CN105442727A - Compound type connection shear wall structure and assembling method thereof - Google Patents

Compound type connection shear wall structure and assembling method thereof Download PDF

Info

Publication number
CN105442727A
CN105442727A CN201510901229.7A CN201510901229A CN105442727A CN 105442727 A CN105442727 A CN 105442727A CN 201510901229 A CN201510901229 A CN 201510901229A CN 105442727 A CN105442727 A CN 105442727A
Authority
CN
China
Prior art keywords
shear
shear wall
grouting
wall component
key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510901229.7A
Other languages
Chinese (zh)
Other versions
CN105442727B (en
Inventor
张沈斌
卓新
吴建挺
陆其荣
周观根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Zhejiang Zhancheng Construction Group Co Ltd
Zhejiang Southeast Space Frame Co Ltd
Original Assignee
Zhejiang University ZJU
Zhejiang Zhancheng Construction Group Co Ltd
Zhejiang Southeast Space Frame Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU, Zhejiang Zhancheng Construction Group Co Ltd, Zhejiang Southeast Space Frame Co Ltd filed Critical Zhejiang University ZJU
Priority to CN201510901229.7A priority Critical patent/CN105442727B/en
Publication of CN105442727A publication Critical patent/CN105442727A/en
Application granted granted Critical
Publication of CN105442727B publication Critical patent/CN105442727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

本发明公开了一种复合式连接剪力墙结构及其装配方法。包括N块结构相同的剪力墙构件,每两块剪力墙构件之间通过复合抗剪键和键槽连接,构成复合式连接剪力墙。因复合抗剪键与键槽的相互导入作用,提高施工精度,避免因装配不准的偏心受压的产生;因下方剪力墙构件上的抗剪键可以在装配下一层时承担上方剪力墙构件的重量,故在楼板浇筑完成后无需等待楼板混凝土达到强度,可以马上进行上一层墙体的装配,可以大大缩短楼层的装配周期;下方剪力墙构件的抗剪键嵌入上方剪力墙构件的键槽之中,抗剪键能够承担横向剪力作用,加强结构的抗剪性能,增强结构可靠度。

The invention discloses a composite connection shear wall structure and an assembly method thereof. It includes N pieces of shear wall components with the same structure, and every two shear wall components are connected by composite shear keys and key grooves to form a composite connected shear wall. Due to the interaction between the composite shear key and the keyway, the construction accuracy is improved, and the eccentric compression caused by inaccurate assembly is avoided; because the shear key on the lower shear wall member can bear the upper shear force when the next layer is assembled The weight of the wall components, so there is no need to wait for the floor concrete to reach strength after the floor is poured, and the upper wall can be assembled immediately, which can greatly shorten the assembly cycle of the floor; the shear keys of the lower shear wall components are embedded in the upper shear force In the keyway of the wall member, the shear key can bear the transverse shear force, strengthen the shear performance of the structure, and enhance the reliability of the structure.

Description

复合式连接剪力墙结构及其装配方法Composite connection shear wall structure and its assembly method

技术领域 technical field

本发明涉及一种装配式剪力墙结构及其装配方法,具体涉及一种复合式连接剪力墙结构及其装配方法。 The invention relates to an assembled shear wall structure and an assembly method thereof, in particular to a compound connected shear wall structure and an assembly method thereof.

背景技术 Background technique

相对于传统现浇混凝土结构,装配式混凝土结构具有构件质量好、施工工期短、资源使用少、生产浪费少等诸多优点。其主要特点是主要结构构件在工厂预制,然后通过车辆运输等方式将构件运送到施工现场,在现场通过机械吊装等方式进行构件拼装和连接,大量施工现场作业工作被工厂集中生产所代替。 Compared with the traditional cast-in-place concrete structure, the prefabricated concrete structure has many advantages such as good component quality, short construction period, less resource use, and less production waste. Its main feature is that the main structural components are prefabricated in the factory, and then the components are transported to the construction site by means of vehicle transportation, etc., and the components are assembled and connected by means of mechanical hoisting on site. A large number of construction site operations are replaced by centralized production in the factory.

套筒灌浆技术是装配式混凝土剪力墙结构连接上下剪力墙的普遍做法之一。施工时将下部剪力墙顶部的预留钢筋插入到上部剪力墙中预埋好的对接套筒中,然后用灌浆机向套筒内注入灌浆材料,待灌浆材料硬化后,钢筋与套筒之间即牢固地连接在一起。现有研究结果表明,采用套筒灌浆连接的剪力墙构件连接节点的抗弯强度基本等同于现浇混凝土节点,且其延性及耗能能力也较为可靠。但采用传统套筒灌浆施工工艺连接的上下墙体间往往难以实现精确对接,极易造成上下层剪力墙体之间错位的现象产生,这不仅对建筑外观和防水性能造成不利影响,还会因剪力墙偏心受压而影响结构的安全性。此外,现有相关规范规定楼板必须要有现浇层,而采用现有施工工艺装配上部剪力墙体,必须要等楼板混凝土达到一定强度后才能进行,这将减缓施工进度。 Sleeve grouting technology is one of the common methods for connecting upper and lower shear walls in prefabricated concrete shear wall structures. During construction, insert the reserved steel bar at the top of the lower shear wall into the pre-buried butt joint sleeve in the upper shear wall, and then inject grouting material into the sleeve with a grouting machine. After the grouting material hardens, the steel bar and the sleeve are firmly connected together. The existing research results show that the flexural strength of the joints of shear wall members connected by sleeve grouting is basically the same as that of cast-in-place concrete joints, and its ductility and energy dissipation capacity are also relatively reliable. However, it is often difficult to achieve precise docking between the upper and lower walls connected by the traditional sleeve grouting construction technology, which can easily cause misalignment between the upper and lower shear walls, which not only adversely affects the appearance and waterproof performance of the building, but also The safety of the structure is affected by the eccentric compression of the shear wall. In addition, the existing relevant regulations stipulate that the floor slab must have a cast-in-situ layer, and the assembly of the upper shear wall with the existing construction technology must wait for the floor concrete to reach a certain strength before proceeding, which will slow down the construction progress.

发明内容 Contents of the invention

本发明的目的在于提供一种复合式连接剪力墙结构及其装配方法,解决了传统套筒灌浆连接的剪力墙的不足,以提高装配式剪力墙施工的准确性和便利性。 The purpose of the present invention is to provide a compound connected shear wall structure and its assembly method, which solves the shortcomings of the traditional sleeve grouting connected shear wall, so as to improve the accuracy and convenience of the assembled shear wall construction.

为达了达到上述目的,本发明采用的技术方案是: In order to achieve the above object, the technical scheme adopted in the present invention is:

一、一种复合式连接剪力墙结构 1. A compound connected shear wall structure

本发明包括N块结构相同的剪力墙构件,每两块剪力墙构件之间通过复合抗剪键和键槽连接,构成复合式连接剪力墙。 The invention includes N pieces of shear wall components with the same structure, and every two pieces of shear wall components are connected by composite shear keys and key grooves to form a compound connected shear wall.

所述每块剪力墙构件上端两侧均预埋有1-2排纵向钢筋,上端中间至少设置一个复合抗剪键,复合抗剪键上部为抗剪键嵌入部分,下部为抗剪键埋入部分,抗剪键埋入部分的形状为长方体,高度与叠合楼板的厚度相等,宽度小于剪力墙的厚度,并设置有多个供剪力墙两侧的叠合楼板钢筋连接的楼板钢筋预留孔;抗剪键嵌入部分的形状为四棱台,四棱台的底面尺寸与抗剪键埋入部分相同,四棱台的顶部平面预埋一排供灌浆连接用的纵向钢筋;剪力墙构件下端两侧均设有灌浆套筒,下端中间至少设置一个键槽,灌浆套筒预埋的位置与剪力墙构件上端预埋的纵向钢筋的位置相对应,并在侧面设有多个供灌浆用的注浆孔与出浆孔,多个供灌浆用的注浆孔与出浆孔分别与各自的灌浆套筒连通;键槽为下凹的四棱台,其形状和尺寸均与抗剪键嵌入部分相同。 1-2 rows of longitudinal steel bars are pre-embedded on both sides of the upper end of each shear wall member, and at least one composite shear key is arranged in the middle of the upper end. The shape of the embedded part of the shear key is a cuboid, the height is equal to the thickness of the laminated floor, and the width is smaller than the thickness of the shear wall, and there are multiple floors for the connection of the laminated floor reinforcement on both sides of the shear wall Reserved holes for steel bars; the shape of the embedded part of the shear key is a square truss, the size of the bottom surface of the four prism is the same as that of the embedded part of the shear key, and a row of longitudinal steel bars for grouting connection is pre-embedded on the top plane of the four prism; Both sides of the lower end of the shear wall member are provided with grouting sleeves, and at least one keyway is provided in the middle of the lower end. A grouting hole and a grouting hole for grouting, and a plurality of grouting holes and grouting holes for grouting are respectively connected with their respective grouting sleeves; the keyway is a concave quadrangular platform, and its shape and size are consistent with the grouting sleeve. The shear key embedding part is the same.

所述键槽靠近剪力墙构件墙体两侧处分别设置一道U型加固用的钢丝网。 A U-shaped steel wire mesh for reinforcement is respectively arranged at the two sides of the wall body of the shear wall member close to the keyway.

二、一种复合式连接剪力墙结构的装配方法,该方法的步骤如下: Two, a kind of assembly method of compound connection shear wall structure, the steps of this method are as follows:

1)楼板吊装与浇筑: 1) Floor hoisting and pouring:

在地基上装配好第一块剪力墙构件后,将两块预制楼板分别装配到墙体两侧,架设并绑扎两块预制楼板上层钢筋,并向楼板钢筋预留孔内插入楼板加固钢筋,再浇筑混凝土至复合抗剪键的上下分界线处; After assembling the first shear wall component on the foundation, assemble the two prefabricated floor slabs on both sides of the wall respectively, erect and bind the upper steel bars of the two prefabricated floor slabs, and insert the floor slab reinforcement steel bars into the reserved holes of the floor slab steel bars. Then pour concrete to the upper and lower boundaries of the composite shear bond;

2)第二块剪力墙构件的装配 2) Assembly of the second shear wall member

在需要连接处铺设一层灌浆料作为坐浆层后,将第二块剪力墙构件吊装到第一块剪力墙构件上方,使第一块剪力墙构件的所有纵向钢筋插入到第二块剪力墙构件对应位置的灌浆套筒中,同时使第一块剪力墙构件的抗剪键嵌入部分插入第二块剪力墙构件的键槽之中。 After laying a layer of grouting material at the required joint as the sitting grout layer, hoist the second shear wall component above the first shear wall component so that all longitudinal reinforcement bars of the first shear wall component are inserted into the second The grouting sleeve at the corresponding position of the first shear wall component, and at the same time insert the shear key embedded part of the first shear wall component into the key groove of the second shear wall component.

3)灌浆连接 3) Grout connection

采用压力注浆的方式向剪力墙构件侧面所有的注浆孔内进行压力注浆,当灌浆料流出最上端各自出浆孔后即停止注浆,封闭所有注浆孔和出浆孔,待灌浆料凝结硬化后即完成第一层的装配; Use pressure grouting to carry out pressure grouting in all the grouting holes on the side of the shear wall components. When the grouting material flows out of the respective grouting holes at the uppermost end, stop grouting and close all the grouting holes and grouting holes. The assembly of the first layer is completed after the grouting material has solidified and hardened;

重复步骤1-3,即能装配需要的层数。 Repeat steps 1-3 to assemble the required layers.

本发明与背景技术相比具有的有益效果是: The beneficial effect that the present invention has compared with background technology is:

1.因复合抗剪键与键槽的相互导入作用,可以使墙体在施工装配时更加简便、精确,减少装配工作量,提高施工精度,避免因装配不准的偏心受压的产生; 1. Due to the interaction between the composite shear key and the keyway, it can make the construction and assembly of the wall more convenient and accurate, reduce the assembly workload, improve the construction accuracy, and avoid the occurrence of eccentric pressure due to inaccurate assembly;

2.因下方剪力墙构件上的抗剪键可以在装配下一层时承担上方剪力墙构件的重量,故在楼板浇筑完成后无需等待楼板混凝土达到强度,可以马上进行上一层墙体的装配,可以大大缩短楼层的装配周期; 2. Because the shear key on the lower shear wall component can bear the weight of the upper shear wall component when the next layer is assembled, there is no need to wait for the floor concrete to reach strength after the floor is poured, and the upper layer of wall can be carried out immediately The assembly of the floor can greatly shorten the assembly cycle of the floor;

3.下方剪力墙构件的抗剪键嵌入上方剪力墙构件的键槽之中,抗剪键能够承担横向剪力作用,加强结构的抗剪性能,增强结构可靠度。 3. The shear key of the lower shear wall component is embedded in the keyway of the upper shear wall component. The shear key can bear the transverse shear force, strengthen the shear performance of the structure, and enhance the reliability of the structure.

附图说明 Description of drawings

图1是本发明剪力墙构件的立体图。 Fig. 1 is a perspective view of a shear wall member of the present invention.

图2是图1的仰视图。 Fig. 2 is a bottom view of Fig. 1 .

图3是两块剪力墙构件装配后的立体图(未画出叠合楼板)。 Figure 3 is a perspective view of two shear wall components after assembly (the laminated floor is not drawn).

图4是图3的A-A局部剖视图。 Fig. 4 is a partial cross-sectional view along line A-A of Fig. 3 .

图5是本发明剪力墙构件的立体图。 Fig. 5 is a perspective view of a shear wall member of the present invention.

图6是本发明剪力墙构件与叠合楼板预制部分装配后的立体图。 Fig. 6 is a perspective view of the assembly of the shear wall member and the prefabricated part of the laminated floor according to the present invention.

图7是本发明剪力墙构件与叠合楼板装配后的立体图。 Fig. 7 is a perspective view of the assembly of the shear wall member and the laminated floor slab of the present invention.

图8是本发明两块剪力墙构件与预制叠合楼板装配后的立体图。 Fig. 8 is a perspective view of two shear wall members and prefabricated laminated floor slabs assembled in the present invention.

图中:1、剪力墙构件,2、纵向钢筋,3、复合抗剪键,4、抗剪键嵌入部分,5、抗剪键埋入部分,6、楼板钢筋预留孔,7、灌浆套筒,8、键槽,9、注浆孔,10、出浆孔,11、加固用钢丝网,12、叠合楼板,13、叠合楼板预制部分,14、楼板上部钢筋,15、楼板加固钢筋,16、叠合楼板现浇部分,17、坐浆层。 In the figure: 1. Shear wall component, 2. Longitudinal reinforcement, 3. Composite shear key, 4. Embedded part of shear key, 5. Embedded part of shear key, 6. Reserved hole for floor reinforcement, 7. Grouting Sleeve, 8, keyway, 9, grouting hole, 10, grouting hole, 11, steel wire mesh for reinforcement, 12, laminated floor slab, 13, prefabricated part of laminated floor slab, 14, upper reinforcement of floor slab, 15, floor slab reinforcement Steel bars, 16, the cast-in-place part of the laminated floor, 17, the slurry layer.

具体实施方式 detailed description

下面结合附图和实施例对本发明做进一步说明。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

如图1、图2、图3所示,本发明包括N块结构相同的剪力墙构件1,每两块剪力墙构件之间通过复合抗剪键3和键槽8连接,构成复合式连接剪力墙。 As shown in Fig. 1, Fig. 2 and Fig. 3, the present invention includes N pieces of shear wall members 1 with the same structure, and every two shear wall members are connected by a composite shear key 3 and a keyway 8 to form a composite connection shear wall.

所述每块剪力墙构件1上端两侧预埋有1-2排(图1、图3中为2排)纵向钢筋2,上端中间至少设置一个复合抗剪键3(图1~3中复合抗剪键为1个),复合抗剪键上部为抗剪键嵌入部分4,下部为抗剪键埋入部分5,抗剪键埋入部分5的形状为长方体,高度与叠合楼板12的厚度相等,宽度小于剪力墙的厚度,并设置有多个供剪力墙两侧的叠合楼板12钢筋连接的楼板钢筋预留孔6;抗剪键嵌入部分4的形状为四棱台,四棱台的底面尺寸与抗剪键埋入部分5相同,四棱台的顶部平面预埋一排供灌浆连接用的纵向钢筋2;剪力墙构件下端两侧均设有灌浆套筒7,下端中间至少设置一个键槽(图2中键槽为1个),灌浆套筒7预埋的位置与剪力墙构件1上端预埋的纵向钢筋2的位置相对应,并在侧面设有多个供灌浆用的注浆孔9与出浆孔10,多个供灌浆用的注浆孔9与出浆孔10分别与各自的灌浆套筒7连通;键槽8为下凹的四棱台,其形状和尺寸均与抗剪键嵌入部分4相同。 1-2 rows (2 rows in Fig. 1 and Fig. 3) of longitudinal steel bars 2 are pre-buried on both sides of the upper end of each shear wall member 1, and at least one composite shear key 3 is arranged in the middle of the upper end (Fig. 1-3). One composite shear key), the upper part of the composite shear key is the embedded part 4 of the shear key, and the lower part is the embedded part 5 of the shear key. The thickness is equal to the thickness of the shear wall, and the width is smaller than the thickness of the shear wall, and there are a plurality of reserved holes 6 for the reinforcement of the laminated floor 12 on both sides of the shear wall to connect the steel bars; the shape of the shear key embedded part 4 is a square platform , the size of the bottom surface of the four-sided platform is the same as that of the embedded part 5 of the shear key, and a row of longitudinal steel bars 2 for grouting connection is pre-embedded on the top plane of the four-sided platform; grouting sleeves 7 are arranged on both sides of the lower end of the shear wall member , at least one keyway is set in the middle of the lower end (there is one keyway in Figure 2), the pre-embedded position of the grouting sleeve 7 corresponds to the position of the pre-embedded longitudinal reinforcement 2 at the upper end of the shear wall member 1, and there are multiple The grouting hole 9 and the grouting hole 10 for grouting, a plurality of grouting holes 9 and the grouting hole 10 for grouting are communicated with the grouting sleeve 7 respectively; The shape and size are the same as the shear key embedded part 4.

如图4所示,考虑到键槽8在墙体两侧部分较为薄弱,在键槽8靠近剪力墙构件1墙体两侧处分别设置一道U型加固用的钢丝网11,防止其在运输和装配中被破坏。 As shown in Figure 4, considering that the keyway 8 is relatively weak on both sides of the wall, a U-shaped steel wire mesh 11 for reinforcement is respectively arranged on both sides of the keyway 8 close to the wall of the shear wall member 1 to prevent it from being transported. was destroyed during assembly.

如图5~图8所示,本发明剪力墙的施工装配过程如下: As shown in Figures 5 to 8, the construction and assembly process of the shear wall of the present invention is as follows:

1)叠合楼板吊装与浇筑: 1) Hoisting and pouring of laminated slabs:

首先如图5所示,装配好第一块剪力墙构件1后,即可进行预制叠合楼板12的吊装与浇筑工作。如图6所示,利用吊车将预制叠合楼板预制部分13吊装并支撑放置在剪力墙构件1的两侧;架设并绑扎楼板上部钢筋14;向剪力墙抗剪键中的板筋预留孔6内插入楼板加固钢筋15,并使楼板加固钢筋15与楼板上部钢筋14有效连接;利用泵送混凝土对叠合楼板现浇部分16进行浇筑,边浇筑边振捣,直到混凝土表面达到复合抗剪键3的抗剪键嵌入部分4与抗剪键埋入部分5的分界线时停止浇筑。如图7所示,待楼板浇筑完毕后第一块剪力墙构件1的复合抗剪键3只有其上部的抗剪键嵌入部分4露出于楼板表面。 First, as shown in FIG. 5 , after the first shear wall component 1 is assembled, the hoisting and pouring of the prefabricated laminated floor 12 can be carried out. As shown in Figure 6, the prefabricated laminated floor slab prefabricated part 13 is hoisted and supported by a crane and placed on both sides of the shear wall member 1; the upper reinforcement 14 of the floor slab is erected and bound; Insert the floor reinforcement bars 15 into the holes 6, and effectively connect the floor reinforcement bars 15 with the upper reinforcement bars 14 of the floor; use pumped concrete to pour the cast-in-place part 16 of the laminated floor, and vibrate while pouring until the concrete surface reaches a composite level. Stop pouring when the boundary line between the shear key embedded part 4 and the shear key embedded part 5 of the shear key 3 is reached. As shown in Figure 7, only the upper shear key embedded part 4 of the composite shear key 3 of the first shear wall member 1 is exposed on the floor surface after the floor slab is poured.

2)第二块剪力墙构件装配前准备: 2) Preparations before assembly of the second shear wall component:

确定构件的吊装顺序,将需要装配的构件按次序叠放以便于现场吊装安排;检查和清理剪力墙构件1的灌浆套筒7及其注浆孔9和出浆孔10,防止被杂物堵塞,保证后续灌浆工作的顺利进行;清理叠合楼板12、复合抗剪键3与第二块剪力墙构件1之间的结合面,并在结合面上铺设一层灌浆料作为坐浆层17用以黏结两块剪力墙构件; Determine the hoisting sequence of the components, and stack the components to be assembled in order to facilitate on-site hoisting arrangements; check and clean the grouting sleeve 7 of the shear wall component 1 and its grouting hole 9 and grouting hole 10 to prevent debris from being To ensure the smooth progress of the subsequent grouting work; clean the joint surface between the laminated floor 12, the composite shear key 3 and the second shear wall member 1, and lay a layer of grouting material on the joint surface as the sitting grout layer 17 is used to bond two shear wall components;

3)第二块剪力墙构件装配作业: 3) Assembly of the second shear wall component:

因复合抗剪键3作用,第二块剪力墙构件1在装配时由第一块剪力墙构件1的复合抗剪键3支承,无需等待楼板混凝土达到强度后再进行第二块剪力墙构件装配,可大大缩短施工周期。装配时用吊车将第二块剪力墙构件吊装到第一块剪力墙的预定位置上方,然后降低构件位置,使第一块剪力墙的纵向钢筋2能够插入到第二块剪力墙的灌浆套筒7中,并使露出于叠合楼板12之上的第一块剪力墙构件1的抗剪键嵌入部分4插入第二块剪力墙构件1的键槽8中。因为键槽8与抗剪键嵌入部分4周围的四个侧面均为斜面且形状相互吻合,第二块剪力墙构件1将在自重作用下依靠键槽8和抗剪键嵌入部分4之间的相互作用而自动准确地落到预定的平面位置,无需再进行人工调整;之后,只需检查调整第二块剪力墙的垂直度即可; Due to the action of the compound shear key 3, the second shear wall element 1 is supported by the compound shear key 3 of the first shear wall element 1 during assembly, and there is no need to wait for the floor concrete to reach strength before performing the second shear force The assembly of wall components can greatly shorten the construction period. During assembly, hoist the second shear wall component above the predetermined position of the first shear wall with a crane, and then lower the position of the component so that the longitudinal reinforcement 2 of the first shear wall can be inserted into the second shear wall grouting sleeve 7, and insert the shear key embedded part 4 of the first shear wall component 1 exposed above the laminated floor 12 into the key groove 8 of the second shear wall component 1. Because the four sides around the keyway 8 and the shear key embedded part 4 are inclined planes and the shapes match each other, the second shear wall member 1 will rely on the interaction between the keyway 8 and the shear key embedded part 4 under its own weight. It automatically and accurately falls to the predetermined plane position without manual adjustment; after that, it is only necessary to check and adjust the verticality of the second shear wall;

4)灌浆连接: 4) Grouting connection:

在第二块剪力墙构件1安装完毕后,对其进行灌浆连接,使两块剪力墙构件1连接成整体。采用压力注浆的方式对灌浆套筒7进行压力注浆,为保证灌浆料密实地填满整个灌浆套筒7,从注浆孔9向灌浆套筒7内注入灌浆料,待出浆孔10流出灌浆料之后即可封闭出浆孔和注浆孔;待灌浆料凝结硬化后,上下剪力墙墙体即连接成整体。连接完成的剪力墙如图8所示。 After the second shear wall component 1 is installed, it is connected by grouting, so that the two shear wall components 1 are connected into a whole. The grouting sleeve 7 is pressure grouted by means of pressure grouting. In order to ensure that the grouting material fills the entire grouting sleeve 7 densely, the grouting material is injected into the grouting sleeve 7 from the grouting hole 9 until the grouting hole 10 After the grouting material flows out, the grouting hole and the grouting hole can be closed; after the grouting material is solidified and hardened, the upper and lower shear walls are connected into a whole. The completed shear wall is shown in Figure 8.

重复步骤1-4,即能装配需要的层数。 Repeat steps 1-4 to assemble the required layers.

Claims (4)

1. a combined type connects shear wall structure, it is characterized in that: comprise the shear wall component (1) that N block structure is identical, be connected with keyway (8) by compound shear key (3) between every two blocks of shear wall components, form combined type and connect shear wall.
2. a kind of combined type according to claim 1 connects shear wall structure, it is characterized in that: described every block shear wall component (1) both sides, upper end are all embedded with 1-2 and arrange longitudinal reinforcement, in the middle of upper end, a compound shear key (3) is at least set, compound shear key top is shear key embedded part (4), bottom is shear key inlet part (5), the shape of shear key inlet part (5) is cuboid, height is equal with the thickness of laminated floor slab (12), width is less than the thickness of shear wall, and be provided with the floor bar preformed hole (6) of multiple laminated floor slab (12) bar connecting for shear wall both sides, the shape of shear key embedded part (4) is truncated rectangular pyramids, and the bed-plate dimension of truncated rectangular pyramids is identical with shear key inlet part (5), and the pre-buried row of top planes of truncated rectangular pyramids is for the longitudinal reinforcement connected that is in the milk, shear wall component (1) both sides, lower end are equipped with grout sleeve (7), in the middle of lower end, a keyway (8) is at least set, the position of the longitudinal reinforcement that the pre-buried position of grout sleeve (7) is pre-buried with shear wall component (1) upper end is corresponding, and multiple injected hole (9) for grouting and slurry outlet (10) is provided with in side, multiple injected hole (9) for grouting is communicated with respective grout sleeve (7) respectively with slurry outlet (10), keyway (8) is recessed truncated rectangular pyramids, and its shape and size are all identical with shear key embedded part (5).
3. a kind of combined type according to claim 1 connects shear wall structure, it is characterized in that: described keyway (8) arranges the gauze wire cloth (11) of U-shaped reinforcing together respectively near shear wall component (1) body of wall both sides place.
4. connect the assembly method of shear wall structure for a kind of combined type according to claim 1, it is characterized in that, the step of the method is as follows:
1) floor lifts and builds:
After ground assembles first piece of shear wall component (1) lower wall body, two blocks of precast floor slabs are assembled to body of wall both sides respectively, erection is colligation two pieces of precast floor slab top reinforcementes also, and insert floor reinforced steel (15) in floor bar preformed hole (6), then concreting is to the place of line of demarcation up and down of compound shear key (3);
2) assembling of second block of shear wall component
Needs junction lay one deck grouting material as seat pulp layer (17) after, second piece of shear wall component (1) is lifted into first piece of shear wall component (1) top, all longitudinal reinforcements (2) of first piece of shear wall component (1) are inserted in the grout sleeve (7) of second piece of shear wall component (1) correspondence position, make the shear key embedded part (5) of first piece of shear wall component (1) insert among the keyway (8) of second piece of shear wall component (1) simultaneously;
3) grouting connects
The mode of slip casing by pressure is adopted to carry out slip casing by pressure in all injected hole (9) in shear wall component (1) side, namely slip casting is stopped after grouting material flows out the respective slurry outlet (10) in the top, close all injected holes (9) and slurry outlet (10), after grouting material setting and harden, namely complete the assembling of first floor;
Repeat step 1-3, the number of plies of needs can be assembled.
CN201510901229.7A 2015-12-09 2015-12-09 Composite connection shear wall structure and its assembly method Active CN105442727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510901229.7A CN105442727B (en) 2015-12-09 2015-12-09 Composite connection shear wall structure and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510901229.7A CN105442727B (en) 2015-12-09 2015-12-09 Composite connection shear wall structure and its assembly method

Publications (2)

Publication Number Publication Date
CN105442727A true CN105442727A (en) 2016-03-30
CN105442727B CN105442727B (en) 2017-08-04

Family

ID=55553320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510901229.7A Active CN105442727B (en) 2015-12-09 2015-12-09 Composite connection shear wall structure and its assembly method

Country Status (1)

Country Link
CN (1) CN105442727B (en)

Cited By (53)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672533A (en) * 2016-04-05 2016-06-15 朱彦超 Assembled composite insulating wall, composite insulating wall structure and construction method
CN105756202A (en) * 2016-04-20 2016-07-13 天津大学建筑设计研究院 Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN105863049A (en) * 2016-05-26 2016-08-17 南京长江都市建筑设计股份有限公司 Prefabricated assembled integral framework column bottom grouting structure
CN105888077A (en) * 2016-06-17 2016-08-24 福建工程学院 Fabricated shear wall connecting device and construction method thereof
CN106013499A (en) * 2016-06-08 2016-10-12 浙江新华建设有限公司 High-strength building wall body structure
CN106088354A (en) * 2016-08-25 2016-11-09 初明进 A kind of interlayer connection node
CN106088352A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast reinforced concrete structure method of attachment
CN106088348A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast concrete method of attachment
CN106121051A (en) * 2016-08-25 2016-11-16 初明进 A kind of interlayer connection node
CN106121050A (en) * 2016-08-25 2016-11-16 初明进 A kind of interlayer connection node
CN106193323A (en) * 2016-07-29 2016-12-07 初明进 A kind of precast concrete method of attachment
CN106193324A (en) * 2016-07-29 2016-12-07 初明进 A kind of precast concrete method of attachment
CN106223473A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223472A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223476A (en) * 2016-08-31 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223487A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223486A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106245787A (en) * 2016-07-29 2016-12-21 初明进 A kind of precast reinforced concrete structure method of attachment
CN106245759A (en) * 2016-08-31 2016-12-21 初明进 A kind of precast concrete method of attachment
CN106245756A (en) * 2016-08-31 2016-12-21 初明进 A kind of precast concrete method of attachment
CN107100290A (en) * 2017-04-28 2017-08-29 广东省建科建筑设计院有限公司 A kind of prefabricated shear wall and overlapping plate node
CN108265835A (en) * 2018-03-16 2018-07-10 中冶建工集团有限公司 Precast shear wall component assembling grouting sealing mechanism and sealing grouting method
CN108385857A (en) * 2018-02-05 2018-08-10 西安建筑科技大学 A kind of precast prestressed connecting structure of wall of abnormity and assembly method
CN108729564A (en) * 2017-04-19 2018-11-02 北京清华同衡规划设计研究院有限公司 Assembled architecture system
CN108978938A (en) * 2018-07-20 2018-12-11 山东科技大学 Precast reinforced concrete shear wall and construction method
CN109235943A (en) * 2018-09-30 2019-01-18 央固工程科技(上海)有限公司 A kind of reinforced concrete precast assembling movie theatre stand structure
CN109252603A (en) * 2018-10-17 2019-01-22 阜阳市卓创科技服务生产力促进中心 A kind of stalk is the precast concrete sandwich wall of thermal insulation material
CN109736427A (en) * 2019-01-24 2019-05-10 浙江立恒建设有限公司 A kind of Antiseismic house builds structure
CN110438988A (en) * 2019-08-14 2019-11-12 中铁二院工程集团有限责任公司 A kind of prefabricated bulkhead and pore digging method
CN110512748A (en) * 2019-09-11 2019-11-29 湖南工学院 Wall-beam-slab connection structure and construction method of prefabricated buildings
CN110528729A (en) * 2019-09-11 2019-12-03 湖南工学院 Lamination overlapped assembly self-stabilization shear wall
CN110593418A (en) * 2018-06-12 2019-12-20 迈瑞司(北京)抗震住宅技术有限公司 Assembled shear wall and mounting method thereof
CN110593437A (en) * 2019-09-11 2019-12-20 湖南工学院 Prefabricated shear wall construction method
CN110644646A (en) * 2019-09-16 2020-01-03 佛山建装建筑科技有限公司 Split-level grouting sleeve connected assembled shear wall system
CN110965668A (en) * 2019-12-23 2020-04-07 北京工业大学 Mortise and tenon structure-based assembled concrete shear wall connection method
CN111002462A (en) * 2019-07-19 2020-04-14 中国二十冶集团有限公司 Processing method of reinforcing through-length steel bar at bottom of prefabricated overlapped wallboard
WO2020114032A1 (en) * 2018-12-07 2020-06-11 青岛理工大学 Prefabricated and assembled double-steel-plate concrete shear wall connection assembly and usage method therefor
CN111321821A (en) * 2020-02-28 2020-06-23 南京工程学院 Adopt prefabricated shear force wall steel bar connection structure tied in a bundle of full assembled level seam
CN111733697A (en) * 2019-11-25 2020-10-02 湖南工业大学 Prefabricated Assembled Laminated Panel Construction
CN111794435A (en) * 2020-07-06 2020-10-20 重庆中航新型材料科技有限公司 Green assembled energy-saving panel wall system
CN112878535A (en) * 2021-01-19 2021-06-01 中国十七冶集团有限公司 Precast concrete wallboard connecting structure and construction method thereof
CN113152512A (en) * 2021-04-02 2021-07-23 中铁第四勘察设计院集团有限公司 Gravity type retaining wall and construction method
CN113293882A (en) * 2021-05-28 2021-08-24 宿迁学院 Assembled building structure convenient to butt joint and grout
CN113756471A (en) * 2021-10-11 2021-12-07 佰昱建设集团有限公司 Connecting structure of thin-wall steel concrete shear wall and lower steel reinforced concrete shear wall
CN114562059A (en) * 2022-04-21 2022-05-31 西南科技大学 Shear wall connector and assembled shear wall and assembly method
CN114753517A (en) * 2022-04-15 2022-07-15 浙江省建工集团有限责任公司 Assembled shear wall and construction method thereof
CN115233833A (en) * 2022-08-17 2022-10-25 山西省安装集团股份有限公司 Sleeve connection structure is exempted from to assembled shear force wall
CN115450378A (en) * 2022-04-30 2022-12-09 张轶鹏 Positioning, aligning and grouting self-locking connection of connecting steel bars of PC (polycarbonate) component of assembled shear wall
CN115492305A (en) * 2022-09-06 2022-12-20 中南大学 A fully assembled building composite interior wall panel with keyway connection and its application
CN115653189A (en) * 2022-09-06 2023-01-31 中南大学 A Fully Assembled Composite Shear Wall Panel with Keyway and Concentrated Reinforcement
CN116335309A (en) * 2022-09-06 2023-06-27 中南大学 Full-assembled building composite external wall board with key slot type joint
CN117926908A (en) * 2024-03-21 2024-04-26 中一达建设集团有限公司 Superimposed concrete member
CN118345949A (en) * 2024-06-14 2024-07-16 广东省建科建筑设计院有限公司 Concrete modularized system based on novel fully assembled shear wall and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169900A (en) * 2005-12-19 2007-07-05 Kajima Corp Precast member for construction and construction method
JP2008223242A (en) * 2007-03-08 2008-09-25 Takenaka Komuten Co Ltd Manufacturing method for precast concrete panel
CN101503887A (en) * 2009-02-04 2009-08-12 南通建筑工程总承包有限公司 Interlayer connection node between inner shear wall, plate and shear walls
CN101818527A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral shear wall structure system and construction method thereof
CN102433945A (en) * 2011-08-30 2012-05-02 东南大学 Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure
CN103104053A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled concrete shear wall and construction method thereof
CN104847039A (en) * 2015-05-27 2015-08-19 天津大学建筑设计研究院 Reinforcing fabricated shear wall structure with shear keys
CN205242683U (en) * 2015-12-09 2016-05-18 浙江大学 Shear wall structure is connected to combined type

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169900A (en) * 2005-12-19 2007-07-05 Kajima Corp Precast member for construction and construction method
JP2008223242A (en) * 2007-03-08 2008-09-25 Takenaka Komuten Co Ltd Manufacturing method for precast concrete panel
CN101503887A (en) * 2009-02-04 2009-08-12 南通建筑工程总承包有限公司 Interlayer connection node between inner shear wall, plate and shear walls
CN101818527A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral shear wall structure system and construction method thereof
CN102433945A (en) * 2011-08-30 2012-05-02 东南大学 Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure
CN103104053A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled concrete shear wall and construction method thereof
CN104847039A (en) * 2015-05-27 2015-08-19 天津大学建筑设计研究院 Reinforcing fabricated shear wall structure with shear keys
CN205242683U (en) * 2015-12-09 2016-05-18 浙江大学 Shear wall structure is connected to combined type

Cited By (65)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672533A (en) * 2016-04-05 2016-06-15 朱彦超 Assembled composite insulating wall, composite insulating wall structure and construction method
CN105756202A (en) * 2016-04-20 2016-07-13 天津大学建筑设计研究院 Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN105863049A (en) * 2016-05-26 2016-08-17 南京长江都市建筑设计股份有限公司 Prefabricated assembled integral framework column bottom grouting structure
CN106013499A (en) * 2016-06-08 2016-10-12 浙江新华建设有限公司 High-strength building wall body structure
CN105888077B (en) * 2016-06-17 2018-06-08 福建工程学院 Fabricated shear wall attachment device and its construction method
CN105888077A (en) * 2016-06-17 2016-08-24 福建工程学院 Fabricated shear wall connecting device and construction method thereof
CN106223473A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106088348A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast concrete method of attachment
CN106193323A (en) * 2016-07-29 2016-12-07 初明进 A kind of precast concrete method of attachment
CN106193324A (en) * 2016-07-29 2016-12-07 初明进 A kind of precast concrete method of attachment
CN106088352A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223472A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223487A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223486A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106245787A (en) * 2016-07-29 2016-12-21 初明进 A kind of precast reinforced concrete structure method of attachment
CN106121051A (en) * 2016-08-25 2016-11-16 初明进 A kind of interlayer connection node
CN106121050A (en) * 2016-08-25 2016-11-16 初明进 A kind of interlayer connection node
CN106088354A (en) * 2016-08-25 2016-11-09 初明进 A kind of interlayer connection node
CN106245759A (en) * 2016-08-31 2016-12-21 初明进 A kind of precast concrete method of attachment
CN106223476A (en) * 2016-08-31 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106245756A (en) * 2016-08-31 2016-12-21 初明进 A kind of precast concrete method of attachment
CN108729564A (en) * 2017-04-19 2018-11-02 北京清华同衡规划设计研究院有限公司 Assembled architecture system
CN108729564B (en) * 2017-04-19 2024-04-16 北京清华同衡规划设计研究院有限公司 Assembled building system
CN107100290A (en) * 2017-04-28 2017-08-29 广东省建科建筑设计院有限公司 A kind of prefabricated shear wall and overlapping plate node
CN108385857A (en) * 2018-02-05 2018-08-10 西安建筑科技大学 A kind of precast prestressed connecting structure of wall of abnormity and assembly method
CN108385857B (en) * 2018-02-05 2019-07-05 西安建筑科技大学 A special-shaped prefabricated prestressed wall connection structure and assembly method
CN108265835A (en) * 2018-03-16 2018-07-10 中冶建工集团有限公司 Precast shear wall component assembling grouting sealing mechanism and sealing grouting method
CN108265835B (en) * 2018-03-16 2024-01-30 中冶建工集团有限公司 Prefabricated shear wall component assembly grouting sealing mechanism and sealing grouting method
CN110593418A (en) * 2018-06-12 2019-12-20 迈瑞司(北京)抗震住宅技术有限公司 Assembled shear wall and mounting method thereof
CN110593418B (en) * 2018-06-12 2024-10-01 迈瑞司(北京)抗震住宅技术有限公司 Assembled shear wall and installation method thereof
CN108978938A (en) * 2018-07-20 2018-12-11 山东科技大学 Precast reinforced concrete shear wall and construction method
CN109235943B (en) * 2018-09-30 2024-08-23 央固工程科技(上海)有限公司 Reinforced concrete prefabricated assembly type cinema stand structure
CN109235943A (en) * 2018-09-30 2019-01-18 央固工程科技(上海)有限公司 A kind of reinforced concrete precast assembling movie theatre stand structure
CN109252603A (en) * 2018-10-17 2019-01-22 阜阳市卓创科技服务生产力促进中心 A kind of stalk is the precast concrete sandwich wall of thermal insulation material
WO2020114032A1 (en) * 2018-12-07 2020-06-11 青岛理工大学 Prefabricated and assembled double-steel-plate concrete shear wall connection assembly and usage method therefor
CN109736427A (en) * 2019-01-24 2019-05-10 浙江立恒建设有限公司 A kind of Antiseismic house builds structure
CN111002462A (en) * 2019-07-19 2020-04-14 中国二十冶集团有限公司 Processing method of reinforcing through-length steel bar at bottom of prefabricated overlapped wallboard
CN110438988A (en) * 2019-08-14 2019-11-12 中铁二院工程集团有限责任公司 A kind of prefabricated bulkhead and pore digging method
CN110512748A (en) * 2019-09-11 2019-11-29 湖南工学院 Wall-beam-slab connection structure and construction method of prefabricated buildings
CN110528729A (en) * 2019-09-11 2019-12-03 湖南工学院 Lamination overlapped assembly self-stabilization shear wall
CN110593437A (en) * 2019-09-11 2019-12-20 湖南工学院 Prefabricated shear wall construction method
CN110644646A (en) * 2019-09-16 2020-01-03 佛山建装建筑科技有限公司 Split-level grouting sleeve connected assembled shear wall system
CN111733697A (en) * 2019-11-25 2020-10-02 湖南工业大学 Prefabricated Assembled Laminated Panel Construction
CN110965668A (en) * 2019-12-23 2020-04-07 北京工业大学 Mortise and tenon structure-based assembled concrete shear wall connection method
CN111321821A (en) * 2020-02-28 2020-06-23 南京工程学院 Adopt prefabricated shear force wall steel bar connection structure tied in a bundle of full assembled level seam
CN111794435A (en) * 2020-07-06 2020-10-20 重庆中航新型材料科技有限公司 Green assembled energy-saving panel wall system
CN112878535A (en) * 2021-01-19 2021-06-01 中国十七冶集团有限公司 Precast concrete wallboard connecting structure and construction method thereof
CN112878535B (en) * 2021-01-19 2022-03-08 中国十七冶集团有限公司 Precast concrete wallboard connecting structure and construction method thereof
CN113152512A (en) * 2021-04-02 2021-07-23 中铁第四勘察设计院集团有限公司 Gravity type retaining wall and construction method
CN113293882A (en) * 2021-05-28 2021-08-24 宿迁学院 Assembled building structure convenient to butt joint and grout
CN113293882B (en) * 2021-05-28 2023-11-03 宿迁学院 A prefabricated building structure that facilitates docking and grouting
CN113756471A (en) * 2021-10-11 2021-12-07 佰昱建设集团有限公司 Connecting structure of thin-wall steel concrete shear wall and lower steel reinforced concrete shear wall
CN114753517B (en) * 2022-04-15 2024-03-26 浙江省建工集团有限责任公司 Assembled shear wall and construction method thereof
CN114753517A (en) * 2022-04-15 2022-07-15 浙江省建工集团有限责任公司 Assembled shear wall and construction method thereof
CN114562059A (en) * 2022-04-21 2022-05-31 西南科技大学 Shear wall connector and assembled shear wall and assembly method
CN114562059B (en) * 2022-04-21 2024-10-25 西南科技大学 Shear wall connecting piece, assembled shear wall and assembling method
CN115450378A (en) * 2022-04-30 2022-12-09 张轶鹏 Positioning, aligning and grouting self-locking connection of connecting steel bars of PC (polycarbonate) component of assembled shear wall
CN115233833B (en) * 2022-08-17 2024-02-06 山西省安装集团股份有限公司 Sleeve-free connecting structure of assembled shear wall
CN115233833A (en) * 2022-08-17 2022-10-25 山西省安装集团股份有限公司 Sleeve connection structure is exempted from to assembled shear force wall
CN116335309A (en) * 2022-09-06 2023-06-27 中南大学 Full-assembled building composite external wall board with key slot type joint
CN115653189A (en) * 2022-09-06 2023-01-31 中南大学 A Fully Assembled Composite Shear Wall Panel with Keyway and Concentrated Reinforcement
CN115492305A (en) * 2022-09-06 2022-12-20 中南大学 A fully assembled building composite interior wall panel with keyway connection and its application
CN117926908A (en) * 2024-03-21 2024-04-26 中一达建设集团有限公司 Superimposed concrete member
CN117926908B (en) * 2024-03-21 2024-05-28 中一达建设集团有限公司 Superimposed concrete member
CN118345949A (en) * 2024-06-14 2024-07-16 广东省建科建筑设计院有限公司 Concrete modularized system based on novel fully assembled shear wall and construction method

Also Published As

Publication number Publication date
CN105442727B (en) 2017-08-04

Similar Documents

Publication Publication Date Title
CN105442727B (en) Composite connection shear wall structure and its assembly method
CN205242683U (en) Shear wall structure is connected to combined type
EP3670778B1 (en) Prefabricated frame
CN103104053B (en) A kind of assembly concrete shear wall and construction method
US9988775B1 (en) Concrete i-beam for bridge construction
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN105839846A (en) Prefabricated reinforced concrete composite beam
CN106065669A (en) Steel bar connection mode in prefabricated shear wall connection component
CN111779160A (en) Prestress assembly type concrete shear wall system and construction method thereof
CN109518858A (en) Fabricated Beam-Slab connection structure and its construction method
CN108316522A (en) The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof
CN110725455A (en) A method for lateral connection of prefabricated laminated floor slabs
CN108104284B (en) Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab
CN103470040A (en) Splicing method of composite floor slab and beam
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN110670770A (en) Combined structure and construction method of solid shear wall and laminated plate edge member
CN106894587A (en) Precast stair connection method
KR101227099B1 (en) Hybrid Column Composed of Centrifugal Concrete Cylinder with Steel Skeleton & Steel Bars
CN108018972B (en) Full prefabricated floor slab and composite floor slab combined structure, manufacturing and assembling method
CN108086488B (en) Assembled frame shear structure wall staggered connection structure and assembling method
CN102352668A (en) Prefabricated reinforced concrete assembled column and its manufacturing method
CN209620089U (en) A prefabricated buttress retaining wall with ribs hoisted in blocks
KR101211332B1 (en) Connecting Structure between Pre-Stressed Concrete Girder and Precast Panel
CN211312950U (en) Assembled integral elevator shaft prefabricated part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant