[go: up one dir, main page]

CN102463272A - Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe - Google Patents

Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe Download PDF

Info

Publication number
CN102463272A
CN102463272A CN2010105384616A CN201010538461A CN102463272A CN 102463272 A CN102463272 A CN 102463272A CN 2010105384616 A CN2010105384616 A CN 2010105384616A CN 201010538461 A CN201010538461 A CN 201010538461A CN 102463272 A CN102463272 A CN 102463272A
Authority
CN
China
Prior art keywords
nickel
small
alloy thin
base alloy
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105384616A
Other languages
Chinese (zh)
Inventor
郭胜利
邬小萍
李德富
杜鹏
郭青苗
彭海健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing General Research Institute for Non Ferrous Metals
Original Assignee
Beijing General Research Institute for Non Ferrous Metals
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Research Institute for Non Ferrous Metals filed Critical Beijing General Research Institute for Non Ferrous Metals
Priority to CN2010105384616A priority Critical patent/CN102463272A/en
Publication of CN102463272A publication Critical patent/CN102463272A/en
Pending legal-status Critical Current

Links

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

The invention relates to a short-process preparation method of a small-caliber nickel-based alloy thin-wall pipe, belonging to the technical field of processing of non-ferrous metal pipes. The method mainly comprises the following steps of (1) preparing a nickel-based alloy tube blank by a centrifugal casting process, wherein the ratio of the outer diameter to the inner diameter of the tube blank is 0.4-0.6; (2) the hot extrusion temperature of the nickel-based alloy pipe is 1000-1250 ℃, and the extrusion ratio is 5-16; (3) adopting an LG/LD series cold pilger mill or a drawing mill to carry out multi-pass cold machining to reduce the diameter and the wall, thus obtaining a thin-walled pipe; (4) intermediate annealing, finished product annealing and finished product pipe straightening. The invention provides a novel processing method with short flow, low labor intensity, labor saving in forming, low cost and high production efficiency for the small-caliber nickel-based alloy thin-wall pipe, the prepared small-caliber nickel-based alloy thin-wall pipe has high added value, the processing technology of the small-caliber nickel-based alloy thin-wall pipe is suitable for large-scale production, and the method has remarkable economic and social benefits.

Description

A kind of short process making method of small-bore nickel-base alloy thin-wall pipes
Technical field
The present invention relates to a kind of short process making method of small-bore nickel-base alloy thin-wall pipes, belong to nonferrous materials tubing processing technique field.
Background technology
Nickel-base alloy tubing has good resistance to high temperature corrosion performance, antioxygenic property and good corrosion resistance, is widely used in fields such as Aeronautics and Astronautics aircraft, naval vessel submarine, chemical industry, navigation, nuclear-energy plant, metallurgy, electrical equipment, weaving, slurrying, energy reforming unit, papermaking, food machinery, Medical Devices and building decoration.But the technological process of the small-bore nickel-base alloy thin-wall pipes of traditional handicraft preparation processing is long; Production cost is high, and its production technology mainly comprises: 1. melting → cast ingot blank → heating → many fiery inferior forging → coolings → aligning → cutting bar end to end → bar peeling → blanking → boring → heating → coating → heat → cover glassing → extruding → surfaces externally and internally processing → cold rolling → annealing → cold rolling or cold-drawn → heat treatment → aligning → pickling → cleaning; 2. melting → cast ingot blank → heating → forging → cooling → aligning → cutting bar end to end → bar peeling → boring → heating → inoxidzable coating → heat → cover glassing is lubricated → hot rolling → surfaces externally and internally processing → cold rolling → annealing → cold rolling or cold-drawn → heat treatment → aligning → pickling → cleaning; Traditional handicraft is produced small-bore nickel-base alloy thin-wall pipes needs 24 procedures, and wherein forging needs many fire time heating and multi-pass upsetting pull, and cold working (cold rolling or cold-drawn) operation has 20 multi-pass approximately, and production process is many and loaded down with trivial details, and production cost is high.China natural resources is nervous, and energy shortage reduces the metal forming manufacturing procedure, and energy savings reduces labour intensity and production cost, improves stock utilization, has remarkable economic efficiency and social benefit.
The retrieval of prior art document is found, adopted centrifugal casting (thin-walled pipe)+spinning process to prepare the existing report of method of heavy caliber nickel-base alloy thin-wall pipes, but the technology that relates to the small-bore nickel-base alloy thin-wall pipes of short flow preparation is not seen open as yet.
Summary of the invention
The objective of the invention is to solve problems such as small-bore nickel-base alloy light-wall pipe production cost is high, labour intensity is big; A kind of lack flow process, the novel preparation method of the short flow process of small-bore nickel-base alloy thin-wall pipes cheaply are provided, are specially a kind of employing centrifugal casting (heavy wall pipe)+hot extrusion+cold working and produce the short process making method of small-bore nickel-base alloy thin-wall pipes.
For realizing above-mentioned purpose, the present invention takes following technical scheme:
A kind of short process making method of small-bore nickel-base alloy thin-wall pipes comprises the steps:
(1) centrifugal casting heavy wall nickel-base alloy pipe;
(2) pipe with said alloy carries out machined, is preheating to 150 ℃~280 ℃ spraying high-temp antioxidizing glass lubricants, is heated to 1100 ℃~1250 ℃ subsequently, is incubated 1h~2h, covers to be coated with the glass powdered lubricant, and hot extrusion obtains tubing;
(3) tubing with step (2) gained carries out cold working (cold rolling or cold rolling+cold-drawn) and intermediate annealing;
(4) with the tubing of step (3) gained heat-treat, aligning, pickling and cleaning, obtain finished product tubing.
A kind of optimized technical scheme is characterized in that: described nickel-base alloy is that Nimonic or ambrose alloy are alloy etc.
A kind of optimized technical scheme is characterized in that: the temperature of step (1) centrifugal casting when centrifugal casting is 1500 ℃~1700 ℃, and the internal diameter of heavy wall nickel-base alloy pipe with the ratio of external diameter is: 0.4~0.6.
A kind of optimized technical scheme is characterized in that: the extrusion speed described in the step (2) is 30mm/s~100mm/s, and extrusion temperature is 1000 ℃~1250 ℃, and extrusion ratio is 5~16.
A kind of optimized technical scheme is characterized in that: the cold working described in the step (3) is cold rolling or cold rolling and cold-drawn, adopts rolling wall and the tube reducing (finishing) of subtracting of LG/LD cold pilger mill, obtains the small-bore nickel alloy thin-wall pipes of high accuracy.
A kind of optimized technical scheme is characterized in that: the cold worked pass reduction described in the step (3) is 10%~35%, is preferably 10%~20%, and the deflection between annealing is 50%~75%, and the intermediate annealing temperature is 850 ℃~1050 ℃.
A kind of optimized technical scheme is characterized in that: the heat treatment described in the step (4) according to customer requirement, is adopted stress relief annealing or recrystallization annealing for annealing, and the finished products temperature is 550 ℃~900 ℃.
A kind of optimized technical scheme is characterized in that: the equipment for straightening described in the step (4) is oblique six-roller straightener, and the finished product tube outer diameter is Φ 2mm~Φ 25mm, and wall thickness is 0.5mm~5mm.
The present invention is that nickel-base alloys such as alloy are research object with Nimonic or ambrose alloy; Adopt centrifugal casting technique to prepare the nickel-base alloy pipe; Adopt hot extrusion technique processing tubing; Adopt rolling wall and the tube reducings (finishing) of subtracting of serial cold pilger mill such as LG/LD; Obtain small-bore accurate nickel-base alloy thin-wall pipes, adopt drawing process further to process for external diameter less than the thin-wall pipes of 3mm, production technology mainly comprises: melting → centrifugal casting pipe → machined → heating → coating → heat → cover glassing → extruding → surfaces externally and internally processing → cold rolling → annealing → cold rolling or cold-drawn → heat treatment → aligning → pickling → cleaning.1. compare with traditional handicraft, the operation few (16 roads are only arranged) of the new preparation process of this patent invention, the wall thickness of extrude tubes is little, has reduced follow-up cold working amount greatly, and flow process is short, and production efficiency is high, and cost is low.
The invention has the advantages that:
The invention provides the short flow process of a kind of small-bore nickel-base alloy thin-wall pipes, low cost, production efficiency is high, labour intensity is low new method for processing; Substitute the method that forging+boring prepares pipe through centrifugal casting technique, tubing has reduced follow-up cold working amount significantly through hot extrusion.Small-bore nickel-base alloy thin-wall pipes process technology of the present invention is suitable for large-scale production, and labour intensity is low, and it is laborsaving, with short production cycle to be shaped, and production efficiency is high, and cost is low, and added value is high, has remarkable economic efficiency and social benefit.
Through the specific embodiment the present invention is further specified below, but and do not mean that restriction protection domain of the present invention.
The specific embodiment
Embodiment 1
Press the Monel400 alloy; Confected materials is put into medium-frequency induction furnace is heated to 1650 ℃, leave standstill 20 minutes after, cool to 1550 ℃ after skimming; With pouring metal melt in the mold of horizontal centrifugal casting machine; The casting mold rotating speed is 950 rev/mins, obtains the Menel400 pipe, and the internal diameter of pipe is 0.5 with the ratio of external diameter.After the machined, with after the blank heating to 180 ℃, spraying high-temp antioxidizing glass lubricant is heated to 1050 ℃ subsequently; Be incubated 1 hour, cover and be coated with the glass powdered lubricant, carry out hot extrusion, extrusion speed is 45mm/s; The external diameter of extrude tubes is Φ 72mm, and wall thickness is 6mm, and extrusion ratio is 13.Serial cold pilger mills such as employing LG/LD carry out cold working, and pass reduction is 14%, and the deflection between annealing is 70%, and annealing temperature is 920 ℃.According to customer requirement, (external diameter is Φ 3mm~Φ 25mm, and wall thickness is 0.5mm~1.5mm) greater than the finished product tubing of 3mm different size to obtain external diameter through cold-rolling process.The typical products specification is: external diameter Φ 18mm, wall thickness 1mm and external diameter Φ 3mm, wall thickness 0.5mm.The tubing of cold rolling gained 3mm is carried out drawing, and (external diameter is Φ 2mm~Φ 3mm, and wall thickness is that 0.5mm~1mm), the drawing passes working modulus is 15%, and the deflection between drawing annealing is 60% less than the finished product tubing of 3mm different size to obtain external diameter.The typical products specification is: external diameter is Φ 2mm, and wall thickness is 0.6mm.The finished products temperature is 615 ℃, is incubated 1 hour.Adopt oblique six-roller straightener to align then, carry out conventional pickling, cleaning again, remove greasyly, obtain finished product tubing.
Embodiment 2
Press the NCu40-2-1 alloy; Confected materials is put into medium-frequency induction furnace is heated to 1630 ℃, leave standstill 15 minutes after, cool to 1520 ℃ after skimming; With pouring metal melt in the mold of horizontal centrifugal casting machine; The casting mold rotating speed is 750 rev/mins, obtains the NCu40-2-1 alloy pipe stock, and the internal diameter of pipe is 0.55 with the ratio of external diameter.After the machined, coat the high-temp antioxidizing agent, be heated to 1000 ℃ subsequently, be incubated 1 hour after the blank heating to 190 ℃; Cover and be coated with the glass powdered lubricant, carry out hot extrusion, extrusion speed is 48mm/s; The external diameter of extrude tubes is Φ 70mm, and wall thickness is 5mm, and extrusion ratio is 15.7.Serial cold pilger mills such as employing LG/LD carry out cold working, and the deflection between mill-annealed is 75%, and pass reduction is 16%, and annealing temperature is 880 ℃.(external diameter is Φ 3mm~Φ 25mm, and wall thickness is 0.5mm~1.5mm) greater than the finished product tubing of Φ 3mm different size to obtain external diameter through cold-rolling process.Typical products specification: external diameter Φ 15mm, wall thickness 0.8mm and external diameter Φ 3mm, wall thickness 0.5mm.The tubing of cold rolling gained Φ 3mm is carried out drawing; (external diameter is Φ 2mm~Φ 3mm less than the finished product tubing of Φ 3mm different size to obtain external diameter; Wall thickness is that 0.5mm~1mm), the drawing passes working modulus is 12%, and the deflection between drawing annealing is 55%; The typical products specification is: external diameter is Φ 1.9mm, and wall thickness is 0.55mm.The finished products temperature is 585 ℃, is incubated 1 hour.Adopt oblique six-roller straightener to align then, carry out conventional pickling, cleaning again, remove greasyly, obtain finished product tubing.
Embodiment 3
Press the NCu28-2.5-1.5 alloy; Confected materials is put into medium-frequency induction furnace is heated to 1670 ℃, leave standstill 25 minutes after, cool to 1580 ℃ after skimming; With pouring metal melt in the mold of horizontal centrifugal casting machine; The casting mold rotating speed is 1000 rev/mins, obtains the NCu28-2.5-1.5 pipe, and the internal diameter of pipe is 0.48 with the ratio of external diameter.After the machined, coat the high-temp antioxidizing agent, be heated to 1100 ℃ subsequently, be incubated 2 hours after the blank heating to 200 ℃; Cover and be coated with the glass powdered lubricant, push, extrusion speed is 52mm/s; The external diameter of extrude tubes is Φ 73mm, and wall thickness is 6.5mm, and extrusion ratio is 11.8.Serial cold pilger mills such as employing LG/LD carry out cold working, and pass reduction is 12%, and the deflection between annealing is 65%, and annealing temperature is 950 ℃.(external diameter is Φ 3mm~Φ 25mm, and wall thickness is 0.5mm~1.5mm) greater than the finished product tubing of Φ 3mm different size to obtain external diameter through cold-rolling process.Typical products specification: external diameter Φ 25mm, wall thickness 1.5mm and external diameter Φ 3mm, wall thickness 0.5mm.The tubing of cold rolling gained 3mm is carried out drawing; (external diameter is Φ 2mm~Φ 3mm less than the finished product tubing of Φ 3mm different size to obtain external diameter; Wall thickness is that 0.5mm~1mm), the drawing passes working modulus is 10%, and the deflection between drawing annealing is 50%; The typical products specification is: external diameter is Φ 2.5mm, and wall thickness is 0.7mm.The finished products temperature is 645 ℃, is incubated 1 hour.Adopt oblique six-roller straightener to align then, carry out conventional pickling, cleaning again, remove greasyly, obtain finished product tubing.
Embodiment 4
Press the Inconel600 alloy; Confected materials is put into medium-frequency induction furnace is heated to 1680 ℃, leave standstill 25 minutes after, cool to 1580 ℃ after skimming; With pouring metal melt in the mold of horizontal centrifugal casting machine; The casting mold rotating speed is 980 rev/mins, obtains the Inconel600 alloy pipe stock, and the internal diameter of pipe is 0.5 with the ratio of external diameter.After the machined, coat the high-temp antioxidizing agent, be heated to 1150 ℃ subsequently, be incubated 1 hour after the blank heating to 260 ℃; Cover and be coated with the glass powdered lubricant, push, extrusion speed is 87mm/s; The external diameter of extrude tubes is Φ 73.6mm, and wall thickness is 6.8mm, and extrusion ratio is 11.2.Serial cold pilger mills such as employing LG/LD carry out cold working, and pass reduction is 11.5%, and the deflection between annealing is 68%, and annealing temperature is 1045 ℃.(external diameter is Φ 3mm~Φ 25mm, and wall thickness is 0.5mm~1.5mm) greater than the finished product tubing of Φ 3mm different size to obtain external diameter through cold-rolling process.Typical products specification: external diameter Φ 18mm, wall thickness 0.8mm, external diameter Φ 3mm, wall thickness 0.5mm.The tubing of cold rolling gained 3mm is carried out drawing, and (external diameter is Φ 2mm~Φ 3mm, and wall thickness is that 0.5mm~1mm), the drawing passes working modulus is 11%, and the deflection between drawing annealing is 65% less than the finished product tubing of Φ 3mm different size to obtain external diameter.The typical products specification is: external diameter is Φ 2mm, and wall thickness is 0.5mm.The finished products temperature is 870 ℃, is incubated 1 hour.Adopt oblique six-roller straightener to align then, carry out conventional pickling, cleaning again, remove greasyly, obtain finished product tubing.
Embodiment 5
Press the Inconel690 alloy; Confected materials is put into medium-frequency induction furnace is heated to 1700 ℃, leave standstill 30 minutes after, cool to 1650 ℃ after skimming; With pouring metal melt in the mold of horizontal centrifugal casting machine; The casting mold rotating speed is 1000 rev/mins, obtains the Inconel690 alloy pipe stock, and the internal diameter of pipe is 0.5 with the ratio of external diameter.Pipe homogenising treatment temperature is 1150 ℃, is incubated 2.5 hours.After the machined, coat the high-temp antioxidizing agent, be heated to 1250 ℃ subsequently, be incubated 2 hours after the blank heating to 280 ℃; Cover and be coated with the glass powdered lubricant, push, extrusion speed is 93mm/s; The external diameter of extrude tubes is Φ 74mm, and wall thickness is 7mm, and extrusion ratio is 10.9.Serial cold pilger mills such as employing LG/LD carry out cold working, and the deflection between annealing is 75%, and pass reduction is 12.5%, and annealing temperature is 1050 ℃.(external diameter is Φ 3mm~Φ 25mm, and wall thickness is 0.5mm~1.5mm) greater than the finished product tubing of Φ 3mm different size to obtain external diameter through cold-rolling process.Typical products specification: external diameter Φ 20.05mm, wall thickness 1.09mm and external diameter Φ 3mm, wall thickness 0.5mm.The tubing of cold rolling gained 3mm is carried out drawing; (external diameter is Φ 2mm~Φ 3mm less than the finished product tubing of Φ 3mm different size to obtain external diameter; Wall thickness is that 0.5mm~1mm), the drawing passes working modulus is 11%, and the deflection between drawing annealing is 65%; The typical products specification is: external diameter is Φ 2mm, and wall thickness is 0.5mm.The finished products temperature is 870 ℃, is incubated 1 hour.Adopt oblique six-roller straightener to align then, carry out conventional pickling, cleaning again, remove greasyly, obtain finished product tubing.

Claims (8)

1. the short process making method of a small-bore nickel-base alloy thin-wall pipes comprises the steps:
(1) centrifugal casting heavy wall nickel-base alloy pipe;
(2) pipe with said alloy carries out machined, is preheating to 150 ℃~280 ℃ spraying high-temp antioxidizing glass lubricants, is heated to 1100 ℃~1250 ℃ subsequently, is incubated 1h~2h, covers to be coated with the glass powdered lubricant, and hot extrusion obtains tubing;
(3) tubing with step (2) gained carries out cold working and intermediate annealing;
(4) with the tubing of step (3) gained heat-treat, aligning, pickling and cleaning, obtain finished product tubing.
2. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 1 is characterized in that: described nickel-base alloy is that Nimonic or ambrose alloy are alloy.
3. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 1; It is characterized in that: the temperature of step (1) centrifugal casting when centrifugal casting is 1500 ℃~1700 ℃, and the internal diameter of heavy wall nickel-base alloy pipe with the ratio of external diameter is: 0.4~0.6.
4. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 1 is characterized in that: the extrusion speed described in the step (2) is 30mm/s~100mm/s, and extrusion temperature is 1000 ℃~1250 ℃, and extrusion ratio is 5~16.
5. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 1 is characterized in that: the cold working described in the step (3) is cold rolling or cold rolling and cold-drawn.
6. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 5; It is characterized in that: described cold worked pass reduction is 10%~35%; Deflection between annealing is 50%~75%, and the intermediate annealing temperature is 850 ℃~1050 ℃.
7. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 1 is characterized in that: the heat treatment described in the step (4) is annealing, and annealing temperature is 550 ℃~900 ℃.
8. the short process making method of small-bore nickel-base alloy thin-wall pipes according to claim 1 is characterized in that: the equipment of aligning is oblique six-roller straightener described in the step (4), and the finished product tube outer diameter is Φ 2mm~Φ 25mm, and wall thickness is 0.5mm~5mm.
CN2010105384616A 2010-11-08 2010-11-08 Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe Pending CN102463272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105384616A CN102463272A (en) 2010-11-08 2010-11-08 Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105384616A CN102463272A (en) 2010-11-08 2010-11-08 Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe

Publications (1)

Publication Number Publication Date
CN102463272A true CN102463272A (en) 2012-05-23

Family

ID=46067556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105384616A Pending CN102463272A (en) 2010-11-08 2010-11-08 Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe

Country Status (1)

Country Link
CN (1) CN102463272A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343261A (en) * 2013-06-28 2013-10-09 江苏双勤民生冶化设备制造有限公司 Centrifugal casting method for Inconel 600 alloy pipe
CN103357696A (en) * 2013-07-18 2013-10-23 中铝洛阳铜业有限公司 Production manufacturing process of large-diameter copper-nickel alloy seamless pipe
CN103484803A (en) * 2013-10-12 2014-01-01 钢铁研究总院 Processing technique of nickel-based heat-resisting alloy boiler pipe
CN103753146A (en) * 2014-01-23 2014-04-30 常州盛德无缝钢管有限公司 Nickel base alloy tube producing technology for high-pressure boiler
CN103769433A (en) * 2014-01-06 2014-05-07 山西太钢不锈钢股份有限公司 Production method for stainless steel pipe for photo-thermal power generation
CN104785572A (en) * 2015-03-23 2015-07-22 嘉兴瑞尔铝业有限公司 Manufacturing method of antirust aluminum alloy flat tube for water tank and air conditioner condenser of automobile
CN105458009A (en) * 2014-09-05 2016-04-06 上海金保莱不锈钢有限公司 Method for producing ultra-thin finish rolling pipe
CN105606426A (en) * 2015-12-18 2016-05-25 北京有色金属研究总院 Metallurgical analysis etching method of layered metal composite material
CN106180254A (en) * 2016-09-26 2016-12-07 中国科学院上海应用物理研究所 A kind of preparation method of the nickel of resistance to fused salt corrosion molybdenum evanohm seamless pipe
CN108034859A (en) * 2017-11-17 2018-05-15 宁波大红鹰学院 NiCu30 alloy pipe processing technologys
CN109386676A (en) * 2017-08-09 2019-02-26 上海众山特殊钢有限公司 A kind of nuclear power control rod heavy caliber ultra-thin-wall nickel-base alloy tubing
CN109940057A (en) * 2019-03-15 2019-06-28 内蒙古北方重工业集团有限公司 The anti-oxidation heating means of blind hole blank inner surface
CN110453109A (en) * 2019-08-12 2019-11-15 浙江久立特材科技股份有限公司 A kind of small-bore accurate seamless pipe of NS3306 high temperature alloy and its manufacturing method
CN110653576A (en) * 2019-10-25 2020-01-07 嘉兴兆丰塑业股份有限公司 Manufacturing method of pull rod assembly for luggage case
CN110802127A (en) * 2019-10-08 2020-02-18 江阴和宏精工科技有限公司 Manufacturing method of thick-wall medium-high pressure copper-nickel alloy large-caliber pipe for ocean engineering
CN111043407A (en) * 2019-12-31 2020-04-21 无锡隆达金属材料有限公司 Manufacturing method of small-caliber thin-wall composite pipe made of BFe10-1-1
CN112404894A (en) * 2020-10-26 2021-02-26 无锡英特派金属制品有限公司 Preparation method of large length-diameter ratio, small-caliber and ultrathin platinum and platinum-rhodium alloy crucible
CN112845658A (en) * 2021-01-05 2021-05-28 太原科技大学 Preparation method of UNS N08825 small-caliber precise seamless tube
CN113500097A (en) * 2021-07-30 2021-10-15 王声兰 Preparation method and application of alloy thin-wall capillary tube for hydrogen purification
CN114178454A (en) * 2021-11-15 2022-03-15 有研工程技术研究院有限公司 Preparation method of magnesium-lithium alloy hollow component with complex section
WO2024207706A1 (en) * 2023-04-06 2024-10-10 浙江久立特材科技股份有限公司 Preparation method for nickel-molybdenum corrosion-resistant alloy seamless pipe and prepared seamless pipe
CN119351824A (en) * 2024-12-23 2025-01-24 邯郸新兴特种管材有限公司 A NS3306 corrosion-resistant alloy pipe and its production process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2556061A1 (en) * 1975-12-12 1977-06-23 Helmut Seilstorfer Thin walled precision tube - made of metal powder by hot isostatic press forming inside autoclave in sheet metal mould
CN1507962A (en) * 2002-12-18 2004-06-30 中国科学院金属研究所 A kind of processing method of superalloy tube billet
CN1701871A (en) * 2005-05-10 2005-11-30 江苏法尔胜技术开发中心 Lubrication impact extrusion forming method of nickel titanium-base shape memory alloy tubing glass
CN1824402A (en) * 2006-03-23 2006-08-30 沈阳理工大学 Alloy pipe hot extrusion method and extrusion die
WO2009142228A1 (en) * 2008-05-22 2009-11-26 住友金属工業株式会社 High-strength ni-base alloy pipe for use in nuclear power plants and process for production thereof
CN101623716A (en) * 2009-07-31 2010-01-13 沈阳工业大学 Preparation method of metal tube

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2556061A1 (en) * 1975-12-12 1977-06-23 Helmut Seilstorfer Thin walled precision tube - made of metal powder by hot isostatic press forming inside autoclave in sheet metal mould
CN1507962A (en) * 2002-12-18 2004-06-30 中国科学院金属研究所 A kind of processing method of superalloy tube billet
CN1701871A (en) * 2005-05-10 2005-11-30 江苏法尔胜技术开发中心 Lubrication impact extrusion forming method of nickel titanium-base shape memory alloy tubing glass
CN1824402A (en) * 2006-03-23 2006-08-30 沈阳理工大学 Alloy pipe hot extrusion method and extrusion die
WO2009142228A1 (en) * 2008-05-22 2009-11-26 住友金属工業株式会社 High-strength ni-base alloy pipe for use in nuclear power plants and process for production thereof
CN101623716A (en) * 2009-07-31 2010-01-13 沈阳工业大学 Preparation method of metal tube

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《特钢技术》 20080930 黄晓斌 G3合金无缝管制管工艺研究 17-20 1-8 第14卷, 第56期 *
黄晓斌: "G3合金无缝管制管工艺研究", 《特钢技术》 *

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343261B (en) * 2013-06-28 2014-02-12 江苏双勤民生冶化设备制造有限公司 Centrifugal casting method for Inconel 600 alloy pipe
CN103343261A (en) * 2013-06-28 2013-10-09 江苏双勤民生冶化设备制造有限公司 Centrifugal casting method for Inconel 600 alloy pipe
CN103357696A (en) * 2013-07-18 2013-10-23 中铝洛阳铜业有限公司 Production manufacturing process of large-diameter copper-nickel alloy seamless pipe
CN103484803A (en) * 2013-10-12 2014-01-01 钢铁研究总院 Processing technique of nickel-based heat-resisting alloy boiler pipe
CN103769433A (en) * 2014-01-06 2014-05-07 山西太钢不锈钢股份有限公司 Production method for stainless steel pipe for photo-thermal power generation
CN103769433B (en) * 2014-01-06 2015-10-28 山西太钢不锈钢股份有限公司 Photo-thermal power generation stainless steel tube production method
CN103753146B (en) * 2014-01-23 2016-06-08 常州盛德无缝钢管有限公司 A kind of high-pressure boiler nickel-based alloy pipe production technology
CN103753146A (en) * 2014-01-23 2014-04-30 常州盛德无缝钢管有限公司 Nickel base alloy tube producing technology for high-pressure boiler
CN105458009A (en) * 2014-09-05 2016-04-06 上海金保莱不锈钢有限公司 Method for producing ultra-thin finish rolling pipe
CN104785572A (en) * 2015-03-23 2015-07-22 嘉兴瑞尔铝业有限公司 Manufacturing method of antirust aluminum alloy flat tube for water tank and air conditioner condenser of automobile
CN105606426A (en) * 2015-12-18 2016-05-25 北京有色金属研究总院 Metallurgical analysis etching method of layered metal composite material
CN106180254A (en) * 2016-09-26 2016-12-07 中国科学院上海应用物理研究所 A kind of preparation method of the nickel of resistance to fused salt corrosion molybdenum evanohm seamless pipe
CN106180254B (en) * 2016-09-26 2018-06-29 中国科学院上海应用物理研究所 A kind of preparation method of the nickel of resistance to fused salt corrosion molybdenum evanohm seamless pipe
CN109386676A (en) * 2017-08-09 2019-02-26 上海众山特殊钢有限公司 A kind of nuclear power control rod heavy caliber ultra-thin-wall nickel-base alloy tubing
CN108034859A (en) * 2017-11-17 2018-05-15 宁波大红鹰学院 NiCu30 alloy pipe processing technologys
CN109940057A (en) * 2019-03-15 2019-06-28 内蒙古北方重工业集团有限公司 The anti-oxidation heating means of blind hole blank inner surface
CN110453109A (en) * 2019-08-12 2019-11-15 浙江久立特材科技股份有限公司 A kind of small-bore accurate seamless pipe of NS3306 high temperature alloy and its manufacturing method
CN110802127A (en) * 2019-10-08 2020-02-18 江阴和宏精工科技有限公司 Manufacturing method of thick-wall medium-high pressure copper-nickel alloy large-caliber pipe for ocean engineering
CN110653576A (en) * 2019-10-25 2020-01-07 嘉兴兆丰塑业股份有限公司 Manufacturing method of pull rod assembly for luggage case
CN111043407B (en) * 2019-12-31 2021-08-06 江苏隆达超合金股份有限公司 Manufacturing method of small-caliber thin-wall composite pipe made of BFe10-1-1
CN111043407A (en) * 2019-12-31 2020-04-21 无锡隆达金属材料有限公司 Manufacturing method of small-caliber thin-wall composite pipe made of BFe10-1-1
CN112404894A (en) * 2020-10-26 2021-02-26 无锡英特派金属制品有限公司 Preparation method of large length-diameter ratio, small-caliber and ultrathin platinum and platinum-rhodium alloy crucible
CN112404894B (en) * 2020-10-26 2022-03-01 英特派铂业股份有限公司 Preparation method of large length-diameter ratio, small-caliber and ultrathin platinum or platinum-rhodium alloy crucible
CN112845658A (en) * 2021-01-05 2021-05-28 太原科技大学 Preparation method of UNS N08825 small-caliber precise seamless tube
CN112845658B (en) * 2021-01-05 2022-09-16 太原科技大学 A kind of preparation method of UNS N08825 small diameter precision seamless pipe
CN113500097A (en) * 2021-07-30 2021-10-15 王声兰 Preparation method and application of alloy thin-wall capillary tube for hydrogen purification
CN113500097B (en) * 2021-07-30 2023-03-03 李新中 Preparation method and application of alloy thin-walled capillary for hydrogen purification
CN114178454A (en) * 2021-11-15 2022-03-15 有研工程技术研究院有限公司 Preparation method of magnesium-lithium alloy hollow component with complex section
CN114178454B (en) * 2021-11-15 2024-06-07 有研工程技术研究院有限公司 Preparation method of magnesium-lithium alloy hollow member with complex section
WO2024207706A1 (en) * 2023-04-06 2024-10-10 浙江久立特材科技股份有限公司 Preparation method for nickel-molybdenum corrosion-resistant alloy seamless pipe and prepared seamless pipe
CN119351824A (en) * 2024-12-23 2025-01-24 邯郸新兴特种管材有限公司 A NS3306 corrosion-resistant alloy pipe and its production process

Similar Documents

Publication Publication Date Title
CN102463272A (en) Short-process preparation method of small-caliber nickel-based alloy thin-wall pipe
CN106583491B (en) A kind of manufacturing method of Cr-Ni-Mo-Nb nickel-base alloy seamless pipe
CN102463273A (en) Preparation method of large-caliber nickel-based alloy thin-walled tube
CN103962411B (en) A kind of manufacture method of GH3600 alloy fine thin-wall seamless pipe
CN104232993B (en) A kind of high-performance TC11 pipe and preparation method thereof
CN104759850B (en) A kind of aluminium alloy height barrier part processing technique
CN103170798B (en) A kind of processing method of high-quality large-diameter thin-wall metal cylinder
CN106493187A (en) A kind of heavy caliber thick wall titanium and its low-cost manufacture method of alloy seamless tubing
CN102294579B (en) Method for manufacturing thin-wall and ultra-long nickel-copper alloy pipes
CN105420651B (en) A kind of manufacture method of the seamless Zirconium tube of heavy caliber thick wall
CN102371288A (en) Preparation method of high-precision and high-strength titanium alloy seamless tube
CN102764838A (en) Gear thermal precision forging machining process adopting carburizing steel 20CrMnTi as material
CN103170797B (en) The Compound Extrusion preparation method of a kind of major diameter high-quality pipe or ring base
CN101619780B (en) Technological method for upwardly continuously casting, rolling, drawing and producing copper alloy tubes
CN103817168B (en) Drawing production process of monel alloy pipe
CN106244959B (en) A kind of forging of 7085 aluminium alloy and Technology for Heating Processing
CN107052076A (en) A kind of method of chuck plug hot rolling heavy caliber titanium or titanium alloy thin-wall seamless pipe
CN103157692B (en) Preparation method for zinc-based alloy specially-shaped tube
CN102434725B (en) A kind of manufacture method of large-caliber stainless steel seamless pipe
CN113305261B (en) Preparation method of TC4 titanium alloy thin-wall high-cylinder ring or pipe forging
CN101934341A (en) Forging technology of TC4 titanium alloy cylindrical part
CN102632175A (en) Radial forging process of cast-state magnesium alloy tube
CN104174807B (en) The manufacture method of a kind of heavy caliber titanium thick-wall tube
CN108842098B (en) Processing technology of titanium alloy pipe
CN105441713A (en) A titanium alloy seamless tube and a manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120523