[go: up one dir, main page]

CN104138925B - A kind of preparation method of copper/phosphorus bimetallic capillary tube - Google Patents

A kind of preparation method of copper/phosphorus bimetallic capillary tube Download PDF

Info

Publication number
CN104138925B
CN104138925B CN201410272511.9A CN201410272511A CN104138925B CN 104138925 B CN104138925 B CN 104138925B CN 201410272511 A CN201410272511 A CN 201410272511A CN 104138925 B CN104138925 B CN 104138925B
Authority
CN
China
Prior art keywords
copper
phosphorus
vertical pulling
tube
annealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410272511.9A
Other languages
Chinese (zh)
Other versions
CN104138925A (en
Inventor
王栩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zaozhuang Mingshi New Material Co., Ltd
Original Assignee
Qingdao Shenda Multi-Creation Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Shenda Multi-Creation Technology Service Co Ltd filed Critical Qingdao Shenda Multi-Creation Technology Service Co Ltd
Priority to CN201410272511.9A priority Critical patent/CN104138925B/en
Publication of CN104138925A publication Critical patent/CN104138925A/en
Application granted granted Critical
Publication of CN104138925B publication Critical patent/CN104138925B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

The invention belongs to metal composite capillary tubes preparing technical field, relate to the preparation method of a kind of copper/phosphorus bimetallic capillary tube.The method is to utilize to swage to realize combining closely of copper pipe and phosphorus pipe, processes to reach the copper/phosphorus multiple tube of metallurgical binding state to interface by high temperature diffusion annealing;Then use tube drawing with floating plug or/and empty drawing is processed, and combine intermediate annealing, obtain high-performance copper/phosphorus bimetallic capillary tube.The present invention uses the method that tube drawing with floating plug and empty drawing combine, and is equipped with the intermediate annealing of necessity, and the composite capillary dimensional accuracy obtained is high, surface quality is good.Drawing processing after diffusion annealing, shapes required deformation force little, instrument, height die life, and the driving force needed for equipment is little, and production cost is low.

Description

A kind of preparation method of copper/phosphorus bimetallic capillary tube
Technical field:
The present invention relates to metal composite capillary tubes preparing technical field, in particular, provide one and can be used for copper/phosphorus bimetallic capillary The production method of pipe.
Technical background:
Copper and copper alloy capillary tube be specification limit be Φ (1.5~6.1) mm × (0.1~0.8) mm (external diameter × wall thickness, under The tubing that class diameter is less, wall thickness is relatively thin together), is extensively should in central air-conditioning, modern household electrical equipment, instrument, instrument Important raw and processed materials.Being characterized in that difficulty of processing is big, added value is high.Along with China's equipment manufacture, electrical appliance industry and ocean Developing rapidly of industry, the market demand of copper and copper alloy capillary tube is increasing.But, on naval vessel, desalinization and strand The sea water strong corrosive environment places such as power station, copper and copper alloy capillary tube can because of seawater corrosion reduction of service life, lowering apparatus Reliability.Pure phosphorus capillary tube has the most excellent decay resistance, but the thermal conductivity of phosphorus is relatively low, the heat exchange of thick-walled capillary Poor-performing, the mechanical property of thin-walled capillary pipe is difficult to again meet use requirement.
At present the preparation method of copper/phosphorus multiple tube mainly has: vertical pulling is compound, hydraulic expanding-forming is compound and the method such as explosive welding, generally It is all to be produced a small amount of plastic deformation by base material or base, clad material to realize being combined obtaining interference fit, prepares Multiple tube interface bond strength low, double-level-metal compatibility of deformation is poor, it is difficult to make capillary tube, especially phosphorous layer uneven thickness Even, it is difficult to ensure that the thickness requirement of phosphorous layer after making capillary tube.
Summary of the invention:
For solving the problem that above-mentioned technique exists, it is an object of the invention to provide cold the swaging of a kind of employing and combine diffusion annealing and vertical pulling The method of copper/phosphorus bimetallic capillary tube is prepared in shaping.The method is to utilize to swage to realize the combining closely, by height of copper pipe and phosphorus pipe Temperature diffusion annealing processes to reach the copper/phosphorus multiple tube of metallurgical binding state to interface;Then floating core head vertical pulling is used or/and sky is straight Draw processing, and combine intermediate annealing, obtain high-performance copper/phosphorus bimetallic capillary tube.
In order to achieve the above object, the technical scheme is that the employing cold method swaged of multi-pass prepares a size of Φ (9.0~15.0) Copper/phosphorus the multiple tube of mm × (1.5~2.0) mm, then under the conditions of 900~950 DEG C and inert gas shielding diffusion annealing 10~ 60min;Tubing after annealing directly carries out the vertical pulling processing of multi-pass, in conjunction with intermediate annealing, it is thus achieved that a size of Φ (1.5~6.1) Copper/phosphorus bimetallic the capillary tube of mm × (0.1~0.8) mm.Wherein, described copper/phosphorus include the internal layer using copper as multiple tube or The situation of outer layer, and described copper-clad includes fine copper and wrought copper alloy, phosphorus includes pure phosphorus and deformation phosphorus alloy;Described multi-pass vertical pulling Vertical pulling or dish can be used to draw, including floating core head vertical pulling or/and empty vertical pulling;Vertical pulling passage section shrinkage rate 10%~40% it Between;When vertical pulling accumulation section shrinkage rate reaches about 70%, an intermediate annealing need to be carried out;Described intermediate annealing process is annealing Temperature 500~600 DEG C, annealing time 1.5~1.0 hours;Applying lubrication in straight pulling process, lubricating oil can use mineral oil or plant Thing oil;Vertical pulling speed is 1~20mm/min;Described noble gas can be nitrogen or argon.
The present invention specifically comprises the following steps that
Step 1: using minor diameter copper/phosphorus multiple tube that cold preparation of swaging reaches to combine closely, technique is: phosphorus pipe is inserted in copper pipe In, carry out, after inserting the plug coating mineral oil, the cold shaping of swaging that multi-pass section shrinkage rate is about 20%, prepare a size of Copper/phosphorus the multiple tube of Φ (9.0~15.0) mm × (1.5~2.0) mm;
Step 2: the cold copper/phosphorus multiple tube swaging preparation is carried out high temperature diffusion annealing, to realize layers of copper and the metallurgy at phosphorous layer interface In conjunction with.Diffusion annealing system is: heating-up temperature is 900~950 DEG C, and temperature retention time is 10~60min, and is passed through noble gas It is protected from oxidation;
Step 3: the multiple tube after DIFFUSION TREATMENT carries out the floating core head vertical pulling of multi-pass again, makes multiple tube size reach External diameter Φ 6.1mm, below wall thickness 0.825mm;Wherein, the passage section shrinkage rate of vertical pulling between 10%~40%, vertical pulling When accumulation section shrinkage rate reaches about 70%, an intermediate annealing need to be carried out;
Step 4: when tube outer diameter is less than Φ 2.0mm, use multi-pass sky vertical pulling, vertical pulling passage section shrinkage rate 10%~ Between 40%, when vertical pulling accumulation section shrinkage rate reaches about 70%, an intermediate annealing need to be carried out and be further continued for vertical pulling, finally obtain Obtain the copper/phosphorus bimetallic capillary tube of a size of Φ (1.5~2.0) mm × (0.1~1.5) mm.
Present invention have the advantage that
1, the present invention uses cold preparation small size copper/phosphorus multiple tube of swaging, vertical pulling processing after diffusion annealing, shapes required deformation Power is little, instrument, height die life, and the driving force needed for equipment is little, and production cost is low.
2, the present invention utilizes the multiple tube interface laminating of cold preparation of swaging closely, and under the conditions of suitable high temperature diffusion annealing, interface can Reaching metallurgical binding, follow-up vertical pulling shapes, and obtains high performance copper/phosphorus bimetallic capillary tube.
3, the present invention uses the method that floating core head vertical pulling and empty vertical pulling combine, and is equipped with the intermediate annealing of necessity, is more beneficial for copper Layer and the deformation processing of phosphorous layer, the composite capillary dimensional accuracy obtained is high, surface quality is good.
Detailed description of the invention:
Below in conjunction with embodiment, the invention will be further described.
Embodiment 1: the copper of a size of Φ 3.0mm × 1.5mm/phosphorus bimetallic processing method of capillary tube.
TA2 pure phosphorus pipe by a size of Φ 12.7mm × 1.55mm is inserted in the T2 copper tube of a size of Φ 19.0mm × 2.0mm In, insert that to carry out 3 passage section shrinkage rates after coating the plug of mineral oil be about 20% cold swage, prepare a size of Φ The copper of 14.1mm × 1.3mm/phosphorus multiple tube.The diffusion annealing that multiple tube carries out under argon shield 950 DEG C of 10min processes, Interface is made to form metallurgical binding.Multiple tube after DIFFUSION TREATMENT obtains Φ 7.2mm × 0.7mm through the floating core head vertical pulling of 5 passages Multiple tube, after carrying out the annealing of 500 DEG C of 1h, continue floating core head vertical pulling 5 passage obtain Φ 3.0mm × 1.5mm's Copper/phosphorus bimetallic capillary tube.Vertical pulling passage section shrinkage rate, between 10%~40%, uses mineral oil to be lubricated.
Embodiment 2: the copper of a size of Φ 2.0mm × 0.4mm/phosphorus alloy bimetallic processing method of capillary tube.
The phosphorus alloy pipe of a size of Φ 12.0mm × 1.5mm is inserted in the T2 copper tube of a size of Φ 15.0mm × 1.4mm, Insert and carry out 4 passage section shrinkage rates after coating the plug of mineral oil about 20% cold swage, prepare a size of Φ 11.0mm The copper of × 1.0mm/phosphorus alloy multiple tube.The diffusion annealing that multiple tube carries out under argon shield 920 DEG C of 30min processes, and makes Interface forms metallurgical binding.Multiple tube after DIFFUSION TREATMENT obtains Φ 5.5mm × 1.5mm's through the floating core head vertical pulling of 5 passages Multiple tube, after carrying out the annealing annealing of 500 DEG C of 1h again through 5 passage floating core head vertical pullings become the copper of Φ 2mm × 0.4mm/ Phosphorus alloy bimetallic capillary tube.Vertical pulling passage section shrinkage rate, between 10%~40%, uses mineral oil to be lubricated.
Embodiment 3: the copper of a size of Φ 1.5mm × 0.1mm/phosphorus bimetallic processing method of capillary tube.
The TA2 pure phosphorus pipe of a size of Φ 8.0mm × 0.4mm is inserted in the T2 copper tube of a size of Φ 10.0mm × 0.9mm, Insert and carry out 5 passage section shrinkage rates after coating the plug of mineral oil about 20% cold swage, prepare a size of Φ 9.0mm The copper of × 0.6mm/phosphorus multiple tube.The diffusion annealing that multiple tube carries out under argon shield 900 DEG C of 60min processes, and makes interface Form metallurgical binding.Multiple tube after DIFFUSION TREATMENT obtains the compound of Φ 4.0mm × 0.3mm through the floating core head vertical pulling of 4 passages Pipe;After carrying out the annealing of 500 DEG C of 1h, obtain the multiple tube of Φ 2.0mm × 0.15mm through the floating core head vertical pulling of 5 passages; After carrying out the annealing of 500 DEG C of 1h, then become the copper/phosphorus bimetallic capillary tube (phase of Φ 1.5mm × 0.1mm through 7 passage sky vertical pullings Between need to carry out the intermediate annealing of 500 DEG C of 1h).Vertical pulling passage section shrinkage rate, between 10%~40%, uses mineral oil to enter Row lubrication.

Claims (2)

1. the preparation method of copper/phosphorus bimetallic capillary tube, it is characterised in that specifically comprise the following steps that
Step 1: using minor diameter copper/phosphorus multiple tube that cold preparation of swaging reaches to combine closely, technique is: be inserted in copper pipe by phosphorus pipe, Insert and carry out, after coating the plug of mineral oil, cold shapings of swaging that multi-pass section shrinkage rate is 20%, prepared a size of Φ (9.0~ 15.0) copper/phosphorus multiple tube of mm × (1.5~2.0) mm;
Step 2: the cold copper/phosphorus multiple tube swaging preparation is carried out high temperature diffusion annealing, to realize layers of copper and the metallurgical binding at phosphorous layer interface; Diffusion annealing system is: heating-up temperature is 900~950 DEG C, and temperature retention time is 10~60min, and it is anti-to be passed through inert gas shielding Oxidation;
Step 3: the composite pipe after DIFFUSION TREATMENT is carried out again the floating core head vertical pulling of multi-pass, vertical pulling passage section shrinkage rate Between 10%~40%;Multiple tube size is made to reach external diameter Φ 6.1mm, below wall thickness 0.825mm;Wherein, the road of vertical pulling Secondary section shrinkage rate is between 10%~40%, when vertical pulling accumulation section shrinkage rate reaches 70%, will carry out an intermediate annealing, Annealing temperature 500~600 DEG C, annealing time 1.5~1.0 hours;
Step 4: when tube outer diameter is less than Φ 2.0mm, using multi-pass sky vertical pulling, vertical pulling passage section shrinkage rate is 10%~40% Between, when vertical pulling accumulation section shrinkage rate reaches 70%, an intermediate annealing need to be carried out and be further continued for vertical pulling, final acquisition is a size of Copper/phosphorus bimetallic the capillary tube of Φ (1.5~2.0) mm × (0.1~1.5) mm.
The preparation method of a kind of copper/phosphorus bimetallic capillary tube, it is characterised in that to apply profit in straight pulling process Sliding, lubricating oil uses mineral oil or vegetable oil;Vertical pulling speed is 1~20mm/min;Described noble gas is nitrogen or argon.
CN201410272511.9A 2014-06-18 2014-06-18 A kind of preparation method of copper/phosphorus bimetallic capillary tube Active CN104138925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410272511.9A CN104138925B (en) 2014-06-18 2014-06-18 A kind of preparation method of copper/phosphorus bimetallic capillary tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410272511.9A CN104138925B (en) 2014-06-18 2014-06-18 A kind of preparation method of copper/phosphorus bimetallic capillary tube

Publications (2)

Publication Number Publication Date
CN104138925A CN104138925A (en) 2014-11-12
CN104138925B true CN104138925B (en) 2016-12-28

Family

ID=51848359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410272511.9A Active CN104138925B (en) 2014-06-18 2014-06-18 A kind of preparation method of copper/phosphorus bimetallic capillary tube

Country Status (1)

Country Link
CN (1) CN104138925B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4105701A1 (en) * 1990-03-08 1991-09-12 Mannesmann Ag METHOD FOR PRODUCING A METAL, THICK-WALLED HIGH-PRESSURE PIPE
CA2303732C (en) * 1999-04-09 2010-05-25 Daido Tokushuko Kabushiki Kaisha Multi-layered anti-coking heat resisting metal tube and the method for manufacturing thereof
CN1331622C (en) * 2004-04-30 2007-08-15 上海瓦恩德特种金属材料有限公司 Composite stainless steel wire and its manufacturing process
CN101745577B (en) * 2008-12-17 2012-06-20 北京有色金属研究总院 Spinning processing method of carbon steel lining stainless steel composite pipe
CN102527768A (en) * 2010-12-08 2012-07-04 江苏兴荣高新科技股份有限公司 Manufacturing method of copper-clad aluminum pipe
CN102553961B (en) * 2010-12-14 2014-05-14 张皓 Compound pipe manufacturing technology for metallurgically bonding anti-corrosion special alloy lining with pipeline steel outer sleeve

Also Published As

Publication number Publication date
CN104138925A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN102294456B (en) Manufacturing method for oblique rolling of bimetallic compound seamless steel pipe by centrifugal blank
CN102463272A (en) Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe
CN101698206B (en) Technique for producing titanium-copper compound wire
CN102500619B (en) Seamless titanium welded pipe and manufacturing method thereof
CN102019727A (en) Aluminium-clad steel strip for coolers and preparation method thereof as well as steel strip and aluminium alloy strip used thereby
CN103668028B (en) Preparation method of titanium and titanium alloy seamless tube blank
WO2006097593A8 (en) Method for making a coated steel part having very high resistance after heat treatment
CN109801756B (en) Preparation method of copper-aluminum composite wire
CN104668305A (en) Method for molding dual-layer alloy-steel pipe
CN109672064A (en) A kind of palldium alloy composite filament brush material and preparation method thereof
JP2009242837A (en) Tool-wearing reduced copper alloy cast billet and copper alloy tube
CN105779828A (en) Copper alloy and aluminum alloy composite wire and preparation processing method thereof
CN107774737A (en) Ni-based composite bimetal pipe part moulding process
CN104174807B (en) The manufacture method of a kind of heavy caliber titanium thick-wall tube
CN104138925B (en) A kind of preparation method of copper/phosphorus bimetallic capillary tube
CN103878204A (en) Method for producing copper/titanium bimetal capillary pipes
CN104668304A (en) Technological method for producing nickel and nickel alloy tube in short process
CN103203598A (en) Metallurgical composite bimetal seamless pipe production process
CN102107233B (en) Method for manufacturing steel/copper composite welded pipe
CN103861887B (en) A kind of preparation method of high-performance copper/titanium bimetallic capillary tube
CN104475615A (en) Manufacturing method of bi-metal composite finned tube
CN100561078C (en) The production technology of aluminum-cladding copper capillary
KR101627919B1 (en) Phosphorus dioxidized copper tube for heat exchanger
CN101780490B (en) Preparation process for titanium-copper composite wires
EP3521463A1 (en) Highly corrosion-resistant copper pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wang Xu

Inventor before: Xie Guangyu

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160922

Address after: 266000 Shandong Province, Licang District, No. nine East Road, No. 320, building 205, room 2

Applicant after: Qingdao Shenda multi-creation Technology Service Co. Ltd.

Address before: 545000, room 89, No. 702, Lane West, Third Middle Road, North willow District, the Guangxi Zhuang Autonomous Region, Liuzhou

Applicant before: Xie Guangyu

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201116

Address after: 277000 west side of Fazhan Road, neixi District, Xuecheng District, Zaozhuang City, Shandong Province

Patentee after: Zaozhuang Mingshi New Material Co., Ltd

Address before: 266000 Shandong Province, Licang District, No. nine East Road, No. 320, building 205, room 2

Patentee before: QINGDAO SHENDAZHONGCHUANG TECHNICAL SERVICES Co.,Ltd.