CN104912004B - Hold rail-type track transportation bridge evacuation maintenance platform - Google Patents
Hold rail-type track transportation bridge evacuation maintenance platform Download PDFInfo
- Publication number
- CN104912004B CN104912004B CN201510357347.6A CN201510357347A CN104912004B CN 104912004 B CN104912004 B CN 104912004B CN 201510357347 A CN201510357347 A CN 201510357347A CN 104912004 B CN104912004 B CN 104912004B
- Authority
- CN
- China
- Prior art keywords
- railing
- fire escape
- rail
- evacuates
- longeron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012423 maintenance Methods 0.000 title abstract description 17
- 238000007689 inspection Methods 0.000 claims description 18
- 238000000926 separation method Methods 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000003187 abdominal effect Effects 0.000 description 1
- 206010000210 abortion Diseases 0.000 description 1
- 231100000176 abortion Toxicity 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000005339 levitation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a hold rail-type track transportation bridge evacuation maintenance platform, which comprises a horizontal beam that is set between two parallelly set single line box beams and that is set at interval along the longitudinal direction and is characterized in that the platform provided herein also comprises a longitudinal maintenance channel set above the horizontal beam and an evacuation channel set above the maintenance channel; and two ends of the horizontal beam are provided with uprights used for supporting the evacuation channel. According to the invention, the evacuation maintenance platform is set on the horizontal beam; evacuation channel and maintenance channel structures are adopted; the evacuation channel and the maintenance channel are not influenced by each other; and the platform provided herein has the advantages of simple structure, convenient use and high safety.
Description
Technical field
The present invention relates to technical field of bridge construction, evacuates maintenance in particular to a kind of armful of rail rail traffic bridge flat
Platform.
Background technology
Magnetic levitation track traffic and cross-saddle single-track traffic using unique " embracing rail " method of operation, meet vehicle gauge
Small bore single line box beam is " embracing rail " most economical beam type of formula track traffic.Program beam structure is travelled by vehicle rail
Road, two-wire location take the juxtaposed mode of two panels single line box beam to process, and domestic built magnetic is floated and cross-saddle single-track traffic track
Liang Jun adopts this beam type.Fig. 1 is Shanghai high speed Maglev track girder sectional view, and Fig. 2 is Chongqing City's cross-saddle single-track traffic
Track girder sectional view, Fig. 3 are certain medium-and low-speed maglev traffic experiment line track girder sectional views.Because of vehicle " embracing rail " operation, small bore
On single line box girder bridge, space is less, and using limited space, box beam top surface can only meet track and arrange needs, power rail, cable
When can be hung on outward box beam side and bottom surface, circuit maintenance repair maintenance and vehicle generation accident needed for passenger's emergency evacuation
Passage cannot arrange.
First straddle-type monorail that Shanghai high speed Maglev, domestic medium-and low-speed maglev test wire and Chongqing are built is handed over
No. 2 line elevated bridges of logical line are not provided with evacuating inspection platform, such as the Human Evacuation during Emergencies such as fire difficulty, bridge
Upper line upkeep is also more inconvenient.For meeting circuit regular maintenance and rescue run needs, Chongqing City is building Article 2
During cross-saddle single-track traffic trajectory No. 3 lines of traffic, completed along circuit by individually setting up girder steel between two trajectory beams
Cable laying, the maintenance of grid coverage steel plate formation thereon and rescue run passage.The processing mode solves daily line upkeep
And the access issues of passenger's emergency evacuation, but still suffer from some defects:Fire escape top surface is far below vehicle floor face, personnel
Evacuate extremely inconvenient;Railing is not provided with around fire escape, and swarm and jostlement event easily occurs when the amount of evacuating an endless flow of people is big;Maintenance is flat
Platform is integrated with rescue run passage, and the cable placed on inspection platform ruptures in passenger evacuation or leaks electricity can be made to passenger
Into personal injury.
The content of the invention
Present invention aim to solve the deficiency of above-mentioned background technology, there is provided a kind of rail rail traffic bridge of embracing is dredged
Scattered inspection platform, fire escape is arranged on above access path, while meeting the in emergency circumstances evacuation of personnel and daily right
The maintenance of circuit.
The technical scheme is that:A kind of rail rail traffic bridge of embracing evacuates inspection platform, including two juxtaposed lists
The crossbeam of longitudinally spaced setting between line box beam, it is characterised in that also including the longitudinal access path being arranged on above crossbeam with
And the fire escape above access path, on the crossbeam, two ends are provided with the column for supporting fire escape.
Preferably, the access path includes access path base plate and is disposed longitudinally on below same heel post, connects adjacent
The lower longeron of column, the access path base plate are longitudinally laid under both sides on longeron.
Further, the fire escape includes fire escape base plate and is disposed longitudinally on above same heel post, connects phase
The upper longeron of adjacent column, the fire escape base plate are longitudinally laid on both sides on longeron.
Further, on the fire escape, between longeron, lateral separation is provided with cross rib plate, and the access path also includes
Arrange, be connected the web member of lower longeron from the outside of upper longeron with cross rib plate corresponding position straight down.
Further, the access path web member is provided with the guardrail of longitudinally connected many web members, and multilamellar guardrail is vertical
Direction interval setting.
Further, the access path web member is provided with cable bearer, and the cable bearer includes vertically being fixed on
Longitudinal carrier and the multilamellar horizontal support being connected on longitudinal carrier on web member.
Further, the fire escape fire escape plate upper surface is highly flushed in or is got on the bus less than two single line box beams
Height of floor from rail top.
Preferably, the fire escape both lateral sides are provided with railing, and the longitudinally spaced setting of the railing, the evacuation are led to
The interval of road both lateral sides railing is interlaced.
Further, the fire escape upper railing is included below the main railing of interval setting and main railing along longitudinal both sides
Secondary railing, the main railing, secondary railing is many cross bars and Duo Gen montants connect the quadra to be formed.
Further, the handrail that manually can be opened is provided with above the fire escape railing, the handrail is fixed for one end
On railing, one end be removably attachable to the suspension chain on longitudinally adjacent railing.
In the present invention, will crossbeam be set between two single line box beams, two box beams are connected by crossbeam, increases the horizontal firm of entirety
Degree.Evacuate inspection platform to be arranged on crossbeam, using double-decker, used as fire escape, lower floor is dredged as access path on upper strata
Scattered passage is used for the evacuation of in emergency circumstances personnel, and access path is used for daily line upkeep, and the two is using being independent of each other.
Advantages of the present invention is:
1. fire escape both sides arrange railing, and pedestrian is protected, it is to avoid during evacuation, artificial abortion is excessive crowded causes personnel
Fall, increase safety.
2. fire escape either flush in or slightly below two single line box beams on vehicle floor, be easy to passenger to be directly entered thin
Scattered passage, in case of emergency increased the speed of evacuating personnel.
3. fire escape, access path are attached to form overall structure by column, web member, upper longeron, lower longeron, jail
Solidity is high, and bearing capacity is strong.
4. multilayer cable holder is provided with the outside of access path, be easy to the placement of cable, and cable is isolated with fire escape
Open, it is to avoid during evacuating personnel, contact cable causes danger.
Description of the drawings
Fig. 1 is Shanghai high speed Maglev track girder sectional view
Fig. 2 is Chongqing City's straddle-seat type single traffic rail beam sectional view
Fig. 3 is certain medium-and low-speed maglev traffic experiment line track girder sectional view
Fig. 4 is crossbeam cross-sectional view
Fig. 5 evacuates inspection platform vertical structure schematic diagram for the present invention
Fig. 6 is fire escape framework top view of the present invention (without railing and fire escape base plate)
Fig. 7 is A-A profiles (having at column) in Fig. 5
Fig. 8 is B-B profiles (having at web member) in Fig. 5
Fig. 9 is structure enlarged diagram at E in Fig. 5
Figure 10 is C-C profiles in Fig. 9
Figure 11 is D-D profiles in Fig. 9
Figure 12 is structure enlarged diagram at F in Fig. 8
Diaphragm structure schematic diagram based on Figure 13
Figure 14 is secondary diaphragm structure schematic diagram
Wherein:1. 2. crossbeam of box beam, 3. access path, 4. fire escape, 5. cable bearer, 6. railing, 7. column 31.
Longeron on 35. connecting plate of access path base plate 32. times longerons, 33. web member, 34. guardrail, 41. fire escape base plate 42.
43. cross rib plates 44. are encorbelmented 52. horizontal support of secondary 51. longitudinal carrier of diaphragm plate of 45. main diaphragm plate 46., 61. main railing
62. 63. handrails of secondary railing.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Existing track girder sectional view, is explained in detail in the introduction, no longer goes to live in the household of one's in-laws on getting married in this as Figure 1-3
State.
As Figure 4-8, evacuation inspection platform of the invention includes longitudinally spaced setting between juxtaposed two single lines box beam 1
Crossbeam 2, two box beams 1 are connected by crossbeam 2, increase overall lateral stiffness;Present invention additionally comprises being arranged on crossbeam 2
Fire escape 4 above longitudinal access path 3 and access path.2 two ends of crossbeam arrange column 7 and support fire escape 4, maintenance
Passage 3 includes access path base plate 31 and is arranged on the lower longeron 32 of longitudinally connected many root posts 7 below same heel post 7, examines
Repair 31 longitudinal direction of channel base plate to be laid under both sides on longeron 32;Fire escape 4 includes fire escape base plate 41 and is arranged on two
The upper longeron 42 of longitudinally connected many root posts above heel post 7, two parallel 42 lateral separations of upper longeron are provided with cross rib plate 43,
Connection between longeron on two 42 increased structural strength by cross rib plate 43.With 43 corresponding position of cross rib plate to having on the outside of upper longeron 42
Upper longeron 42 is connected by the web member 33 of the lower longeron 32 of vertical direction connection, web member 33 with lower longeron 32, by access path 3 and evacuation
The bonding strength of passage 4 is further strengthened.42 upper surface of upper longeron is concordant with 43 upper surface of cross rib plate, and fire escape base plate 41 is indulged
To upper longeron 42 and 43 upper surface of cross rib plate is laid on, 41 upper level of fire escape base plate is flushed in or less than two single line casees
Vehicle height of floor from rail top on beam 1, in the present embodiment, 41 upper level of fire escape base plate is slightly below vehicle in two single line box beams 1
Height of floor from rail top.41 both lateral sides of fire escape base plate are provided with railing 6.
Main cantilevered structure is interval with upper longeron 42, and main cantilevered structure is mainly used in installing cross rib plate 43 and web member 33.
Secondary cantilevered structure is interval with the outside of upper longeron 42 also, main cantilevered structure, secondary cantilevered structure are used to be fixedly installed on evacuates logical
The railing 6 of 41 both lateral sides of road base plate.As shown in figs. 9-11, main cantilevered structure includes that L-type is encorbelmented 44 and main diaphragm plate 45, main horizontal stroke
As shown in figure 13, main diaphragm plate 45 is welded on longeron 42 45 structure of dividing plate, and two encorbelment 44 vertical arms in main diaphragm plate
45 Outboard Sections are welded with the two sides of main diaphragm plate 45, and main diaphragm plate 45 is located at 42 inboard portion of upper longeron and connects cross rib plate 43,
Screw is provided with below main diaphragm plate 45 for main diaphragm plate 45 and 33 bolt connection of web member, L-type encorbelment 44 levels an arm on be provided with
Screw, for installing railing 6;Secondary cantilevered structure includes that L-type is encorbelmented 44 and secondary diaphragm plate 46,46 structure of secondary diaphragm plate such as Figure 14 institutes
Show, two L-types, 44 vertical arms of encorbelmenting are welded with the two sides of secondary diaphragm plate 46 on the outside of the secondary diaphragm plate 46, L-type is encorbelmented 44 levels
An arm on be provided with screw, for installing railing 6.
So that, in upper-part, column 7 is that the relative welding of two channel-section steel abdominal paries forms column structure, angle of the lower longeron 32 for longitudinal direction
Steel, upper longeron 42 are longitudinal I-steel, and it is T-shaped knot that cross rib plate 43 is welded by two angle steel correspondence right-angle side and forms cross section
Structure.Access path base plate 31 is composite steel grating with fire escape base plate 41.
Web member 33 is provided with guardrail 34, and in same level height perforate, guardrail 34 is round steel to many longitudinal web members 33, is passed through
Perforate on many web members 33 is simultaneously welded with web member 33, and guardrail 34 vertical direction Spaced can be arranged according to the actual requirements, shield
Hurdle 34 will be many web members 33 longitudinally connected, increased the longitudinal rigidity of 3 both sides of access path.Web member 33 is provided with cable bearer 5,
Cable bearer 5 includes the longitudinal carrier 51 being vertically fixed on web member 33 and the multilamellar horizontal support being connected on longitudinal carrier
52, horizontal support 52 is arranged also according to actual demand vertical direction Spaced, and line cord longitudinally lays and is positioned over laterally
On support 52.As shown in figure 12,33 lower end of web member is connected with lower longeron 32 by connecting plate 35, and access path base plate 31 is laid on
Under both sides between longeron 32.
41 both lateral sides of fire escape base plate are provided with railing 6, and 6 longitudinally spaced setting of railing, fire escape base plate 41 are horizontal
Interval to two lateral rails 6 is interlaced, effective protection pedestrian, crowded generation falling accident when preventing from evacuating.Between railing 6 includes
Every the secondary railing 62 below main railing 61 and main railing along longitudinal both sides is arranged, main railing 61, secondary railing 62 are many cross bars
Connect the quadra to be formed with many montants.61 lower end of main railing is fixedly connected with 44 bolts of encorbelmenting.The secondary hurdle of adjacent handrails 6
Between bar 62, distance is only held a people and is passed through, and is provided with the handrail 63 that manually can be opened above railing 6, and handrail 63 is hung for hanging chain
Chain one end is fixed on railing 6, one end is removably attachable on longitudinally adjacent railing 6.
After maintenance evacuation platform comes into operation, in emergency evacuation, vehicle parking opens one end of handrail 63, Ren Yuancong
Between fire escape railing 6, space enters, and is evacuated along fire escape, and vehicle cuts out handrail 63 before driving away, and prevents personnel from falling
Fall.Fire escape base plate 41 is provided with openable portable plate, and during needs daily line upkeep, workmen is from portable plate
Into in access path, there is guardrail 34 access path both sides, and workmen is protected, and line cord longitudinally lays and is positioned over
On horizontal support 52, between guardrail 34, there is maintenance of enough spaces for line cord.
The above, specific embodiment only of the invention, it is noted that any those of ordinary skill in the art exist
Disclosed herein technical scope in, the change or replacement that can be readily occurred in, should all cover protection scope of the present invention it
It is interior.
Claims (9)
1. a kind of rail rail traffic bridge of embracing evacuates inspection platform, including longitudinally spaced between two juxtaposed single line box beam (1)
The crossbeam (2) of setting, it is characterised in that also including the longitudinal access path (3) and access path being arranged on above crossbeam (2)
(3) fire escape (4) above, on crossbeam (2), two ends are provided with the column (7) for supporting fire escape (4), the inspection
Passage (3) is repaiied including access path base plate (31) and the lower longeron of adjacent upright posts is disposed longitudinally on below same heel post, connects
(32), described access path base plate (31) are longitudinally laid on longeron under both sides (32).
2. rail rail traffic bridge is embraced as claimed in claim 1 and evacuates inspection platform, it is characterised in that the fire escape
(4) include fire escape base plate (41) and be disposed longitudinally on above same heel post, connect the upper longeron (42) of adjacent upright posts, it is described
Fire escape base plate (41) is longitudinally laid on longeron on both sides (42).
3. rail rail traffic bridge is embraced as claimed in claim 2 and evacuates inspection platform, it is characterised in that the fire escape
(4) on, between longeron (42), lateral separation is provided with cross rib plate (43), access path (3) also include from the outside of upper longeron (42) with
Cross rib plate (43) corresponding position arranges, connects the web member (33) of lower longeron (32) straight down.
4. rail rail traffic bridge is embraced as claimed in claim 3 and evacuates inspection platform, it is characterised in that the access path
(3) web member (33) is provided with the guardrail (34) of longitudinally connected many web members, multilamellar guardrail (34) vertical direction interval setting.
5. rail rail traffic bridge is embraced as claimed in claim 3 and evacuates inspection platform, it is characterised in that the access path
(3) web member (33) is provided with cable bearer (5), and described cable bearer (5) include the longitudinal direction being vertically fixed on web member (33)
Frame (51) and the multilamellar horizontal support (52) being connected on longitudinal carrier (51).
6. rail rail traffic bridge is embraced as claimed in claim 2 and evacuates inspection platform, it is characterised in that the fire escape
(4) fire escape base plate (41) upper level is flushed in or less than vehicle height of floor from rail top in two single line box beams (1).
7. rail rail traffic bridge is embraced as claimed in claim 1 and evacuates inspection platform, it is characterised in that the fire escape
(4) both lateral sides are provided with railing (6), railing (6) longitudinally spaced setting, fire escape (4) both lateral sides railing
(6) interval is interlaced.
8. rail rail traffic bridge is embraced as claimed in claim 7 and evacuates inspection platform, it is characterised in that the fire escape
(4) upper railing (6) includes the secondary railing (62) below the main railing of interval setting (61) and main railing along longitudinal both sides, the main hurdle
Bar (61), secondary railing (62) is many cross bars and Duo Gen montants connect the quadra to be formed.
9. rail rail traffic bridge is embraced as claimed in claim 7 and evacuates inspection platform, it is characterised in that the fire escape
(4) handrail (63) that manually can be opened is provided with above railing (6), and handrail (63) are fixed on railing for one end, one end can
The suspension chain being connected on longitudinally adjacent railing (6) of dismounting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510357347.6A CN104912004B (en) | 2015-06-25 | 2015-06-25 | Hold rail-type track transportation bridge evacuation maintenance platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510357347.6A CN104912004B (en) | 2015-06-25 | 2015-06-25 | Hold rail-type track transportation bridge evacuation maintenance platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104912004A CN104912004A (en) | 2015-09-16 |
CN104912004B true CN104912004B (en) | 2017-03-22 |
Family
ID=54081410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510357347.6A Active CN104912004B (en) | 2015-06-25 | 2015-06-25 | Hold rail-type track transportation bridge evacuation maintenance platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104912004B (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105568838B (en) * | 2015-12-17 | 2017-07-11 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105568788B (en) * | 2015-12-17 | 2017-09-29 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105421167B (en) * | 2015-12-17 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105544371B (en) * | 2015-12-17 | 2017-08-01 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105544372B (en) * | 2015-12-17 | 2017-08-01 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105568839B (en) * | 2015-12-17 | 2017-07-11 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105568789B (en) * | 2015-12-17 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105421166B (en) * | 2015-12-17 | 2017-09-29 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105603859B (en) * | 2015-12-17 | 2017-05-10 | 中铁第四勘察设计院集团有限公司 | Magnetic levitation holding track type rail transit double-line track beam |
CN105507126B (en) * | 2015-12-17 | 2017-10-27 | 中铁第四勘察设计院集团有限公司 | Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension |
CN105926379A (en) * | 2016-07-06 | 2016-09-07 | 上海市隧道工程轨道交通设计研究院 | Monorail traffic overhead section overhauling passage and application method thereof |
CN107435291A (en) * | 2017-08-18 | 2017-12-05 | 中车南京浦镇车辆有限公司 | A kind of cross-saddle single-track traffic Emergency Access |
CN112144376A (en) * | 2020-09-17 | 2020-12-29 | 上海市政工程设计研究总院(集团)有限公司 | Semi-fixed personnel passageway for bridge expansion joint |
CN112144377A (en) * | 2020-09-17 | 2020-12-29 | 上海市政工程设计研究总院(集团)有限公司 | Electrician evacuation channel for bridge expansion joint |
CN112144375A (en) * | 2020-09-17 | 2020-12-29 | 上海市政工程设计研究总院(集团)有限公司 | Personnel inspection channel for bridge expansion joint and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050023803A (en) * | 2003-09-02 | 2005-03-10 | 유니슨 주식회사 | rail type expantion joint |
CN202831706U (en) * | 2012-10-15 | 2013-03-27 | 沈阳铝镁设计研究院有限公司 | Channel structure for rectification debugging, overhauling, inspection and maintenance |
CN203603030U (en) * | 2013-11-25 | 2014-05-21 | 中铁第四勘察设计院集团有限公司 | Steel box truss beam |
CN203684117U (en) * | 2013-11-25 | 2014-07-02 | 中铁第四勘察设计院集团有限公司 | Track beam and platform beam integration structure |
KR20150043914A (en) * | 2013-10-15 | 2015-04-23 | 김효례 | Deformation girder recovery method and device using section stiffiness and hydraulic jack |
CN104594173A (en) * | 2014-11-28 | 2015-05-06 | 中铁第四勘察设计院集团有限公司 | Rail holding type electromagnetic suspension track traffic box girder |
CN204728225U (en) * | 2015-06-25 | 2015-10-28 | 中铁第四勘察设计院集团有限公司 | A kind of rail rail traffic bridge of embracing evacuates inspection platform |
-
2015
- 2015-06-25 CN CN201510357347.6A patent/CN104912004B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050023803A (en) * | 2003-09-02 | 2005-03-10 | 유니슨 주식회사 | rail type expantion joint |
CN202831706U (en) * | 2012-10-15 | 2013-03-27 | 沈阳铝镁设计研究院有限公司 | Channel structure for rectification debugging, overhauling, inspection and maintenance |
KR20150043914A (en) * | 2013-10-15 | 2015-04-23 | 김효례 | Deformation girder recovery method and device using section stiffiness and hydraulic jack |
CN203603030U (en) * | 2013-11-25 | 2014-05-21 | 中铁第四勘察设计院集团有限公司 | Steel box truss beam |
CN203684117U (en) * | 2013-11-25 | 2014-07-02 | 中铁第四勘察设计院集团有限公司 | Track beam and platform beam integration structure |
CN104594173A (en) * | 2014-11-28 | 2015-05-06 | 中铁第四勘察设计院集团有限公司 | Rail holding type electromagnetic suspension track traffic box girder |
CN204728225U (en) * | 2015-06-25 | 2015-10-28 | 中铁第四勘察设计院集团有限公司 | A kind of rail rail traffic bridge of embracing evacuates inspection platform |
Also Published As
Publication number | Publication date |
---|---|
CN104912004A (en) | 2015-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912004B (en) | Hold rail-type track transportation bridge evacuation maintenance platform | |
CN104594173B (en) | One kind embraces rail magnetic levitation track traffic box beam | |
CN1800495A (en) | Grooved steel-concrete combination beam | |
CN103938538A (en) | Railroad bridge evacuation platform | |
CN112184955B (en) | A safety interlocking system suitable for urban railway vehicle maintenance depot | |
CN103277112A (en) | Tunnel engineering train type rapid lifting and folding working platform | |
CN202227701U (en) | Assembled horizontal passage device | |
CN204728225U (en) | A kind of rail rail traffic bridge of embracing evacuates inspection platform | |
CN109398371B (en) | Stepped evacuation platform with cable support | |
CN210939226U (en) | Overhanging type power-concentrated motor train unit head car maintenance operation platform | |
CN110512517B (en) | Bridge engineering construction platform | |
CN112061173B (en) | A boarding operation maintenance warehouse suitable for urban rail vehicles | |
CN106522566A (en) | Roof steel truss slipping rail and dismounting and installing method thereof | |
CA2648177C (en) | Integrated walkway system | |
CN203321529U (en) | Train type rapid lifting and folding work platform for tunnel engineering | |
CN210529487U (en) | Bridge and box-shaped bridge inspection device with flange plates | |
CN209258116U (en) | A kind of staged evacuation platform with cable bearer | |
CN207194946U (en) | A kind of dropproof subway dispersing platform | |
CN102146798B (en) | Arch ring lining trolley for additionally building open cut tunnel on electrified railway business line and construction method of arch ring lining trolley | |
CN212695656U (en) | An integrated hoisting system for integrated pipelines in municipal railway inspection warehouses | |
CN215097598U (en) | Fixed maintenance work platform suitable for suspension type monorail train | |
CN215331331U (en) | Bridge type jump barrier frame is striden to binary channels | |
CN211922299U (en) | Construction equipment of prefabricated bridge | |
CN209779433U (en) | Overhauling and evacuating channel | |
CN110653781B (en) | Single-column double-side type power centralized motor train unit head car overhauling operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |