizhong Contract record no.: 2011110000108 Denomination of invention: Concrete pile construction method Granted publication date: 20080319 License type: Exclusive License Open date: 20050601 Record date: 20110718 |
|
CX01 | Expiry of patent term |
Granted publication date: 20080319 |
|
CX01 | Expiry of patent term |