CN103669570A - Special-shaped steel column-prestress central supporting frame easy to restore after earthquake - Google Patents

Special-shaped steel column-prestress central supporting frame easy to restore after earthquake Download PDF

Info

Publication number
CN103669570A
CN103669570A CN201310703484.1A CN201310703484A CN103669570A CN 103669570 A CN103669570 A CN 103669570A CN 201310703484 A CN201310703484 A CN 201310703484A CN 103669570 A CN103669570 A CN 103669570A
Authority
CN
China
Prior art keywords
shaped
column
steel
special
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310703484.1A
Other languages
Chinese (zh)
Other versions
CN103669570B (en
Inventor
王威
高娇娇
苏经宇
马东辉
桑兆龙
杨夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong New Fengwei Machinery Technology Co ltd
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201310703484.1A priority Critical patent/CN103669570B/en
Publication of CN103669570A publication Critical patent/CN103669570A/en
Application granted granted Critical
Publication of CN103669570B publication Critical patent/CN103669570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

一种新型震后易修复钢异形柱-预应力中心支撑架,其特征在于:所述双槽钢梁通过梁端封板,与异形柱连接,形成无焊缝全螺栓的连接形式;所述对无焊缝全螺栓节点施加预应力钢索,形成预应力自复位节点;所述自复位柱脚预应力柱脚通过加强板来优化柱底部的轴向与水平向的受力性能,防屈曲钢板主要用来耗散地震能量,剪切板是防止剪力过大造成柱底的局部屈服;所述预应力柱脚的关键构件是预应力拉杆,拉杆的作用是对柱提供预压力使柱与梁紧密连接,从而使柱脚在承受弯矩较小时近似刚性连接,并使其具有震后自复位能力;预应力中心支撑使结构具有更好的抗侧能力。

Figure 201310703484

A new type of post-earthquake easy-to-repair steel special-shaped column-prestressed central support frame, characterized in that: the double-channel steel beam is connected to the special-shaped column through a beam end sealing plate to form a connection form with no welds and full bolts; Prestressed steel cables are applied to all bolted joints without welds to form prestressed self-resetting joints; the self-resetting column foot prestressed column foot optimizes the axial and horizontal mechanical performance of the column bottom through the reinforcement plate, preventing buckling The steel plate is mainly used to dissipate earthquake energy, and the shear plate is to prevent the local yield of the column bottom caused by excessive shear force; the key component of the prestressed column foot is the prestressed tie rod, and the function of the tie rod is to provide prestress to the column to make the column It is tightly connected with the beam, so that the column foot is almost rigidly connected when the bending moment is small, and it has self-resetting ability after an earthquake; the prestressed central support makes the structure have better lateral resistance.

Figure 201310703484

Description

Steel hetermorphiscal column-prestressing force center support is easily repaired in a kind of novel shake afterwards
Technical field
The present invention relates to a kind of easy reparation steel hetermorphiscal column-prestressing force center support, belong to antidetonation shake mitigation technical field, relate in particular to a kind of novel shake and easily repair afterwards steel hetermorphiscal column-prestressing force center support.
Background technology
Collapsing of building in earthquake is to threaten people's life safety and the topmost reason that causes any property loss.Wenchuan and Yaan earthquake show that concrete structure anti-seismic performance is not good, China's steel work development at present rapidly, especially prestressed steel structure technology is in international most advanced level, Bidirectional String Structure in National Gymnasium and Beijing University of Technology Gymnasium suspended-dome structure are all created the maximum world record of homogeneous structure span at that time, have led the development of prestressed steel structure.Performance prestressing technique advantage, applies it on Column Joint, can improve anti-seismic performance and the self-resetting capability of node, and Column Joint designs to obtain the fine or not quality that directly has influence on steel work.If member does not destroy, node had lost efficacy, and did not just reach the original intention of seismic design of structures, more can not meet the design concept of " strong node, weak member ".
On January 17th, 1994, Los Angeles,U.S generation earthquake, the steel building of building more than 100 is in the fracture of bean column node position, and crackle originates from bean column node weld seam conventionally.After 1 year, there is earthquake in the slope god of Japan, and shake " Invest, Then Investigate " shows, causes the basic reason of most of fracture to be the design of node and the problem of construction aspect.This two secondary earthquake has impelled the design of scholar's research and knot modification.Before there is earthquake in Los Angeles in 1994, the joint forms that adopt as shown in Figure 1 more.At Los Angeles Earthquake before death, this node is cheap, easy construction, and generally believed at that time that this joint form can utilize Material ductility preferably, and impel beam-ends to occur plastic hinge, make node avoid destroying, realize the design philosophy of " strong node, weak member ".But in earthquake, this category node form does not show due ductility, and has occurred prematurely brittle fracture, crackle originates from bean column node weld seam conventionally.Draw by analysis and cause the basic reason of most of fracture to be the design of node and the problem of construction aspect.After the earthquake of Los Angeles 10 years, beam column switching performance and the impact of steel framed structure is become to one of primary study content of field of steel structure.
Summary of the invention
The object of the present invention is to provide to have proposed a kind of novel shake and easily repair afterwards steel hetermorphiscal column-prestressing force center support, this bracing frame has improved structural seismic performance, repairs difficulty and maintenance cost after having reduced shake; This bracing frame basic comprising comprises the members such as Vierendeel girder, post, prestressed member, angle steel or friction member.Concrete structure is in work progress, base angle, top steel is first installed, then high-strength steel pull bar is installed and is carried out stretch-draw, under the effect of pull bar stretching force, beam column contact surface produces compressive stress, this compressive pre-stress will provide larger opposing moment of flexure for node, and the frictional force of beam column contact surface will provide larger opposing shearing for node.It is beam column junction plate that backing plate is installed between beam end and post, prevent that web from directly contacting and causing local stress excessive with post, a stiffener is respectively welded at place, upper bottom flange at beam, stiffener can increase the contact surface between flange of beam and post, thereby reduce the compressive stress in flange of beam, avoid flange of beam local yielding under action of compressive stress.
Prestressing force Self-resetting node base present principles: when geological process acquires a certain degree, the contact surface of beam column opens, there is plastic strain power consumption in angle steel, thereby has avoided the damage of the main components such as beam column.After geological process, structure returns to original vertical position under prestressing force effect.Research shows, if at web or place, the edge of a wing design dissipative member of beam, this node stiffness and strength is similar with full weldering node, and has good ductility.Post tensioning Self-resetting frame joint can obtain the strength and stiffness similar to conventional steel framework.But this Self-resetting node construction scene does not need welding, whole Huo with bolts factory carries out bolt connection after welding in advance again to job site.
The initial stiffness of node and welding node are substantially suitable, and the in the situation that of reaching 5% at relative storey displacement angle, agent structure beam and column still keeps elasticity, and angle steel enters plastic state with dissipation energy, and geological process posterior nodal point can be returned to its initial position.
Prestressed applying makes steel framed structure can access higher safety factor.The major advantage of prestressed node: (1) has self-centering ability, thus the rear permanent set of shake greatly reduced; (2) initial stiffness is similar to full welding node greatly, is equivalent to rigid joint; (3) under earthquake, beam column all keeps elasticity, and nonelastic deformation concentrates on node, and provides energy consume mechanism by the nonelastic deformation of node connector; (4) greatly reduce rear difficulty and the cost repaired of shake.
For achieving the above object, the technical solution used in the present invention is that steel hetermorphiscal column-prestressing force center support is easily repaired in a kind of novel shake afterwards, and this bracing frame comprises double flute girder steel, angle with equal legs, beam column junction plate, web plate, single channel-section steel, steel cable, L shaped hetermorphiscal column, T shape hetermorphiscal column, cross hetermorphiscal column, cover plate, anti-buckling plate, stiffener, shear plate, stiffening rib, fixedly angle steel, junction plate, otic placode I, otic placode II, prestressed cable.
Beam involved in the present invention is the double flute girder steel consisting of shaped steel, and double flute girder steel is with web plate, to be spliced at beam-ends by channel-section steel.
Suspension column position is at hetermorphiscal column and ground connecting place.
It is that framework L shaped hetermorphiscal column in framework bight is connected with double flute girder steel that L shaped node connects; Concrete Connection Step is, beam column junction plate and web plate weld in advance in factory, beam column junction plate is perpendicular to web plate, web plate is positioned at the middle part of beam column junction plate, it highly equals the shape steel web height of double flute girder steel, and scene is fixed on the beam column junction plate welding together and web plate on the L shaped hetermorphiscal column edge of a wing with bolt; Double flute girder steel is comprised of two steel channel beams, when double flute girder steel is connected with hetermorphiscal column, the mode that adopts single channel-section steel to connect respectively, first a channel-section steel is connected with L shaped hetermorphiscal column with angle with equal legs, channel-section steel is vertical with the edge of a wing of hetermorphiscal column, after a channel-section steel connects, connect in the same way another root channel-section steel; After double flute girder steel is connected with L shaped hetermorphiscal column, two channel-section steels will connect into integral body with web plate, with bolt, two channel-section steels are connected with the web plate 4 in the middle of being positioned at two channel-section steels.
The form of hetermorphiscal column has three kinds, is respectively L shaped hetermorphiscal column, T shape hetermorphiscal column, cross hetermorphiscal column; Its joint form comprises three kinds of specifications, is respectively L shaped node connection, the connection of T-section point, crisscross joint connection; T-shaped node type of attachment, cross node type of attachment and L-type node type of attachment are basic identical, and just hetermorphiscal column adopts respectively T shape hetermorphiscal column and cross hetermorphiscal column; L shaped node is that L shaped hetermorphiscal column is connected with double flute girder steel; T-section point is that T shape hetermorphiscal column is connected with double flute girder steel; Crisscross joint is that cross hetermorphiscal column is connected with double flute girder steel 1; Wherein, L shaped suspension column is divided into A, B two sides, and T shape suspension column is divided into A, B, tri-faces of C, and cross suspension column is totally four faces, but four faces are all identical.
The prestressed arrangement of its node connects each multi-form node in the manner described above, and framework basically forms; Steel cable, successively through being reserved in the hole on the hetermorphiscal column edge of a wing, is applied to the prestress value of calculating, with permanent ground tackle, be anchored on the hetermorphiscal column edge of a wing.
Novel shake of the present invention is easily repaired in steel hetermorphiscal column-prestressing force center support afterwards, and its suspension column form comprises three kinds of forms, L shaped suspension column, T shape suspension column, cross suspension column; Described L-type suspension column Connection Step: beam column junction plate and web plate weld in advance in factory, beam column junction plate is perpendicular to web plate, web plate is positioned at the middle part of beam column junction plate, it highly equals the shape steel web height of double flute girder steel, and scene is fixed on the beam column junction plate welding together and web plate on the hetermorphiscal column edge of a wing with bolt; Double flute girder steel is divided into two channel-section steels, when suspension column connects, two channel-section steels one are reinstated to bolt and be connected on web plate, the strength and stiffness being connected with hetermorphiscal column for strengthening suspension column place beam, is that channel-section steel inner ring applies three weld all arounds at double flute girder steel and beam column junction plate contact position; Another limb is identical with this limb; At the larger manomelia interior welds transverse stiffener (welding can complete in factory process) of L-type hetermorphiscal column moment of flexure, at stiffening rib, weld up and down angle steel in order to fixing prestressed draw-bar; Prestressed draw-bar is passed to reserving hole, and apply prestressing force, with permanent ground tackle, be anchored on angle steel; Again anti-buckling plate, stiffener and cover plate are connected in to place, the L shaped hetermorphiscal column edge of a wing with bolt; Cover plate periphery has outstanding surrounding edge, definitely closely knit with cover plate and stiffener, prevents the anti-buckling plate of moisture invasion cover plate internal corrosion; Again shear plate is connected with double flute girder steel with bolt.
T shape suspension column, cross suspension column Connection Step that steel hetermorphiscal column-prestressing force center support is easily repaired in this novel shake are afterwards identical with L shaped suspension column; Stiffening rib is arranged on the limb that the suffered moment of flexure of hetermorphiscal column is larger, and another limb does not need to arrange.
Its herringbone lateral resistant member is comprised of prestressed cable, otic placode I and otic placode II; Otic placode I is connected on double flute girder steel by welding or bolt, and prestressed cable and otic placode I are bolted; Otic placode II is connected in hetermorphiscal column bottom by welding or bolt, and prestressed cable and otic placode II are bolted; Prestressed cable is by tightening and apply prestressing force attaching adapter sleeve on prestressed cable; Prestressed cable is high strength rod iron, or uses high strength steel strand, high strength shaped steel member, or uses high strength rod iron, high strength steel strand or the high strength shaped steel member with damper.
Its V font lateral resistant member is comprised of prestressed cable, otic placode I and otic placode II; Otic placode I is connected on double flute girder steel by welding or bolt, and prestressed cable and otic placode I are bolted; Otic placode II is connected in hetermorphiscal column top by welding or bolt, and prestressed cable and otic placode II are bolted; Prestressed cable is by tightening and apply prestressing force attaching adapter sleeve on prestressed cable; Described prestressed cable is high strength rod iron, or uses high strength steel strand, high strength shaped steel member, or uses high strength rod iron, high strength steel strand or the high strength shaped steel member with damper.
Its monocline rod-type lateral resistant member is comprised of prestressed cable, otic placode II; Otic placode II is connected in hetermorphiscal column bottom by welding or bolt, and prestressed cable otic placode II is bolted; Another otic placode II is connected in hetermorphiscal column top by welding or bolt, and prestressed cable and otic placode II are bolted; Prestressed cable is by tightening and apply prestressing force attaching adapter sleeve on prestressed cable; Described prestressed cable is high strength rod iron, or uses high strength steel strand, high strength shaped steel member, or uses high strength rod iron, high strength steel strand or the high strength shaped steel member with damper.After assembling, finally obtain easily repairing steel hetermorphiscal column-prestressing force center support after this novel shake.
Compared with prior art, the present invention has following beneficial effect.
1, in above-mentioned novel shake, easily repair afterwards in steel hetermorphiscal column-prestressing force center support, the beam adopting is all section steel beam, because the belly space of beam is larger, is convenient to pipeline and passes, and has effectively increased the clear height in room.
2, steel hetermorphiscal column-prestressing force center support is easily repaired in described novel shake afterwards, adopt bolt to carry out site assembly completely, traditional Site Welding mode and concreting mode have been cancelled, effectively guaranteed construction quality, the environment pollution of having avoided concreting and steel welding to cause completely, realize site operation " anhydrous, without fire, dustless " three without standard, reduced the generation of the hazardous accidents such as fire.When the present invention removes at member, can recycle efficiently, reduced building waste, real realization the theory of environmental protection, be a kind of green, the steel structure system of sustainable development.
3, steel hetermorphiscal column-prestressing force center support is easily repaired in described novel shake afterwards, adopts prestressing force Self-resetting joint form and suspension column form, has realized the Self-resetting of shake posterior nodal point, has greatly reduced the rear rehabilitation cost of shake; Improve the anti-seismic performance of node, thereby improve the anti-seismic performance of frame structure system.
4, it is to the overturning of traditional steel building-prestressing force center support that steel hetermorphiscal column-prestressing force center support is easily repaired in the novel shake that the present invention proposes afterwards, has given full play to the advantage of steel work.Compare with traditional steel building framework-prestressing force center support, it has that security performance is high, environment pollution is little, security incident is few and the plurality of advantages such as construction costs is low.
Accompanying drawing explanation
Fig. 1 is channel steel type girder steel schematic diagram of the present invention.
Fig. 2 is Self-resetting suspension column position view of the present invention.
Fig. 3 is that prestressing force Self-resetting node of the present invention splits schematic diagram.
Fig. 4 is L shaped post schematic diagram of the present invention.
Fig. 5 is T shape post schematic diagram of the present invention.
Fig. 6 is cross section column schematic diagram of the present invention.
Fig. 7 is L shaped post Node Decomposition schematic diagram of the present invention.
Fig. 8 is T shape post Node Decomposition schematic diagram of the present invention.
Fig. 9 is cross section column Node Decomposition schematic diagram of the present invention.
Figure 10 is that Self-resetting suspension column of the present invention splits schematic diagram.
Figure 11 is L shaped Self-resetting suspension column facade A decomposing schematic representation of the present invention.
Figure 12 is L shaped Self-resetting suspension column facade B decomposing schematic representation of the present invention.
Figure 13 is T shape Self-resetting suspension column facade A decomposing schematic representation of the present invention.
Figure 14 is T shape Self-resetting suspension column facade of the present invention 2 decomposing schematic representations.
Figure 15 is T shape Self-resetting suspension column facade C decomposing schematic representation of the present invention.
Figure 16 is cross Self-resetting suspension column facade decomposing schematic representation of the present invention.
Figure 17 is herringbone lateral resisting prestressing force center support schematic diagram of the present invention.
Figure 18 is V font lateral resisting prestressing force center support schematic diagram of the present invention.
Figure 19 is single bevel lateral resisting prestressing force center support schematic diagram of the present invention.
Figure 20 is otic placode I floor map of the present invention.
Figure 21 is otic placode II floor map of the present invention.
Figure 22 is otic placode I schematic perspective view of the present invention.
Figure 23 is otic placode II schematic perspective view of the present invention.
Figure 24 is that steel shaped pile frame prestressing force center support schematic diagram is easily repaired in novel shake of the present invention afterwards.
In figure: 1, double flute girder steel, 2, angle with equal legs, 3, beam column junction plate, 4, web plate, 5, channel-section steel, 6, steel cable, 7, L shaped hetermorphiscal column, 8, T shape hetermorphiscal column, 9, cross hetermorphiscal column, 10, cover plate, 11, anti-buckling plate, 12, stiffener, 13, shear plate, 14, stiffening rib, 15, angle steel, 16, prestressed draw-bar, 17, otic placode I, 18, otic placode II, 19, prestressed cable.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
As shown in Fig. 1~24, novel shake of the present invention is easily repaired afterwards steel hetermorphiscal column-prestressing force center support and is comprised double flute girder steel 1, angle with equal legs 2, beam column junction plate 3, web plate 4, single channel-section steel 5, steel cable 6, L shaped hetermorphiscal column 7, T shape hetermorphiscal column 8, cross hetermorphiscal column 9, cover plate 10, anti-buckling plate 11, stiffener 12, shear plate 13, stiffening rib 14, fixedly angle steel 15, junction plate 16, otic placode I17, otic placode II18, prestressed cable 19.
As shown in Figure 1, beam involved in the present invention is the double flute girder steel 1 consisting of shaped steel, and double flute girder steel 1 is with web plate 4, to be spliced at beam-ends by channel-section steel.
As shown in Figure 2, suspension column position is at hetermorphiscal column and ground connecting place.
As shown in Figure 3, L shaped node connection is that framework L shaped hetermorphiscal column 7 in framework bight is connected with double flute girder steel 1; Concrete Connection Step is, beam column junction plate 3 welds in factory in advance with web plate 4, beam column junction plate 3 is perpendicular to web plate 4, web plate 4 is positioned at the middle part of beam column junction plate 3, it highly equals the shape steel web height of double flute girder steel 1, and scene is fixed on the beam column junction plate welding together 3 and web plate 4 on L shaped hetermorphiscal column 7 edges of a wing with bolt; Double flute girder steel 1 is comprised of two steel channel beams, when double flute girder steel 1 is connected with hetermorphiscal column, the mode that adopts single channel-section steel 5 to connect respectively, first a channel-section steel is connected with L shaped hetermorphiscal column 7 with angle with equal legs 2, channel-section steel is vertical with the edge of a wing of hetermorphiscal column 7, after a channel-section steel connects, connect in the same way another root channel-section steel; After double flute girder steel 1 is connected with L shaped hetermorphiscal column 7, two channel-section steels will connect into integral body with web plate 4, with bolt, two channel-section steels are connected with the web plate 4 in the middle of being positioned at two channel-section steels.
As shown in accompanying drawing 4-9, the form of hetermorphiscal column has three kinds, is respectively L shaped hetermorphiscal column 7, T shape hetermorphiscal column 8, cross hetermorphiscal column 9; Its joint form comprises three kinds of specifications, is respectively L shaped node connection, the connection of T-section point, crisscross joint connection; T-shaped node type of attachment, cross node type of attachment and L-type node type of attachment are basic identical, and just hetermorphiscal column adopts respectively T shape hetermorphiscal column 8 and cross hetermorphiscal column 9; L shaped node is that L shaped hetermorphiscal column 7 is connected with double flute girder steel 1; T-section point is that T shape hetermorphiscal column 8 is connected with double flute girder steel 1; Crisscross joint is that cross hetermorphiscal column 9 is connected with double flute girder steel 1; Wherein, L shaped suspension column is divided into A, B two sides, and T shape suspension column is divided into A, B, tri-faces of C, and cross suspension column is totally four faces, but four faces are all identical.
The prestressed arrangement of its node connects each multi-form node in the manner described above, and framework basically forms; Steel cable 6, successively through being reserved in the hole on the hetermorphiscal column edge of a wing, is applied to the prestress value of calculating, with permanent ground tackle, be anchored on the hetermorphiscal column edge of a wing.
As shown in Figure 10, novel shake of the present invention is easily repaired in steel hetermorphiscal column-prestressing force center support afterwards, and its suspension column form comprises three kinds of forms: L shaped suspension column, T shape suspension column, cross suspension column; Described L-type suspension column Connection Step: beam column junction plate 3 welds in factory in advance with web plate 4, beam column junction plate 3 is perpendicular to web plate 4, web plate 4 is positioned at the middle part of beam column junction plate 3, it highly equals the shape steel web height of double flute girder steel 1, and scene is fixed on the beam column junction plate welding together 3 and web plate 4 on hetermorphiscal column 7 edges of a wing with bolt; Double flute girder steel 1 is divided into two channel-section steels, when suspension column connects, two channel-section steels one are reinstated to bolt and be connected on web plate 4, the strength and stiffness being connected with hetermorphiscal column for strengthening suspension column place beam, is that channel-section steel inner ring applies three weld all arounds at double flute girder steel 1 with beam column junction plate 3 contact positions; Another limb is identical with this limb; In the larger manomelia interior welds transverse stiffener 14(of L-type hetermorphiscal column moment of flexure welding, can complete in factory process) at stiffening rib 14, weld up and down angle steel 15 in order to fixing prestressed draw-bar 16; Prestressed draw-bar 16 is passed to reserving hole, and apply prestressing force, with permanent ground tackle, be anchored on angle steel 15; Again anti-buckling plate 11, stiffener 12 and cover plate 10 use bolts are connected in to L shaped hetermorphiscal column 7 places, the edge of a wing; Cover plate 10 peripheries have outstanding surrounding edge, definitely closely knit with cover plate 10 and stiffener 12, prevent the anti-buckling plate 11 of moisture invasion cover plate internal corrosion; Again shear plate 13 use bolts are connected with double flute girder steel 1.
As shown in accompanying drawing 11-16, T shape suspension column, cross suspension column Connection Step that steel hetermorphiscal column-prestressing force center support is easily repaired in this novel shake are afterwards identical with L shaped suspension column; Stiffening rib 14 is arranged on the limb that the suffered moment of flexure of hetermorphiscal column is larger, and another limb does not need to arrange.
As shown in figure 17, its herringbone lateral resistant member is comprised of prestressed cable 19, otic placode I17 and otic placode II18; Otic placode I17 is connected on double flute girder steel 1 by welding or bolt, and prestressed cable 19 and otic placode I17 are bolted; Otic placode II18 is connected in hetermorphiscal column bottom by welding or bolt, and prestressed cable 19 and otic placode II18 are bolted; Prestressed cable 19 is by tightening and apply prestressing force attaching adapter sleeve on prestressed cable 19; Prestressed cable 19 is high strength rod iron, or uses high strength steel strand, high strength shaped steel member, or uses high strength rod iron, high strength steel strand or the high strength shaped steel member with damper.
As shown in figure 18, its V font lateral resistant member is comprised of prestressed cable 19, otic placode I17 and otic placode II18; Otic placode I17 is connected on double flute girder steel 1 by welding or bolt, and prestressed cable 19 and otic placode I17 are bolted; Otic placode II18 is connected in hetermorphiscal column top by welding or bolt, and prestressed cable 19 and otic placode II18 are bolted; Prestressed cable 19 is by tightening and apply prestressing force attaching adapter sleeve on prestressed cable 19; Described prestressed cable 19 is high strength rod iron, or uses high strength steel strand, high strength shaped steel member, or uses high strength rod iron, high strength steel strand or the high strength shaped steel member with damper.
As shown in figure 19, its monocline rod-type lateral resistant member is comprised of prestressed cable 19, otic placode II18; Otic placode II18 is connected in hetermorphiscal column bottom by welding or bolt, and prestressed cable 19 otic placode II18 are bolted; Another otic placode II18 is connected in hetermorphiscal column top by welding or bolt, and prestressed cable 19 and otic placode II18 are bolted; Prestressed cable 19 is by tightening and apply prestressing force attaching adapter sleeve on prestressed cable 19; Described prestressed cable is high strength rod iron, or uses high strength steel strand, high strength shaped steel member, or uses high strength rod iron, high strength steel strand or the high strength shaped steel member with damper.
As shown in accompanying drawing 20-23, be respectively exploded detail and the otic placode detail drawing at otic placode and cable body connected node place.
As shown in Figure 24, after assembling, finally obtain easily repairing steel hetermorphiscal column-prestressing force center support after this novel shake.

Claims (1)

1.一种新型震后易修复钢异形柱-预应力中心支撑架,其特征在于:该支撑架包括双槽钢梁(1)、等肢角钢(2)、梁柱连接板(3)、梁端腹板(4)、单根槽钢(5)、钢拉索(6)、L形异形柱(7)、T形异形柱(8)、十字形异形柱(9)、盖板(10)、防屈曲板(11)、加强板(12)、剪切板(13)、加劲肋(14)、固定角钢(15)、连接板(16)、耳板I(17)、耳板II(18)、预应力索(19);1. A new type of post-earthquake easy-to-repair steel special-shaped column-prestressed central support frame, characterized in that: the support frame includes double-channel steel beams (1), equal-leg angle steel (2), beam-column connecting plates (3), Beam end web (4), single channel steel (5), steel cable (6), L-shaped special-shaped column (7), T-shaped special-shaped column (8), cross-shaped special-shaped column (9), cover plate ( 10), anti-buckling plate (11), reinforcing plate (12), shearing plate (13), stiffening rib (14), fixed angle steel (15), connecting plate (16), ear plate I (17), ear plate II (18), prestressed cables (19); 支撑架中的梁是由型钢构成的双槽钢梁(1),双槽钢梁(1)是由槽钢在梁端用梁端腹板(4)拼接而成;The beam in the support frame is a double-channel steel beam (1) composed of section steel, and the double-channel steel beam (1) is spliced by channel steel at the beam end with a beam end web (4); 柱脚位置在异形柱与地基相连处;The position of the column foot is at the connection between the special-shaped column and the foundation; L形节点连接是框架角部框架L形异形柱(7)与双槽钢梁(1)连接;具体连接步骤为,梁柱连接板(3)与梁端腹板(4)在工厂先行焊接,梁柱连接板(3)垂直于梁端腹板(4),梁端腹板(4)位于梁柱连接板(3)的中部,其高度等于双槽钢梁(1)的型钢腹板高度,现场用螺栓将焊接在一起的梁柱连接板(3)与梁端腹板(4)固定在L形异形柱(7)翼缘上;双槽钢梁(1)是由两只单根槽钢(5)梁组成的,双槽钢梁(1)与异形柱连接时,采用单根槽钢(5)分别连接的方式,先将一根槽钢用等肢角钢(2)与L形异形柱(7)连接,槽钢与异形柱(7)的翼缘垂直,一根槽钢连接后,用同样的方式连接另一根槽钢;双槽钢梁(1)与L形异形柱(7)连接后,两根槽钢要用梁端腹板(4)连接成整体,用螺栓将两根槽钢与位于两根槽钢中间的梁端腹板(4)连接;The L-shaped node connection is the connection between the L-shaped special-shaped column (7) of the frame corner frame and the double-channel steel beam (1); the specific connection steps are: the beam-column connection plate (3) and the beam end web (4) are welded in the factory first , the beam-column connecting plate (3) is perpendicular to the beam-end web (4), and the beam-end web (4) is located in the middle of the beam-column connecting plate (3), and its height is equal to the section steel web of the double-channel steel beam (1) The beam-column connecting plate (3) and the beam end web (4) welded together are fixed on the flange of the L-shaped special-shaped column (7) with bolts on site; the double-channel steel beam (1) is composed of two single When the double-channel steel beam (1) is connected with the special-shaped column, the single channel steel (5) is connected separately. The L-shaped special-shaped column (7) is connected, and the channel steel is perpendicular to the flange of the special-shaped column (7). After one channel steel is connected, the other channel steel is connected in the same way; the double channel steel beam (1) and the L-shaped After the special-shaped column (7) is connected, the two channel steels shall be connected into a whole with the beam end web (4), and the two channel steels shall be connected with the beam end web (4) in the middle of the two channel steels with bolts; 异形柱的形式有三种,分别为L形异形柱(7)、T形异形柱(8)、十字形异形柱(9);其节点形式包括三种规格,分别为L形节点连接、T形节点连接、十字形节点连接;T型节点连接形式、十字型节点连接形式与L型节点连接形式基本相同,只是异形柱分别采用T形异形柱(8)与十字形异形柱(9);L形节点是L形异形柱(7)与双槽钢梁1连接;T形节点是T形异形柱(8)与双槽钢梁(1)连接;十字形节点是十字形异形柱(9)与双槽钢梁(1)连接;其中,L形柱脚分为A、B两面,T形柱脚共分A、B、C三个面,十字形柱脚共四个面,但四个面均相同;There are three types of special-shaped columns, which are L-shaped special-shaped column (7), T-shaped special-shaped column (8), and cross-shaped special-shaped column (9); the node forms include three specifications, which are L-shaped node connection, T-shaped Node connection, cross-shaped node connection; T-shaped node connection form, cross-shaped node connection form and L-shaped node connection form are basically the same, except that the special-shaped columns adopt T-shaped special-shaped columns (8) and cross-shaped special-shaped columns (9); L T-shaped joints are L-shaped special-shaped columns (7) connected to double-channel steel beams 1; T-shaped joints are T-shaped special-shaped columns (8) connected to double-channel steel beams (1); cross-shaped joints are cross-shaped special-shaped columns (9) It is connected with the double-channel steel beam (1); among them, the L-shaped column foot is divided into two sides A and B, the T-shaped column foot is divided into three sides A, B, and C, and the cross-shaped column foot has four sides in total, but the four The faces are the same; 其节点预应力的布置方式按照上述方式连接各个不同形式的节点,框架已经基本形成;将钢拉索(6)依次穿过预留在异形柱翼缘上的孔洞,施加计算的预应力值,用永久锚具锚固在异形柱翼缘上;The prestressing arrangement of the nodes is connected with different types of nodes according to the above method, and the frame has been basically formed; the steel cables (6) are sequentially passed through the holes reserved on the flange of the special-shaped column, and the calculated prestressing value is applied. Anchor to the special-shaped column flange with permanent anchors; 其柱脚形式包括三种形式:L形柱脚、T形柱脚、十字形柱脚;所述L型柱脚连接步骤:梁柱连接板(3)与梁端腹板(4)在工厂先行焊接,梁柱连接板(3)垂直于梁端腹板(4),梁端腹板(4)位于梁柱连接板(3)的中部,其高度等于双槽钢梁(1)的型钢腹板高度,现场用螺栓将焊接在一起的梁柱连接板(3)与梁端腹板(4)固定在异形柱(7)翼缘上;双槽钢梁(1)分为两根槽钢,柱脚连接时,将两根槽钢一起用螺栓连接在梁端腹板(4)上,为加强柱脚处梁与异形柱连接的强度与刚度,在双槽钢梁(1)与梁柱连接板(3)接触处即槽钢内圈施加三面围焊;另一肢与本肢相同;在L型异形柱弯矩较大的短肢内部焊接横向加劲肋(14)在加劲肋14上下焊接角钢(15)用以固定预应力拉杆(16);将预应力拉杆(16)穿过预留孔洞,并施加预应力,用永久锚具锚固在角钢(15)上;再将防屈曲板(11)、加强板(12)以及盖板(10)用螺栓连接于L形异形柱(7)翼缘处;盖板(10)周边有突出围边,以盖板(10)与加强板(12)绝对密实,防止潮气入侵盖板内腐蚀防屈曲板(11);再将剪切板(13)用螺栓与双槽钢梁(1)连接;The form of the column foot includes three forms: L-shaped column foot, T-shaped column foot, and cross-shaped column foot; the connection steps of the L-shaped column foot: the beam-column connecting plate (3) and the beam end web (4) are assembled in the factory Welding first, the beam-column connection plate (3) is perpendicular to the beam end web (4), and the beam end web (4) is located in the middle of the beam-column connection plate (3), and its height is equal to the section steel of the double-channel steel beam (1) Web height, the welded beam-column connecting plate (3) and beam-end web (4) are fixed on the flange of the special-shaped column (7) with bolts on site; the double-channel steel beam (1) is divided into two grooves When connecting steel and column feet, two channel steels are bolted together on the beam end web (4). The contact of the beam-column connecting plate (3), that is, the inner ring of the channel steel, is welded on three sides; the other leg is the same as this leg; the transverse stiffener (14) is welded inside the short leg of the L-shaped special-shaped column with a large bending moment. 14 Weld the angle steel (15) up and down to fix the prestressed tie rod (16); pass the prestressed tie rod (16) through the reserved hole, apply prestress, and anchor it on the angle steel (15) with a permanent anchor; Buckling plate (11), reinforcing plate (12) and cover plate (10) are connected to the flange of L-shaped special-shaped column (7) with bolts; The reinforcement plate (12) is absolutely dense to prevent the corrosion of the anti-buckling plate (11) from moisture intrusion into the cover plate; then the shear plate (13) is connected to the double-channel steel beam (1) with bolts; 该新型震后易修复钢异形柱-预应力中心支撑架的T形柱脚、十字形柱脚连接步骤与L形柱脚相同;加劲肋(14)均布置在异形柱所受弯矩较大的一肢上,另一肢不需要布置;The connection steps of T-shaped column feet and cross-shaped column feet of the new post-earthquake easy-to-repair steel special-shaped column-prestressed central support frame are the same as that of L-shaped column feet; On one limb, the other limb does not need to be arranged; 其人字形抗侧力构件由预应力索(19)、耳板I(17)和耳板II(18)组成;耳板I(17)通过焊接或者螺栓连接于双槽钢梁(1)上,预应力索(19)和耳板I(17)通过螺栓连接;耳板II(18)通过焊接或者螺栓连接于异形柱底部,预应力索(19)和耳板II(18)通过螺栓连接;预应力索(19)通过将附带在预应力索(19)上的连接套拧紧施加预应力;预应力索(19)为高强度钢棒,或者使用高强度钢绞线、高强度型钢构件,或者使用带阻尼器的高强度钢棒、高强度钢绞线或者高强度型钢构件;Its herringbone lateral force-resistant member is composed of prestressed cables (19), ear plate I (17) and ear plate II (18); ear plate I (17) is connected to the double-channel steel beam (1) by welding or bolts , the prestressed cable (19) and the ear plate I (17) are connected by bolts; the ear plate II (18) is connected to the bottom of the special-shaped column by welding or bolts, and the prestressed cable (19) and the ear plate II (18) are connected by bolts ; The prestressed cable (19) applies prestress by tightening the connecting sleeve attached to the prestressed cable (19); , or use high-strength steel rods with dampers, high-strength steel strands or high-strength steel members; 其V字形抗侧力构件由预应力索(19)、耳板I(17)和耳板II(18)组成;耳板I(17)通过焊接或者螺栓连接于双槽钢梁(1)上,预应力索(19)和耳板I(17)通过螺栓连接;耳板II(18)通过焊接或者螺栓连接于异形柱顶部,预应力索(19)和耳板II(18)通过螺栓连接;预应力索(19)通过将附带在预应力索(19)上的连接套拧紧施加预应力;所述预应力索(19)为高强度钢棒,或者使用高强度钢绞线、高强度型钢构件,或者使用带阻尼器的高强度钢棒、高强度钢绞线或者高强度型钢构件;Its V-shaped lateral force-resistant member is composed of prestressed cables (19), ear plate I (17) and ear plate II (18); ear plate I (17) is connected to the double-channel steel beam (1) by welding or bolts , the prestressed cable (19) and the ear plate I (17) are connected by bolts; the ear plate II (18) is connected to the top of the special-shaped column by welding or bolts, and the prestressed cable (19) and the ear plate II (18) are connected by bolts The prestressed cable (19) applies prestress by tightening the connecting sleeve attached to the prestressed cable (19); the prestressed cable (19) is a high-strength steel rod, or uses a high-strength steel strand, high-strength Section steel members, or use high-strength steel rods with dampers, high-strength steel strands or high-strength section steel members; 其单斜杆式抗侧力构件由预应力索(19)、耳板II(18)组成;耳板II(18)通过焊接或者螺栓连接于异形柱底部,预应力索(19)耳板II(18)通过螺栓连接;另一耳板II(18)通过焊接或者螺栓连接于异形柱顶部,预应力索(19)和耳板II(18)通过螺栓连接;预应力索(19)通过将附带在预应力索(19)上的连接套拧紧施加预应力;所述预应力索为高强度钢棒,或者使用高强度钢绞线、高强度型钢构件,或者使用带阻尼器的高强度钢棒、高强度钢绞线或者高强度型钢构件;经过装配后最终得到该新型震后易修复钢异形柱-预应力中心支撑架。Its single-slope anti-lateral force component is composed of prestressed cables (19) and ear plate II (18); the ear plate II (18) is connected to the bottom of the special-shaped column by welding or bolts, and the prestressed cable (19) and ear plate II (18) is connected by bolts; the other ear plate II (18) is connected to the top of the special-shaped column by welding or bolts, and the prestressed cable (19) and the ear plate II (18) are connected by bolts; the prestressed cable (19) is connected by The connecting sleeve attached to the prestressed cable (19) is tightened to apply prestress; the prestressed cable is a high-strength steel rod, or a high-strength steel strand, a high-strength section steel member, or a high-strength steel with a damper Rods, high-strength steel strands or high-strength steel components; after assembly, the new post-earthquake easy-to-repair steel special-shaped column-prestressed central support frame is finally obtained.
CN201310703484.1A 2013-12-19 2013-12-19 A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards Active CN103669570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310703484.1A CN103669570B (en) 2013-12-19 2013-12-19 A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310703484.1A CN103669570B (en) 2013-12-19 2013-12-19 A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards

Publications (2)

Publication Number Publication Date
CN103669570A true CN103669570A (en) 2014-03-26
CN103669570B CN103669570B (en) 2016-03-02

Family

ID=50308280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310703484.1A Active CN103669570B (en) 2013-12-19 2013-12-19 A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards

Country Status (1)

Country Link
CN (1) CN103669570B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201095A (en) * 2015-10-16 2015-12-30 中建四局第一建筑工程有限公司 Restrained brace anti-seismic structure for super high-rise building and manufacturing method
CN107119800A (en) * 2017-04-09 2017-09-01 北京工业大学 A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems
CN107165274A (en) * 2017-04-09 2017-09-15 北京工业大学 A kind of many high-rise assembled modularization Self-resetting steel construction H profile steel post frame systems
CN108560706A (en) * 2018-06-20 2018-09-21 中国矿业大学 A kind of friction energy-dissipating Self-resetting fully assembled joint
CN108824918A (en) * 2018-07-22 2018-11-16 北京工业大学 Self-resetting can assemble the girder pre-stressed accentric support steel frame of multistage after shake
CN109024880A (en) * 2018-07-22 2018-12-18 北京工业大学 Self-resetting can assemble multistage joist steel frame joint after shake
CN109057012A (en) * 2018-07-22 2018-12-21 北京工业大学 Self-resetting can assemble multistage beam center pre-loaded support struts steel frame after shake
CN109629670A (en) * 2019-01-25 2019-04-16 北京工业大学 A kind of assembled Self-resetting double flute steel girder frame system of recoverable function
CN109853733A (en) * 2019-01-25 2019-06-07 北京工业大学 A kind of assembled self reset curvature-prevention inverted L shape web cutting member frame system of recoverable function
CN109853734A (en) * 2019-01-25 2019-06-07 北京工业大学 A kind of assembled Self-resetting frame system of recoverable function
CN109853753A (en) * 2019-01-25 2019-06-07 北京工业大学 A kind of anti-buckling inverted L shape web cutting member combined joint attachment device of recoverable function assembled
CN110230357A (en) * 2019-07-15 2019-09-13 南京林业大学 A kind of assembled steel-semi-rigid energy dissipating node frame of bamboo combination
CN110905077A (en) * 2019-11-11 2020-03-24 华侨大学 Replaceable steel beam with buckling-restrained cover plate
CN112144566A (en) * 2020-09-27 2020-12-29 重庆大学 Assembled conical special-shaped steel pipe column base with restorable function and assembling method
CN113216413A (en) * 2021-04-29 2021-08-06 同济大学建筑设计研究院(集团)有限公司 Articulated column base cable node of large-span cable-stayed structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5660017A (en) * 1994-12-13 1997-08-26 Houghton; David L. Steel moment resisting frame beam-to-column connections
CN101798849A (en) * 2010-03-26 2010-08-11 东南大学 Node connection device for self-centering prestressed concrete frame
CN101812872A (en) * 2010-05-06 2010-08-25 福州大学 Easily repaired steel-structure beam-column node
US20110030305A1 (en) * 2008-08-21 2011-02-10 Mitek Holdings, Inc. Building Structure, Method of Making, and Components
CN102287008A (en) * 2011-07-01 2011-12-21 青岛理工大学 Asymmetric haunch type anti-seismic node of steel structure beam flange
CN102758499A (en) * 2012-07-05 2012-10-31 北京工业大学 Precast prestressed steel girder with post-seismic restorable function
CN103276804A (en) * 2013-06-10 2013-09-04 北京工业大学 Industrialized assembling type special-shaped column steel structure prestress central supporting system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5660017A (en) * 1994-12-13 1997-08-26 Houghton; David L. Steel moment resisting frame beam-to-column connections
US20110030305A1 (en) * 2008-08-21 2011-02-10 Mitek Holdings, Inc. Building Structure, Method of Making, and Components
CN101798849A (en) * 2010-03-26 2010-08-11 东南大学 Node connection device for self-centering prestressed concrete frame
CN101812872A (en) * 2010-05-06 2010-08-25 福州大学 Easily repaired steel-structure beam-column node
CN102287008A (en) * 2011-07-01 2011-12-21 青岛理工大学 Asymmetric haunch type anti-seismic node of steel structure beam flange
CN102758499A (en) * 2012-07-05 2012-10-31 北京工业大学 Precast prestressed steel girder with post-seismic restorable function
CN103276804A (en) * 2013-06-10 2013-09-04 北京工业大学 Industrialized assembling type special-shaped column steel structure prestress central supporting system

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201095A (en) * 2015-10-16 2015-12-30 中建四局第一建筑工程有限公司 Restrained brace anti-seismic structure for super high-rise building and manufacturing method
CN105201095B (en) * 2015-10-16 2017-10-27 中建四局第一建筑工程有限公司 A kind of high-rise building constraint support anti-seismic structure and preparation method
CN107119800A (en) * 2017-04-09 2017-09-01 北京工业大学 A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems
CN107165274A (en) * 2017-04-09 2017-09-15 北京工业大学 A kind of many high-rise assembled modularization Self-resetting steel construction H profile steel post frame systems
CN107119800B (en) * 2017-04-09 2019-04-05 北京工业大学 A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems
CN107165274B (en) * 2017-04-09 2019-04-05 北京工业大学 A kind of more high-rise assembled modularization Self-resetting steel construction H profile steel column frame systems
CN108560706A (en) * 2018-06-20 2018-09-21 中国矿业大学 A kind of friction energy-dissipating Self-resetting fully assembled joint
CN108824918A (en) * 2018-07-22 2018-11-16 北京工业大学 Self-resetting can assemble the girder pre-stressed accentric support steel frame of multistage after shake
CN109024880A (en) * 2018-07-22 2018-12-18 北京工业大学 Self-resetting can assemble multistage joist steel frame joint after shake
CN109057012A (en) * 2018-07-22 2018-12-21 北京工业大学 Self-resetting can assemble multistage beam center pre-loaded support struts steel frame after shake
CN109629670A (en) * 2019-01-25 2019-04-16 北京工业大学 A kind of assembled Self-resetting double flute steel girder frame system of recoverable function
CN109853733A (en) * 2019-01-25 2019-06-07 北京工业大学 A kind of assembled self reset curvature-prevention inverted L shape web cutting member frame system of recoverable function
CN109853734A (en) * 2019-01-25 2019-06-07 北京工业大学 A kind of assembled Self-resetting frame system of recoverable function
CN109853753A (en) * 2019-01-25 2019-06-07 北京工业大学 A kind of anti-buckling inverted L shape web cutting member combined joint attachment device of recoverable function assembled
CN110230357A (en) * 2019-07-15 2019-09-13 南京林业大学 A kind of assembled steel-semi-rigid energy dissipating node frame of bamboo combination
CN110905077A (en) * 2019-11-11 2020-03-24 华侨大学 Replaceable steel beam with buckling-restrained cover plate
CN110905077B (en) * 2019-11-11 2024-07-02 华侨大学 Take removable girder steel of buckling restrained apron
CN112144566A (en) * 2020-09-27 2020-12-29 重庆大学 Assembled conical special-shaped steel pipe column base with restorable function and assembling method
CN112144566B (en) * 2020-09-27 2024-04-16 重庆大学 Assembled conical special-shaped steel pipe column base with restorable function and assembling method
CN113216413A (en) * 2021-04-29 2021-08-06 同济大学建筑设计研究院(集团)有限公司 Articulated column base cable node of large-span cable-stayed structure

Also Published As

Publication number Publication date
CN103669570B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN103669570A (en) Special-shaped steel column-prestress central supporting frame easy to restore after earthquake
CN103696498A (en) Novel post-earthquake easy-to-repair steel irregular column- center support
CN107916726B (en) Assembled self-recovery circular concrete-filled steel tube combined node
CN103669650B (en) Easily steel shaped pile frame-steel plate shear force wall is repaired after a kind of shake
CN207919763U (en) Assembled self-recovery circular concrete-filled steel tube combined node
CN103711215B (en) An easily repairable post-earthquake steel special-shaped column frame-eccentric support frame
CN106401018B (en) A prefabricated self-reset swinging steel plate wall structure system
CN101851970B (en) Horizontal seamed energy dissipation prestressed shear wall structure
CN105888058B (en) One kind damages recoverable assembled combination suspension column
CN201679114U (en) Energy-dissipative prestressed shear wall structure with horizontal joints
CN103669594A (en) Special-shaped steel column frame structure joint easy to restore after earthquake
CN105926764B (en) A kind of industrialization preprocessing regenerative structural system and its construction method
CN209779950U (en) A Full Swing Structural System Containing Swing Columns and Swing Walls
CN103696503A (en) Novel post-earthquake easy-to-repair steel irregular column framework
CN105756217B (en) A kind of steel wood mixing seismic structural wall, earthquake resistant wall with runback bit function after shake
CN107386481B (en) Transformer substation's structural rigidity reinforcing means
CN205669255U (en) A kind of industrialization preprocessing regenerative structural system
CN107246085A (en) Built-in soap-free emulsion polymeization steel plate concealed bracings prestressing force automatic reset concrete shear wall
CN103669567B (en) Easily steel hetermorphiscal column-prestressing force accentric support frame is repaired after a kind of shake
CN205046755U (en) Harm controllable shake and decrease steel column that to repair
CN109024881A (en) Self-resetting can assemble multistage beam accentric support steel frame after shake
CN205577143U (en) Steel wood mixes antidetonation wall with shake back from reset function
CN209082693U (en) Prestressing without bondn assembling type node with energy-consuming device
CN105178509A (en) A damage-controllable and repairable steel column
CN102011434A (en) BRB (buckling restrained brace) concrete frame beam-column joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200821

Address after: Room 302, No. 8319, Yanshan Road, Bengbu City, Anhui Province

Patentee after: Bengbu Lichao Information Technology Co.,Ltd.

Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100

Patentee before: Beijing University of Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201020

Address after: 226300 Diwei Town Industrial Concentration Zone, Tongzhou District, Nantong City, Jiangsu Province

Patentee after: Nantong New Fengwei Machinery Technology Co.,Ltd.

Address before: Room 302, No. 8319, Yanshan Road, Bengbu City, Anhui Province

Patentee before: Bengbu Lichao Information Technology Co.,Ltd.