CN104265279A - Logging-while-drilling curve prediction method under fault condition - Google Patents
Logging-while-drilling curve prediction method under fault condition Download PDFInfo
- Publication number
- CN104265279A CN104265279A CN201410367695.7A CN201410367695A CN104265279A CN 104265279 A CN104265279 A CN 104265279A CN 201410367695 A CN201410367695 A CN 201410367695A CN 104265279 A CN104265279 A CN 104265279A
- Authority
- CN
- China
- Prior art keywords
- well
- curve
- logging
- prediction
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000005553 drilling Methods 0.000 title claims abstract description 15
- 238000003325 tomography Methods 0.000 claims description 24
- 238000004364 calculation method Methods 0.000 claims description 8
- 230000015572 biosynthetic process Effects 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 6
- 238000011088 calibration curve Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- GNFTZDOKVXKIBK-UHFFFAOYSA-N 3-(2-methoxyethoxy)benzohydrazide Chemical compound COCCOC1=CC=CC(C(=O)NN)=C1 GNFTZDOKVXKIBK-UHFFFAOYSA-N 0.000 claims description 2
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 claims description 2
- 238000012937 correction Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000010835 comparative analysis Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000012706 support-vector machine Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
The invention discloses a logging while drilling curve prediction method under fault conditions, which comprises the following steps: and on the basis of reference well information beside a logging-while-drilling operation well, combining a track along with drilling and a stratum model, calculating a logging prediction curve along a well track, comparing the logging prediction curve with an actual drilling curve, judging whether the established stratum model is correct or not, and correcting the stratum model. The invention not only can utilize the small layer comparison result of the reference well, but also can accurately express various faults, and can predict the curve along the well track under the control of the fault and the stratum position, thereby improving the accuracy of the predicted curve.
Description
Technical field
The present invention relates to a kind of well logging during curve prediction method under tomography condition, belong to drilling prospection development technique field.
Background technology
In the exploration and development of Sichuan Basin stone carbon system reservoir, often can bore and run into high-dip structure and tomography.The method supposition carrying out at present curve prediction in well logging during do not have tomography or tomography vertical carry out, such as, 06 phase in 2010 " oil drilling technology " disclosed a kind of log Forecasting Methodology based on SVMs, set up SVM prediction model by offset well to predict current borehole logging tool curve, introduce Measurement While Drilling Data simultaneously and carry out upgrading with brill to the log of current Jing Zuantouchu.
And tomography often exists and is not vertical under conditions down-hole, the curve prediction carried out under assumed conditions obviously can not meet on-the-spot actual needs, and prior art mainly exists following shortcoming: 1. stratigraphic horizon line does not have geological Significance; 2. adopt line of demarcation to manage fault block, line of demarcation does not have geological Significance; 3. the layer bit line between fault block does not set up correlation, and when operating the layer position of a fault block, other fault block can not synchronously change; 4. curve prediction can not be carried out to when there is reverse fault.
Summary of the invention
The object of the invention is to overcome the problems referred to above that prior art exists, a kind of well logging during curve prediction method under tomography condition is provided.The present invention not only can utilize the detail correlation of reservoir bed result with reference to well, and can carry out accurate expression to all kinds of tomography, carries out the curve prediction along well track, improve the precision of prediction curve under the control of tomography and stratigraphic horizon.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of well logging during curve prediction method under tomography condition, it is characterized in that: based on the reference well information that well logging during well in operation is other, in conjunction with the track of drilling well and stratigraphic model, calculate the logging prediction curve along well track, logging prediction curve is bored curve comparison with real, judge that whether the stratigraphic model set up is correct, formation model is revised.
Described method specifically comprises the steps:
A, to reference to well interval of interest, determine the layer position (degree of depth) of representative curve;
B, in the layer position of the representative curve determined, calculate well track, calculate the vertical depth of indicatrix value and substratum;
C, by step b result of calculation import stratigraphic model, set up the relation of well track and stratigraphic model, adopt chained list manage stratigraphic model, each fault block has a tomography and multiple bed boundary;
D, according to the stratigraphic model relation set up, judge the fault block residing for point on well track, then judge this layer position residing for point successively;
At the bottom of point in e, respectively calculation procedure d to layer top and layer, the vertical distance of two line segments, represents with L1 and L2 respectively;
F, calculating well track current point correspond to reference to well vertical depth TVD;
G, then find the value of indicatrix according to the size of TVD;
H, prediction is carried out to each point of well track obtain a continuous print logging prediction curve;
I, logging prediction curve is bored curve comparison with real, judge that whether the stratigraphic model set up is correct, formation model is revised.
In described step a, select the meticulous division of well logging Qu Jinhang that cross directional variations is stable, take natural gamma (GR), resistivity (RT) curve as calibration curve, determine the layer position of representative curve.
In described step b, input well oblique angle (DEV) and direction of deflection (DAZ), application curvature method calculates well track, and calculating with vertical depth is the indicatrix value of index and the vertical depth of substratum.
In described step f, if the corresponding vertical depth with reference to well in layer top is TVD1, at the bottom of layer, the corresponding vertical depth with reference to well is TVD2, then well track current point corresponding to the design formulas with reference to well vertical depth is:
。
In described step g, the value design formulas of indicatrix is:
;
In above formula, V is the curve values of corresponding TVD, T1 be before any vertical depth, T2 be after any vertical depth, V1 be before any curve values, V2 be after any curve values.
Employing the invention has the advantages that:
One, there is the prediction curve along well track in situation in energy calculation of complex tomography of the present invention, by with real comparative analysis of boring curve, can differentiate that whether correctly stratigraphic model, and guides the correction of stratigraphic model, thus improve the reservoir Drilling ratio of geologic steering drilling, improve drilling benefit.
Two, the present invention is because adopt the stratum detail correlation of reservoir bed, can mark off stratum variations in detail longitudinally and laterally subtly; Adopt visual Modifying model, make the correction of stratigraphic model become directly perceived and quick; Employ fault block management, make prediction curve become possibility in case there being reverse fault to deposit; Employ the layer position administrative skill with STRATIGRAPHIC SIGNIFICANCE, make curve prediction be convenient to realize.
Accompanying drawing explanation
Fig. 1 judges that for the present invention the fault block residing for point on well track judges the layer position schematic diagram residing for this point more successively.
Detailed description of the invention
Technical problem to be solved by this invention: one is solve with reference to well stratum detail stratigraphic division problem; Two is relations of well track and stratigraphic model; Three is well logging during curve prediction problems under tomography condition; Four is solve problem computational methods realized by computer language.Below be specifically described.
A kind of well logging during curve prediction method under tomography condition, comprise: based on the reference well information that well logging during well in operation is other, in conjunction with the track of drilling well and stratigraphic model, calculate the logging prediction curve along well track, logging prediction curve is bored curve comparison with real, judge that whether the stratigraphic model set up is correct, formation model is revised.
Described method specifically comprises the steps:
A, to carefully analyze with reference to well interval of interest, select the meticulous division of well logging Qu Jinhang that cross directional variations is more stable, take natural gamma (GR), resistivity (RT) curve as calibration curve, determine the layer position (degree of depth) of representative curve; Meticulous division can adopt prior art.
B, in the layer position of the representative curve determined, input well oblique angle (DEV) and direction of deflection (DAZ), application curvature method calculate well track, calculating with vertical depth is the indicatrix value of index and the vertical depth of substratum.
C, by step b result of calculation import stratigraphic model, set up the relation of well track and stratigraphic model, adopt chained list manage stratigraphic model, each fault block has a tomography and multiple bed boundary.
D, according to tomography, the stratigraphic model relation set up, first judge the fault block residing for point on well track, then judge this layer position residing for point successively, as shown in Figure 1.
At the bottom of point in e, respectively calculation procedure d to layer top and layer, the vertical distance of two line segments, represents with L1 and L2 respectively.
F, set the corresponding vertical depth with reference to well in layer top as TVD1, at the bottom of layer, the corresponding vertical depth with reference to well is TVD2, then well track current point corresponds to the design formulas with reference to well vertical depth and is:
。
G, then can find the value of indicatrix according to the size of TVD, its design formulas is:
In above formula, V is the curve values of corresponding TVD, T1 be before any vertical depth, T2 be after any vertical depth, V1 be before any curve values, V2 be after any curve values.
H, prediction is carried out to each point of well track just can obtain a continuous print logging prediction curve.
I, logging prediction curve is bored curve comparison with real, just can judge whether correctly set up stratigraphic model, and then formation model is revised.
To sum up, there is the prediction curve along well track in situation in energy calculation of complex tomography of the present invention, by with real comparative analysis of boring curve, can differentiate that whether stratigraphic model correct, and guide the correction of stratigraphic model, be conducive to the Drilling ratio of raising reservoir.The easy-to-use computer language of algorithm realizes.
These are only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the technical solution adopted in the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.The technological means that the present invention does not elaborate, all can adopt prior art means.
Claims (6)
1. well logging during curve prediction method under a tomography condition, it is characterized in that: based on the reference well information that well logging during well in operation is other, in conjunction with the track of drilling well and stratigraphic model, calculate the logging prediction curve along well track, logging prediction curve is bored curve comparison with real, judge that whether the stratigraphic model set up is correct, formation model is revised.
2. well logging during curve prediction method under tomography condition according to claim 1, it is characterized in that, described method specifically comprises the steps:
A, to reference to well interval of interest, determine the layer position of representative curve;
B, in the layer position of the representative curve determined, calculate well track, calculate the vertical depth of indicatrix value and substratum;
C, by step b result of calculation import stratigraphic model, set up the relation of well track and stratigraphic model, adopt chained list manage stratigraphic model, each fault block has a tomography and multiple bed boundary;
D, according to the stratigraphic model relation set up, judge the fault block residing for point on well track, then judge this layer position residing for point successively;
At the bottom of point in e, respectively calculation procedure d to layer top and layer, the vertical distance of two line segments, represents with L1 and L2 respectively;
F, calculating well track current point correspond to reference to well vertical depth TVD;
G, then find the value of indicatrix according to the size of TVD;
H, prediction is carried out to each point of well track obtain a continuous print logging prediction curve;
I, logging prediction curve is bored curve comparison with real, judge that whether the stratigraphic model set up is correct, formation model is revised.
3. well logging during curve prediction method under tomography condition according to claim 2, it is characterized in that: in described step a, select the meticulous division of well logging Qu Jinhang that cross directional variations is stable, take natural gamma (GR), resistivity (RT) curve as calibration curve, determine the layer position of representative curve.
4. well logging during curve prediction method under the tomography condition according to Claims 2 or 3, it is characterized in that: in described step b, input well oblique angle (DEV) and direction of deflection (DAZ), application curvature method calculates well track, and calculating with vertical depth is the indicatrix value of index and the vertical depth of substratum.
5. well logging during curve prediction method under tomography condition according to claim 4, it is characterized in that: in described step f, if the corresponding vertical depth with reference to well in layer top is TVD1, the corresponding vertical depth with reference to well is TVD2 at the layer end, then well track current point corresponding to the design formulas with reference to well vertical depth is:
.
6. well logging during curve prediction method under tomography condition according to claim 5, is characterized in that: in described step g, and the value design formulas of indicatrix is:
;
In above formula, V is the curve values of corresponding TVD, T1 be before any vertical depth, T2 be after any vertical depth, V1 be before any curve values, V2 be after any curve values.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410367695.7A CN104265279B (en) | 2014-07-30 | 2014-07-30 | Logging-while-drilling curve prediction method under fault condition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410367695.7A CN104265279B (en) | 2014-07-30 | 2014-07-30 | Logging-while-drilling curve prediction method under fault condition |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104265279A true CN104265279A (en) | 2015-01-07 |
CN104265279B CN104265279B (en) | 2017-05-10 |
Family
ID=52156837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410367695.7A Expired - Fee Related CN104265279B (en) | 2014-07-30 | 2014-07-30 | Logging-while-drilling curve prediction method under fault condition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104265279B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107091081A (en) * | 2017-06-02 | 2017-08-25 | 中国石油天然气股份有限公司 | Method and system for early warning of drilling fault in drilling process |
CN108547611A (en) * | 2018-03-01 | 2018-09-18 | 杭州迅美科技有限公司 | Horizontal well complex environment is with brill electromagnetic wave resistivity logging rapid simulation method |
CN108625842A (en) * | 2017-03-22 | 2018-10-09 | 中国石油化工股份有限公司 | A kind of wellbore trace control method and system |
CN110231660A (en) * | 2019-05-15 | 2019-09-13 | 防灾科技学院 | The method of the dislocation amount of buried active fault is determined using magnetic susceptibility log method |
CN112901070A (en) * | 2019-12-03 | 2021-06-04 | 中国石油天然气股份有限公司 | Horizontal well tracking while drilling method and control method for controlling drilling direction of drill bit |
CN113379907A (en) * | 2020-03-10 | 2021-09-10 | 中国石油天然气股份有限公司 | Method and device for constructing fault block geological model |
CN113743175A (en) * | 2020-10-21 | 2021-12-03 | 中国石油天然气集团有限公司 | Stratum inclination angle analysis method and device, computer equipment and storage medium |
CN114564800A (en) * | 2022-02-25 | 2022-05-31 | 北京金阳普泰石油技术股份有限公司 | Vertical thickness longitudinal fitting method and system for horizontal well logging curve |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6236620B1 (en) * | 1994-08-15 | 2001-05-22 | Halliburton Energy Services, Inc. | Integrated well drilling and evaluation |
US20050171698A1 (en) * | 2004-01-20 | 2005-08-04 | Sung Roger R. | Real time earth model for collaborative geosteering |
CN101647023A (en) * | 2007-02-21 | 2010-02-10 | 地质力学国际公司 | Method and apparatus for remote characterization of faults in the vicinity of boreholes |
US20110132662A1 (en) * | 2009-12-08 | 2011-06-09 | Schlumberger Technology Corporation | Phase wellbore steering |
CN103046868A (en) * | 2012-12-28 | 2013-04-17 | 中国石油集团川庆钻探工程有限公司 | Integrated geosteering method for horizontal well |
-
2014
- 2014-07-30 CN CN201410367695.7A patent/CN104265279B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6236620B1 (en) * | 1994-08-15 | 2001-05-22 | Halliburton Energy Services, Inc. | Integrated well drilling and evaluation |
US20050171698A1 (en) * | 2004-01-20 | 2005-08-04 | Sung Roger R. | Real time earth model for collaborative geosteering |
CN101647023A (en) * | 2007-02-21 | 2010-02-10 | 地质力学国际公司 | Method and apparatus for remote characterization of faults in the vicinity of boreholes |
US20110132662A1 (en) * | 2009-12-08 | 2011-06-09 | Schlumberger Technology Corporation | Phase wellbore steering |
CN103046868A (en) * | 2012-12-28 | 2013-04-17 | 中国石油集团川庆钻探工程有限公司 | Integrated geosteering method for horizontal well |
Non-Patent Citations (1)
Title |
---|
周明晖: "储层地质模型的建立及动态实时跟踪研究", 《中国优秀硕士学位论文全文数据库基础科学辑》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625842A (en) * | 2017-03-22 | 2018-10-09 | 中国石油化工股份有限公司 | A kind of wellbore trace control method and system |
CN107091081A (en) * | 2017-06-02 | 2017-08-25 | 中国石油天然气股份有限公司 | Method and system for early warning of drilling fault in drilling process |
CN107091081B (en) * | 2017-06-02 | 2020-11-03 | 中国石油天然气股份有限公司 | Method and system for early warning of drilling fault in drilling process |
CN108547611A (en) * | 2018-03-01 | 2018-09-18 | 杭州迅美科技有限公司 | Horizontal well complex environment is with brill electromagnetic wave resistivity logging rapid simulation method |
CN108547611B (en) * | 2018-03-01 | 2022-02-11 | 杭州迅美科技有限公司 | Method for rapidly simulating logging of electromagnetic wave resistivity while drilling in complex environment of horizontal well |
CN110231660A (en) * | 2019-05-15 | 2019-09-13 | 防灾科技学院 | The method of the dislocation amount of buried active fault is determined using magnetic susceptibility log method |
CN112901070A (en) * | 2019-12-03 | 2021-06-04 | 中国石油天然气股份有限公司 | Horizontal well tracking while drilling method and control method for controlling drilling direction of drill bit |
CN113379907A (en) * | 2020-03-10 | 2021-09-10 | 中国石油天然气股份有限公司 | Method and device for constructing fault block geological model |
CN113743175A (en) * | 2020-10-21 | 2021-12-03 | 中国石油天然气集团有限公司 | Stratum inclination angle analysis method and device, computer equipment and storage medium |
CN113743175B (en) * | 2020-10-21 | 2024-05-31 | 中国石油天然气集团有限公司 | Stratum inclination analysis method and device, computer equipment and storage medium |
CN114564800A (en) * | 2022-02-25 | 2022-05-31 | 北京金阳普泰石油技术股份有限公司 | Vertical thickness longitudinal fitting method and system for horizontal well logging curve |
Also Published As
Publication number | Publication date |
---|---|
CN104265279B (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104265279A (en) | Logging-while-drilling curve prediction method under fault condition | |
CN106869790B (en) | A kind of quick fine geology guidance method of shale gas horizontal well | |
US10024104B2 (en) | Improving geosteering inversion using look-ahead look-around electromagnetic tool | |
CA2796410C (en) | Systems and methods for horizontal well correlation and geosteering | |
CN106154322B (en) | Log curve correction method and apparatus | |
CA3087038C (en) | Multi-well ranging and drill path determination | |
AU2020426065B2 (en) | Trajectory control for directional drilling using azimuthal gamma ray measurements | |
CN103590828B (en) | Method for evaluating formation pressure by logging dck index method | |
CN109740183A (en) | Tunnel face stability evaluation model and step method excavation height design method | |
CN109826174A (en) | A method for determining the extent of the deep area of slope reinforcement | |
CN105911592A (en) | Practical drilling constraint three-dimensional seismic data long wavelength static correction method | |
CN104459800A (en) | Sand body pinch-out prediction method and device | |
AU2011374333B2 (en) | Method and system of correlating a measured log to a predicted log | |
AU2016203126A1 (en) | System and method for joint inversion of bed boundaries and petrophysical properties from borehole logs | |
CN105484732B (en) | Processing method for horizontal well drilling geosteering work progress well depth | |
CN112901070B (en) | Method for tracking horizontal well while drilling and control method for controlling drilling direction of drill bit | |
CN107835962A (en) | The time adjustment of drilling data | |
CN109902890A (en) | A kind of horizontal well land in target evaluation method and system | |
Tyvonchuk | Predicting of the geometrical behavior of formations in subsurface based on the analysis of LWD/MWD data while drilling horizontal wells | |
CN113191187B (en) | A horizontal well landing analysis chart method | |
Wang et al. | A Downhole Closed-Loop Method for Wellbore Trajectory Control Based on Azimuthal Logging While Drilling Data | |
Li et al. | Best practices of integrated well placement technologies in developing an ultrathin reservoir: a case history from Tarim basin west China | |
CN119535563A (en) | A method for geosteering parameter modeling in complex thin layers | |
CN115434636A (en) | Well deviation adjustment method for horizontal wells before landing based on double constraints of marker layers and included angles | |
CN116025281A (en) | Landing track control method for thin oil layer horizontal well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170510 Termination date: 20180730 |
|
CF01 | Termination of patent right due to non-payment of annual fee |