[go: up one dir, main page]

CN103968402A - 一种燃煤机组的烟气脱硝系统 - Google Patents

一种燃煤机组的烟气脱硝系统 Download PDF

Info

Publication number
CN103968402A
CN103968402A CN201410166410.3A CN201410166410A CN103968402A CN 103968402 A CN103968402 A CN 103968402A CN 201410166410 A CN201410166410 A CN 201410166410A CN 103968402 A CN103968402 A CN 103968402A
Authority
CN
China
Prior art keywords
economizer
coal
flue gas
flue
fired unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410166410.3A
Other languages
English (en)
Inventor
方占岭
赵建军
代东
孟庆文
庄润民
季益冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUNCO BOILER CO Ltd
Original Assignee
JIANGSU SUNCO BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUNCO BOILER CO Ltd filed Critical JIANGSU SUNCO BOILER CO Ltd
Priority to CN201410166410.3A priority Critical patent/CN103968402A/zh
Publication of CN103968402A publication Critical patent/CN103968402A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Exhaust Gas Treatment By Means Of Catalyst (AREA)

Abstract

本发明公开了一种烟气脱硝反应完全的燃煤机组的烟气脱硝系统,包括通过烟道连接在一起的锅炉本体和脱硝反应器、以及省煤器,脱硝反应器内设有脱硝催化剂,所述省煤器包括第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接。

Description

一种燃煤机组的烟气脱硝系统
技术领域
本发明涉及一种燃煤机组的烟气脱硝系统。
背景技术
目前燃煤机组的烟气脱硝是环保要求的必须项目,为保证烟气脱硝的效果和质量,必须使进入脱硝反应器的烟气温度在一定范围内。一般燃煤机组的烟气脱硝系统,包括锅炉本体、省煤器以及脱硝反应器,省煤器设置在锅炉本体的尾部烟道处,但由于锅炉本体上省煤器换热面积大、换热充分,使得在燃煤机组低负荷状态下,由锅炉本体上的省煤器出来的烟气温度偏低,不能满足脱硝的要求,使脱硝反应系统不能正常投运,因此脱硝反应不完全,仍然会对环境造成污染。
发明内容
本发明所要解决的技术问题是:提供一种烟气脱硝反应完全的燃煤机组的烟气脱硝系统。
为解决上述技术问题,本发明所采用的技术方案为:一种燃煤机组的烟气脱硝系统,包括通过烟道连接在一起的锅炉本体和脱硝反应器、以及省煤器,脱硝反应器内设有脱硝催化剂,所述省煤器包括第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接。
所述脱硝反应器出口处通过烟道设有空气预热器。
所述第二省煤器设置在脱硝反应器内脱硝催化剂的下方。
所述第二省煤器设置在脱硝反应器与空气预热器之间的烟道中。
本发明的有益效果是:由于将省煤器分为了第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接,使得即使在燃煤机组低负荷状态下进入脱硝反应器的烟气温度也可以满足脱硝反应要求,从而确保烟气脱硝完全。而且在机组负荷变化时,进入脱硝反应器的烟温范围缩小,有利于保证脱硝的高效率,从而也降低了运行成本,提高了环境质量。
由于脱硝反应器出口处通过烟道设有空气预热器,提高了整个系统的热效率。
由于第二省煤器设置在脱硝反应器内脱硝催化剂的下方,该处安装空间大便于第二省煤器的安装操作,另外该处烟气流速分布较为均匀,对第二省煤器的磨损也较均匀的,可提高第二省煤器的使用寿命。
附图说明
图1是本发明的结构示意图。
图1中:1.烟道,2.锅炉本体,3.脱硝反应器,31.脱硝催化剂,4.烟道,5.空气预热器,6.第一省煤器,7.第二省煤器,8.给水管,9.出水管。
具体实施方式
下面结合附图,详细描述本发明的具体实施方案。
如图1所示,一种燃煤机组的烟气脱硝系统,包括通过烟道1连接在一起的锅炉本体2和脱硝反应器3、以及省煤器,脱硝反应器3内设有脱硝催化剂31,脱硝反应器3出口处通过烟道4设有空气预热器5。所述省煤器包括第一省煤器6和第二省煤器7。第一省煤器6设置在锅炉本体2上的尾部烟道中,第二省煤器7设置在脱硝反应器3内脱硝催化剂31的下方。第一省煤器6与第二省煤器7串联,且第二省煤器7与给水管8相连接,第一省煤器6与出水管9相连接。
上述的实施例仅例示性说明本发明创造的原理及其功效,以及部分运用的实施例,而非用于限制本发明;应当指出,对于本领域的普通技术人员来说,在不脱离本发明创造构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。

Claims (4)

1.一种燃煤机组的烟气脱硝系统,包括通过烟道连接在一起的锅炉本体和脱硝反应器、以及省煤器,脱硝反应器内设有脱硝催化剂,其特征在于:所述省煤器包括第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接。
2.如权利要求1所述的一种燃煤机组的烟气脱硝系统,其特征在于:所述脱硝反应器出口处通过烟道设有空气预热器。
3.如权利要求2所述的一种燃煤机组的烟气脱硝系统,其特征在于:所述第二省煤器设置在脱硝反应器内脱硝催化剂的下方。
4.如权利要求2所述的一种燃煤机组的烟气脱硝系统,其特征在于:所述第二省煤器设置在脱硝反应器与空气预热器之间的烟道中。
CN201410166410.3A 2014-04-24 2014-04-24 一种燃煤机组的烟气脱硝系统 Pending CN103968402A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410166410.3A CN103968402A (zh) 2014-04-24 2014-04-24 一种燃煤机组的烟气脱硝系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410166410.3A CN103968402A (zh) 2014-04-24 2014-04-24 一种燃煤机组的烟气脱硝系统

Publications (1)

Publication Number Publication Date
CN103968402A true CN103968402A (zh) 2014-08-06

Family

ID=51238225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410166410.3A Pending CN103968402A (zh) 2014-04-24 2014-04-24 一种燃煤机组的烟气脱硝系统

Country Status (1)

Country Link
CN (1) CN103968402A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104534492A (zh) * 2014-12-25 2015-04-22 哈尔滨锅炉厂有限责任公司 用于提高脱硝入口烟温的装置及方法
CN105570956A (zh) * 2016-03-12 2016-05-11 河北工业大学 一种锅炉烟气余热循环供热系统
CN110332514A (zh) * 2019-08-22 2019-10-15 哈尔滨锅炉厂有限责任公司 一种高效宽负荷二次再热塔式炉省煤器分级布置系统
CN111603928A (zh) * 2020-05-24 2020-09-01 西安交通大学 一种高效清洁灵活协同燃煤发电系统及运行方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5315639A (en) * 1976-07-27 1978-02-13 Hitachi Zosen Corp Boiler has denitration device built-in
US20040045513A1 (en) * 2002-09-06 2004-03-11 Mcnertney Robert M. Passive system for optimal NOx reduction via selective catalytic reduction with variable boiler load
CN102430306A (zh) * 2011-09-14 2012-05-02 无锡华光新动力环保科技股份有限公司 用于燃煤锅炉scr烟气脱硝的预除尘装置
CN202709159U (zh) * 2012-07-05 2013-01-30 东方电气集团东方锅炉股份有限公司 一种可满足scr脱硝装置全负荷运行低排烟温度的锅炉
CN102937295A (zh) * 2012-11-20 2013-02-20 上海锅炉厂有限公司 一种适用脱硝设备负全程负荷投运的锅炉省煤器布置方式
CN203464231U (zh) * 2013-09-16 2014-03-05 山西大唐国际临汾热电有限责任公司 一种省煤器安装结构
CN203797683U (zh) * 2014-04-24 2014-08-27 江苏申港锅炉有限公司 一种燃煤机组的烟气脱硝系统

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5315639A (en) * 1976-07-27 1978-02-13 Hitachi Zosen Corp Boiler has denitration device built-in
US20040045513A1 (en) * 2002-09-06 2004-03-11 Mcnertney Robert M. Passive system for optimal NOx reduction via selective catalytic reduction with variable boiler load
CN102430306A (zh) * 2011-09-14 2012-05-02 无锡华光新动力环保科技股份有限公司 用于燃煤锅炉scr烟气脱硝的预除尘装置
CN202709159U (zh) * 2012-07-05 2013-01-30 东方电气集团东方锅炉股份有限公司 一种可满足scr脱硝装置全负荷运行低排烟温度的锅炉
CN102937295A (zh) * 2012-11-20 2013-02-20 上海锅炉厂有限公司 一种适用脱硝设备负全程负荷投运的锅炉省煤器布置方式
CN203464231U (zh) * 2013-09-16 2014-03-05 山西大唐国际临汾热电有限责任公司 一种省煤器安装结构
CN203797683U (zh) * 2014-04-24 2014-08-27 江苏申港锅炉有限公司 一种燃煤机组的烟气脱硝系统

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104534492A (zh) * 2014-12-25 2015-04-22 哈尔滨锅炉厂有限责任公司 用于提高脱硝入口烟温的装置及方法
CN105570956A (zh) * 2016-03-12 2016-05-11 河北工业大学 一种锅炉烟气余热循环供热系统
CN105570956B (zh) * 2016-03-12 2018-03-16 河北工业大学 一种锅炉烟气余热循环供热系统
CN110332514A (zh) * 2019-08-22 2019-10-15 哈尔滨锅炉厂有限责任公司 一种高效宽负荷二次再热塔式炉省煤器分级布置系统
CN111603928A (zh) * 2020-05-24 2020-09-01 西安交通大学 一种高效清洁灵活协同燃煤发电系统及运行方法
CN111603928B (zh) * 2020-05-24 2021-07-06 西安交通大学 一种高效清洁灵活协同燃煤发电系统及运行方法

Similar Documents

Publication Publication Date Title
US9857125B2 (en) Denitration and waste heat recovery integrated furnace
CN106949446B (zh) 配套于催化裂化装置的高温高压脱硝余热锅炉
CN102042605B (zh) 回转式空气预热器分侧热清灰方法
CN102309918B (zh) 火电厂燃煤烟气除尘脱硝系统
CN104437082A (zh) 一种用于流化床锅炉的超净排放系统及方法
CN103084064A (zh) 一种用于提高电厂scr脱硝装置运行能力的系统和方法
CN103277788A (zh) 锅炉的scr调温系统和调节锅炉scr入口烟温的方法
CN103968402A (zh) 一种燃煤机组的烟气脱硝系统
CN203043817U (zh) 一种利用高温蒸汽提高烟气温度的scr脱硝系统
CN108786455B (zh) 一种烧结烟气scr脱硝装置热利用系统及脱硝方法
CN202021013U (zh) 一种火电厂燃煤烟气除尘脱硝系统
CN203170222U (zh) 一种用于提高电厂scr脱硝装置运行能力的系统
CN205627628U (zh) 一种低温焦炉烟气脱硫脱硝一体化装置
CN203517748U (zh) 可控温型省煤器
CN208599489U (zh) 一种水泥窑烟气scr脱硝系统
CN106839794B (zh) 一种烧结烟气脱硫脱硝及余热回收一体化系统及实现方法
CN207745694U (zh) 一种烟气脱硝脱硫处理系统
CN203797683U (zh) 一种燃煤机组的烟气脱硝系统
CN208786167U (zh) 一种气水协同实现宽负荷脱硝的系统
CN204395745U (zh) 一种用于流化床锅炉的洁净排放系统
CN202993536U (zh) 带余热锅炉的燃煤热风炉
CN204665224U (zh) 一种内置于烧结机烟道上的水管加热管余热锅炉系统
CN204345619U (zh) 一种降低氮氧化物排放量的燃烧装置
CN203771375U (zh) 一种提高scr系统入口烟气温度的省煤器
CN203075835U (zh) 一种防止scr脱硝催化剂超温的事故喷淋系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140806