CN103175397A - Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide - Google Patents

Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide Download PDF

Info

Publication number
CN103175397A
CN103175397A CN2013100241215A CN201310024121A CN103175397A CN 103175397 A CN103175397 A CN 103175397A CN 2013100241215 A CN2013100241215 A CN 2013100241215A CN 201310024121 A CN201310024121 A CN 201310024121A CN 103175397 A CN103175397 A CN 103175397A
Authority
CN
China
Prior art keywords
kiln car
tunnel
kiln
tunnel cave
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100241215A
Other languages
Chinese (zh)
Inventor
尹建程
尹克胜
王文东
尹弘毅
刘红亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGHAI TUOHAI NEW MATERIAL Co Ltd
Original Assignee
尹克胜
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 尹克胜 filed Critical 尹克胜
Priority to CN2013100241215A priority Critical patent/CN103175397A/en
Publication of CN103175397A publication Critical patent/CN103175397A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Furnace Details (AREA)

Abstract

Provided is a tunnel kiln car using airflow bed reactor to discharge nitrogen and produce a product combining silicon nitride with silicon carbide. The kiln car is in a structure of four wheels. Each wheel is in a standard wheel structure of a common tramcar or a common tunnel kiln car. A car body is made of cast iron or steel. The top portion of the car body is identical with the tunnel kiln tunnel bottom line in height. Fire-proof and heat-insulation materials are constructed on the top portion of the car body in an erected mode so that sealing structures located at positions parallel to the tunnel kiln tunnel are formed. The intervals between the sealing structures range from 20 mm to 80 mm. Sand-holding disks are arranged on two sides of the car body, wherein the distance between each sand-holding disk and an inner side of each tunnel kiln framework vertical column ranges from 60 mm to 150 mm and each sand-holding disk is lower than the plane of a kiln car main body by 60 mm to120 mm. At the same time that a tunnel kiln is sealed, the gravity center of the kiln car is lowered. A sand-sealing device in which a plurality of sand-holding disks move is formed by metal strips installed at the bottom of the tunnel kiln together with the sand-holding disks, so that air in the kiln is prevented from leaking. Meanwhile, heat dissipated from the tunnel kiln is used to dry silica powder filter cakes. The total length of the tunnel kiln is integral times that of the kiln car.

Description

Discharge the kiln car of nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor
Technical field
The present invention relates to a kind of kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor, belong to solar-energy photo-voltaic cell crystalline silicon processing waste and fully utilize the field.
Background technology
The silicon nitride combined silicon carbide ceramic material is a kind of advanced person's engineering ceramic material, have high room temperature and elevated temperature strength, high rigidity, corrosion resistance, non-oxidizability and good heat shock resistance and mechanical shock performance, thought high comprehensive performance in the structural ceramics field by material supply section educational circles, obtain a kind of new material of extensive use in high-tech, high-temperature field.
Crystalline silicon processing waste mortar is the quaternary mixture system that is mixed with 40~50%PEG, 45~30%SiC, 1~3% iron powder, 14~17%Si powder that forms in the solar-energy photo-voltaic cell process of manufacture.
the applicant paid close attention to the processing problem of solar-energy photo-voltaic cell crystalline silicon processing waste mortar since 2006, the application for a patent for invention of application number 201110101064.7 " waste mortar formed by processing photovoltaic cell crystalline silicon integrated treatment new method " was proposed, the application for a patent for invention that proposed application number 201110238197.9 " comprehensive treatment technology of waste mortar in processing of photovoltaic crystalline silicon " on 08 12nd, 2011 on April 22nd, 2011, on the June 26th, 2012 of " without the crystalline silicon processing waste mortar comprehensive treatment technique of sewage and solid waste discharging " application for a patent for invention take No. 201110238197.9 patent applications of application number as the priority number of filing an application 201210207989.4, by the project Industrialized processing technique is furtherd investigate, invention has designed " utilizing crystalline silicon processing waste mortar to reclaim the unit that silica flour prepares silicon nitride product ", " reclaiming the entrained-flow reactor that silica flour prepares beta-silicon nitride powder with crystalline silicon processing waste mortar ", " discharging the tunnel cave of nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor ", design just becomes necessary with the kiln car of this tunnel cave coupling.
Summary of the invention
The present invention is to application number 201210207989.4 " without the crystalline silicon processing waste mortar comprehensive treatment technique of sewage and solid waste discharging " and this " reclaiming the unit that silica flour prepares silicon nitride product with crystalline silicon processing waste mortar " of applying for together, the Supplementary and perfect of " reclaiming the entrained-flow reactor that silica flour prepares beta-silicon nitride powder with crystalline silicon processing waste mortar ", " discharging the tunnel cave of nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor " application for a patent for invention; Mainly solve organization of production and the sealing problem of tunnel cave.
The purpose of this invention is to provide a kind of kiln car of discharging the tunnel cave of nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor.
The object of the present invention is achieved like this: kiln car adopts the four-wheel structure, vehicle body cylinder iron or steel make, build fire-resistant heat insulating material on car by laying bricks or stones, be formed at the hermetically-sealed construction of tunnel cave tunnel parallel position; There is the Sheng sand table vehicle body both sides, contain sand seal sand, consist of multiple tracks with the bonding jumper of installing at the bottom of tunnel cave and contain the sand seal device that sand table moves, and stop Leakage Gas in kiln.
There is the Sheng sand table kiln car both sides, operate in the Sheng sand table of the kiln car on the tunnel cave track apart from the inboard 60--150mm of tunnel cave upright of frame, contain sand table lower than kiln car main body plane 60--200mm; When being provided, the tunnel cave sealing reduces the kiln car center of gravity.
The kiln car that assembles operates on the tunnel cave track, and the vehicle body top is consistent with tunnel cave tunnel bottom line height, and insulating refractory masonry and the tunnel lower seal passage that build by laying bricks or stones at the vehicle body top form labyrinth seal structure; The spacing 20--80mm of two seal grooves.
The tunnel cave total length is the integral multiple of kiln car length; Vehicle body adopts iron casting or steel welding.
Hereby in conjunction with the accompanying drawings and embodiments the present invention is further illustrated.
Description of drawings
Fig. 1 is the kiln car front half sectional view that there is labyrinth seal the side.
Fig. 2 is that the side is the kiln car front half sectional view on plane.
Fig. 3 is the kiln car side half sectional view that front/rear end has labyrinth seal.
Fig. 4 is that front/rear end is the kiln car side half sectional view on plane.
Numeral tunnel kiln bassinet structure parts in figure: 1 is the kiln car vehicle body, and 2 for containing sand table, and 3 is wheel arrangement, and 4 is that plain edition fire-resistant heat insulating material masonry, 5 is the fire-resistant heat insulating material masonry with seal groove.
The specific embodiment
Be below specific embodiments of the invention, but method of the present invention and not exclusively being limited, the those skilled in the art can be as required changes or adjusts wherein structure.
Embodiment 1:
Have as shown in the half sectional view of the kiln car front half sectional view of labyrinth seal, Fig. 3 front/rear end has labyrinth seal kiln car side as Fig. 1 side: kiln car is the four-wheel structure, and wheel arrangement 3 comprises wheel, axletree, apolegamy standard tramcar wheel; Vehicle body 1 and the cylinder iron monoblock cast of Sheng sand table 2, body top section is built fire-resistant heat insulating material by laying bricks or stones, its centre is built filling by laying bricks or stones with plain edition fire-resistant heat insulating material 4, the edge is with building by laying bricks or stones with the fire-resistant heat insulating material 5 of seal groove, forms the labyrinth seal structure of kiln car lateral surface and tunnel cave tunnel medial surface, kiln car front/rear end; Add that vehicle body both sides contain sand table, consist of multiple tracks with the bonding jumper of installing at the bottom of tunnel cave and contain the sand seal device that sand table moves, can stop to greatest extent Leakage Gas in kiln.
Contain sand table 2 outer rims apart from the inboard 80mm of tunnel cave upright of frame, contain sand table lower than kiln car main body plane 120mm; When being provided, the tunnel cave sealing reduces the kiln car center of gravity.
The kiln car that assembles operates on the tunnel cave track, and the vehicle body top is consistent with tunnel cave tunnel bottom line height, and insulating refractory masonry and the tunnel lower seal passage that build by laying bricks or stones at the vehicle body top form labyrinth seal structure; The spacing 40mm of two seal grooves, tunnel cave total length are the integral multiples of kiln car length.
The refractory heat-insulating encapsulant building construction complexity of the present embodiment but sealing property is best.
Embodiment 2:
As Fig. 2 side be as shown in the half sectional view of the kiln car front half sectional view on plane, Fig. 3 front/rear end has labyrinth seal kiln car side: kiln car is the four-wheel structure, and wheel arrangement 3 comprises wheel, axletree, apolegamy standard kiln car wheel; Vehicle body 1 and Sheng sand table 2 steel welding production, body top section is built fire-resistant heat insulating material by laying bricks or stones, build by laying bricks or stones with plain edition fire-resistant heat insulating material 4 position, intermediate portion, front/rear end is with building by laying bricks or stones with the fire-resistant heat insulating material 5 of seal groove, forms the kiln car lateral surface and tunnel cave tunnel medial surface is that plane, kiln car front/rear end are labyrinth sealed version; Mainly utilize vehicle body both sides to contain sand table, consist of multiple tracks with the bonding jumper of installing at the bottom of tunnel cave and contain the sand seal device that sand table moves, stop Leakage Gas in kiln.
Contain sand table 2 apart from the inboard 100mm of tunnel cave upright of frame, contain sand table lower than kiln car main body plane 100mm; When being provided, the tunnel cave sealing reduces the kiln car center of gravity.
The kiln car that assembles operates on the tunnel cave track, and the vehicle body top is consistent with tunnel cave tunnel bottom line height, and insulating refractory masonry and the tunnel lower seal passage that build by laying bricks or stones at the vehicle body top form labyrinth seal structure; The spacing 50mm of two seal grooves, tunnel cave total length are the integral multiples of kiln car length;
The refractory heat-insulating encapsulant building construction difficulty of the present embodiment greatly reduces, and due to the employing of novel sand seal structure, still has good sealing effectiveness between kiln car and tunnel cave simultaneously.
Embodiment 3:
Have as shown in the half sectional view of the kiln car front half sectional view of labyrinth seal, Fig. 4 front/rear end is the plane kiln car side as Fig. 1 side: kiln car is the four-wheel structure, and wheel arrangement 3 comprises wheel, axletree, apolegamy standard tramcar wheel; Vehicle body 1 and Sheng sand table 2 steel welding production, body top section is built fire-resistant heat insulating material by laying bricks or stones, build by laying bricks or stones with plain edition fire-resistant heat insulating material 4 position, intermediate portion, the left and right side is with building by laying bricks or stones with the fire-resistant heat insulating material 5 of seal groove, forms the kiln car lateral surface and tunnel cave tunnel medial surface is that labyrinth sealing, kiln car front/rear end are the version on plane; Mainly utilize vehicle body both sides to contain sand table, consist of multiple tracks with the bonding jumper of installing at the bottom of tunnel cave and contain the sand seal device that sand table moves, stop Leakage Gas in kiln.
Contain sand table 2 apart from the inboard 120mm of tunnel cave upright of frame, contain sand table lower than kiln car main body plane 200mm; When being provided, the tunnel cave sealing reduces the kiln car center of gravity.
The kiln car that assembles operates on the tunnel cave track, and the vehicle body top is consistent with tunnel cave tunnel bottom line height, and insulating refractory masonry and the tunnel lower seal passage that build by laying bricks or stones at the vehicle body top form labyrinth seal structure; The spacing 40mm of two seal grooves, tunnel cave total length are the integral multiples of kiln car length;
The refractory heat-insulating encapsulant building construction difficulty of the present embodiment decreases than embodiment 1, but because kiln car front/rear end sealing property reduces, although it is the employing of labyrinth sealing and novel sand seal structure that kiln car lateral surface and tunnel cave tunnel medial surface are arranged, the sealing effectiveness between kiln car and tunnel cave is lower than embodiment 2.
Embodiment 4:
As Fig. 2 side be as shown in the half sectional view of the kiln car front half sectional view on plane, Fig. 4 front/rear end is the plane kiln car side: kiln car is the four-wheel structure, and wheel arrangement 3 comprises wheel, axletree, apolegamy ordinary crossing kiln kiln car wheel; Vehicle body 1 and contain sand table 2 and use Ductile Iron Casting, body top section is built plain edition fire-resistant heat insulating material 4 by laying bricks or stones, and formation kiln car lateral surface and tunnel cave tunnel medial surface, kiln car front/rear end are the version on plane; Mainly utilize the bonding jumper of installing at the bottom of vehicle body both sides Sheng sand table and tunnel cave to consist of multiple tracks and contain the sand seal device that sand table moves, stop the interior Leakage Gas of kiln.
Contain sand table 2 apart from the inboard 60mm of tunnel cave upright of frame, contain sand table lower than kiln car main body plane 150mm; When being provided, the tunnel cave sealing reduces the kiln car center of gravity.
The kiln car that assembles operates on the tunnel cave track, and the vehicle body top is consistent with tunnel cave tunnel bottom line height, and insulating refractory masonry and the tunnel that build by laying bricks or stones at the vehicle body top form plane sealing structure; The spacing 40mm of two seal grooves, tunnel cave total length are the integral multiples of kiln car length;
The fire-resistant heat insulating material building construction of the present embodiment is the most simple and convenient, and sealing effectiveness is near embodiment 3.

Claims (7)

1. discharge the kiln car of nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor, it is characterized in that: kiln car adopts the four-wheel structure, vehicle body cylinder iron or steel make, build fire-resistant heat insulating material on car by laying bricks or stones, be formed at the hermetically-sealed construction of tunnel cave tunnel parallel position; There is the Sheng sand table vehicle body both sides, contain sand seal sand, consist of multiple tracks with the bonding jumper of installing at the bottom of tunnel cave and contain the sand seal device that sand table moves, and stop Leakage Gas in kiln.
2. kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor according to claim 1, it is characterized in that: there is the Sheng sand table kiln car both sides, operate in the Sheng sand table of the kiln car on the tunnel cave track apart from the inboard 60--150mm of tunnel cave upright of frame, contain sand table lower than kiln car main body plane 60--200mm; When being provided, the tunnel cave sealing reduces the kiln car center of gravity.
3. kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor according to claim 1, it is characterized in that: the kiln car that assembles operates on the tunnel cave track, the vehicle body top is consistent with tunnel cave tunnel bottom line height, and insulating refractory masonry and the tunnel lower seal passage that build by laying bricks or stones at the vehicle body top form labyrinth seal structure; The spacing 20--80mm of two seal grooves.
4. kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor according to claim 1, it is characterized in that: the kiln car that assembles operates on the tunnel cave track, the vehicle body top is consistent with tunnel cave tunnel bottom line height, the insulating refractory masonry side that build by laying bricks or stones at the vehicle body top is planar structure, spacing 20--80mm with the tunnel cave sidewall
5. kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor according to claim 1, it is characterized in that: the tunnel cave total length is the integral multiple of kiln car length.
6. kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor according to claim 1, is characterized in that: kiln car vehicle body employing iron casting.
7. kiln car of discharging the nitrogen production silicon nitride products based on silicon carbide with entrained-flow reactor according to claim 1, is characterized in that: the welding of kiln car vehicle body employing steel.
CN2013100241215A 2013-01-23 2013-01-23 Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide Pending CN103175397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100241215A CN103175397A (en) 2013-01-23 2013-01-23 Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100241215A CN103175397A (en) 2013-01-23 2013-01-23 Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide

Publications (1)

Publication Number Publication Date
CN103175397A true CN103175397A (en) 2013-06-26

Family

ID=48635434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100241215A Pending CN103175397A (en) 2013-01-23 2013-01-23 Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide

Country Status (1)

Country Link
CN (1) CN103175397A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2092731U (en) * 1991-03-29 1992-01-08 机械电子工业部第五设计研究院 Self-seal type sang sealing equipment for trolley furnace
JP2931132B2 (en) * 1991-07-12 1999-08-09 日本碍子株式会社 Truck sealing device in continuous furnace
CN2789697Y (en) * 2005-04-30 2006-06-21 洛伊热工工程(天津)有限公司 Bogie furnace sand seal device
CN201311185Y (en) * 2008-10-14 2009-09-16 上海和欣金属制品有限公司 Bogie hearth electric resistance furnace for processing twin-rolls
CN201583130U (en) * 2009-11-07 2010-09-15 杭州鼎盛炉业有限公司 Platform dual purpose resistance furnace

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2092731U (en) * 1991-03-29 1992-01-08 机械电子工业部第五设计研究院 Self-seal type sang sealing equipment for trolley furnace
JP2931132B2 (en) * 1991-07-12 1999-08-09 日本碍子株式会社 Truck sealing device in continuous furnace
CN2789697Y (en) * 2005-04-30 2006-06-21 洛伊热工工程(天津)有限公司 Bogie furnace sand seal device
CN201311185Y (en) * 2008-10-14 2009-09-16 上海和欣金属制品有限公司 Bogie hearth electric resistance furnace for processing twin-rolls
CN201583130U (en) * 2009-11-07 2010-09-15 杭州鼎盛炉业有限公司 Platform dual purpose resistance furnace

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江苏省宜兴陶瓷公司: "《日用陶瓷隧道窑》", 31 July 1977, article "日用陶瓷隧道窑" *

Similar Documents

Publication Publication Date Title
CN107226704A (en) A kind of kiln saves castable with fire resisting
CN106595314A (en) Rotary kiln liner structure and laying method
CN102735049A (en) Novel energy-saving tunnel kiln firing system
CN103175397A (en) Tunnel kiln car using airflow bed reactor to discharge nitrogen and produce product combining silicon nitride with silicon carbide
CN103230842A (en) Ceramic cyclone and preparation method thereof
CN204346094U (en) Assembly type tunnel cave
CN204569745U (en) A kind of foamed ceramics production line
CN202530122U (en) Refractory material structure of trolley of silicon steel annular annealing furnace
CN204648932U (en) The steelframe module of the straight tunnel cave of a kind of novel environment friendly
CN202954052U (en) Novel blast-furnace crucible
CN203719418U (en) Light thermal-insulation energy-saving type kiln car
CN103423999B (en) Charging end wall for heating furnace and construction method of charging end wall
CN203432294U (en) Energy-saving improved wide-cross-section sintered brick tunnel kiln
CN202734561U (en) Liquid outlet launder for calcium carbide furnace
CN206300495U (en) Lightweight annular furnace furnace roof
CN105130459A (en) Aluminum-use anode carbon roasting furnace fire path wall burning-free prefabricated big brick
CN207095298U (en) A kind of inner lining structure of fire-proof
CN202519034U (en) Resistance furnace for silicon carbide synthesis
CN203364625U (en) Masonry structure of brackets of inner upper covers and outer upper covers of primary cooling section and secondary cooling section of annular cooler
CN203170449U (en) Ceramic cyclone
CN202166336U (en) Flash board for tertiary air duct in novel dry-process cement kiln
CN102759274B (en) Kiln crown component of kiln
CN103743233A (en) Movable type tunnel kiln insulation structure
CN101871724B (en) Built-in carbon box type sealed device for horizontal kiln and sealing method
CN201964773U (en) Combined inner lining of rotary kiln

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: WUXI TUOHAI INVESTMENT CO., LTD.

Free format text: FORMER OWNER: YIN KESHENG

Effective date: 20140213

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yin Jiancheng

Inventor after: Yin Kesheng

Inventor after: Wang Wendong

Inventor after: Yin Hongyi

Inventor after: Liu Hongliang

Inventor after: Lu Yiping

Inventor after: Zhu Haifei

Inventor after: Zou Jianping

Inventor before: Yin Jiancheng

Inventor before: Yin Kesheng

Inventor before: Wang Wendong

Inventor before: Yin Hongyi

Inventor before: Liu Hongliang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG BOLUN WANG PEILEI WANG XIAODAN QIU SHUYI ZHANG XIAOLONG TO: WANG BOLUN WANG PEILEI WANG XIAODAN QIU SHUYI ZHANG XIAOLONG CHEN MENGQIANG QIU SHUYI WANG XIAODAN

Free format text: CORRECT: ADDRESS; FROM: 276700 LINYI, SHANDONG PROVINCE TO: 214001 WUXI, JIANGSU PROVINCE

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20140213

Address after: 1206 room 159, No. 214001, Zhongshan Road, Jiangsu, Wuxi

Applicant after: Wuxi maritime Investment Co. Ltd.

Address before: 276700, Shandong County, Linshu province after the town of Dragon Village

Applicant before: Yin Kesheng

ASS Succession or assignment of patent right

Owner name: QINGHAI TUOHAI NEW MATERIAL CO., LTD.

Free format text: FORMER OWNER: WUXI TUOHAI INVESTMENT CO., LTD.

Effective date: 20140414

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 214001 WUXI, JIANGSU PROVINCE TO: 810012 XINING, QINGHAI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140414

Address after: 810012 Qinghai province Xining Nanchuan Industrial Park Venture Road No. 26 Building No. 4

Applicant after: Qinghai Tuohai New Material Co., Ltd.

Address before: 1206 room 159, No. 214001, Zhongshan Road, Jiangsu, Wuxi

Applicant before: Wuxi maritime Investment Co. Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130626