[go: up one dir, main page]

CN103572785B - All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application - Google Patents

All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application Download PDF

Info

Publication number
CN103572785B
CN103572785B CN201310339617.1A CN201310339617A CN103572785B CN 103572785 B CN103572785 B CN 103572785B CN 201310339617 A CN201310339617 A CN 201310339617A CN 103572785 B CN103572785 B CN 103572785B
Authority
CN
China
Prior art keywords
layer
soil
clay
covering system
landfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310339617.1A
Other languages
Chinese (zh)
Other versions
CN103572785A (en
Inventor
吴宏伟
徐洁
陈锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hong Kong University of Science and Technology
Original Assignee
Hong Kong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hong Kong University of Science and Technology filed Critical Hong Kong University of Science and Technology
Priority to CN201310339617.1A priority Critical patent/CN103572785B/en
Publication of CN103572785A publication Critical patent/CN103572785A/en
Application granted granted Critical
Publication of CN103572785B publication Critical patent/CN103572785B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The invention provides an all-weather anti-seepage airtight refuse landfill soil coverage system, a preparation method and application. The soil coverage system is laid on the garbage to be buried or a gas collection layer covered on the garbage; the soil covering system is characterized by comprising a clay layer and a capillary blocking covering layer, wherein the clay layer is positioned below the capillary blocking covering layer, and the capillary blocking covering layer sequentially comprises a gravel layer and a silt layer from bottom to top. The soil coverage system can prevent liquid from infiltrating through the capillary retardation of the silt layer and the gravel layer under the condition that the soil body is dry. Under the condition that the soil body is wet and saturated, the liquid can be prevented from infiltrating by the additionally arranged clay layer. The clay layer can effectively prevent the landfill gas from escaping under all weather (any dry and wet weather) conditions. The materials used by the soil coverage system are all natural soil materials, and the soil coverage system has the characteristics of convenient material acquisition, simple construction, good durability, low cost and the like.

Description

全天候防渗闭气的垃圾填埋土质覆盖系统、制法和用途All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application

技术领域technical field

本发明涉及垃圾填埋场封场覆盖系统技术领域,特别是涉及一种用于垃圾填埋处理的全天候防渗闭气的土质覆盖系统、制备方法和用途。The invention relates to the technical field of landfill sealing and covering systems, in particular to an all-weather anti-seepage and air-tight soil covering system for landfill treatment, a preparation method and an application.

背景技术Background technique

填埋是当前和今后相当长时期内处置城市垃圾的主要方式。垃圾在堆积降解过程中产生大量的渗滤液和填埋气(主要成分为甲烷和二氧化碳)。填埋气扩散污染城市空气,加剧温室效应,且可能引发火灾和爆炸。雨水、雪水等液体入渗则会加剧渗滤液污染地下水。因此,垃圾填埋场封场覆盖系统的主要功能是防止液体入渗和填埋气逸出,即防渗闭气。Landfill is the main way to dispose of municipal waste at present and for a long time to come. A large amount of leachate and landfill gas (mainly composed of methane and carbon dioxide) are produced during the accumulation and degradation of garbage. The spread of landfill gas pollutes urban air, contributes to the greenhouse effect, and can cause fires and explosions. The infiltration of liquids such as rainwater and snowwater will intensify the leachate pollution of groundwater. Therefore, the main function of the landfill closure cover system is to prevent liquid infiltration and landfill gas escape, that is, seepage-proof and air-tight.

垃圾填埋场一般是利用山坳、平原堆砌等进行填埋,主要有平原型和山谷型等形式。因此,垃圾填埋场封场覆盖系统主要有水平式和斜坡式两种形式。传统的覆盖系统包括单一压实粘土覆盖层以及由压实粘土层与土工膜组成的土工复合材料覆盖系统等,均利用材料的低渗透性来达到防渗闭气的目的。然而,在这些传统覆盖系统中,粘土层为表面土层。暴露在空气中的粘土层在天气干燥的情况下,极易开裂,导致渗透性变大,从而不能阻挡液体入渗和填埋气逸出(参见文献:“Albrecht,B.&Benson,C.(2001).EffectofDesiccationonCompactedNaturalClays.JournalofGeotechnicalandGeoenvironmentalEngineering,ASCE,127(1),67–75.”;“Albright,W.,Benson,C.,Gee,G.,Abichou,T.,McDonald,E.,Tyler,S.&Rock,S.(2006).FieldPerformanceofaCompactedClayLandfillFinalCoverataHumidSite.JournalofGeotechnicalandGeoenvironmentalEngineering,ASCE,132(11),1393–1403.”)。而土工膜则存在沿界面易滑动失稳及耐久性不佳等问题(参见文献:“Stark,T.D.,Arellano,D.,Evans,W.D.,Wilson,V.L.,andGonda,J.M.(1998).Unreinforcedgeosyntheticclaylinercasehistory.GeosyntheticsInternational,5(5),521-544.”)。因此,这些传统覆盖系统的长期性能均不尽如人意。Waste landfills are generally filled with cols and plains, mainly in the form of plains and valleys. Therefore, there are mainly two forms of landfill closure and covering systems: horizontal and slope. Traditional covering systems include a single compacted clay covering layer and a geocomposite covering system composed of a compacted clay layer and a geomembrane, all of which use the low permeability of the material to achieve the purpose of preventing seepage and sealing air. However, in these traditional cover systems, the clay layer is the surface soil layer. Clay layers exposed to air are prone to cracking in dry weather, making them more permeable and unable to block liquid infiltration and landfill gas escape (see "Albrecht, B. & Benson, C.( 2001). Effect of Desiccation on Compacted Natural Clays. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 127(1), 67–75.”; “Albright, W., Benson, C., Gee, G., Abichou, T., McDonald, E., Tyler, S. & Rock, S. (2006). Field Performance of a Compacted Clay Landfill Final Coverata Humid Site. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 132(11), 1393–1403.”). However, the geomembrane has problems such as easy sliding and instability along the interface and poor durability (see literature: "Stark, T.D., Arellano, D., Evans, W.D., Wilson, V.L., and Gonda, J.M. (1998). Unreinforced geosynthetic clay liner case history. Geosynthetics International , 5(5), 521-544."). Therefore, the long-term performance of these traditional overlay systems is not satisfactory.

近年来,基于水分储存—释放原理的腾发式土质覆盖系统,逐渐受到重视与发展。腾发式土质覆盖系统早期主要为种植有植被的单一细粒土层,在降雨条件下储存水分,在干燥条件下通过地面蒸发和植物蒸腾作用释放水分。然而,这种单一土层型腾发式覆盖系统只适用于降雨很少的干旱地区,且所需的土层厚度较厚,厚达2m(参见文献:“Benson,C.H.&Khire,M.V.(1995).Earthencoversforsemi-aridandaridclimates.GeotechnicalSpecialPublication,No.53,201-217.”)。因此,毛细阻滞型腾发式土质覆盖系统得到发展(参见文献:“Khire,M.V.,Benson,C.H.&Bosscher,P.J.(2000).Capillarybarriers:designvariablesandwaterbalance.JournalofGeotechnicalandGeoenvironmentalEngineering,ASCE,126(8):695–708.”;“Aubertin,M.,Cifuentes,E.,Apithy,S.A.,Bussiere,B.,Molson,J.&Chapuis,R.P.(2009).Analysesofwaterdiversionalonginclinedcoverswithcapillarybarriereffects.CanadianGeotechnicalJournal,46(10),1146-1164.”;“Rahardjo,H.,Santoso,V.A.,Leong,E.C.,Ng,Y.S.&Hua,C.J.(2012).Performanceofaninstrumentedslopecoveredbyacapillarybarriersystem.JournalofGeotechnicalandGeoenvironmentalEngineering,ASCE,138(4),481-490.”)。毛细阻滞覆盖系统由非饱和状态下的一层细粒土下卧一层粗粒土组成,利用粗细粒土层界面处的毛细阻滞作用来增大上部细粒土层的储水能力,提高侧向排水能力,减少雨水入渗。所述的非饱和状态,指的是土体孔隙中既有水又有气,且土体内水和气分别各自连通的状态。研究结果表明,毛细阻滞覆盖系统在干旱和半干旱气候区能达到有效的防渗功能,但是在湿润气候区防渗效果不佳(参见文献:“Benson,C.H.&Khire,M.V.(1995).Earthencoversforsemi-aridandaridclimates.GeotechnicalSpecialPublication,No.53,201-217.”;“Benson,C.H.,Albright,W.H.,Roesler,A.C.&Abichou,T.(2002).Evaluationoffinalcoverperformance:fielddatafromtheAlternativeCoverAssessmentProgram(ACAP).Proc.WasteManagement,Vol.2,1-15.”)。In recent years, the Tengfa soil cover system based on the principle of water storage and release has gradually received attention and development. In the early days, the evaporative soil cover system was mainly a single fine-grained soil layer planted with vegetation, which stored water under rainfall conditions and released water through ground evaporation and plant transpiration under dry conditions. However, this single-soil type evacuation covering system is only suitable for arid areas with little rainfall, and the required soil layer thickness is thicker, up to 2m (see literature: "Benson, C.H. & Khire, M.V. (1995) . Earthen covers for semi-aridandarid climates. Geotechnical Special Publication, No. 53, 201-217."). Therefore, the capillary barrier-type soil cover system has been developed (see literature: "Khire, M.V., Benson, C.H. & Bosscher, P.J. (2000). "; "Aubertin, M., Cifuentes, E., Apithy, S.A., Bussiere, B., Molson, J. & Chapuis, R.P. (2009). , H., Santoso, V.A., Leong, E.C., Ng, Y.S. & Hua, C.J. (2012). Performance of an instrumented slope covered by a capillary barrier system. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 138(4), 481-490.”). The capillary retardation covering system is composed of a layer of fine-grained soil under an unsaturated state and a layer of coarse-grained soil lying below it. The capillary retardation at the interface of the coarse-grained soil layer is used to increase the water storage capacity of the upper fine-grained soil layer. Improve lateral drainage capacity and reduce rainwater infiltration. The above-mentioned unsaturated state refers to a state in which both water and air exist in the pores of the soil body, and the water and air in the soil body are connected to each other respectively. The research results show that the capillary barrier covering system can achieve effective anti-seepage function in arid and semi-arid climate areas, but the anti-seepage effect is not good in humid climate areas (see literature: "Benson, C.H. & Khire, M.V. (1995).Earthencoversforsemi -aridandaridclimates.GeotechnicalSpecialPublication, No.53,201-217."; "Benson, C.H., Albright, W.H., Roesler, A.C. & Abichou, T. (2002).Evaluationoffinalcoverperformance:fielddatafromtheAlternativeCoverAssessmentProgram(ACAP).Proc.Waste2agement,1-Vol. 15.").

之后,有学者提出在毛细阻滞覆盖层的粗细粒土层中间增设非饱和导排层的方法,来进一步提高其侧向排水能力(参见文献:“Stormonont,J.C.&Morris,C.E.(1997).Unsaturateddrainagelayersfordiversionofinfiltratingwater.JournalofIrrigationandDrainageEngineering,ASCE,123(5),364-367.”;“邓林恒,詹良通,陈云敏,贾官伟(2012).含非饱和导排层的毛细阻滞型覆盖层性能模型试验研究.岩土工程学报,第34卷,第1期,75-80.”)。中国专利申请公开CN102493496A(申请号为No.201110441895.9,发明名称为“一种具有侧向排水能力的毛细阻滞型覆盖层结构”)中就是利用在粉土层和碎石层中间增设非饱和砂层的方法来提高其侧向排水能力。然而,这种覆盖系统仍然只适用于土体处于非饱和状态的情况。当长时间强降雨条件下土体内含水量接近饱和或者达到饱和状态时,该覆盖系统就会失去防渗的功效。此外,该覆盖系统为斜坡式,如采用水平式,则其防渗效果存在疑问。该覆盖系统在表层设置了植被层用于美观,在砂层和碎石层中间设置了土工布层防止砂嵌入碎石,但对于垃圾填埋场防渗没有实际作用。Later, some scholars proposed the method of adding an unsaturated drainage layer in the middle of the coarse and fine-grained soil layer of the capillary retardation cover layer to further improve its lateral drainage capacity (see literature: "Stormonont, J.C. & Morris, C.E. (1997). Unsaturated drainage layers for diversion of filtering water .Journal of Irrigation and Drainage Engineering, ASCE,123(5),364-367."; "Deng Linheng, Zhan Liangtong, Chen Yunmin, Jia Guanwei (2012). Model test research on the performance of capillary barrier overburden with unsaturated drainage layer. Geotechnical Engineering Acta, Vol. 34, No. 1, 75-80.”). Chinese patent application publication CN102493496A (application number is No. 201110441895.9, the title of the invention is "a kind of capillary retardation overburden structure with lateral drainage capacity") is to use unsaturated sand in the middle of the silt layer and gravel layer Layer method to improve its lateral drainage capacity. However, this covering system is still only applicable when the soil is in an unsaturated state. When the water content in the soil is close to or reaches saturation under long-term heavy rainfall conditions, the covering system will lose its anti-seepage effect. In addition, the covering system is a slope type, and if it is a horizontal type, its anti-seepage effect is questionable. The covering system has a vegetation layer on the surface for aesthetics, and a geotextile layer between the sand layer and the gravel layer to prevent sand from being embedded in the gravel, but it has no practical effect on seepage control of the landfill.

另外,非常重要的一点是,上述传统和改进后的毛细阻滞覆盖系统都不能有效防止填埋气逸出,即没有闭气功能。In addition, a very important point is that none of the above-mentioned traditional and improved capillary arrest covering systems can effectively prevent landfill gas from escaping, that is, they have no gas-holding function.

至今为止,没有一种覆盖系统可以在任何气候条件下达到长期防渗闭气的功能,尤其是不能有效防止填埋气逸出以及在土体接近饱和或达到饱和状态下不能有效防止液体入渗。So far, there is no cover system that can achieve long-term anti-seepage and air-tight function under any climatic conditions, especially cannot effectively prevent landfill gas from escaping and cannot effectively prevent liquid infiltration when the soil is close to or reaches saturation.

发明内容Contents of the invention

本发明的目的在于克服上述缺陷,提供一种新型全天候多功能的垃圾填埋场封场土质覆盖系统,适用于任何气候条件,既能有效防止液体入渗,又能有效防止填埋气逸出,且具有良好的耐久性。The purpose of the present invention is to overcome the above-mentioned defects and provide a novel all-weather and multifunctional landfill closure soil covering system, which is suitable for any climatic conditions and can effectively prevent liquid infiltration and landfill gas escape , and has good durability.

为解决上述技术问题,本发明提供了一种用于垃圾填埋处理的全天候防渗闭气的土质覆盖系统、制备方法和用途。In order to solve the above-mentioned technical problems, the present invention provides an all-weather anti-seepage and air-tight soil covering system, preparation method and application for landfill treatment.

具体而言,本发明提供:Specifically, the present invention provides:

(1)一种用于垃圾填埋的土质覆盖系统,其铺设于所要填埋的垃圾之上,或者在该垃圾上覆盖有气体收集层的情况下,则铺设于该气体收集层之上;其特征在于,该土质覆盖系统包括粘土层和毛细阻滞覆盖层,并且所述粘土层位于所述毛细阻滞覆盖层的下方,并且位于所要填埋的垃圾的上方;其中,所述毛细阻滞覆盖层包括砾砂层和粉土层,并且所述粉土层位于所述砾砂层的上方。(1) A soil cover system for landfills, which is laid over the waste to be landfilled or, in the case of such waste covered with a gas-collecting layer, over the gas-collecting layer; It is characterized in that the soil covering system includes a clay layer and a capillary blocking covering layer, and the clay layer is located below the capillary blocking covering layer and above the garbage to be landfilled; wherein, the capillary blocking covering layer The lagging cover layer includes a gravel sand layer and a silt layer, and the silt layer is located above the gravel sand layer.

(2)根据(1)所述的土质覆盖系统,其特征在于,所述粘土层是经过压实处理的,其中所述压实处理包括在最优含水量进行压实。(2) The soil covering system according to (1), characterized in that the clay layer is compacted, wherein the compaction process includes compaction at an optimal water content.

(3)根据(1)所述的土质覆盖系统,其特征在于,所述粘土层的厚度为0.3-0.8m,所述粘土层的土体粒径小于0.075mm,并且所述粘土层的饱和水渗透系数不高于1×10-9m/s。(3) The soil covering system according to (1), characterized in that the thickness of the clay layer is 0.3-0.8m, the soil particle size of the clay layer is less than 0.075mm, and the saturation of the clay layer The water permeability coefficient is not higher than 1×10 -9 m/s.

(4)根据(1)所述的土质覆盖系统,其特征在于,所述砾砂层的厚度为0.2-0.3m,所述砾砂层的土体粒径为0.5-5mm,并且所述砾砂层的饱和水渗透系数不低于1×10-4m/s。(4) The soil covering system according to (1), characterized in that the thickness of the gravel sand layer is 0.2-0.3m, the soil particle size of the gravel sand layer is 0.5-5mm, and the gravel sand layer The saturated water permeability coefficient of the sand layer should not be lower than 1×10 -4 m/s.

(5)根据(1)所述的土质覆盖系统,其特征在于,所述粉土层的厚度为0.3-0.6m,所述粉土层的土体粒径不大于2mm,并且所述粉土层的饱和水渗透系数为1×10-8-1×10-5m/s。(5) The soil covering system according to (1), characterized in that the thickness of the silt layer is 0.3-0.6m, the soil particle size of the silt layer is not greater than 2mm, and the silt layer The saturated water permeability coefficient of the layer is 1×10 -8 -1×10 -5 m/s.

(6)根据(1)所述的土质覆盖系统,其特征在于,该土质覆盖系统为水平式或斜坡式,斜坡式的坡度为:垂直向与水平向比不大于1:3。(6) The soil covering system according to (1), characterized in that the soil covering system is a horizontal or slope type, and the slope of the slope type is: the ratio of the vertical direction to the horizontal direction is not greater than 1:3.

(7)根据(1)所述的土质覆盖系统,其特征在于,该土质覆盖系统沿水平向每隔20-40m设置有一道排水沟。(7) The soil covering system according to (1), characterized in that the soil covering system is provided with a drainage ditch every 20-40m along the horizontal direction.

(8)一种根据(1)-(7)中任意一项所述的土质覆盖系统的制备方法,该方法包括:(8) A method for preparing the soil covering system according to any one of (1)-(7), the method comprising:

1)提供具有平整表面的水平式或斜坡式的垃圾填埋体;1) Provide a horizontal or sloped landfill with a flat surface;

2)可选地,在所述垃圾填埋体的表面上铺设气体收集层(例如,一层由碎石组成的气体收集层);2) Optionally, laying a gas collection layer on the surface of the landfill body (for example, a gas collection layer composed of gravel);

3)在所述气体收集层(如果有该层的情况下)或垃圾填埋体(如果没有气体收集层的情况下)的表面上铺设粘土层,在最优含水量压实并进行平整处理;3) On the surface of the gas collection layer (if there is one) or the landfill body (if there is no gas collection layer) a layer of clay is laid, compacted and leveled at an optimal water content ;

4)在所述粘土层的表面上铺设砾砂层,压实并进行平整处理;以及4) laying a gravel sand layer on the surface of the clay layer, compacting and leveling; and

5)在所述砾砂层的表面上铺设粉土层,压实并进行平整处理,从而得到所述土质覆盖系统。5) A silt layer is laid on the surface of the gravel layer, compacted and leveled to obtain the soil covering system.

(9)根据(1)-(7)中任意一项所述的土质覆盖系统在全天候(任何干湿气候)条件下用于防止液体渗入垃圾填埋体的用途。(9) Use of the soil cover system according to any one of (1)-(7) for preventing liquid from penetrating into a landfill under all-weather (any wet or dry climate) conditions.

(10)根据(1)-(7)中任意一项所述的土质覆盖系统在全天候条件下用于防止气体从垃圾填埋体中逸出的用途。(10) Use of the soil covering system according to any one of (1)-(7) for preventing gas escape from landfills under all weather conditions.

本发明的方法与现有技术相比具有以下优点和积极效果:Compared with the prior art, the method of the present invention has the following advantages and positive effects:

(1)在任何干湿气候条件下,特别是土体接近饱和或者达到饱和状态时,可有效防止液体(特别是雨水)渗入垃圾填埋体;(1) Under any dry and wet climate conditions, especially when the soil is close to or reaches saturation, it can effectively prevent liquid (especially rainwater) from seeping into the landfill;

(2)在任何气候条件下,可有效防止填埋气逸出;(2) Under any climatic conditions, it can effectively prevent landfill gas from escaping;

(3)本发明的土质覆盖系统组成材料均为天然土料,来源丰富,取材方便,造价低;(3) The constituent materials of the soil covering system of the present invention are all natural soil materials, which are rich in sources, convenient to obtain materials, and low in cost;

(4)本发明的土质覆盖系统施工简单,耐久性好,后期维护成本低;(4) The soil covering system of the present invention is simple in construction, good in durability, and low in later maintenance costs;

(5)本发明的土质覆盖系统可用于水平式和斜坡式的垃圾填埋体,特别是,即使垃圾填埋体为水平式,本发明的土质覆盖系统也能有效达到全天候防渗闭气的效果。(5) The soil covering system of the present invention can be used for horizontal and slope landfills, especially, even if the landfill is horizontal, the soil covering system of the present invention can effectively achieve the effect of anti-seepage and air-tightness all-weather .

附图说明Description of drawings

图1为本发明的土质覆盖系统的结构组成及防渗闭气原理示意图;Fig. 1 is the structural composition of the soil covering system of the present invention and the schematic diagram of the anti-seepage and air-tight principle;

图2为本发明的土质覆盖系统中各土层水渗透系数与吸力的关系函数示意图;Fig. 2 is the relation function schematic diagram of each soil layer water permeability coefficient and suction in the soil covering system of the present invention;

图3为本发明的土质覆盖系统中各土层气流量与气压的关系函数示意图;Fig. 3 is the relational function schematic diagram of each soil layer air flow and air pressure in the soil covering system of the present invention;

图4为作为比较的毛细阻滞覆盖系统一个具体例子的数值模拟结果图;Fig. 4 is the numerical simulation result figure of a specific example of capillary retardation covering system as comparison;

图5为本发明的土质覆盖系统的一个具体例子的数值模拟结果图;Fig. 5 is the numerical simulation result figure of a concrete example of soil covering system of the present invention;

图6为本发明的土质覆盖系统的防渗性能的一个具体例子的土柱模型试验结果图;Fig. 6 is the soil column model test result figure of a concrete example of the anti-seepage performance of soil covering system of the present invention;

图7为本发明的土质覆盖系统的闭气性能的一个具体例子的土柱模型试验结果图;Fig. 7 is the soil column model test result figure of a specific example of the air-trap performance of the soil covering system of the present invention;

在各图中的附图标记分别表示:1为粉土层,2为砾砂层,3为粘土层,4为可选的气体收集层,5为垃圾填埋体,6为填埋气,7为水流,8为土质覆盖系统,9为土工布,10为排水沟,S1为粉土层与砾砂层水渗透系数函数交叉点对应的吸力值,S2为砾砂层与粘土层水渗透系数函数交叉点对应的吸力值,A为粘土层的进气值。The reference signs in each figure indicate respectively: 1 is a silt layer, 2 is a gravel sand layer, 3 is a clay layer, 4 is an optional gas collection layer, 5 is a landfill body, 6 is a landfill gas, 7 is the water flow, 8 is the soil covering system, 9 is the geotextile, 10 is the drainage ditch, S 1 is the suction value corresponding to the intersection point of the water permeability coefficient function of the silt layer and the gravel sand layer, S 2 is the gravel sand layer and the clay layer The suction value corresponding to the intersection point of the water permeability coefficient function, A is the air intake value of the clay layer.

具体实施方式detailed description

以下通过具体实施方式的描述并参照附图对本发明作进一步说明,但这并非是对本发明的限制,本领域技术人员根据本发明的基本思想,可以做出各种修改或改进,但是只要不脱离本发明的基本思想,均在本发明的范围之内。The present invention will be further described below by the description of specific embodiment and with reference to accompanying drawing, but this is not limitation of the present invention, those skilled in the art can make various modifications or improvements according to the basic idea of the present invention, but as long as not departing from The basic idea of the present invention is within the scope of the present invention.

现有的毛细阻滞覆盖系统均不能在任何气候条件下达到长期防渗闭气的功能,尤其是不能有效防止填埋气逸出以及在土体接近饱和或达到饱和状态下不能有效防止液体入渗。而本发明人惊奇地发现,只要在由粉土层和砾砂层组成的毛细阻滞覆盖层下方增设一层粘土层,特别是压实粘土层,就能够在任何气候条件下,特别是土体接近饱和或者达到饱和状态时,有效防止液体(特别是雨水)渗入垃圾填埋体,以及有效防止填埋气逸出。None of the existing capillary blocking covering systems can achieve long-term anti-seepage and air-tight functions under any climatic conditions, especially cannot effectively prevent landfill gas from escaping and cannot effectively prevent liquid infiltration when the soil is close to or reaches saturation. . And the inventor surprisingly found that as long as a layer of clay layer, especially a compacted clay layer is added below the capillary retardation cover layer composed of silt layer and gravel sand layer, it can be used under any climatic conditions, especially in soil. When the body is close to saturation or reaches saturation, it can effectively prevent liquid (especially rainwater) from penetrating into the landfill body, and effectively prevent landfill gas from escaping.

而假若将粘土层设置在覆盖系统的表层,则不可能达到在任何气候条件下长期防渗闭气的效果。这是因为,在天气干燥的情况下,暴露在空气中的粘土层极易开裂,导致渗透性变大,从而不能再阻挡液体渗入或气体逸出。本发明中,粘土层设置在覆盖系统的底层,即粉土层和砾砂层的下方,且饱和度较高,故不存在干燥开裂的问题。And if the clay layer is set on the surface of the covering system, it is impossible to achieve the effect of long-term anti-seepage and air-tightness under any climatic conditions. This is because, in dry weather, the clay layers exposed to the air are extremely prone to cracking, making them more permeable and no longer able to stop liquids from seeping in or gases from escaping. In the present invention, the clay layer is arranged at the bottom layer of the covering system, that is, below the silt layer and gravel sand layer, and has a high degree of saturation, so there is no problem of drying and cracking.

在本文中,“全天候”指任何气候条件,包括任何干湿气候,更具体而言,包括:湿润、半湿润、半干旱、干旱的气候条件。In this context, "all weather" refers to any climatic conditions, including any wet and dry climates, and more specifically, includes: humid, semi-humid, semi-arid, and arid climatic conditions.

在本文中,“土体”指本发明覆盖系统中的粘土层、砾砂层、粉土层或它们的总称。Herein, "soil body" refers to the clay layer, gravel sand layer, silt layer or their general term in the covering system of the present invention.

本文中所述的“粉土”、“砾砂”和“粘土”的定义和划分在本领域是已知的,具体可参见中华人民共和国国家标准“土的工程分类标准GB/T50145-2007”和“建筑地基基础设计规范GB50007-2002”,其中主要根据粒径分布范围来确定。The definitions and divisions of "silt", "gravel" and "clay" described in this article are known in the art. For details, please refer to the National Standard of the People's Republic of China "Engineering Classification Standard for Soil GB/T50145-2007" And "Code for Design of Building Foundation GB50007-2002", which is mainly determined according to the particle size distribution range.

在本文中,“液体”指包括雨水、雪水等各种形式的液体。In this article, "liquid" refers to various forms of liquid including rainwater, snowwater, etc.

具体而言,本发明提供了一种用于垃圾填埋处理的全天候防渗闭气的土质覆盖系统,其包括粘土层、砾砂层和粉土层;其特征在于,所述粘土层、砾砂层和粉土层由下往上依次铺设于所要填埋的垃圾之上,或者在该垃圾上覆盖有气体收集层的情况下,则铺设于该气体收集层之上,即在所述砾砂层和所述粉土层组成的毛细阻滞覆盖层下方增设一层所述粘土层。Specifically, the present invention provides an all-weather anti-seepage and air-tight soil covering system for landfill treatment, which includes a clay layer, a gravel sand layer and a silt layer; it is characterized in that the clay layer, gravel sand Layer and silt layer are laid sequentially from bottom to top on the garbage to be landfilled, or in the case of a gas collection layer covering the garbage, on the gas collection layer, that is, on the gravel A layer of said clay layer is added below the capillary retardation covering layer composed of the layer and said silt layer.

优选地,所述粘土层是经过压实处理的,其中所述压实处理包括在最优含水量进行压实。Preferably, said clay layer is compacted, wherein said compaction includes compaction at an optimum water content.

本文中所述的“最优含水量”的定义在本领域是已知的,其是指根据击实试验在一定击实条件下土体达到最大密实度时对应的含水量(具体可参见中华人民共和国国家标准“《土工试验方法标准》GB/T50123-1999”)。The definition of "optimum water content" described herein is known in the art, and it refers to the corresponding water content when the soil reaches the maximum compaction under certain compaction conditions according to the compaction test (for details, please refer to The National Standard of the People's Republic of China "Standards for Soil Test Methods" GB/T50123-1999").

图1示意性地示出了本发明的一种土质覆盖系统8,其主要由粘土层3、砾砂层2和粉土层1由下往上依次铺设组成,即在粉土层1和砾砂层2组成的毛细阻滞覆盖层下方增设一层粘土层3。Fig. 1 schematically shows a kind of soil covering system 8 of the present invention, and it is mainly made up of clay layer 3, gravel sand layer 2 and silt layer 1 laid in sequence from bottom to top, namely between silt layer 1 and gravel layer A clay layer 3 is added below the capillary retardation covering layer composed of the sand layer 2 .

还优选地,所述粘土层3的厚度为0.3-0.8m,并且所述粘土层的土体粒径小于0.075mm,并且所述粘土层的饱和水渗透系数不高于1×10-9m/s;所述砾砂层的厚度为0.2-0.3m,所述砾砂层的土体粒径为0.5-5mm,并且所述砾砂层的饱和水渗透系数不低于1×10-4m/s;所述粉土层的厚度为0.3-0.6m,所述粉土层的土体粒径不大于2mm,并且所述粉土层的饱和水渗透系数为1×10-8-1×10-5m/s。土层厚度范围可通过参数分析获得,例如,可采用本领域已知的数值模拟软件(例如,GeoStudio2007软件,可得自位于加拿大的GEO-SLOPE公司)进行。可采用不同土层厚度和不同水渗透系数进行参数分析,从而能够得到从饱和到干的任何气候条件都能达到最佳防渗闭气效果的土层厚度范围。Also preferably, the thickness of the clay layer 3 is 0.3-0.8m, and the soil particle size of the clay layer is less than 0.075mm, and the saturated water permeability coefficient of the clay layer is not higher than 1×10 -9 m /s; the thickness of the gravel sand layer is 0.2-0.3m, the soil particle size of the gravel sand layer is 0.5-5mm, and the saturated water permeability coefficient of the gravel sand layer is not less than 1×10 -4 m/s; the thickness of the silt layer is 0.3-0.6m, the soil particle size of the silt layer is not greater than 2mm, and the saturated water permeability coefficient of the silt layer is 1×10 -8 -1 ×10 -5 m/s. The thickness range of the soil layer can be obtained through parametric analysis, for example, by using numerical simulation software known in the art (eg, GeoStudio2007 software, available from GEO-SLOPE, Inc. located in Canada). Different soil layer thicknesses and different water permeability coefficients can be used for parameter analysis, so that the soil layer thickness range that can achieve the best anti-seepage and air-tight effect can be obtained under any climatic conditions from saturated to dry.

还优选地,该土质覆盖系统可为水平式或斜坡式,斜坡式的坡度为:垂直向与水平向比不大于1:3。Also preferably, the soil covering system can be horizontal or slope-type, and the slope of the slope-type is: the ratio of the vertical direction to the horizontal direction is not greater than 1:3.

还优选地,该土质覆盖系统是铺设在水平的或坡体形状的垃圾填埋体上的,坡体的坡度为:垂直向与水平向比不大于1:3。Also preferably, the soil covering system is laid on a horizontal or slope-shaped landfill body, and the slope of the slope body is: the ratio of the vertical direction to the horizontal direction is not greater than 1:3.

本发明中对土质覆盖系统的区域大小没有特别限制,本领域技术人员能够根据实际需要(如垃圾填埋体的实际大小)进行选择,并且可根据需要对该土质覆盖系统沿水平向每隔20-40m设置一道排水沟。当气候长期非常干旱时,可采用回灌的方法在坡体上部将水灌入砾砂层从而湿润粘土层。排水沟的设置与回灌方法可采用本领域的常规手段或方法进行。In the present invention, there is no special limitation on the area size of the soil covering system. Those skilled in the art can choose according to actual needs (such as the actual size of the landfill body), and the soil covering system can be horizontally spaced every 20 Set up a drainage ditch at -40m. When the climate is very dry for a long time, the method of recharge can be used to pour water into the gravel layer on the upper part of the slope to moisten the clay layer. The setting and refilling method of the drainage ditch can be carried out by conventional means or methods in the art.

此外,对于本发明的土质覆盖系统,当相邻两层土体颗粒的粒径差异较大时,可以任选地铺设可透气透水的土工布层9,以防止不同土层之间的颗粒互混。例如,当粉土层和砾砂层的颗粒平均粒径差大于5倍时,可在粉土层和砾砂层之间铺设土工布层,防止粉土颗粒嵌入砾砂层。类似地,当砾砂层和粘土层的颗粒平均粒径差大于5倍时,可在砾砂层和粘土层之间铺设土工布层。In addition, for the soil covering system of the present invention, when the particle diameters of adjacent two layers of soil particles differ greatly, an air-permeable and water-permeable geotextile layer 9 can be optionally laid to prevent the particles from interfering between different soil layers. mix. For example, when the average particle size difference between the silt layer and the gravel sand layer is greater than 5 times, a geotextile layer can be laid between the silt layer and the gravel sand layer to prevent the silt particles from being embedded in the gravel sand layer. Similarly, when the average particle size difference between the gravel sand layer and the clay layer is greater than 5 times, a geotextile layer can be laid between the gravel sand layer and the clay layer.

此外,在将本发明的土质覆盖系统应用于垃圾填埋体时,可以任选地在垃圾填埋体上铺设气体收集层。气体收集层是现有技术已知的,其用于使垃圾填埋体产生的气体迁移扩散,从而有利于提高气体收集效率,因此,气体收集层也可被称为气体扩散层。气体收集层可以由碎石组成,但不限于此。In addition, when the soil covering system of the present invention is applied to a landfill body, a gas collection layer may optionally be laid on the landfill body. The gas collection layer is known in the prior art, and it is used to migrate and diffuse the gas generated by the landfill body, so as to improve the gas collection efficiency. Therefore, the gas collection layer can also be called a gas diffusion layer. The gas collection layer may be composed of crushed rock, but is not limited thereto.

本发明还提供了所述土质覆盖系统的制备方法,该方法包括:The present invention also provides a preparation method of the soil covering system, the method comprising:

1)提供具有平整表面的水平式或斜坡式的垃圾填埋体;1) Provide a horizontal or sloped landfill with a flat surface;

2)可选地,在所述垃圾填埋体的表面上铺设气体收集层(例如,一层由碎石组成的气体收集层);2) Optionally, laying a gas collection layer on the surface of the landfill body (for example, a gas collection layer composed of gravel);

3)在所述气体收集层(如果有该层的情况下)或垃圾填埋体(如果没有气体收集层的情况下)的表面上铺设粘土层,在最优含水量压实并进行平整处理;3) On the surface of the gas collection layer (if there is one) or the landfill body (if there is no gas collection layer) a layer of clay is laid, compacted and leveled at an optimal water content ;

4)在所述粘土层的表面上铺设砾砂层,压实并进行平整处理;以及4) laying a gravel sand layer on the surface of the clay layer, compacting and leveling; and

5)在所述砾砂层的表面上铺设粉土层,压实并进行平整处理,从而得到所述土质覆盖系统。5) A silt layer is laid on the surface of the gravel layer, compacted and leveled to obtain the soil covering system.

优选地,本发明的土质覆盖系统可以按照以下步骤使用(参见图1):Preferably, the soil covering system of the present invention can be used according to the following steps (see Figure 1):

1)平整垃圾填埋体5的表面;1) leveling the surface of the landfill body 5;

2)可选地,在垃圾填埋体5的表面上铺设气体收集层4(例如,一层由碎石组成的气体收集层);2) Optionally, laying a gas collection layer 4 on the surface of the landfill body 5 (for example, a gas collection layer composed of gravel);

3)在气体收集层4的表面上铺设粘土层3(如果没有气体收集层4,则在垃圾填埋体5的表面上铺设粘土层3),在最优含水量压实后进行平整处理;3) lay clay layer 3 on the surface of gas collection layer 4 (if there is no gas collection layer 4, lay clay layer 3 on the surface of landfill body 5), and perform leveling treatment after compaction with optimal water content;

4)在粘土层3的表面上铺设砾砂层2,压实并进行平整处理;4) laying gravel sand layer 2 on the surface of clay layer 3, compacting and leveling;

5)在砾砂层2的表面上铺设粉土层1,压实并进行平整处理。5) The silt layer 1 is laid on the surface of the gravel layer 2, compacted and leveled.

本发明还提供了所述的土质覆盖系统在全天候条件下用于防止液体(特别是雨水)渗入垃圾填埋体的用途。本发明还提供了所述的土质覆盖系统在全天候条件下用于防止气体从垃圾填埋体中逸出的用途。The present invention also provides the use of the soil covering system for preventing liquid (especially rainwater) from seeping into landfills under all-weather conditions. The present invention also provides the use of the soil covering system for preventing gas from escaping from landfills under all-weather conditions.

本发明的土质覆盖系统的防渗功能可以通过以下原理实现:The anti-seepage function of the soil covering system of the present invention can be realized by the following principles:

本领域技术人员能够理解的是,土体从饱和到干,饱和度减小,含水量减小,对应的吸力则增大,而土的水渗透系数随吸力增大而减小(参见文献:“Ng,C.W.W.&Menzies,B.(2007).AdvancedUnsaturatedSoilMechanicsandEngineering.Taylor&Francis,LondonandNY.ISBN:978-0-415-43679-3.687p.”)。Those skilled in the art can understand that when the soil is saturated to dry, the saturation decreases, the water content decreases, and the corresponding suction increases, and the water permeability coefficient of the soil decreases with the increase of suction (see literature: "Ng, C.W.W. & Menzies, B. (2007). Advanced Unsaturated Soil Mechanics and Engineering. Taylor & Francis, London and NY. ISBN: 978-0-415-43679-3.687p.").

本文中所述的“吸力”的定义在本领域是已知的,其是指土体中气体压力与水压力的差值。The definition of "suction" described herein is known in the art, and it refers to the difference between gas pressure and water pressure in a soil mass.

本文中所述的“饱和度”的定义在本领域是已知的,其是指土体孔隙中水占的体积与土体孔隙体积的比值。The definition of "saturation" described herein is known in the art, which refers to the ratio of the volume occupied by water in the pores of the soil to the volume of the pores of the soil.

本文中所述的“水渗透系数”的定义在本领域是已知的,其是指在单位水力梯度下土体内的单位水流量,其数值单位可为“m/s”。The definition of "water permeability coefficient" described herein is known in the art, which refers to the unit water flow rate in the soil body under the unit hydraulic gradient, and its numerical unit may be "m/s".

本文中所述的“饱和水渗透系数”的定义在本领域是已知的,其是指土体达到饱和(即饱和度为100%)时对应的水渗透系数。The definition of "saturated water permeability coefficient" described herein is known in the art, and it refers to the corresponding water permeability coefficient when the soil reaches saturation (ie, the saturation is 100%).

图2所示为土质覆盖系统中各土层水渗透系数与吸力的关系函数示意图。以下参照图2进行说明。Figure 2 is a schematic diagram of the relationship function between water permeability coefficient and suction of each soil layer in the soil cover system. The following description will be made with reference to FIG. 2 .

(1)当土质覆盖系统中土体的吸力小于S1,即处于湿润气候条件时,土体含水量较高,处于饱和或者接近饱和状态,砾砂层2的水渗透系数最高,粘土层3的水渗透系数最低。因为砾砂层2的水渗透系数高于粉土层1的水渗透系数,毛细阻滞作用失效,故此时依靠粘土层3的超低透水性防止雨水渗入垃圾填埋体。另一方面,因为砾砂层2的水渗透系数最大,故侧向排水主要发生在砾砂层2,如图1所示。(1) When the soil suction in the soil cover system is less than S 1 , that is, under humid climate conditions, the water content of the soil is high, saturated or close to saturation, the water permeability coefficient of the gravel layer 2 is the highest, and the clay layer 3 The water permeability coefficient is the lowest. Because the water permeability coefficient of the gravel layer 2 is higher than that of the silt layer 1, capillary retardation fails, so the ultra-low water permeability of the clay layer 3 is relied on to prevent rainwater from seeping into the landfill. On the other hand, because the water permeability coefficient of the gravel sand layer 2 is the largest, the lateral drainage mainly occurs in the gravel sand layer 2, as shown in Fig. 1 .

(2)当土质覆盖系统中土体的吸力介于S1与S2之间(参见图2),即处于半湿润气候条件时,土体比较湿润,粉土层1的水渗透系数最高,粘土层3的水渗透系数最低。因为粉土层1的水渗透系数最大,故侧向排水主要发生在粉土层1。但仍可能有部分水渗入砾砂层2中,所以仍然需要依靠粘土层3的超低透水性防止雨水渗入垃圾填埋体。(2) When the soil suction in the soil cover system is between S 1 and S 2 (see Figure 2), that is, in semi-humid climate conditions, the soil is relatively moist, and the water permeability coefficient of silt layer 1 is the highest. Clay layer 3 has the lowest water permeability coefficient. Because the water permeability coefficient of the silt layer 1 is the largest, the lateral drainage mainly occurs in the silt layer 1. However, some water may still seep into the gravel sand layer 2, so it is still necessary to rely on the ultra-low water permeability of the clay layer 3 to prevent rainwater from seeping into the landfill.

(3)当土质覆盖系统中土体的吸力大于S2,即处于半干旱或干旱气候条件时,土体比较干燥,粉土层1的水渗透系数远高于砾砂层2的水渗透系数,毛细阻滞作用生效。雨水主要储存于粉土层1中或在粉土层1内沿坡侧向排走,而不渗入砾砂层2中,从而不渗入垃圾填埋体。(3) When the soil suction in the soil cover system is greater than S 2 , that is, in semi-arid or arid climate conditions, the soil is relatively dry, and the water permeability coefficient of the silt layer 1 is much higher than that of the gravel layer 2 , the capillary arrest effect takes effect. The rainwater is mainly stored in the silt layer 1 or drained away along the side of the slope in the silt layer 1, and does not infiltrate into the gravel sand layer 2, so that it does not infiltrate into the landfill body.

本发明土质覆盖系统的闭气功能通过以下原理实现:The gas-holding function of the soil covering system of the present invention is realized by the following principles:

图3所示为土质覆盖系统中各土层气流量与填埋气气压的关系函数示意图。以下参照图3进行说明。当填埋气气压较低时,土体内气流量几乎为零,之后气流量随填埋气气压增大而迅速增大。以粘土层3为例,图中A点为粘土层3的击穿气压或称为进气值,即气体开始进入土体时对应的气压值。当填埋气气压低于A时,填埋气无法进入土体,粘土层3内气流量几乎为零。当填埋气气压大于A时,气体开始进入粘土层3,气流量迅速增大。土质覆盖系统中粘土层3的击穿气压(即进气值)最高,且粘土层3在底层,直接与填埋气6接触(参见图1)。填埋气6的气压通常在20kPa以下(参见文献:“魏海云(2007).城市生活垃圾填埋场气体运移规律研究.浙江大学博士论文.”)。因此,压实粘土层3,使其击穿气压(即进气值)A高于填埋气6产生的气压,则可有效防止填埋气逸出。Figure 3 is a schematic diagram of the relationship function between the air flow rate of each soil layer and the landfill air pressure in the soil cover system. The following description will be made with reference to FIG. 3 . When the landfill gas pressure is low, the air flow in the soil is almost zero, and then the air flow increases rapidly with the increase of the landfill gas pressure. Taking the clay layer 3 as an example, point A in the figure is the breakdown pressure of the clay layer 3 or the air intake value, that is, the corresponding air pressure value when the gas starts to enter the soil. When the landfill gas pressure is lower than A, the landfill gas cannot enter the soil, and the air flow in the clay layer 3 is almost zero. When the landfill gas pressure is greater than A, the gas begins to enter the clay layer 3, and the gas flow increases rapidly. The clay layer 3 has the highest breakdown pressure (i.e. air intake value) in the soil cover system, and the clay layer 3 is at the bottom layer, directly in contact with the landfill gas 6 (see Figure 1). The pressure of landfill gas 6 is usually below 20kPa (refer to literature: "Wei Haiyun (2007). Research on gas migration law in municipal solid waste landfill. Doctoral dissertation of Zhejiang University."). Therefore, compacting the clay layer 3 so that the breakdown air pressure (that is, the air intake value) A is higher than the air pressure generated by the landfill gas 6 can effectively prevent the landfill gas from escaping.

以下通过例子的方式进一步解释或说明本发明的内容,但这些例子不应被理解为对本发明的保护范围的限制。The content of the present invention is further explained or illustrated by way of examples below, but these examples should not be construed as limiting the protection scope of the present invention.

例子一example one

在以下例子中采用GeoStudio2007软件(可得自位于加拿大的GEO-SLOPE公司)进行数值模拟。GeoStudio软件是用于岩土工程和岩土环境模拟计算的仿真软件。据报道,采用这一软件对垃圾填埋场及土质覆盖系统进行数值模拟,发现模拟结果与真实模型试验结果非常吻合(参见文献:“贾官伟(2010).固废堆场终场土质覆盖层中水分运移规律及调控方法研究.浙江大学博士论文.”)。Numerical simulations were performed in the following examples using GeoStudio 2007 software (available from GEO-SLOPE, Inc., Canada). GeoStudio software is a simulation software for geotechnical engineering and geotechnical environment simulation calculation. According to reports, this software was used to simulate the landfill and soil cover system, and it was found that the simulation results were in good agreement with the real model test results (see literature: "Jia Guanwei (2010). Moisture in the soil cover layer at the end of the solid waste yard Research on migration laws and regulation methods. Doctoral dissertation of Zhejiang University.").

比较例1Comparative example 1

作为比较,先对传统毛细阻滞覆盖系统进行模拟,即只采用粉土层和砾砂层作为覆盖系统,粉土层下方为砾砂层。其中砾砂层的厚度为0.3m,土体粒径为0.5-5mm,饱和水渗透系数为2×10-4m/s;粉土层的厚度为0.3m,土体粒径不大于2mm,饱和水渗透系数为3×10-6m/s。坡度垂直向与水平向比为1:3。As a comparison, the traditional capillary retardation covering system is simulated first, that is, only the silt layer and the gravel sand layer are used as the covering system, and the gravel sand layer is under the silt layer. Among them, the thickness of the gravel layer is 0.3m, the particle size of the soil is 0.5-5mm, and the saturated water permeability coefficient is 2×10 -4 m/s; the thickness of the silt layer is 0.3m, and the particle size of the soil is not greater than 2mm. The saturated water permeability coefficient is 3×10 -6 m/s. The vertical to horizontal ratio of the slope is 1:3.

采用GeoStudio2007软件进行数值模拟,气候条件设置为:施加强降雨,其强度为100mm/小时,持续2小时。结果如图4所示,图中箭头方向表征水流方向,箭头大小表征水流速度的大小。该结果证明了传统毛细阻滞覆盖系统在强降雨条件下,即土体接近饱和或达到饱和时,不能防止雨水渗入垃圾填埋体。GeoStudio2007 software was used for numerical simulation, and the climate conditions were set as follows: heavy rainfall with an intensity of 100mm/hour for 2 hours. The results are shown in Figure 4. The direction of the arrow in the figure represents the direction of the water flow, and the size of the arrow represents the speed of the water flow. This result demonstrates that the traditional capillary barrier cover system cannot prevent rainwater from seeping into the landfill under heavy rainfall conditions, that is, when the soil is close to or reaches saturation.

实施例1Example 1

在本发明的一种土质覆盖系统中,在粉土层和砾砂层组成的传统毛细阻滞覆盖系统下方增设一层粘土层。粘土层的厚度为0.3m,土体粒径小于0.075mm,饱和水渗透系数为1×10-9m/s;砾砂层的厚度为0.3m,土体粒径为0.5-5mm,饱和水渗透系数为2×10-4m/s;粉土层的厚度为0.3m,土体粒径不大于2mm,饱和水渗透系数为3×10-6m/s。坡度垂直向与水平向比为1:3。In a soil covering system of the present invention, a clay layer is added below the traditional capillary retardation covering system composed of a silt layer and a gravel sand layer. The thickness of the clay layer is 0.3m, the soil particle size is less than 0.075mm, and the saturated water permeability coefficient is 1×10 -9 m/s; the thickness of the gravel sand layer is 0.3m, the soil particle size is 0.5-5mm, and the saturated water The permeability coefficient is 2×10 -4 m/s; the thickness of the silt layer is 0.3m, the soil particle size is not more than 2mm, and the saturated water permeability coefficient is 3×10 -6 m/s. The vertical to horizontal ratio of the slope is 1:3.

采用GeoStudio2007软件进行数值模拟,气候条件设置为:施加强降雨,其强度为100mm/小时,持续2小时。结果如图5所示,图中箭头方向表征水流方向,箭头大小表征水流速度的大小。这一结果证明了本发明土质覆盖系统在强降雨条件下,即土体接近饱和或达到饱和时,可利用粘土层的超低透水性有效防止雨水渗入垃圾填埋体。GeoStudio2007 software was used for numerical simulation, and the climate conditions were set as follows: heavy rainfall with an intensity of 100mm/hour for 2 hours. The results are shown in Figure 5. The direction of the arrow in the figure represents the direction of the water flow, and the size of the arrow represents the speed of the water flow. This result proves that the soil covering system of the present invention can effectively prevent rainwater from seeping into landfills by utilizing the ultra-low water permeability of the clay layer under heavy rainfall conditions, that is, when the soil is close to or reaches saturation.

实施例2Example 2

在本发明的一种土质覆盖系统中,粘土层的厚度为0.5m,土体粒径小于0.075mm,饱和水渗透系数为1×10-9m/s;砾砂层的厚度为0.2m,土体粒径为0.5-5mm,饱和水渗透系数为1×10-3m/s;粉土层的厚度为0.3m,土体粒径小于2mm,饱和水渗透系数为1×10-8m/s。坡度垂直向与水平向比为1:4。In a soil covering system of the present invention, the thickness of the clay layer is 0.5m, the particle size of the soil is less than 0.075mm, and the saturated water permeability coefficient is 1× 10-9 m/s; the thickness of the gravel layer is 0.2m, The soil particle size is 0.5-5mm, the saturated water permeability coefficient is 1×10 -3 m/s; the thickness of the silt layer is 0.3m, the soil particle size is less than 2mm, and the saturated water permeability coefficient is 1×10 -8 m /s. The vertical to horizontal ratio of the slope is 1:4.

采用GeoStudio2007软件进行数值模拟,气候条件设置为:施加强降雨,其强度为70mm/小时,持续4小时。结果证明了本发明土质覆盖系统可在强降雨条件下,即土体接近饱和或达到饱和时,有效防止雨水渗入垃圾填埋体。GeoStudio2007 software was used for numerical simulation, and the climate conditions were set as follows: heavy rainfall with an intensity of 70mm/hour for 4 hours. The result proves that the soil covering system of the present invention can effectively prevent rainwater from infiltrating into the landfill under the condition of heavy rainfall, that is, when the soil is close to or reaches saturation.

例子二Example two

在以下例子中,采用一维土柱进行室内试验验证水平式土质覆盖系统的防渗闭气性能。在制备土柱时,底部粘土层和其上砾砂层按最优含水量和95%压实度进行压实,上部粉土层按最优含水量和80%压实度进行压实,然后密闭土柱上下通道,使得每层土体水分分布尽量均匀。通过控制土柱上、下边界进行防渗或闭气试验,在试验过程中分别进行孔隙水压力、孔隙气压力和含水量沿覆盖层不同深度的测量。In the following example, a one-dimensional soil column is used to conduct indoor tests to verify the anti-seepage and air-tight performance of the horizontal soil cover system. When preparing the soil column, the bottom clay layer and the upper gravel sand layer were compacted according to the optimal water content and 95% compaction degree, and the upper silt layer was compacted according to the optimal water content and 80% compaction degree, and then The upper and lower passages of the soil column are sealed to make the moisture distribution of each layer of soil as uniform as possible. The anti-seepage or air-tight test is carried out by controlling the upper and lower boundaries of the soil column, and the pore water pressure, pore air pressure and water content are measured along different depths of the overburden layer during the test.

实施例1Example 1

对本发明的一种土质覆盖系统进行一维土柱降雨模拟试验,粘土层的厚度为0.4m,土体粒径小于0.075mm,饱和水渗透系数低于1×10-9m/s;砾砂层的厚度为0.2m,土体粒径为0.5-5mm,饱和水渗透系数高于1×10-4m/s;粉土层的厚度为0.4m,土体粒径小于2mm,饱和水渗透系数为5×10-7m/s。在覆盖系统上方施加降雨,经历了不同强度的降雨后覆盖系统中的体积含水量分布如图6所示,其中,降雨强度“x年一遇”参照香港气候资料文献确定(参见文献:“Lam,C.C.andLeung,Y.K.(1995).ExtremerainfallstatisticsanddesignrainstormprofilesatselectedlocationsinHongKong.TechnicalNoteNo.86,RoyalObservatory,HongKong.”)。即使在200年一遇甚至更高的降雨强度下,覆盖系统中的粘土层底部土体的含水量仍基本保持不变。这说明对于设计年限通常为120年的覆盖系统来说,在其服役年限内,雨水不会穿透粘土层。A soil covering system of the present invention is subjected to a one-dimensional soil column rainfall simulation test. The thickness of the clay layer is 0.4m, the particle size of the soil is less than 0.075mm, and the saturated water permeability coefficient is lower than 1× 10-9 m/s; The thickness of the layer is 0.2m, the particle size of the soil is 0.5-5mm, and the saturated water permeability coefficient is higher than 1×10 -4 m/s; the thickness of the silt layer is 0.4m, the particle size of the soil is less than 2mm, and the saturated water permeability The coefficient is 5×10 -7 m/s. Rainfall is applied above the cover system, and the distribution of volumetric water content in the cover system after experiencing different intensities of rainfall is shown in Figure 6, where the rainfall intensity "once in x years" is determined with reference to the Hong Kong climate data literature (refer to the literature: "Lam , CC and Leung, YK (1995). Extreme rain fall statistics and design rain storm profile sat selected locations in Hong Kong. Technical Note No. 86, Royal Observatory, Hong Kong."). Even under rainfall intensities of 1 in 200 years or higher, the water content of the soil at the bottom of the clay layer in the cover system remains basically unchanged. This means that for a cover system with a typical design life of 120 years, rainwater will not penetrate the clay layer during its service life.

实施例2Example 2

对本发明的一种土质覆盖系统中的粘土层进行气体击穿试验,粘土层的厚度为0.4m,土体粒径小于0.075mm,饱和水渗透系数低于1×10-9m/s。在粘土层下方施加气压力(在图7中以横坐标“底部气体压力”示出),观测粘土层上部的气流量变化(在图7中以纵坐标“顶部气体流量”示出)。试验结果如图7所示,在粘土层饱和状态下(即饱和度100%,即在湿润的气候条件),即使气压力达到50kPa仍未能击穿粘土层;饱和度80%的粘土层(即在湿润、半湿润的气候条件),其击穿气压约为35kPa;饱和度60%的粘土层,击穿气压约为22kPa。由于通常情况下垃圾填埋场中填埋气压力在20kPa以下,所以即使在土体干燥的气候条件下,粘土层的饱和度为60%,仍然能够有效防止垃圾填埋气的逸出。A gas breakdown test is carried out on the clay layer in a soil covering system of the present invention. The thickness of the clay layer is 0.4m, the particle size of the soil is less than 0.075mm, and the saturated water permeability coefficient is lower than 1×10 -9 m/s. Apply gas pressure below the clay layer (shown by abscissa "bottom gas pressure" in Figure 7), and observe changes in air flow above the clay layer (shown by ordinate "top gas flow" in Figure 7). The test results are shown in Figure 7. In the saturated state of the clay layer (that is, the saturation is 100%, that is, in humid climate conditions), even if the air pressure reaches 50kPa, the clay layer still cannot be broken down; the clay layer with a saturation of 80% ( That is, in humid and semi-humid climate conditions), the breakdown pressure is about 35kPa; for a clay layer with a saturation of 60%, the breakdown pressure is about 22kPa. Since the pressure of the landfill gas in the landfill is usually below 20kPa, even under dry soil conditions, the saturation of the clay layer is 60%, which can still effectively prevent the escape of landfill gas.

Claims (9)

1.一种用于垃圾填埋的土质覆盖系统,其铺设于所要填埋的垃圾之上,或者在所述垃圾上覆盖有气体收集层的情况下则铺设于该气体收集层之上;其特征在于,该土质覆盖系统包括粘土层和毛细阻滞覆盖层,并且所述粘土层位于所述毛细阻滞覆盖层的下方,并且位于所要填埋的垃圾的上方;其中,所述毛细阻滞覆盖层包括砾砂层和粉土层,并且所述粉土层位于所述砾砂层的上方;所述粘土层的厚度为0.3-0.8m,所述粘土层的土体粒径小于0.075mm,并且所述粘土层的饱和水渗透系数不高于1×10-9m/s。1. A soil covering system for landfills, which is laid over the waste to be landfilled or, in the case of said waste being covered with a gas-collecting layer, over the gas-collecting layer; its It is characterized in that the earthy covering system includes a clay layer and a capillary-blocking covering layer, and the clay layer is located below the capillary-blocking covering layer and above the garbage to be landfilled; wherein, the capillary-blocking The covering layer includes a gravel layer and a silt layer, and the silt layer is located above the gravel layer; the thickness of the clay layer is 0.3-0.8m, and the soil particle size of the clay layer is less than 0.075mm , and the saturated water permeability coefficient of the clay layer is not higher than 1×10 -9 m/s. 2.根据权利要求1所述的土质覆盖系统,其特征在于,所述粘土层是经过压实处理的,其中所述压实处理包括在最优含水量进行压实。2. The soil cover system of claim 1, wherein the clay layer is compacted, wherein the compaction includes compacting at an optimum moisture content. 3.根据权利要求1所述的土质覆盖系统,其特征在于,所述砾砂层的厚度为0.2-0.3m,所述砾砂层的土体粒径为0.5-5mm,并且所述砾砂层的饱和水渗透系数不低于1×10-4m/s。3. The soil covering system according to claim 1, characterized in that, the thickness of the gravel sand layer is 0.2-0.3m, and the soil particle diameter of the gravel sand layer is 0.5-5mm, and the gravel sand layer The saturated water permeability coefficient of the layer is not lower than 1×10 -4 m/s. 4.根据权利要求1所述的土质覆盖系统,其特征在于,所述粉土层的厚度为0.3-0.6m,所述粉土层的土体粒径不大于2mm,并且所述粉土层的饱和水渗透系数为1×10-8-1×10-5m/s。4. soil covering system according to claim 1, is characterized in that, the thickness of described silt layer is 0.3-0.6m, and the soil particle diameter of described silt layer is not more than 2mm, and the thickness of described silt layer The saturated water permeability coefficient is 1×10 -8 -1×10 -5 m/s. 5.根据权利要求1所述的土质覆盖系统,其特征在于,该土质覆盖系统为水平式或斜坡式,所述斜坡式的坡度为:垂直向与水平向比不大于1:3。5. The soil covering system according to claim 1, characterized in that, the soil covering system is horizontal or slope type, and the slope of the slope type is: the ratio of vertical direction to horizontal direction is not greater than 1:3. 6.根据权利要求1所述的土质覆盖系统,其特征在于,该土质覆盖系统沿水平向每隔20-40m设置有一道排水沟。6. The soil covering system according to claim 1, characterized in that, the soil covering system is provided with a drainage ditch every 20-40m along the horizontal direction. 7.一种根据权利要求1-6中任意一项所述的土质覆盖系统的制备方法,该方法包括:7. A method for preparing the soil covering system according to any one of claims 1-6, the method comprising: 1)提供具有平整表面的水平式或斜坡式的垃圾填埋体;1) Provide a horizontal or sloped landfill with a flat surface; 2)可选地,在所述垃圾填埋体的表面上铺设气体收集层;2) Optionally, laying a gas collection layer on the surface of the landfill body; 3)在所述垃圾填埋体的表面上铺设粘土层,或者在设有所述气体收集层的情况下则在该气体收集层的表面上铺设粘土层,在最优含水量压实并进行平整处理;3) laying a clay layer on the surface of the landfill, or laying a clay layer on the surface of the gas collection layer if the gas collection layer is provided, compacting and carrying out smoothing; 4)在所述粘土层的表面上铺设砾砂层,压实并进行平整处理;以及4) laying a gravel sand layer on the surface of the clay layer, compacting and leveling; and 5)在所述砾砂层的表面上铺设粉土层,压实并进行平整处理,从而得到所述土质覆盖系统。5) laying a silt layer on the surface of the gravel sand layer, compacting and leveling, so as to obtain the soil covering system. 8.根据权利要求1-6中任意一项所述的土质覆盖系统在全天候条件下用于防止液体渗入垃圾填埋体的用途。8. Use of the soil cover system according to any one of claims 1-6 for preventing the infiltration of liquids into landfills under all weather conditions. 9.根据权利要求1-6中任意一项所述的土质覆盖系统在全天候条件下用于防止气体从垃圾填埋体中逸出的用途。9. Use of a soil cover system according to any one of claims 1-6 for preventing the escape of gases from landfills under all weather conditions.
CN201310339617.1A 2012-08-06 2013-08-06 All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application Active CN103572785B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310339617.1A CN103572785B (en) 2012-08-06 2013-08-06 All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201210284493 2012-08-06
CN2012102844937 2012-08-06
CN201210284493.7 2012-08-06
CN201310339617.1A CN103572785B (en) 2012-08-06 2013-08-06 All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application

Publications (2)

Publication Number Publication Date
CN103572785A CN103572785A (en) 2014-02-12
CN103572785B true CN103572785B (en) 2016-03-02

Family

ID=50045442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310339617.1A Active CN103572785B (en) 2012-08-06 2013-08-06 All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application

Country Status (1)

Country Link
CN (1) CN103572785B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104438276B (en) * 2014-11-27 2017-03-22 河南省电力勘测设计院 Refuse landfill cover layer
CN105642642B (en) * 2016-01-27 2018-03-06 辽宁工程技术大学 A kind of composite closure structure of the Mine Solid Wastes landfill field of sulfur compound
CN106120813B (en) * 2016-06-27 2018-01-30 中国矿业大学 It is a kind of to avoid seepage flow water barrier from forming discharge method in the opencut with capillary effect
CN107091916B (en) * 2017-04-17 2019-12-10 武汉大学 covering layer structure optimization method for adjusting landfill seepage through plant dissipation
CN107570522A (en) * 2017-10-18 2018-01-12 中国地质大学(武汉) A multi-functional overburden structure and its application in landfill
CN108914979B (en) * 2018-06-25 2020-10-16 广州市香港科大霍英东研究院 Landfill capping layer and preparation method and application thereof
CN108941145B (en) * 2018-06-25 2021-12-17 广州市香港科大霍英东研究院 Intermediate covering layer of refuse landfill and preparation method and application thereof
CN109047267A (en) * 2018-09-27 2018-12-21 苏州金螳螂园林绿化景观有限公司 Degeneration system is polluted in refuse landfill
CN111636443B (en) * 2020-04-26 2021-12-07 合肥工业大学 Guiding and sucking type swelling soil slope shallow water control covering system based on capillary retardation mechanism
CN115012454B (en) * 2022-05-11 2023-11-07 武汉轻工大学 Solid waste base composite refuse landfill covering barrier system and preparation method thereof
CN114912158B (en) * 2022-05-13 2023-02-14 华中科技大学 Design method of soil covering layer of solid waste landfill with consideration of plant root system effect

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2036754T3 (en) * 1989-06-30 1993-06-01 Jost-Ulrich Kugler PROCEDURE FOR THE PRODUCTION OF A WATERPROOFING IN LANDFILLS OR THE LIKE.
DE4446691A1 (en) * 1993-12-30 1995-07-06 Horn Wolfgang Protection of buildings against dangerous gas entry
CN1478610A (en) * 2002-08-28 2004-03-03 中国科学院武汉岩土力学研究所 Method for backfilling abandoned mining site with urban solid waste
KR20050062121A (en) * 2003-12-19 2005-06-23 문정기 Method for repairing water leakage in scrapped material landfill
CN201334723Y (en) * 2008-12-17 2009-10-28 武汉新冠亿碳能源开发有限公司 Garbage landfill leachate draining and landfill gas collection system
CN101879516A (en) * 2009-05-06 2010-11-10 中国环境科学研究院 Improved municipal solid waste landfill structure and landfill treatment method
CN102493496A (en) * 2011-12-27 2012-06-13 浙江大学 Capillary blockage cover layer structure with lateral drainage capacity

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101966422B (en) * 2010-09-26 2013-06-05 环境保护部南京环境科学研究所 Method for processing CH4 in landfill site after acclimatizing and mineralizing garbage by utilizing percolate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2036754T3 (en) * 1989-06-30 1993-06-01 Jost-Ulrich Kugler PROCEDURE FOR THE PRODUCTION OF A WATERPROOFING IN LANDFILLS OR THE LIKE.
DE4446691A1 (en) * 1993-12-30 1995-07-06 Horn Wolfgang Protection of buildings against dangerous gas entry
CN1478610A (en) * 2002-08-28 2004-03-03 中国科学院武汉岩土力学研究所 Method for backfilling abandoned mining site with urban solid waste
KR20050062121A (en) * 2003-12-19 2005-06-23 문정기 Method for repairing water leakage in scrapped material landfill
CN201334723Y (en) * 2008-12-17 2009-10-28 武汉新冠亿碳能源开发有限公司 Garbage landfill leachate draining and landfill gas collection system
CN101879516A (en) * 2009-05-06 2010-11-10 中国环境科学研究院 Improved municipal solid waste landfill structure and landfill treatment method
CN102493496A (en) * 2011-12-27 2012-06-13 浙江大学 Capillary blockage cover layer structure with lateral drainage capacity

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
含非饱和导排层的毛细阻滞型覆盖层性能模型试验研究;邓林恒;《岩土工程学报》;20120131;第34卷(第1期);第75页第1行至78页第2.1节、图3-4 *

Also Published As

Publication number Publication date
HK1189638A1 (en) 2014-06-13
CN103572785A (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103572785B (en) All-weather anti-seepage and air-tight landfill soil covering system, preparation method and application
US10017911B2 (en) Municipal solid waste landfill barrier system capable of prolonging breakthrough time of leachate and manufacturing method thereof
CN108914979B (en) Landfill capping layer and preparation method and application thereof
US9101968B2 (en) All-weather landfill soil cover system for preventing water infiltration and landfill gas emission
CN103604907B (en) Environmental evolution and impermeable failure analog simulation system for refuse landfill closure coverage system
CN203212970U (en) Red clay roadbed structure
CN106351103A (en) Permeable pavement structure with high strength and high permeability and paving method thereof
CN109763393A (en) A kind of gardens sponge-type road pavement structure and its construction method
CN102493496A (en) Capillary blockage cover layer structure with lateral drainage capacity
CN216865196U (en) A closure covering structure for a municipal solid waste landfill
CN113265924B (en) Construction method for using red bed mudstone blocks as high-fill dynamic compaction roadbed filling
CN201678926U (en) Novel combined type water-permeable sidewalk
CN206219935U (en) A kind of permeable pavement structure of high intensity, high osmosis
CN114731910B (en) A controllable ecological restoration system of steam-seepage in mine landfills in arid areas
CN108941145B (en) Intermediate covering layer of refuse landfill and preparation method and application thereof
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN103485322B (en) The capillary retardance road structure of a kind of effective preventing and treating roadbed humidifying disease and construction method
CN216766009U (en) Landfill odor adsorption system
CN109930611A (en) A kind of capillary retardance coating and its preparation method and application for side slope protection
CN209457111U (en) A Sponge City Bioretention Facility Containing Recycled Aggregate of Construction Waste
CN207512879U (en) Suitable for the stepped rain water seepage well of sponge urban construction
CN208152219U (en) A kind of dry depression for sponge city
CN206127800U (en) Sponge city infiltration road structure
CN207042997U (en) Household refuse landfill sites capillary water absorption transpiration type covered structure
CN203238511U (en) Porous brick ground structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1189638

Country of ref document: HK

C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1189638

Country of ref document: HK