[go: up one dir, main page]

CN104986174A - Guiding device for rectification device of train bogie - Google Patents

Guiding device for rectification device of train bogie Download PDF

Info

Publication number
CN104986174A
CN104986174A CN201410695871.XA CN201410695871A CN104986174A CN 104986174 A CN104986174 A CN 104986174A CN 201410695871 A CN201410695871 A CN 201410695871A CN 104986174 A CN104986174 A CN 104986174A
Authority
CN
China
Prior art keywords
guide
bogie
train
sleeve seat
guide sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410695871.XA
Other languages
Chinese (zh)
Other versions
CN104986174B (en
Inventor
苗泽旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Jinan
Original Assignee
University of Jinan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Jinan filed Critical University of Jinan
Priority to CN201410695871.XA priority Critical patent/CN104986174B/en
Publication of CN104986174A publication Critical patent/CN104986174A/en
Application granted granted Critical
Publication of CN104986174B publication Critical patent/CN104986174B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61FRAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
    • B61F5/00Constructional details of bogies; Connections between bogies and vehicle underframes; Arrangements or devices for adjusting or allowing self-adjustment of wheel axles or bogies when rounding curves
    • B61F5/50Other details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)

Abstract

列车转向架整流装置的导向装置涉及列车整流技术领域。列车转向架整流装置的导向装置,包括壳体框架、转向架侧架、导向轴、导向轴橡胶套、导向套、导向套座、导向套座板,其特征在于:导向轴与转向架侧架焊接连接,导向轴外套导向套,导向套连接导向套座板,导向套座板连接导向套座,导向套座连接壳体框架。列车转向架整流装置在不改变列车运行运动性能的前提下,减少列车运行的空气阻力,降低能耗或提高列车运行速度;保证转向架的自由转动和上下方向对于车箱的相对运动;保证刹车时的散热;不增加转向架的负载;列车转向架整流装置的导向装置的设计可保证在导向导流罩外壳体随转向架同步转动;导向轴橡胶套防止钢对钢硬的碰撞。便于检修。

A guide device for a rectification device of a train bogie relates to the technical field of train rectification. The guide device of the train bogie rectification device includes the shell frame, the bogie side frame, the guide shaft, the guide shaft rubber sleeve, the guide sleeve, the guide sleeve seat, and the guide sleeve seat plate. It is characterized in that: the guide shaft and the bogie side frame Welding connection, the guide shaft is covered with the guide sleeve, the guide sleeve is connected with the guide sleeve seat plate, the guide sleeve seat plate is connected with the guide sleeve seat, and the guide sleeve seat is connected with the shell frame. The train bogie rectification device can reduce the air resistance of the train running, reduce energy consumption or increase the running speed of the train without changing the motion performance of the train; ensure the free rotation of the bogie and the relative movement of the upper and lower directions to the carriage; ensure No increase in the load of the bogie; the design of the guiding device of the rectification device of the train bogie can ensure that the outer shell of the guide shroud rotates synchronously with the bogie; the rubber sleeve of the guide shaft prevents the collision of steel against steel. Easy to overhaul.

Description

列车转向架整流装置的导向装置Guiding device for train bogie rectifying device

列车转向架整流装置的导向装置,为发明“列车转向架整流装置”的分案申请。原申请日:2012年11月11日,申请号:2012104479618,原发明创造名称:列车转向架整流装置。The guiding device of the train bogie rectifying device is a divisional application for the invention of "train bogie rectifying device". Original application date: November 11, 2012, application number: 2012104479618, original invention name: train bogie rectification device.

技术领域technical field

列车转向架整流装置的导向装置涉及列车车腹整流技术领域。A guide device for a train bogie rectification device relates to the technical field of train belly rectification.

背景技术Background technique

现代列车不断朝着高速舒适的方向发展,列车行驶的阻力主要来自车轮和钢轨的摩擦阻力、空气气流对列车的流体动力学阻力。为克服空气气流对行驶列车的阻力,列车车厢下连接有裙边,但列车转向架周围却无裙边,其原因是因在列车行驶到轨道转弯处时随轨道的转弯而转弯,厢体连接的裙边会阻碍转向架的转动。中国专利申请:200810195674.6提出了高速列车车腹整流的技术方案,但因公开不充分可行性差。其一,根据权利要求2的技术特征:“紧贴车腹横梁下安装有平板型横梁整流罩”,阻断了列车制动装置对转向架上轮子的制动;其二,根据权利要求2的技术特征:“紧贴车腹横梁下安装有平板型横梁整流罩”,列车制动时闸瓦与车轮摩擦放热,热量使气体膨胀,热气体密度<冷气体密度,热气流上升而转向架上却被平板型横梁整流罩罩住,不能散热,其后果难以预料;其三,列车的运行参数是依据动力学原理及长期经验而设计,根据权利要求1的技术特征:高速列车车腹整流装置的整体重量由转向架承载,而其运行参数又未做相应的修正,影响列车整体运行性能;其四,根据权利要求5的技术特征:外挂箱整流罩顺列车运行方向呈流线型设置。技术方案公开不完全,整流罩如何与车体连接未公开,转向架被整流罩完全包住,转向架如何转动未做说明,综上所述诸多原因,此技术方案难于实施。Modern trains are constantly developing towards high-speed comfort. The resistance of trains mainly comes from the frictional resistance of wheels and rails, and the hydrodynamic resistance of airflow to trains. In order to overcome the resistance of the air flow to the running train, there is a skirt connected under the train car, but there is no skirt around the bogie of the train. The skirt will hinder the rotation of the bogie. Chinese patent application: 200810195674.6 proposes a technical solution for high-speed train belly rectification, but the feasibility is poor due to insufficient disclosure. First, according to the technical feature of claim 2: "a flat-plate beam fairing is installed under the belly beam", which blocks the braking of the wheels on the bogie by the train braking device; second, according to claim 2 The technical features of the train: "A flat-plate beam fairing is installed under the belly beam". When the train brakes, the friction between the brake shoe and the wheel releases heat, and the heat causes the gas to expand. The density of the hot gas is less than the density of the cold gas. The hot air flow rises and turns The frame is covered by a flat beam fairing, which cannot dissipate heat, and its consequences are unpredictable; three, the operating parameters of the train are designed according to the principle of dynamics and long-term experience, according to the technical characteristics of claim 1: the belly of the high-speed train The overall weight of the rectifying device is carried by the bogie, and its operating parameters have not been corrected accordingly, which affects the overall operating performance of the train; fourth, according to the technical feature of claim 5: the fairing of the external box is arranged in a streamlined shape along the direction of the train. The disclosure of the technical solution is not complete, how the fairing is connected to the car body is not disclosed, the bogie is completely wrapped by the fairing, and how the bogie rotates is not explained. In summary, for many reasons, this technical solution is difficult to implement.

发明内容Contents of the invention

针对现有技术存在的不足,本发明的任务是:For the deficiencies in the prior art, the task of the present invention is:

一、提供一种减轻列车运行时空气阻力的转向架导流装置;1. To provide a bogie deflector that reduces air resistance during train operation;

二、确保列车刹车时的散热;2. Ensure the heat dissipation when the train brakes;

三、增加导流装置后保证转向架的水平方向的转动和上下的相对运动不受影响;3. After adding the deflector, ensure that the horizontal rotation of the bogie and the relative movement up and down are not affected;

四、保障列车整体运行性能;4. Guarantee the overall operation performance of the train;

五、不增加转向架的负载;5. Do not increase the load on the bogie;

六、保证转向架的检修。6. Guarantee the overhaul of the bogie.

本发明的列车转向架整流装置采用如下技术方案:The train bogie rectifying device of the present invention adopts the following technical solutions:

1、列车转向架整流装置,包括:导流罩轨道1、导流罩轮2、壳体框架3、检修门4、导流罩外壳体5、客车箱车底6、转向架侧架7、导向装置8、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5、转向架9,其特征在于:转向架9外罩有导流罩外壳体5,导流罩外壳体5呈上下敞口的箱形,导流罩外壳体5的前、后面上部两侧装有导流罩轮2,导流罩外壳体5通过导流罩轮2与导流罩轨道1连接,导流罩轨道1连接客车箱车底6;所述的导流罩外壳体5内连接有壳体框架3。1. Train bogie rectification device, including: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, Guide device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, characterized in that: bogie 9 The outer cover has a shroud outer casing 5, and the shroud outer casing 5 is box-shaped up and down. The shroud wheel 2 is connected with the shroud rail 1, and the shroud rail 1 is connected with the bottom 6 of the passenger car box; the casing frame 3 is connected inside the shroud outer shell 5.

2、所述的列车转向架整流装置,其特征在于:导流罩外壳体5前后面为圆弧面,两侧面为平面。2. The train bogie rectifying device is characterized in that: the front and rear of the outer casing 5 of the shroud are arc-shaped surfaces, and the two sides are planes.

3、所述的列车转向架整流装置,其特征在于:导流罩轨道1焊接连接客车箱车底6。3. The train bogie rectifying device is characterized in that the guide cover rail 1 is welded to the bottom 6 of the passenger car box.

4、所述的列车转向架整流装置,其特征在于:壳体框架3为方管钢。4. The train bogie rectification device is characterized in that: the housing frame 3 is made of square tube steel.

5、所述的列车转向架整流装置,其特征在于:导流罩外壳体5两侧面开有检修门4。5. The train bogie rectifying device is characterized in that: there are inspection doors 4 on both sides of the outer body 5 of the shroud.

6、所述的列车转向架整流装置,其特征在于:导流罩外壳体5内焊接连接壳体框架3。6. The train bogie rectification device is characterized in that: the casing frame 3 is welded inside the casing 5 of the shroud.

7、所述的列车转向架整流装置,其特征在于:导流罩外壳体5前后的圆弧面的圆弧半径=转向架9中心点到圆弧面的垂直距离。7. The train bogie rectifying device is characterized in that: the arc radius of the arc surface before and after the outer casing 5 of the shroud = the vertical distance from the center point of the bogie 9 to the arc surface.

8、导向装置8,包括壳体框架3、转向架侧架7、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5,其特征在于:导向轴8-1与转向架侧架7焊接连接,导向轴8-1外套导向套8-3,导向套8-3连接导向套座板8-5,导向套座板8-5连接导向套座8-4,导向套座8-4连接壳体框架3。8. Guide device 8, including shell frame 3, bogie side frame 7, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8 -5, characterized in that: the guide shaft 8-1 is welded to the bogie side frame 7, the guide shaft 8-1 is covered with the guide sleeve 8-3, the guide sleeve 8-3 is connected to the guide sleeve seat plate 8-5, and the guide sleeve seat The plate 8-5 is connected with the guide sleeve 8-4, and the guide sleeve 8-4 is connected with the housing frame 3.

9、所述的导向装置8,其特征在于:导向轴8-1外紧密套装有导向轴橡胶套8-2。9. The above-mentioned guiding device 8 is characterized in that: the guiding shaft 8-1 is tightly fitted with a guiding shaft rubber sleeve 8-2.

10、所述的导向装置8,其特征在于:导向轴橡胶套8-2与导向套8-3的间隙=10±1mm。10. The above-mentioned guide device 8 is characterized in that the gap between the guide shaft rubber sleeve 8-2 and the guide sleeve 8-3 is 10±1mm.

有益效果Beneficial effect

在不改变列车运行运动性能的前提下,减少列车运行的空气阻力,降低能耗提高列车运行速度;保证转向架的自由转动和上下方向对于车箱的相对运动;确保刹车时闸瓦摩擦热量的散失;不增加转向架的承载负荷;保障列车的运动性能;便于检修。Under the premise of not changing the running performance of the train, reduce the air resistance of the train running, reduce energy consumption and increase the running speed of the train; ensure the free rotation of the bogie and the relative movement of the upper and lower directions to the carriage; ensure the loss of frictional heat of the brake shoes during braking ; Do not increase the bearing load of the bogie; guarantee the movement performance of the train; facilitate maintenance.

附图说明Description of drawings

图1:列车转向架整流装置主视图;Figure 1: Front view of train bogie rectification device;

图2:列车转向架整流装置俯视图;Figure 2: Top view of train bogie rectification device;

图3:车转向架整流装置A-A左视剖面图;Figure 3: A left sectional view of the bogie rectification device A-A;

图4:B-B导向装置剖面图;Figure 4: Sectional view of B-B guide device;

图5:C向局部放大视图;Figure 5: Partial enlarged view from direction C;

图中:1导流罩轨道、2导流罩轮、3壳体框架、4检修门、5导流罩外壳体、6客车箱车底、7转向架侧架、8导向装置、8-1导向轴、8-2导向轴橡胶套、8-3导向套、8-4导向套座、8-5导向套座板、9转向架。In the figure: 1 dome track, 2 dome wheel, 3 shell frame, 4 inspection door, 5 dome outer shell, 6 bus bottom, 7 bogie side frame, 8 guiding device, 8-1 Guide shaft, 8-2 guide shaft rubber sleeve, 8-3 guide sleeve, 8-4 guide sleeve seat, 8-5 guide sleeve seat plate, 9 bogie.

具体实施方式Detailed ways

下面结合附图和实施例对列车转向架整流装置做进一步说明。The train bogie rectification device will be further described below in conjunction with the accompanying drawings and embodiments.

实施例1Example 1

1、列车转向架整流装置,包括:导流罩轨道1、导流罩轮2、壳体框架3、检修门4、导流罩外壳体5、客车箱车底6、转向架侧架7、导向装置8、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5、转向架9,其特征在于:转向架9外罩有导流罩外壳体5,导流罩外壳体5呈上下敞口的箱形,导流罩外壳体5的前、后面上部两侧装有导流罩轮2,导流罩外壳体5通过导流罩轮2与导流罩轨道1连接,导流罩轨道1连接客车箱车底6;导流罩外壳体5内连接有壳体框架3。导流罩外壳体5呈上下敞口的箱形,便于刹车时的散热;导流罩轮2和导流罩轨道1的滑动连接,使导流罩可灵活转动,又可使客车箱车底6承载导流罩的全部重量,则不会影响转向架的动力学性能,保障行车安全。1. Train bogie rectification device, including: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, Guide device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, characterized in that: bogie 9 The outer cover has a shroud outer casing 5, and the shroud outer casing 5 is box-shaped up and down. The shroud wheel 2 is connected with the shroud rail 1, and the shroud rail 1 is connected with the bottom 6 of the passenger car box; The shroud outer casing 5 is box-shaped up and down, which is convenient for heat dissipation during braking; the sliding connection of the shroud wheel 2 and the shroud track 1 enables the shroud to rotate flexibly, and can also make the bottom of the passenger car box 6 Carrying the full weight of the air deflector will not affect the dynamic performance of the bogie and ensure driving safety.

2、所述的列车转向架整流装置,其特征在于:导流罩外壳体5前后面为圆弧面,两侧面为平面。导流罩外壳体5前后为圆弧面,即可保证导流罩轮2沿导流罩轨道1的滑动,又不致转动时触碰车箱裙边,又可进一步降低行驶中的气流阻力。2. The train bogie rectifying device is characterized in that: the front and rear of the outer casing 5 of the shroud are arc-shaped surfaces, and the two sides are planes. The front and back of the shroud outer casing 5 are arc surfaces, which can ensure the sliding of the shroud wheel 2 along the shroud track 1 without touching the skirt of the carriage when rotating, and can further reduce the airflow resistance in driving.

3、所述的列车转向架整流装置,其特征在于:导流罩轨道1焊接连接客车箱车底6。焊接连接不会松动,造成意外。3. The train bogie rectifying device is characterized in that the guide cover rail 1 is welded to the bottom 6 of the passenger car box. Solder connections won't come loose and cause accidents.

实施例2Example 2

1、列车转向架整流装置,包括:导流罩轨道1、导流罩轮2、壳体框架3、检修门4、导流罩外壳体5、客车箱车底6、转向架侧架7、导向装置8、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5、转向架9,其特征在于:转向架9外罩有导流罩外壳体5,导流罩外壳体5呈上下敞口的箱形,外罩导流罩外壳体5的前、后面上部两侧装有导流罩轮2,导流罩外壳体5通过导流罩轮2与导流罩轨道1连接,导流罩轨道1连接客车箱车底6;导流罩外壳体5内连接有壳体框架3。1. Train bogie rectification device, including: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, Guide device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, characterized in that: bogie 9 The outer cover has a shroud outer casing 5, and the shroud outer casing 5 is box-shaped up and down. 5 is connected to the shroud track 1 through the shroud wheel 2, and the shroud rail 1 is connected to the bottom 6 of the passenger car box;

2、所述的列车转向架整流装置,其特征在于:导流罩外壳体5前后面为圆弧面,两侧面为平面。导流罩外壳体5前后面为圆弧面,一方面利于在导流罩轨道1的滑动,另一方面进一步降低行驶时的气流阻力。2. The train bogie rectifying device is characterized in that: the front and rear of the outer casing 5 of the shroud are arc-shaped surfaces, and the two sides are planes. The front and back sides of the wind deflector shell body 5 are circular arc surfaces, on the one hand, it is beneficial to slide on the wind deflector track 1, and on the other hand, the air flow resistance during driving is further reduced.

3、所述的列车转向架整流装置,其特征在于:导流罩轨道1焊接连接客车箱车底6。3. The train bogie rectifying device is characterized in that the guide cover rail 1 is welded to the bottom 6 of the passenger car box.

4、所述的列车转向架整流装置,其特征在于:壳体框架3为方管钢。通过方管钢的壳体框架3加强对导流罩外壳体5的稳固,防止运行时的形变。4. The train bogie rectification device is characterized in that: the housing frame 3 is made of square tube steel. The shell frame 3 of square tube steel strengthens the stability of the outer casing 5 of the shroud to prevent deformation during operation.

5、所述的列车转向架整流装置,其特征在于:导流罩外壳体5两侧面开有检修门4。导流罩外壳体5两侧面设置检修门4利于维修,避免检修时要把列车转向架整流装置全部拆卸。5. The train bogie rectifying device is characterized in that: there are inspection doors 4 on both sides of the outer body 5 of the shroud. An inspection door 4 is arranged on both sides of the shroud outer shell body 5 and is beneficial to maintenance, so that the train bogie rectifying device will be completely dismantled when avoiding maintenance.

实施例3Example 3

1、列车转向架整流装置包括:导流罩轨道1、导流罩轮2、壳体框架3、检修门4、导流罩外壳体5、客车箱车底6、转向架侧架7、导向装置8、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5、转向架9,其特征在于:转向架9外罩有导流罩外壳体5,导流罩外壳体5呈上下敞口的箱形,外罩导流罩外壳体5的前、后面上部两侧装有导流罩轮2,导流罩外壳体5通过导流罩轮2与导流罩轨道1连接,导流罩轨道1连接客车箱车底6;所述的导流罩外壳体5内连接有壳体框架3。1. The train bogie rectification device includes: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, guide Device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, characterized in that: bogie 9 outer cover There is a shroud shell 5, the shroud shell 5 is box-shaped up and down, the front and rear upper sides of the shroud shell 5 are equipped with shroud wheels 2, the shroud shell 5 The shroud wheel 2 is connected with the shroud rail 1, and the shroud rail 1 is connected with the bottom 6 of the passenger car box; the casing frame 3 is connected inside the shroud outer shell 5.

2、所述的列车转向架整流装置,其特征在于:导流罩外壳体5内焊接连接壳体框架3。导流罩外壳体5内焊接连接壳体框架3,可加强支撑。2. The train bogie rectifying device is characterized in that: the casing frame 3 is welded inside the casing 5 of the shroud. The casing frame 3 is welded and connected in the casing 5 of the shroud, which can strengthen the support.

实施例4Example 4

1、列车转向架整流装置包括:导流罩轨道1、导流罩轮2、壳体框架3、检修门4、导流罩外壳体5、客车箱车底6、转向架侧架7、导向装置8、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5、转向架9,其特征在于:转向架9外罩有导流罩外壳体5,导流罩外壳体5呈上下敞口的箱形,导流罩外壳体5的前、后面上部两侧装有导流罩轮2,导流罩外壳体5通过导流罩轮2与导流罩轨道1连接,导流罩轨道1连接客车箱车底6;所述的导流罩外壳体5内连接有壳体框架3。1. The train bogie rectification device includes: deflector track 1, deflector wheel 2, shell frame 3, inspection door 4, deflector outer shell 5, passenger car bottom 6, bogie side frame 7, guide Device 8, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8-5, bogie 9, characterized in that: bogie 9 outer cover There is a shroud shell 5, the shroud shell 5 is box-shaped up and down, the front and rear upper sides of the shroud shell 5 are equipped with shroud wheels 2, and the shroud shell 5 passes through The shroud wheel 2 is connected with the shroud rail 1, and the shroud rail 1 is connected with the bottom 6 of the passenger car box; the casing frame 3 is connected inside the shroud outer shell 5.

2、、所述的列车转向架整流装置,其特征在于:导流罩外壳体5前后的圆弧面的圆弧半径=转向架9中心点到圆弧面的垂直距离。2. The rectification device for train bogies is characterized in that: the arc radius of the arc surfaces before and after the outer casing 5 of the shroud = the vertical distance from the center point of the bogie 9 to the arc surfaces.

3、导向装置8,包括壳体框架3、转向架侧架7、导向轴8-1、导向轴橡胶套8-2、导向套8-3、导向套座8-4、导向套座板8-5,其特征在于:导向轴8-1与转向架侧架7焊接连接,导向轴8-1外套导向套8-3,导向套8-3连接导向套座板8-5,导向套座板8-5连接导向套座8-4,导向套座8-4连接壳体框架3。保证在导向导流罩外壳体5随转向架9同步转动。3. Guide device 8, including shell frame 3, bogie side frame 7, guide shaft 8-1, guide shaft rubber sleeve 8-2, guide sleeve 8-3, guide sleeve seat 8-4, guide sleeve seat plate 8 -5, characterized in that: the guide shaft 8-1 is welded to the bogie side frame 7, the guide shaft 8-1 is covered with the guide sleeve 8-3, the guide sleeve 8-3 is connected to the guide sleeve seat plate 8-5, and the guide sleeve seat The plate 8-5 is connected with the guide sleeve 8-4, and the guide sleeve 8-4 is connected with the housing frame 3. Guaranteed to rotate synchronously with the bogie 9 at the outer casing 5 of the guiding shroud.

4、所述的导向装置8,其特征在于:导向轴8-1外紧密套装有导向轴橡胶套8-2。导向轴8-1套装有导向轴橡胶套8-2防止钢对钢硬的碰撞。4. The above-mentioned guide device 8 is characterized in that: the guide shaft rubber sleeve 8-2 is tightly fitted outside the guide shaft 8-1. Guide shaft 8-1 is covered with guide shaft rubber sleeve 8-2 to prevent steel from colliding with hard steel.

5、所述的导向装置8,其特征在于:导向轴橡胶套8-2与导向套8-3的间隙=10±1mm。保证在导向导流罩外壳体5随转向架9同步转动的同时,也保证转向架9与客车箱车底6的上下方向的相对运动。5. The above-mentioned guide device 8 is characterized in that the gap between the guide shaft rubber sleeve 8-2 and the guide sleeve 8-3 is 10±1mm. It is ensured that the relative movement of the bogie 9 and the bottom 6 of the passenger car box in the up and down direction is ensured while the guide shroud shell 5 rotates synchronously with the bogie 9 .

以上发明内容的技术方案的技术特征及实施例公开的技术特征均符合中华人民共和国《铁路技术管理规程》。The technical features of the technical solution of the above content of the invention and the technical features disclosed in the embodiments all conform to the "Railway Technology Management Regulations" of the People's Republic of China.

除本说明书所述的技术特征外,均为本技术领域技术人员惯常的技术,不再赘述。Except for the technical features described in this specification, all are common techniques of those skilled in the art, and will not be repeated here.

Claims (3)

1. the guide piece of train bogie rectifying device, comprise case frame, truck side frame, the axis of guide, axis of guide rubber coating, orienting sleeve, guide sleeve seat, orienting sleeve seat board, it is characterized in that: the axis of guide and truck side frame are welded to connect, axis of guide overcoat orienting sleeve, orienting sleeve connects orienting sleeve seat board, orienting sleeve seat board connects guide sleeve seat, and guide sleeve seat connects case frame;
Train bogie rectifying device comprises: streamlined reefer housing track, water conservancy diversion hubcap, case frame, access door, streamlined reefer housing body skin, at the bottom of passenger vehicle boxcar, truck side frame, guide piece, the axis of guide, axis of guide rubber coating, orienting sleeve, guide sleeve seat, orienting sleeve seat board, bogie truck, it is characterized in that: bogie truck is covered with streamlined reefer housing body skin, streamlined reefer housing body skin presents the box-shaped of lower open mouth, before streamlined reefer housing body skin, water conservancy diversion hubcap is equipped with in both sides, top below, streamlined reefer housing body skin is connected with streamlined reefer housing track by water conservancy diversion hubcap, streamlined reefer housing track connects at the bottom of passenger vehicle boxcar, case frame is connected with in streamlined reefer housing body skin.
2. the guide piece of train bogie rectifying device as claimed in claim 1, is characterized in that: the axis of guide is closely set with axis of guide rubber coating outward.
3. the guide piece of train bogie rectifying device as claimed in claim 2, is characterized in that: the gap=10 ± 1mm of axis of guide rubber coating and orienting sleeve.
CN201410695871.XA 2012-11-11 2012-11-11 The guider of train bogie fairing Expired - Fee Related CN104986174B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410695871.XA CN104986174B (en) 2012-11-11 2012-11-11 The guider of train bogie fairing

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210447961.8A CN102923151B (en) 2012-11-11 2012-11-11 Train bogie rectifying device
CN201410695871.XA CN104986174B (en) 2012-11-11 2012-11-11 The guider of train bogie fairing

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210447961.8A Division CN102923151B (en) 2012-11-11 2012-11-11 Train bogie rectifying device

Publications (2)

Publication Number Publication Date
CN104986174A true CN104986174A (en) 2015-10-21
CN104986174B CN104986174B (en) 2017-08-15

Family

ID=47638124

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201210447961.8A Expired - Fee Related CN102923151B (en) 2012-11-11 2012-11-11 Train bogie rectifying device
CN201410695871.XA Expired - Fee Related CN104986174B (en) 2012-11-11 2012-11-11 The guider of train bogie fairing

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201210447961.8A Expired - Fee Related CN102923151B (en) 2012-11-11 2012-11-11 Train bogie rectifying device

Country Status (1)

Country Link
CN (2) CN102923151B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112519821B (en) * 2020-12-09 2022-05-17 中车唐山机车车辆有限公司 Bogie cabin for railway vehicle and bogie system
CN112519820B (en) * 2020-12-09 2022-05-17 中车唐山机车车辆有限公司 Bogie system of railway vehicle and railway vehicle
CN113696929B (en) * 2021-09-26 2023-05-23 中车唐山机车车辆有限公司 Bogie assembly and rail vehicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4419798A1 (en) * 1994-06-06 1995-12-07 Goerlitz Waggonbau Gmbh Soundproofing, esp. for rail=borne vehicles
CN101204959A (en) * 2006-12-20 2008-06-25 南车四方机车车辆股份有限公司 Underframe bearing type windhole of orbit vehicle and mounting method with same
CN101624058A (en) * 2008-04-02 2010-01-13 阿尔斯通运输股份有限公司 Device for disturbing the air flow circulating beneath the chassis of a railway vehicle
CN101670839A (en) * 2008-09-09 2010-03-17 严宏生 High-speed train belly fairing
CN102639382A (en) * 2010-01-20 2012-08-15 Db远程交通股份公司 Rail vehicle for a driving operation on track systems having a ballasted superstructure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE726181C (en) * 1940-11-07 1942-10-08 Linke Hofmann Werke Ag A streamlined vehicle, especially a railcar
DE2542780C2 (en) * 1975-09-25 1983-01-05 Messerschmitt-Bölkow-Blohm GmbH, 8000 München Cladding elements for bogies of rail vehicles
DE102009006562A1 (en) * 2009-01-27 2010-08-12 Siemens Aktiengesellschaft Cladding for a bogie of a rail vehicle and rail vehicle with a clad bogie
JP4486696B1 (en) * 2009-02-20 2010-06-23 三菱重工業株式会社 Guide rail type vehicle cart
WO2011097466A1 (en) * 2010-02-05 2011-08-11 Aerofficient, Llc Improved vehicle side fairing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4419798A1 (en) * 1994-06-06 1995-12-07 Goerlitz Waggonbau Gmbh Soundproofing, esp. for rail=borne vehicles
CN101204959A (en) * 2006-12-20 2008-06-25 南车四方机车车辆股份有限公司 Underframe bearing type windhole of orbit vehicle and mounting method with same
CN101624058A (en) * 2008-04-02 2010-01-13 阿尔斯通运输股份有限公司 Device for disturbing the air flow circulating beneath the chassis of a railway vehicle
CN101670839A (en) * 2008-09-09 2010-03-17 严宏生 High-speed train belly fairing
CN102639382A (en) * 2010-01-20 2012-08-15 Db远程交通股份公司 Rail vehicle for a driving operation on track systems having a ballasted superstructure

Also Published As

Publication number Publication date
CN104986174B (en) 2017-08-15
CN102923151A (en) 2013-02-13
CN102923151B (en) 2014-12-31

Similar Documents

Publication Publication Date Title
CN106476832B (en) A kind of magnetic levitation track vehicle and its bogie
Zhao et al. High-speed EMUs: characteristics of technological development and trends
CN202011330U (en) High-speed pantograph capable of reducing resistance and noises
CN205737571U (en) Derailing-preventiondevice device for rail train
CN104986174B (en) The guider of train bogie fairing
CN103241225B (en) Single wing plate operated aerodynamic braking device
WO2018043010A1 (en) Railroad car bogie, railroad car, and train
CN103847759B (en) Wheel track auxiliary brake
CN102975736B (en) Bogie rectifying device capable of overcoming airflow resistance
CN202847719U (en) Framework for bogie of rail commuter train
CN206012593U (en) A kind of nonmetallic water conservancy diversion in high-speed railway headstock bottom and masking device
CN202923654U (en) Rectifying device for overcoming airflow resistance
CN100591546C (en) Pantograph flow guiding device of rail vehicle
CN202863462U (en) Bogie fairing
CN202879456U (en) Railway vehicle wind drag brake device air guide sleeve
CN102673407A (en) Flow guide device of pantograph of high-speed motor train unit
CN111976754A (en) Double-deck windage arresting gear, double-deck cab structure and high-speed train
CN215553153U (en) Be applied to outer windscreen device of freight transportation EMUs
CN202345707U (en) Vertical aerodynamic brake device
CN211571456U (en) Sound absorption short barrier beside high-speed railway track
CN102756739A (en) B0+B0 shaft-type locomotive bogie
CN210423500U (en) Passenger car chassis braking device with silencer
CN202686378U (en) B0+B0 axial locomotive bogie
CN208148950U (en) A kind of train wheel being easily installed
CN201198283Y (en) Pantograph flow guiding device of rail vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Shi Qiang

Inventor after: Miao Zewang

Inventor after: Ma Jing

Inventor before: Miao Zewang

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20181111