- layer
- cracking
- control structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 239000002131 composite material Substances 0.000 title claims abstract description 14
- 238000005336 cracking Methods 0.000 title claims abstract description 14
- 238000009413 insulation Methods 0.000 claims abstract description 13
- 239000004568 cement Substances 0.000 claims description 11
- 239000004576 sand Substances 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 239000004698 Polyethylene Substances 0.000 claims description 6
- -1 polyethylene Polymers 0.000 claims description 6
- 229920000573 polyethylene Polymers 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 5
- 239000011083 cement mortar Substances 0.000 claims description 2
- 150000001336 alkenes Chemical class 0.000 claims 1
- 239000006260 foam Substances 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000006073 displacement reaction Methods 0.000 abstract description 2
- 230000009467 reduction Effects 0.000 abstract description 2
- 230000006872 improvement Effects 0.000 description 7
- 239000004567 concrete Substances 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 229920006327 polystyrene foam Polymers 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009966 trimming Methods 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall and outer wall of basement, waterproof layer, damp-proof layer and heat-insulation layer are provided between diaphram wall and outer wall of basement, waterproof layer is arranged on the even curface of diaphram wall, damp-proof layer is laid on waterproof layer, and heat-insulation layer is pasted on damp-proof layer.Beneficial effect:Ensure that basement structure outer wall and foundation ditch diaphram wall have as best one can be capable of the reduction basement combined type out-wall crack of high degree and the probability of seepage with the space of displacement relatively.
Description
Technical field
The utility model is related to technical field of building construction, more particularly to a kind of basement composite external wall anti-cracking and seepage control structure
Construction.
Background technology
The quickening of urbanization process causes the growing tension of urban land resource, particularly in the environment for building limit for height
The exploitation of the lower underground space and the highest attention for rationally utilizing more developer.In recent years, the fast development of underground engineering causes
Engineering accident hidden danger of quality it is more frequent, the particularly common quality defect such as percolating water of underground engineering long-standing problem engineer
.Armored concrete undergrounds such as " the two wall superposed types ", " two walls separate, are independently arranged formula ", " two wall Integral types " that uses at present
Outdoor wall construction, because it is influenceed by the temperature difference, the contraction of concrete itself and Water And Earth Pressures;In addition design, material, coagulation
Soil coordinates the when various factors such as construction, and outer wall of basement structure quite a lot exists vertical, oblique through splitting according to investigations
Stitch and percolating water, even if two walls, which are separated, can set up waterproof layer on the outside of the outer wall of basement for the formula that is independently arranged, but eventually because of its protection
Layer is often not in place and backfill expects fragile waterproof layer and can still occur outer wall of basement percolating water.Need to carry out for quite a long time
Leak stopping is repaired repeatedly, not only needs to spend an expensive leak stopping cost of repairs, produces very big worry, and influence basement uses work(
Can, and steel bar corrosion at outer wall of basement percolating water can be caused to rot, influence its service life.It is not known for design and requires
Or else some practicable crack and leak preventing measures are taken under the premise of closed sticked type basement composite external wall processing method, are easily made
Into external wall structure Seepage, it is bigger that the later stage repairs difficulty.
Utility model content
The purpose of this utility model is that the defect for overcoming prior art to exist can effectively prevent basement from answering there is provided one kind
Box-like out-wall crack and the external wall structure of seepage construction.
The utility model is realized by following technical scheme:
A kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall and outer wall of basement, its feature
It is, waterproof layer, damp-proof layer and heat-insulation layer are provided between the diaphram wall and outer wall of basement, and the waterproof layer is arranged at
On the even curface of diaphram wall, the damp-proof layer is laid on waterproof layer, and the heat-insulation layer is pasted on damp-proof layer.It is anti-
Only building enclosure diaphram wall protruding parts produces stress concentration to it and causes cracking phenomena to enter after outer wall of basement concrete placings
And seepage is produced, therefore before basement structure outer wall construction, building enclosure diaphram wall surface irregularity is rebuild in advance
Region, and then lay waterproof layer, damp-proof layer, heat-insulation layer successively on the surface of smooth diaphram wall body.
As a further improvement, the waterproof layer includes cement sand bed and waterproof layer, the cement sand bed
It is coated on the even curface of diaphram wall, the waterproof layer is coated in cement mortar layer surface.
As a further improvement, the thickness of the cement sand bed is 8mm.
As a further improvement, the damp-proof layer is malthoid layer, and the malthoid layer is two layers.
As a further improvement, the heat-insulation layer is polyethylene flaggy.
As a further improvement, the thickness of the polyethylene flaggy is 40-50mm.
As a further improvement, the steel fabric sheets of 4@of Φ 200 are laid in the outer surface of the outer wall of basement.
The beneficial effects of the utility model are:It ensure that basement structure outer wall has phase with foundation ditch diaphram wall as best one can
Pair can with the space of displacement, be capable of high degree reduction basement combined type out-wall crack and seepage probability.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 A-A portions sectional view.
Label in figure:
1st, diaphram wall 2, outer wall of basement 3, cement sand bed
4th, waterproof layer 6, the steel fabric sheets of 4@of Φ 200
7th, malthoid layer 8, polyethylene flaggy
Embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
As shown in Figure 1-2, a kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall 1 and underground
Room exterior wall 2, is provided with waterproof layer, damp-proof layer and heat-insulation layer between diaphram wall 1 and outer wall of basement 2, waterproof layer is arranged at ground
On the even curface of lower diaphragm wall 1, damp-proof layer is laid on waterproof layer, and heat-insulation layer is pasted on damp-proof layer.Waterproof layer includes
Cement sand bed 3 and waterproof layer 4, cement sand bed 3 are coated on the even curface of diaphram wall body 1, waterproof material
The bed of material 4 is coated on the surface of cement sand bed 3.The thickness of cement sand bed 3 is 8mm.Damp-proof layer is malthoid layer 7, and malthoid layer 7 is
Two layers.Heat-insulation layer is polyethylene flaggy 8.The thickness of polyethylene flaggy 8 is 40-50mm.The appearance of underground external wall body 2
The steel fabric sheets 6 of Φ 4 200 are namely laid facing surface of wall on the inside of foundation ditch in face.
Specific implementation step is as follows:
1st, trimming foundation pit enclosure structure diaphram wall surface, particularly protruding parts exceed 30mm wedge angle or concrete
Block is cleared up, and makes every effort to surfacing;
2nd, drill embedded tool-type screw sleeve, and consolidates it;
3rd, the thick waterproof mortars of 8mm are painted on the diaphram wall surface after the completion of rebuilding;
4th, the brushing waterproof material in the case of construction requirement is met after its drying simultaneously;
5th, two layers of malthoid is laid, the sky for ensureing the slip relative with foundation pit enclosure diaphram wall of outer wall of basement structure
Between;
6th, paste and lay the thick polystyrene foam plates of 40-50mm, for insulation;
7th, integral hoisting or live colligation outer wall of basement steel reinforcement cage, and Φ 4 is laid facing surface of wall on the inside of foundation ditch
200 anticracking steel fabric sheets;
8th, mounting tool type screw rod, and ensure effective connection with diaphram wall embedded sleeve barrel;
9th, it is unilateral to seal template and carry out effective support reinforcing, it is ensured that the stabilization of template;
10th, pour basement structure outer wall concrete and arrange special messenger to implement effective maintenance;
11st, after concrete strength reaches design strength removal tool formula screw rod and to hole be implemented with effect closure, it is ensured that
Screw arbor assembly position is non-leakage.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (7)
1. a kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall and outer wall of basement, its feature exist
In provided with waterproof layer, damp-proof layer and heat-insulation layer between the diaphram wall and outer wall of basement, the waterproof layer is arranged at ground
On the even curface of lower diaphragm wall, the damp-proof layer is laid on waterproof layer, and the heat-insulation layer is pasted on damp-proof layer.
2. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 1, it is characterised in that the waterproof
Layer includes cement sand bed and waterproof layer, and the cement sand bed is coated on the even curface of diaphram wall, institute
Waterproof layer is stated to be coated in cement mortar layer surface.
3. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 2, it is characterised in that the cement
The thickness of screed is 8mm.
4. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 1, it is characterised in that the protection against the tide
Layer is malthoid layer, and the malthoid layer is two layers.
5. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 1, it is characterised in that the insulation
Layer is polyethylene flaggy.
6. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 5, it is characterised in that the poly- second
The thickness of alkene foam sheet is 40-50mm.
7. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 5, it is characterised in that the underground
Outdoor face of wall lays the steel fabric sheets of 4@of Φ 200.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720339523.8U CN206607675U (en) | 2017-04-01 | 2017-04-01 | A kind of basement composite external wall anti-cracking and seepage control structure construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720339523.8U CN206607675U (en) | 2017-04-01 | 2017-04-01 | A kind of basement composite external wall anti-cracking and seepage control structure construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206607675U true CN206607675U (en) | 2017-11-03 |
Family
ID=60173380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720339523.8U Expired - Fee Related CN206607675U (en) | 2017-04-01 | 2017-04-01 | A kind of basement composite external wall anti-cracking and seepage control structure construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206607675U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114351675A (en) * | 2022-01-14 | 2022-04-15 | 江苏盐城水利建设有限公司 | Heat-insulation construction method for lock chamber wall of integrally combined large steel mould ship lock |
CN114991121A (en) * | 2022-05-16 | 2022-09-02 | 中国建筑第八工程局有限公司 | Inner lining wall structure and construction method thereof |
-
2017
- 2017-04-01 CN CN201720339523.8U patent/CN206607675U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114351675A (en) * | 2022-01-14 | 2022-04-15 | 江苏盐城水利建设有限公司 | Heat-insulation construction method for lock chamber wall of integrally combined large steel mould ship lock |
CN114991121A (en) * | 2022-05-16 | 2022-09-02 | 中国建筑第八工程局有限公司 | Inner lining wall structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203222815U (en) | Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall | |
CN105862873A (en) | Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit | |
CN107268688B (en) | Construction method for reinforcing and sealing I-shaped steel joint of underground continuous wall | |
CN210163948U (en) | Construction system for pouring post-cast strip of basement roof | |
CN205444257U (en) | Novel drainage system is prevented to bottom plate | |
CN206607675U (en) | A kind of basement composite external wall anti-cracking and seepage control structure construction | |
CN104790435A (en) | Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof | |
CN211257093U (en) | Underground cast-in-place structure outer wall post-cast strip template pre-supporting device | |
CN104975607A (en) | Offshore area local deep foundation pit stanching pit construction method | |
CN106948502A (en) | A kind of water-proof top cover and its construction method | |
CN207211188U (en) | Outer wall of underground structure HCMW engineering methods overlap wall | |
CN107035006B (en) | A kind of node waterproof method at laminated floor slab difference of height | |
CN211735379U (en) | Waterproof structure of anti-floating anchor rod penetrating through basement bottom plate | |
KR101380782B1 (en) | Eco-composite type steel temporary construction and construction method thereof | |
CN204385775U (en) | Underground waterproof engineering water-stopping structure | |
CN208056126U (en) | A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system | |
CN204298860U (en) | Lid digs the inverse side wall construction joint waterproofing node that does and constructs | |
CN210216499U (en) | A bottom plate and side wall handing-over department waterproof construction for piping lane | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN203960912U (en) | A kind of ater-casting waterproof construction | |
CN106013911B (en) | A kind of interior steel plated assembled circle underground granary with premoulded filler strip | |
CN214090006U (en) | Basement lateral wall post-cast strip block structure | |
CN205399499U (en) | Waterproofing membrane basic unit | |
CN205502069U (en) | Basement outer wall fabricated construction based on excavation supporting stake | |
CN204959763U (en) | Stake wall composite construction structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171103 Termination date: 20210401 |
|
CF01 | Termination of patent right due to non-payment of annual fee |