[go: up one dir, main page]

CN103790230A - Novel post-earthquake self-reset concrete framework structural system - Google Patents

Novel post-earthquake self-reset concrete framework structural system Download PDF

Info

Publication number
CN103790230A
CN103790230A CN201410061677.6A CN201410061677A CN103790230A CN 103790230 A CN103790230 A CN 103790230A CN 201410061677 A CN201410061677 A CN 201410061677A CN 103790230 A CN103790230 A CN 103790230A
Authority
CN
China
Prior art keywords
cup
shaped foundation
foundation
frame
frame column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410061677.6A
Other languages
Chinese (zh)
Other versions
CN103790230B (en
Inventor
高娇娇
王威
苏经宇
马东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Science And Technology Innovation Service Center Of Hunan Miluo Circular Economy Industrial Park
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201410061677.6A priority Critical patent/CN103790230B/en
Publication of CN103790230A publication Critical patent/CN103790230A/en
Application granted granted Critical
Publication of CN103790230B publication Critical patent/CN103790230B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明涉及一种新型震后自复位混凝土框架结构体系,属于防震减灾技术领域;嵌合式杯形基础的初始刚度与现浇混凝土结构的刚度基本相当,在层间位移角较小的情况下,预应力钢筋仍保持弹性,耗能钢筋则进入塑性状态以耗散能量,地震作用后嵌合式杯形基础可以回复到其初始位置,与现有技术相比,本发明提出的一种新型震后自复位混凝土框架结构体系是对传统的混凝土结构建筑基础的颠覆,基本解决了混凝土结构的不易装配、延性差的难题;与传统的混凝土结构基础相比,它具有安全性能高,环境污染小,安全事故少和工程造价低等诸多优点。

The invention relates to a new post-earthquake self-resetting concrete frame structure system, which belongs to the technical field of earthquake prevention and disaster reduction; the initial stiffness of the embedded cup-shaped foundation is basically equivalent to that of the cast-in-place concrete structure, and when the interstory displacement angle is small, The prestressed steel bar still maintains elasticity, and the energy-dissipating steel bar enters a plastic state to dissipate energy. After the earthquake, the chiseled cup-shaped foundation can return to its original position. Compared with the prior art, a new post-earthquake The self-resetting concrete frame structure system is a subversion of the traditional concrete structure building foundation, which basically solves the problems of difficult assembly and poor ductility of the concrete structure; compared with the traditional concrete structure foundation, it has high safety performance and less environmental pollution. It has many advantages such as few safety accidents and low construction cost.

Description

Self-resetting concrete frame structure system after a kind of novel shake
Technical field
The present invention relates to Self-resetting concrete frame structure system after a kind of novel shake, belong to protection against and mitigation of earthquake disasters technical field.
Background technology
In earthquake, collapsing of building structure is to threaten people's life safety and the topmost reason that causes any property loss.Wenchuan and Yaan earthquake show that concrete structure anti-seismic performance is not good, weak foundation, China's concrete structure is main architecture structure form at present, especially prestressed reinforced concrete construction technology is in international most advanced level, the application of prestressing technique can reduce the amount of deflection of beam, increase the span of beam, also can play the effect of the rear Self-resetting of shake.Performance prestressing technique advantage, applies it on concrete frame basis, can improve anti-seismic performance and the self-resetting capability of cup-shaped foundation, and concrete frame basic engineering obtains the fine or not quality that directly has influence on concrete structure.If concrete component does not destroy, lost efficacy in basis, just do not reach the original intention of seismic design of structures, more can not meet the design concept of " strong basis plinth ".
In recent years, concrete anti-earthquake research based on performance design and design are conceived to promote the rear performance of concrete structure shake more and more, to guarantee the safety of China's primary structure form-concrete structure, to by the ingehious design to structure, reduce to greatest extent earthquake loss.Compare with basis with superstructure, the anti-seismic performance of superstructure and basic junction is more important.But in earthquake, junction does not show due ductility and good anti-seismic performance, and has occurred prematurely the phenomenon such as gap, crackle.After earthquake, even if structure does not collapse, also can be because of excessive expendable plasticity permanent set has occurred, and finally still need to be removed, to rebuild.At present, concrete superstructure becomes one of the primary study in concrete structure field content with basic being connected.
Summary of the invention
The object of the invention is to propose Self-resetting concrete frame structure system after a kind of novel shake of one that belongs to protection against and mitigation of earthquake disasters technical field, its object is to improve concrete structure anti-seismic performance, repairs difficulty and maintenance cost after reducing shake.After novel shake, Self-resetting concrete frame structure cup-shaped foundation basic comprising comprises the members such as frame column, cup-shaped foundation, prestressed reinforcement, power consumption reinforcing bar.Concrete structure is in work progress, cup-shaped foundation and frame column are prefabricated units, frame column has run through power consumption reinforcing bar while construction in workshop, reserving hole by power consumption reinforcing bar through cup-shaped foundation, and apply prestressing force, utilize permanent ground tackle to be fixed on the bottom of cup-shaped foundation, then with performance prestressed high reinforcing bar the reserving hole through frame column and cup-shaped foundation, this prestressed reinforcement make frame column with basic be connected tightr.Outstanding cone-shaped end is arranged at frame column bottom, and cup-shaped foundation is provided with cone tank in relevant position, and such mosaic joint can guarantee that frame column is connected closely with cup-shaped foundation, and larger opposing shearing is provided.The power consumption reinforcing bar main dissipative member of type of attachment for this reason, makes it have better Hysteresis Behavior, and ductility factor greatly improves.
For achieving the above object, the technical solution used in the present invention is Self-resetting concrete frame structure system after a kind of novel shake, the initial stiffness of mosaic cup-shaped foundation and the rigidity of cast-in-place concrete structure are substantially suitable, the in the situation that of less at relative storey displacement angle, prestressed reinforcement still keeps elasticity, power consumption reinforcing bar enters plastic state with dissipation energy, and after geological process, mosaic cup-shaped foundation can be returned to its initial position.
Prestressed applying makes concrete frame structure can obtain higher safety factor.The major advantage of this frame structure system: have self-centering ability, thereby greatly reduced the rear permanent set of shake; Initial stiffness is large similar to cast-in-place concrete structure rigidity; Geological process lower prestress reinforcing bar keeps elasticity, and nonelastic deformation concentrates on power consumption reinforcing bar, and carrys out dissipation energy by the nonelastic deformation of power consumption reinforcing bar; After greatly reducing shake, repair difficulty and cost.
Compared with prior art, the present invention has following beneficial effect.
1, after novel shake in Self-resetting concrete frame structure system, the cup-shaped foundation, the frame column that adopt are all prefabricated units, can be in factory process, assemble job site, and such construction method can solve the difficult problem that prefabricated concrete structure basis is difficult for assembling.
2, Self-resetting concrete frame structure system after described novel shake, adopt prefabricated units to carry out Assembling completely, cancel the traditional approach of job site concreting, effectively guarantee construction quality, the environment pollution of having avoided concreting to cause completely, realize site operation " anhydrous, without fire, dustless " three without standard, reduced the generation of the hazardous accidents such as fire.When the present invention removes at member, can recycle efficiently, reduce building waste, real realization the theory of environmental protection, be concrete frame structure a kind of green, sustainable development basis.
3, Self-resetting concrete frame structure system after described novel shake, adopts prestressing force Self-resetting base form, has realized the Self-resetting of shake posterior nodal point, has greatly reduced the rear rehabilitation cost of shake; Improve the anti-seismic performance of basis and superstructure junction, thereby improve the anti-seismic performance of frame structure system.
4, after the novel shake that the present invention proposes, Self-resetting concrete frame structure system is to the overturning of traditional concrete structure building foundation, and has substantially solved the poor difficult problem of difficult assembling, ductility of concrete structure; The plurality of advantages such as compared with traditional concrete structure basis, it is high that it has security performance, and environment pollution is little, and the few and construction costs of security incident is low.
Accompanying drawing explanation
Fig. 1 is Self-resetting suspension column position view of the present invention.
Fig. 2 is the generalized section of Self-resetting of the present invention basis and frame column.
Fig. 3 is the fractionation schematic diagram of Self-resetting of the present invention basis and frame column.
Fig. 4 is cup-shaped foundation floor map of the present invention.
Fig. 5 is cup-shaped foundation side elevation schematic diagram of the present invention.
Fig. 6 is frame column generalized section of the present invention.
Fig. 7 is the three-dimensional assembling drawing of frame structure system of the present invention.
In figure: 1, power consumption reinforcing bar, 2, prestressed reinforcement, 3, permanent ground tackle, 4, cup-shaped foundation, 5, frame column, 6, pea gravel concreten, 7, cone-shaped end, 8, the reserved power consumption of cup-shaped foundation reinforcing bar hole, 9, the reserved prestressed reinforcement hole of cup-shaped foundation, 10, cone tank, 11, the reserved prestressed reinforcement hole of frame column.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
As shown in Fig. 1-7, Self-resetting concrete frame structure system after a kind of novel shake, this frame structure system comprises lower floor's frame foundation, upper strata concrete structure; Lower floor's frame foundation is made up of frame set; Every framing group comprises cup-shaped foundation 4, frame column 5; Described cup-shaped foundation 4 is platform shape cone structure, the platform shape cone platform of cup-shaped foundation 4 is provided with the groove step with frame column 5 cylindroid assemblings, in the middle of groove step, be provided with cone tank 10, cone tank 10 two ends of groove step plane are provided with the reserved power consumption of cup-shaped foundation reinforcing bar hole 8 side by side, and cone tank 10 intermediate layers of groove step plane are provided with the reserved prestressed reinforcement hole 9 of cup-shaped foundation side by side; The reserved power consumption of described cup-shaped foundation reinforcing bar hole 8 is parallel construction with the reserved prestressed reinforcement hole 9 of cup-shaped foundation.
Frame column 5 is cylindricality conehead structure, and frame column 5 one end are cone-shaped end 7, and can match with the cone tank of cup-shaped foundation 4 10, and the other end is cylindrical cross-section; In the middle of frame column 5, being provided with the reserved prestressed reinforcement hole 11 of frame column aligns with the reserved prestressed reinforcement hole 9 of cup-shaped foundation side by side of cup-shaped foundation 4; In frame column 5, be furnished with the power consumption reinforcing bar 1 coordinating with the reserved power consumption of the cup-shaped foundation reinforcing bar hole 8 in cup-shaped foundation 4; Prestressed reinforcement 2 is reserved the reserved prestressed reinforcement hole 9 of prestressed reinforcement hole 11, cup-shaped foundation by frame column cup-shaped foundation 4 is connected with frame column 5; Power consumption reinforcing bar 1 is fixing by permanent ground tackle 3 with prestressed reinforcement 2; Described pea gravel concreten 6 is filled in cylindroid and the cup-shaped foundation 4 groove surface contact positions of frame column 5.
After novel shake of the present invention in Self-resetting concrete frame structure cup-shaped foundation, frame column 5 has run through power consumption reinforcing bar 1 when prefabricated, in the time that frame column 5 and cup-shaped foundation 4 are assembled, power consumption reinforcing bar 1, through the power consumption reinforcing bar reserving hole 8 of cup-shaped foundation, utilizes permanent ground tackle 3 power consumption reinforcing bar 1 to be anchored in to the bottom of cup-shaped foundation 4.
After described novel shake, in Self-resetting concrete frame structure cup-shaped foundation, cup-shaped foundation 4 positions are at post and ground connecting place; After completing the assembling of every framing and joining, build upper strata concrete structure, thereby form concrete frame structure system.
After described novel shake, in Self-resetting concrete frame structure cup-shaped foundation, described cup-shaped foundation 4 is as follows with the connection procedure of frame column 5.
S1 is at the prefabricated cup-shaped foundation power consumption reinforcing bar hole 8 of factory or job site and reserved prestressed reinforcement hole 9.
S2 completes after the prefabricated work of cup-shaped foundation power consumption reinforcing bar hole 8 and reserved prestressed reinforcement hole 9, assemble at the construction field (site), by vertical frame column 5 cup-shaped foundation 4 that inserts, the cone-shaped end 7 of frame column 5 bottoms inserts in the cone tank 10 of cup-shaped foundation 4 just, the power consumption reinforcing bar 1 of frame column inserts in the reserving hole 8 of cup-shaped foundation 4, now utilize total powerstation test block trestle 5 whether vertical with cup-shaped foundation 4, after guaranteeing vertically, utilize permanent ground tackle 3 that power consumption reinforcing bar 1 is carried out to anchoring in cup-shaped foundation 4 bottoms.
After 1 anchoring of S3 power consumption reinforcing bar, prestressed reinforcement 2 is run through to the reserving hole 9 of frame column reserving hole 11 and cup-shaped foundation 4, two ends apply prestressing force, prestressed size, by calculative determination in early stage, utilizes permanent ground tackle 3 that prestressed reinforcement 2 is anchored at respectively to frame column 5 tops and cup-shaped foundation 4 bottoms.
After S4 assembling, by cup-shaped foundation 4 and frame column 5 integral lifting, be installed on ground, again use the verticality of total powerstation test block trestle, after guaranteeing vertically, build pea gravel concreten at the gap place of cup-shaped foundation and frame column.
After S5 completes the assembling of every framing and joins, build upper strata concrete structure, thereby form concrete frame structure system.

Claims (4)

1.一种新型震后自复位混凝土框架结构体系,其特征在于:该框架结构体系包括下层框架基础、上层混凝土结构;下层框架基础由框架组构成;每组框架组包括杯形基础(4)、框架柱(5);所述杯形基础(4)为台形锥体结构,杯形基础(4)的台形锥体平台设有与框架柱(5)柱形面装配的凹槽台阶,凹槽台阶中间设有锥形槽(10),凹槽台阶平面的锥形槽(10)两端并排设有杯形基础预留耗能钢筋孔洞(8),凹槽台阶平面的锥形槽(10)中间层设有并排杯形基础预留预应力钢筋孔洞(9);所述杯形基础预留耗能钢筋孔洞(8)与杯形基础预留预应力钢筋孔洞(9)为平行结构;1. A new post-earthquake self-resetting concrete frame structure system, characterized in that: the frame structure system includes a lower frame foundation and an upper concrete structure; the lower frame foundation is composed of frame groups; each group of frame groups includes cup-shaped foundations (4) , frame column (5); the cup-shaped foundation (4) is a trapezoidal cone structure, and the trapezoidal cone platform of the cup-shaped foundation (4) is provided with a groove step assembled with the cylindrical surface of the frame column (5). There is a tapered groove (10) in the middle of the groove step, and the two ends of the tapered groove (10) on the groove step plane are arranged side by side with cup-shaped foundation reserved energy-dissipating reinforcement holes (8), and the tapered groove on the groove step plane ( 10) The middle layer is provided with side-by-side cup-shaped foundation reserved prestressed steel holes (9); the cup-shaped foundation reserved energy-dissipating steel holes (8) and the cup-shaped foundation reserved prestressed steel holes (9) are parallel structures ; 框架柱(5)为柱形锥头结构,框架柱(5)一端为锥形端头(7),且可以与杯形基础(4)的锥形槽(10)相配合,另一端为柱形截面;框架柱(5)中间设有框架柱预留预应力钢筋孔洞(11)与杯形基础(4)的并排杯形基础预留预应力钢筋孔洞(9)对齐;框架柱(5)内布置有与杯形基础(4)内的杯形基础预留耗能钢筋孔洞(8)配合的耗能钢筋(1);预应力钢筋(2)通过框架柱预留预应力钢筋孔洞(11)、杯形基础预留预应力钢筋孔洞(9)将杯形基础(4)与框架柱(5)连接;耗能钢筋(1)与预应力钢筋(2)通过永久锚具(3)固定;所述细石混凝土(6)填充于框架柱(5)的柱形面与杯形基础(4)凹槽面接触处。The frame column (5) is a cylindrical cone head structure, one end of the frame column (5) is a conical end (7), and can be matched with the conical groove (10) of the cup-shaped foundation (4), and the other end is a column shaped cross-section; the frame column (5) is provided with the frame column reserved prestressed steel hole (11) and the cup-shaped foundation (4) side by side cup-shaped foundation reserved prestressed steel hole (9) is aligned; the frame column (5) The energy-dissipating reinforcement (1) is arranged in the cup-shaped foundation (4) to cooperate with the energy-dissipating reinforcement holes (8) reserved in the cup-shaped foundation; the prestressed reinforcement (2) passes through the prestressed reinforcement holes (11 ), the prestressed reinforcement holes (9) are reserved in the cup-shaped foundation to connect the cup-shaped foundation (4) with the frame column (5); the energy-dissipating reinforcement (1) and the prestressed reinforcement (2) are fixed by permanent anchors (3) ; The fine stone concrete (6) is filled in the contact between the cylindrical surface of the frame column (5) and the groove surface of the cup-shaped foundation (4). 2.依权利要求1所述下层框架基础的连接过程,其特征在于:2. according to the connection process of the described lower frame foundation of claim 1, it is characterized in that: S1在工厂或施工现场预制杯形基础耗能钢筋孔洞(8)和预留预应力钢筋孔洞(9);S1 Prefabricate cup-shaped foundation energy-dissipating reinforcement holes (8) and reserved prestressed reinforcement holes (9) at the factory or construction site; S2完成杯形基础耗能钢筋孔洞(8)和预留预应力钢筋孔洞(9)的预制工作后,在施工现场进行组装,将框架柱(5)垂直插入杯形基础(4),框架柱(5)底部的锥形端头(7)恰好插入杯形基础(4)的锥形槽(10)内,框架柱的耗能钢筋(1)插入杯形基础(4)的预留孔洞(8)内,此时利用全站仪测试框架柱(5)是否与杯形基础(4)垂直,确保垂直后,在杯形基础(4)底部利用永久锚具(3)将耗能钢筋(1)进行锚固;S2 After completing the prefabrication work of energy-dissipating steel bar holes (8) and reserved prestressed steel bar holes (9) in the cup-shaped foundation, assemble them at the construction site, insert the frame column (5) vertically into the cup-shaped foundation (4), and frame the column (5) The tapered end (7) at the bottom is just inserted into the tapered groove (10) of the cup-shaped foundation (4), and the energy-dissipating steel bar (1) of the frame column is inserted into the reserved hole ( 8), at this time, use the total station to test whether the frame column (5) is perpendicular to the cup-shaped foundation (4). After ensuring the verticality, use the permanent anchorage (3) at the bottom of the cup-shaped foundation (4). 1) Anchoring; S3耗能钢筋(1)锚固后,将预应力钢筋(2)贯穿框架柱预留孔洞(11)与杯形基础(4)的预留孔洞(9),两端施加预应力,预应力的大小通过前期计算确定,利用永久锚具(3)将预应力钢筋(2)分别锚固在框架柱(5)顶部与杯形基础(4)底部;After the S3 energy-dissipating steel bar (1) is anchored, the prestressed steel bar (2) runs through the reserved hole (11) of the frame column and the reserved hole (9) of the cup-shaped foundation (4), and prestress is applied at both ends. The size is determined through preliminary calculations, and the prestressed steel bars (2) are respectively anchored to the top of the frame column (5) and the bottom of the cup-shaped foundation (4) using permanent anchors (3); S4组装后将杯形基础(4)与框架柱(5)整体起吊,安装于地基之上,再次用全站仪测试框架柱的垂直度,确保垂直后,在杯形基础与框架柱的缝隙处浇筑细石混凝土;S4 After assembly, hoist the cup-shaped foundation (4) and the frame column (5) as a whole, install them on the foundation, and test the verticality of the frame column with a total station again. After ensuring verticality, check the gap between the cup-shaped foundation and the frame column Pouring fine stone concrete; S5完成每组框架组装配后,浇筑上层混凝土结构,从而构成混凝土框架结构体系。After S5 completes the assembly of each group of frame groups, the upper concrete structure is poured to form a concrete frame structure system. 3.根据权利要求1所述的一种新型震后自复位混凝土框架结构体系,其特征在于:所述新型震后自复位混凝土框架结构杯形基础中,框架柱(5)在预制时已经贯穿了耗能钢筋(1),在框架柱(5)与杯形基础(4)组装时,耗能钢筋(1)穿过杯形基础的耗能钢筋预留孔洞(8),利用永久锚具(3)将耗能钢筋(1)锚固于杯形基础(4)的底部。3. A new post-earthquake self-resetting concrete frame structure system according to claim 1, characterized in that: in the cup-shaped foundation of the new post-earthquake self-resetting concrete frame structure, the frame column (5) has been penetrated during prefabrication When the frame column (5) is assembled with the cup-shaped foundation (4), the energy-dissipating reinforcement (1) passes through the reserved hole (8) of the energy-dissipating reinforcement of the cup-shaped foundation, and the permanent anchor (3) Anchor the energy-dissipating steel bars (1) to the bottom of the cup-shaped foundation (4). 4.根据权利要求1所述的一种新型震后自复位混凝土框架结构体系,其特征在于:所述新型震后自复位混凝土框架结构杯形基础中,杯形基础(4)位置在柱与地基相连处;完成每组框架组装配后,浇筑上层混凝土结构,从而构成混凝土框架结构体系。4. A new post-earthquake self-resetting concrete frame structure system according to claim 1, characterized in that: in the cup-shaped foundation of the new post-earthquake self-resetting concrete frame structure, the position of the cup-shaped foundation (4) is between the column and the The place where the foundation is connected; after the assembly of each frame group is completed, the upper concrete structure is poured to form a concrete frame structure system.
CN201410061677.6A 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system Active CN103790230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410061677.6A CN103790230B (en) 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410061677.6A CN103790230B (en) 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system

Publications (2)

Publication Number Publication Date
CN103790230A true CN103790230A (en) 2014-05-14
CN103790230B CN103790230B (en) 2017-01-18

Family

ID=50666247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410061677.6A Active CN103790230B (en) 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system

Country Status (1)

Country Link
CN (1) CN103790230B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649101A (en) * 2016-01-22 2016-06-08 湖州职业技术学院 Reinforced concrete vibration-isolated foundation
CN108049517A (en) * 2018-01-11 2018-05-18 重庆大学 A kind of external replaceable energy consuming components Self-resetting RC frame foot joints
CN109267584A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 Assembly concrete prismoid shaped basis and column steel connection structure and assembly method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100538A (en) * 1995-10-06 1997-04-15 Kajima Corp Basic structure of building
CN2330704Y (en) * 1998-06-12 1999-07-28 李岭群 Castin-situ vibration-damping device for foundation socket
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN103276793A (en) * 2013-06-08 2013-09-04 北京工业大学 Hollow irregular column multi-layer high-rise assembling steel frame-central support system
CN103362210A (en) * 2013-07-08 2013-10-23 中国矿业大学 Prestress assembly frame structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100538A (en) * 1995-10-06 1997-04-15 Kajima Corp Basic structure of building
CN2330704Y (en) * 1998-06-12 1999-07-28 李岭群 Castin-situ vibration-damping device for foundation socket
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN103276793A (en) * 2013-06-08 2013-09-04 北京工业大学 Hollow irregular column multi-layer high-rise assembling steel frame-central support system
CN103362210A (en) * 2013-07-08 2013-10-23 中国矿业大学 Prestress assembly frame structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649101A (en) * 2016-01-22 2016-06-08 湖州职业技术学院 Reinforced concrete vibration-isolated foundation
CN108049517A (en) * 2018-01-11 2018-05-18 重庆大学 A kind of external replaceable energy consuming components Self-resetting RC frame foot joints
CN108049517B (en) * 2018-01-11 2024-02-06 重庆大学 External replaceable energy consumption assembly self-resetting RC frame column foot node
CN109267584A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 Assembly concrete prismoid shaped basis and column steel connection structure and assembly method

Also Published As

Publication number Publication date
CN103790230B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN103104039B (en) Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN206570676U (en) A kind of queen post Self-resetting power consumption bridge pier of the replaceable steel coupling beam of band
CN107268807B (en) A prefabricated concrete-filled steel tubular column
CN106351113B (en) A kind of high-speed railway bridge seismic Damage control system
WO2019149270A1 (en) Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar
CN107460954A (en) A post-tensioned prestressed assembled concrete frame anti-seismic energy-dissipating component system and construction method
CN106087702B (en) It is a kind of based on waving Self-resetting dual deck bridge framed bent pier with perps power consumption angle steel
CN108104273A (en) Assembled self-recovery steel pipe concrete combined node, installation method and structural system
CN205329526U (en) Pier is assembled to precast concrete
CN102409606A (en) Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN107190635B (en) Dumbbell-shaped concrete-filled steel tubular composite pier and its connection structure and method with bearing platform
CN204645273U (en) A kind of prestressing force Self-resetting concrete space frame node
CN103669570A (en) Special-shaped steel column-prestress central supporting frame easy to restore after earthquake
CN103711329B (en) The Method of Reinforcement of the Structure by Attaching the Steel Reinforced Concrete Frame Method
CN107246085A (en) Built-in soap-free emulsion polymeization steel plate concealed bracings prestressing force automatic reset concrete shear wall
CN103711330A (en) Method for using prefabricated reinforced concrete frame to reinforce existing structure through prestressing assembly
CN111455833B (en) Self-resetting prefabricated assembled bridge pier and construction method thereof
CN103741877A (en) Lattice anti-shearing device-steel-profiled steel plate-renewable concrete combination beam and production method
CN104452567B (en) A swinging double-deck bridge bent frame and its installation method
CN106245820A (en) It is a kind of that segmentation prestressing force Self-resetting damage concentration is prefabricated waves shear wall
CN103790259B (en) A post-earthquake self-resetting concrete frame-central support structure system
CN103195183A (en) Standard unit assembled shock isolating and damping structure system
CN103790230A (en) Novel post-earthquake self-reset concrete framework structural system
CN103790258B (en) Self-resetting concrete frame-eccentrically braces structure system after a kind of shake
CN107859354B (en) A self-resetting frame-shear wall structure and construction method for reinforcing an existing frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200824

Address after: Room 302, No. 8319, Yanshan Road, Bengbu City, Anhui Province

Patentee after: Bengbu Lichao Information Technology Co.,Ltd.

Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100

Patentee before: Beijing University of Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 414400 100m northwest of the intersection of Longzhou North Road and Longzhou South Road, Miluo City, Yueyang City, Hunan Province

Patentee after: Science and technology innovation service center of Hunan Miluo circular economy industrial park

Address before: Room 302, No. 8319, Yanshan Road, Bengbu City, Anhui Province

Patentee before: Bengbu Lichao Information Technology Co.,Ltd.