CN103062511A - Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab - Google Patents

Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab Download PDF

Info

Publication number
CN103062511A
CN103062511A CN2012105840641A CN201210584064A CN103062511A CN 103062511 A CN103062511 A CN 103062511A CN 2012105840641 A CN2012105840641 A CN 2012105840641A CN 201210584064 A CN201210584064 A CN 201210584064A CN 103062511 A CN103062511 A CN 103062511A
Authority
CN
China
Prior art keywords
concrete floor
floor slab
pvc pipe
pipe material
pea gravel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105840641A
Other languages
Chinese (zh)
Inventor
陈炳普
商金峰
刘红贤
李跃成
宿亚
张艳化
郑会肖
李喜乐
齐亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd
Hebei Construction Group Corp Ltd
Original Assignee
HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd, Hebei Construction Group Corp Ltd filed Critical HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2012105840641A priority Critical patent/CN103062511A/en
Publication of CN103062511A publication Critical patent/CN103062511A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joints With Sleeves (AREA)

Abstract

The invention discloses a processing method for preventing water leakage at contact position of a polyvinyl chloride (PVC) tube and a concrete floor slab. An outer wall of the PVC tube is grinded coarsely so as to facilitate bonding of the PVC tube and concrete, microdilatancy fine aggregate concrete and a secondary pouring process are adopted, a cracking phenomenon is decreased, and water leakage is effectively prevented.

Description

The preventing water leakage processing method of a kind of pvc pipe material and concrete floor slab contacting point
Technical field
The present invention relates to the construction and installation field, in particular to the preventing water leakage processing method of a kind of pvc pipe material and concrete floor slab contacting point.
Background technique
In building engineering, general elder generation goes out agent structure by concreting, and then lays various upper and lower conduits road is installed, and will be the pipeline preformed hole hole at floor during concreting, and pipeline carries out the shutoff slit with concrete after passing preformed hole again.The present multiselect pvc pipe of pipeline material, but pvc pipe material outer wall is smooth, and outer wall contacts easily cracking with concrete, cause leaking, and therefore to the occasion of waterproof requirement is arranged, does not also have now a kind of good method for waterproofing to solve above-mentioned seepy question.
Summary of the invention
The preventing water leakage processing method that the purpose of this invention is to provide a kind of pvc pipe material and concrete floor slab contacting point, the method can effectively reduce the cracking of pvc pipe material outer wall and concrete joint synapsis, thereby effectively prevents from leaking.
For achieving the above object, the present invention takes following technological scheme:
The preventing water leakage processing method of a kind of pvc pipe material and concrete floor slab contacting point comprises the steps:
(a) the pvc pipe material is installed, is made the pvc pipe material pass the concrete floor slab preformed hole;
(b) with 100 purpose sand paper the outer wall of pvc pipe material is polished to coarse in the position of passing preformed hole, the roughness coefficient is 3.2, the position range that the outer wall of pvc pipe material is polished is from the concrete floor slab bottom surface to the concrete floor slab upper surface, and upwards prolongs 1/2nd of pvc pipe material radius again;
(c) lower limb in described polishing position contacts around the pvc pipe material sealing annular template of installation and with the sealing of concrete floor slab bottom surface, then pour into the microdilatancy pea gravel concreten to the slit between pvc pipe material and the concrete floor slab, and the height that makes the microdilatancy pea gravel concreten is 2/3rds of thickness of concrete floor, then left standstill 24 hours, and removed annular template;
(d) on above-mentioned microdilatancy pea gravel concreten, continue to add the microdilatancy pea gravel concreten to the top edge of described polishing position, and make microdilatancy pea gravel concreten upper surface be the upper surface that the gradient drops to concrete floor slab, then left standstill 24 hours.
The technical program is coarse with pvc pipe material outer wall polishing, being conducive to adopting simultaneously the microdilatancy pea gravel concreten with concrete bonding, and the technique that adopts secondary to build, reduced the generation of cracking phenomena, effectively prevent from leaking.
Description of drawings
Fig. 1 is the structural representation after the conventional method water-proofing treating;
Structural representation after Fig. 2 the inventive method water-proofing treating.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be further described:
Structure after the tradition preventing water leakage disposal methods as shown in Figure 1, the method is that annular template is sealed on the bottom surface of pvc pipe material 2 and concrete floor slab 1, then directly pour into pea gravel concreten 3 and equal with the upper surface of concrete floor slab 1, this kind processing method makes between pea gravel concreten 3 and the pvc pipe material 2 and very easily ftractures, and leaks thereby cause.
Operating procedure of the present invention is as follows:
As shown in Figure 2, pvc pipe material 2 is installed, is made pvc pipe material 2 pass the preformed hole of concrete floor slab 1; Then with 100 purpose sand paper the outer wall of pvc pipe material 2 is polished, until coarse, the roughness coefficient of degree of roughness is 3.2, the concrete position range that the outer wall of pvc pipe material is polished is the upper surface 6 from the bottom surface 7 of concrete floor slab 1 to concrete floor slab 1, and then upwards prolonging 1/2nd of pvc pipe material radius, this position range is the pvc pipe material 2 outer walls height 4 of being polished namely; Lower limb in the polishing position is installed annular template and is contacted (not drawing annular template among Fig. 2) with bottom surface 7 sealings of concrete floor slab 1 around 2 sealings of pvc pipe material, then pour into microdilatancy pea gravel concreten 3 to the slit between pvc pipe material 2 and the concrete floor slab 1, and the height that makes microdilatancy pea gravel concreten 3 be concrete floor slab 1 thickness 2/3rds, then left standstill 24 hours, and removed afterwards annular template; On above-mentioned microdilatancy pea gravel concreten 3, continue to add microdilatancy pea gravel concreten 5 top edges to described polishing position, and the upper surface that makes microdilatancy pea gravel concreten 5 is the upper surface 6 that the gradient drops to concrete floor slab, then leaves standstill and namely finishes processing procedure in 24 hours.
After said method is processed, pvc pipe material 2 and microdilatancy pea gravel concreten 3, microdilatancy pea gravel concreten 5 are not easy to crack, even pvc pipe material 2 and microdilatancy pea gravel concreten 3 crackings, also have being connected between pvc pipe material 2 and the microdilatancy pea gravel concreten 5 that the secondary guarantee is provided, so effectively realized the preventing water leakage requirement.

Claims (1)

1. the preventing water leakage processing method of a pvc pipe material and concrete floor slab contacting point is characterized in that comprising the steps:
(a) the pvc pipe material is installed, is made the pvc pipe material pass the concrete floor slab preformed hole;
(b) with 100 purpose sand paper the outer wall of pvc pipe material is polished to coarse in the position of passing preformed hole, the roughness coefficient is 3.2, the position range that the outer wall of pvc pipe material is polished is from the concrete floor slab bottom surface to the concrete floor slab upper surface, and upwards prolongs 1/2nd of pvc pipe material radius again;
(c) lower limb in described polishing position contacts around the pvc pipe material sealing annular template of installation and with the sealing of concrete floor slab bottom surface, then pour into the microdilatancy pea gravel concreten to the slit between pvc pipe material and the concrete floor slab, and the height that makes the microdilatancy pea gravel concreten is 2/3rds of thickness of concrete floor, then left standstill 24 hours, and removed annular template;
(d) on above-mentioned microdilatancy pea gravel concreten, continue to add the microdilatancy pea gravel concreten to the top edge of described polishing position, and make microdilatancy pea gravel concreten upper surface be the upper surface that the gradient drops to concrete floor slab, then left standstill 24 hours.
CN2012105840641A 2012-12-30 2012-12-30 Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab Pending CN103062511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105840641A CN103062511A (en) 2012-12-30 2012-12-30 Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105840641A CN103062511A (en) 2012-12-30 2012-12-30 Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab

Publications (1)

Publication Number Publication Date
CN103062511A true CN103062511A (en) 2013-04-24

Family

ID=48105284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105840641A Pending CN103062511A (en) 2012-12-30 2012-12-30 Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab

Country Status (1)

Country Link
CN (1) CN103062511A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500851A (en) * 2014-09-29 2015-04-08 史春丰 Waterproof and leaking-stoppage device and waterproof and leaking-stoppage method employing same
CN105442861A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for restoring water leakage air face of toilet drainage pipeline
CN107060115A (en) * 2017-04-24 2017-08-18 中建二局第二建筑工程有限公司华东分公司 A kind of combustion gas hole plugging system and its plugging construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1340557A (en) * 2000-08-30 2002-03-20 希尔蒂股份有限公司 Elastic fire-prevention board and its use for fire prevention at openings in wall, floor or top slab
CN101781935A (en) * 2009-12-30 2010-07-21 中国瑞林工程技术有限公司 Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN102095033A (en) * 2010-12-15 2011-06-15 成都市第四建筑工程公司 One-time embedded water-stop section for construction engineering drainage and construction method thereof
CN102127968A (en) * 2011-01-17 2011-07-20 湖南省第五工程有限公司 Method for grouting floor slab bushing hole reservation preembedding die and grouting die
CN202532026U (en) * 2012-04-22 2012-11-14 项谱成 Floor board pipeline waterproof structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1340557A (en) * 2000-08-30 2002-03-20 希尔蒂股份有限公司 Elastic fire-prevention board and its use for fire prevention at openings in wall, floor or top slab
CN101781935A (en) * 2009-12-30 2010-07-21 中国瑞林工程技术有限公司 Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN102095033A (en) * 2010-12-15 2011-06-15 成都市第四建筑工程公司 One-time embedded water-stop section for construction engineering drainage and construction method thereof
CN102127968A (en) * 2011-01-17 2011-07-20 湖南省第五工程有限公司 Method for grouting floor slab bushing hole reservation preembedding die and grouting die
CN202532026U (en) * 2012-04-22 2012-11-14 项谱成 Floor board pipeline waterproof structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500851A (en) * 2014-09-29 2015-04-08 史春丰 Waterproof and leaking-stoppage device and waterproof and leaking-stoppage method employing same
CN105442861A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for restoring water leakage air face of toilet drainage pipeline
CN105442861B (en) * 2015-11-19 2018-02-23 江苏鼎达建筑新技术有限公司 Drainage conduit of toilet percolating water backwater surface repair method
CN107060115A (en) * 2017-04-24 2017-08-18 中建二局第二建筑工程有限公司华东分公司 A kind of combustion gas hole plugging system and its plugging construction method

Similar Documents

Publication Publication Date Title
CN105465481A (en) Construction method for jacking structure of pipe jacking work well
CN205090098U (en) Pipeline hangs hole block structure
CN206973068U (en) A kind of through-flooring is pre-buried to use the pre-buried adapter of flexible interface adjusting center
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN104088298A (en) Municipal road prefabricated concrete inspection well and construction method thereof
CN104420480A (en) Collapsible loess area integrated pipe network layout method and structure
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN103062511A (en) Processing method for preventing water leakage at contact position of polyvinyl chloride (PVC) tube and concrete floor slab
CN104264700A (en) Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN106979386A (en) A kind of self waterproofing sleeve pipe quick for installation
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN109025899B (en) Well sealing device
CN203307978U (en) Double-floor-drain seepage prevention structure
CN111945901A (en) Waterproof construction method for floor penetrating drainage main pipe hole of toilet in old community
CN212452713U (en) A plugging device for raft foundation precipitation well head
CN104455757A (en) Downcomer assembly and installation method thereof
CN209040243U (en) Urban discharging pipeline seam construction
KR101421459B1 (en) The method for repairing the tide gate
CN206607675U (en) A kind of basement composite external wall anti-cracking and seepage control structure construction
CN104060677B (en) A kind of skyscraper has construction method and the composite floor drain used of floor drain between boiled water room
CN105525751B (en) A kind of connection sleeve pipe component and the method using component construction blow-off line
CN210216499U (en) A bottom plate and side wall handing-over department waterproof construction for piping lane
CN108589758A (en) A kind of foundation structure and construction method of acid-resistance infiltration
CN105780791B (en) Deep-well precipitation well head shut-in well construction method in underground garage foundation pit
CN202769079U (en) Sleeve pipe of floor pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130424