CN103212592A - Steel pipe shape adjusting method - Google Patents

Steel pipe shape adjusting method Download PDF

Info

Publication number
CN103212592A
CN103212592A CN2012100155624A CN201210015562A CN103212592A CN 103212592 A CN103212592 A CN 103212592A CN 2012100155624 A CN2012100155624 A CN 2012100155624A CN 201210015562 A CN201210015562 A CN 201210015562A CN 103212592 A CN103212592 A CN 103212592A
Authority
CN
China
Prior art keywords
welded
steel pipe
tube
weld seam
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100155624A
Other languages
Chinese (zh)
Other versions
CN103212592B (en
Inventor
李路华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panyu Chu Kong Steel Pipe Zhuhai Co ltd
Original Assignee
ZHUJIANG STEEL PIPE CO Ltd PANYU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUJIANG STEEL PIPE CO Ltd PANYU filed Critical ZHUJIANG STEEL PIPE CO Ltd PANYU
Priority to CN201210015562.4A priority Critical patent/CN103212592B/en
Publication of CN103212592A publication Critical patent/CN103212592A/en
Application granted granted Critical
Publication of CN103212592B publication Critical patent/CN103212592B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明钢管调型方法属于钢管制造和加工领域,在换辊期间,准备长管,长管的长度与飞锯到挤压辊的距离相当,长管与规格相同的焊管对接,长管的焊缝都要朝上,焊缝对焊缝,每个环焊缝焊接完之后,要用砂轮机将焊疤和过高的焊缝修磨平,然后利用定径辊的动力,反向运行,将焊接好的长管,从飞锯穿过已换好的矫直辊、定径辊和水冷、空冷段到磨光辊,与过挤压辊的钢管前端对接,定径辊、矫直辊,逐架调整好,飞锯调整好高度和刀距参数,待牵引管与高频处的管对接好后,启动轧机,一次性将焊接好的管牵引出来。本发明能快速、方便地将合格管生产出来。

Figure 201210015562

The steel pipe adjustment method of the present invention belongs to the field of steel pipe manufacturing and processing. During the roll change, a long pipe is prepared. The length of the long pipe is equivalent to the distance from the flying saw to the extrusion roller. The seam must face up, the weld seam to the weld seam, after each girth weld seam is welded, use a grinder to smooth the weld scar and the excessively high weld seam, and then use the power of the sizing roller to run in reverse, Put the welded long pipe from the flying saw through the replaced straightening roller, sizing roller and water cooling, air cooling section to the polishing roller, and connect with the front end of the steel pipe passing through the extrusion roller, the sizing roller, straightening roller , adjusted frame by frame, the flying saw adjusted the height and cutter distance parameters, after the traction tube and the tube at the high frequency are connected, start the rolling mill, and pull out the welded tube at one time. The invention can quickly and conveniently produce qualified pipes.

Figure 201210015562

Description

Steel pipe tune type method
  
Technical field
The present invention steel pipe tune type methodbelong to steel pipe manufacture and manufacture field, be mainly used in the ERW steel pipe's production, a kind of method of tune type poling after roll change.
Background technology
At present, in the ERW steel pipe's production, change roll post debugging poling, all will run into and can not once the steel pipe after welding be passed to the problem that flies saw smoothly.Cause the reason of this phenomenon to mainly contain: 1. in the poling process, steel pipe is to take format roll as driving force, is pushing away the steel pipe welded and is going ahead, and the steel pipe front end does not have tractive force, easily causes weld seam deflection; 2. the device layout of medium-large caliber ERW tubulation unit distance is all long, and the rolling centerline deviation of roll, cause weld seam deflection; 3. pipe at shaping area, compression roller place unbalance stress with carry out weld seam heat treatment, causes the perk of steel pipe head and weld seam deflection.
In most cases, finish changing first poling after roll and cross intermediate frequency heat treatment, air cooling, water-cooled, size rolls, smoothing roll, fly saw, at least want disorderly closedown could pass more than 3 times and fly to saw.Each shutdown all produces the disconnected welded tube of 10 meters long and (comprises and shutting down while restarting; heat treatment, the length that welding temperature is not enough, outer burr has not been removed); so each roll change poling tune type is produced to normal, at least will produce the long defective pipe of 30--40 rice, just can produce qualified pipe.When the material used, not at ordinary times, moulding welding fluctuation is large for the plate face, and the easy deflection of weld seam causes steel pipe seriously crooked, can not be smoothly by sizing, fly to saw operation, adjust also very difficult, and length consuming time, have a strong impact on manufacturing schedule.While particularly producing the pipe with small pipe diameter steel pipe, weld seam deflection is fast, and interior cutter is very easily scraped partially, causes Removing of inner burs undesirable, and slot scraping or inner burr are not scraped totally, affects product quality and increases the workload that postorder is processed; Also cause in addition welding seam bias intermediate frequency inductor center, cause weld seam heat treatment insufficient, the steel pipe of producing does not reach standard-required, product is remodeled, change roll post debugging poling, can not once the steel pipe after welding be sawed through flying smoothly, cause larger waste, these all have a strong impact on the lumber recovery that the small lot order is produced.
Summary of the invention
The object of the invention is to avoid weak point of the prior art, and a kind of time that shortens steel pipe tune type poling is provided, reduce the quantity of defective pipe in tune type poling process, improve product percent of pass, reduce production costs steel pipe tune type method.
The objective of the invention is to reach by following measures, of the present invention steel pipe tune type method is as follows,
?during roll change, prepare long tube, the length of long tube and the distance that flies to cut compression roller are quite, the welded tube docking that long tube is identical with specification, the weld seam of long tube all will be upward, the weld seam butt welded seam, after each girth joint has welded, to crator and too high welding seam grinding be put down with abrasive machine, then utilize the power of size rolls, inverted running, by the long tube welded, from flying saw through the smoothing roll of having finished changing, size rolls and water-cooled, the air cooling section is to burnisher, with the steel pipe front end of crossing compression roller, dock, size rolls, smoothing roll, by frame, adjust, fly the saw adjust the height and cutter apart from parameter, until the pipe of traction tube and high frequency treatment to after connecting, start milling train, disposable the pipe welded is pulled out.
The invention has the beneficial effects as follows: than general tune type method, shut down less 3 ~ 4 times, reduce raw material and drop into 30 ~ 40 meters, reduced production cost; Shorten the time of poling tune type, accelerated to produce the progress of debugging; Welding quality stable, be conducive to the removal of inside and outside burr, can quickly and easily qualified pipe be produced.
The accompanying drawing explanation
Accompanying drawing 1 is that ERW steel pipe's production traction method poling tune type high frequency is to flying to saw the post schematic layout pattern;
Accompanying drawing 2 is ERW steel pipe's production traction method poling tune type high frequency post butt tube schematic layout patterns;
Accompanying drawing 3 is ERW steel pipe's production traction method poling tune type air cooling section, water-cooled segment layout schematic diagram;
Accompanying drawing 4 is that ERW steel pipe's production traction method poling tune type flies to saw the post schematic layout pattern;
Below in conjunction with accompanying drawing, the present invention is further described.
  
As shown in accompanying drawing 1, accompanying drawing 2, accompanying drawing 3, accompanying drawing 4, that the ERW steel pipe's production is drawn method poling tune type high frequency to flying to saw the post schematic layout pattern, be mainly pipe through high-frequency welding-→ IF process-→ the air cooling section-→ water-cooled-→ sizing-→ fly the full mistake of saw cutting. ?during roll change, prepare long tube, the length of long tube and the distance that flies to cut compression roller are quite, the welded tube docking that long tube is identical with specification, the weld seam of long tube all will be upward, the weld seam butt welded seam, after each girth joint has welded, to crator and too high welding seam grinding be put down with abrasive machine, then utilize the power of size rolls, inverted running, by the long tube welded, from flying saw through the smoothing roll of having finished changing, size rolls and water-cooled, the air cooling section is to burnisher, with the steel pipe front end of crossing compression roller, dock, size rolls, smoothing roll, by frame, adjust, fly the saw adjust the height and cutter apart from parameter, until the pipe of traction tube and high frequency treatment to after connecting, start milling train, disposable the pipe welded is pulled out.

Claims (1)

1. one kind steel pipe tune type method is as follows,during roll change, prepare long tube, the length of long tube and the distance that flies to cut compression roller are quite, the welded tube docking that long tube is identical with specification, the weld seam of long tube all will be upward, the weld seam butt welded seam, after each girth joint has welded, to crator and too high welding seam grinding be put down with abrasive machine, then utilize the power of size rolls, inverted running, by the long tube welded, from flying saw through the smoothing roll of having finished changing, size rolls and water-cooled, the air cooling section is to burnisher, with the steel pipe front end of crossing compression roller, dock, size rolls, smoothing roll, by frame, adjust, fly the saw adjust the height and cutter apart from parameter, until the pipe of traction tube and high frequency treatment to after connecting, start milling train, disposable the pipe welded is pulled out.
CN201210015562.4A 2012-01-18 2012-01-18 Steel pipe shape adjusting method Active CN103212592B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210015562.4A CN103212592B (en) 2012-01-18 2012-01-18 Steel pipe shape adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210015562.4A CN103212592B (en) 2012-01-18 2012-01-18 Steel pipe shape adjusting method

Publications (2)

Publication Number Publication Date
CN103212592A true CN103212592A (en) 2013-07-24
CN103212592B CN103212592B (en) 2015-01-14

Family

ID=48810934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210015562.4A Active CN103212592B (en) 2012-01-18 2012-01-18 Steel pipe shape adjusting method

Country Status (1)

Country Link
CN (1) CN103212592B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105921546A (en) * 2016-06-22 2016-09-07 中石化石油工程机械有限公司沙市钢管厂 Method for shape adjusting and channel changing of spiral steel pipe production unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3042379B2 (en) * 1995-08-31 2000-05-15 日本鋼管株式会社 HDR continuous rolling method
CN1864917A (en) * 2005-05-18 2006-11-22 上海申花钢管有限公司 Method for manufacturing high-strength structured steel pipe
CN101380649A (en) * 2008-07-30 2009-03-11 郝建庚 High precision steel tube manufacture technique and system
CN101480776A (en) * 2008-01-11 2009-07-15 江苏嘉宝科技制管有限公司 High-efficient ERW welding tube manufacturing technology
CN101481995A (en) * 2008-01-11 2009-07-15 江苏嘉宝科技制管有限公司 High steel level petroleum casing pipe and oil pipe manufacturing process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3042379B2 (en) * 1995-08-31 2000-05-15 日本鋼管株式会社 HDR continuous rolling method
CN1864917A (en) * 2005-05-18 2006-11-22 上海申花钢管有限公司 Method for manufacturing high-strength structured steel pipe
CN101480776A (en) * 2008-01-11 2009-07-15 江苏嘉宝科技制管有限公司 High-efficient ERW welding tube manufacturing technology
CN101481995A (en) * 2008-01-11 2009-07-15 江苏嘉宝科技制管有限公司 High steel level petroleum casing pipe and oil pipe manufacturing process
CN101380649A (en) * 2008-07-30 2009-03-11 郝建庚 High precision steel tube manufacture technique and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105921546A (en) * 2016-06-22 2016-09-07 中石化石油工程机械有限公司沙市钢管厂 Method for shape adjusting and channel changing of spiral steel pipe production unit

Also Published As

Publication number Publication date
CN103212592B (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN203170699U (en) Stainless steel black roll online rolling annealing pickling production line
CN206966315U (en) High-speed wire production line
CN204195249U (en) A kind of band steel longitudinal-transverse shear process equipment
CN105729260A (en) Roller grinding process
CN202387934U (en) Online automatic cleaning device of casting blank incision dregs
CN103394546B (en) Production method for longitudinal welded pipe
CN201751022U (en) Equipment for forming hollow anchor rods at one step by reducing hot rolling
CN103212592A (en) Steel pipe shape adjusting method
CN107127645A (en) Slitting automatic knife-grinding apparatus
CN203471505U (en) Device for polishing punching burrs on inner wall of radiator oil collecting tube for transformer
CN118951372A (en) A method for improving micro-jet laser rolling efficiency of silicon carbide crystal rod, silicon carbide crystal rod and application thereof
CN202388336U (en) Off-line inner bur grinding machine for high frequency welding (HFW) steel pipes
CN204545711U (en) A kind of amorphous alloy strips laser slitting line
CN104537136B (en) A kind of six-high cluster mill roll neck concentric reducer defect-compensating method
CN206264073U (en) A kind of sanitary napkin trimming mechanism
CN202846277U (en) Dismountable inner hole grinding machine
CN201871795U (en) Automatic cutting machine for burrs outside welded pipe
CN104525587B (en) One wears the total forming apparatus of water
CN201588012U (en) Silk floss machine
CN101906528B (en) Method for reducing folding mark defects of cold-rolled steel coil
CN204448874U (en) Crutches are curved falls greatly air-cooled roller-way
CN203945501U (en) A kind of dismantled and assembled diamond brazing cutter head saw disc
CN206604907U (en) A kind of small-radius arc shaped device
CN208929887U (en) A kind of glass edging production line
CN205934282U (en) Loom is with fervent limit water spray mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170627

Address after: 1 No. 519050 Guangdong city of Zhuhai province equipment manufacturing district Gaolan Port Economic Zone South Road

Patentee after: PANYU CHU KONG STEEL PIPE (ZHUHAI) CO.,LTD.

Address before: Qinghe Road Guangzhou city Guangdong province 511400 Panyu District Shiji Town

Patentee before: PANYU CHU KONG STEEL PIPE Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Steel pipe shape adjusting method

Effective date of registration: 20190920

Granted publication date: 20150114

Pledgee: Zhuhai Huafa Business and Trade Holding Co.,Ltd.

Pledgor: PANYU CHU KONG STEEL PIPE (ZHUHAI) CO.,LTD.

Registration number: Y2019980000179

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200903

Granted publication date: 20150114

Pledgee: Zhuhai Huafa Business and Trade Holding Co.,Ltd.

Pledgor: PANYU CHU KONG STEEL PIPE (ZHUHAI) Co.,Ltd.

Registration number: Y2019980000179

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Steel pipe profile adjustment method

Effective date of registration: 20200911

Granted publication date: 20150114

Pledgee: Zhuhai Huafa Business and Trade Holding Co.,Ltd.

Pledgor: PANYU CHU KONG STEEL PIPE (ZHUHAI) Co.,Ltd.

Registration number: Y2020980005957

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221031

Granted publication date: 20150114

Pledgee: Zhuhai Huafa Business and Trade Holding Co.,Ltd.

Pledgor: PANYU CHU KONG STEEL PIPE (ZHUHAI) CO.,LTD.

Registration number: Y2020980005957

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for adjusting steel pipe shape

Granted publication date: 20150114

Pledgee: China Postal Savings Bank Co.,Ltd. Zhuhai Jinwan Branch

Pledgor: PANYU CHU KONG STEEL PIPE (ZHUHAI) CO.,LTD.

Registration number: Y2024980045289

PE01 Entry into force of the registration of the contract for pledge of patent right