[go: up one dir, main page]

CN206607675U - A kind of basement composite external wall anti-cracking and seepage control structure construction - Google Patents

A kind of basement composite external wall anti-cracking and seepage control structure construction Download PDF

Info

Publication number
CN206607675U
CN206607675U CN201720339523.8U CN201720339523U CN206607675U CN 206607675 U CN206607675 U CN 206607675U CN 201720339523 U CN201720339523 U CN 201720339523U CN 206607675 U CN206607675 U CN 206607675U
Authority
CN
China
Prior art keywords
wall
basement
layer
cracking
control structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720339523.8U
Other languages
Chinese (zh)
Inventor
叶耀东
张晋
单正猷
方庆法
王金飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd
Original Assignee
SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd filed Critical SHANGHAI JIANHAO ENGINEERING CONSULTANCY Co Ltd
Priority to CN201720339523.8U priority Critical patent/CN206607675U/en
Application granted granted Critical
Publication of CN206607675U publication Critical patent/CN206607675U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall and outer wall of basement, waterproof layer, damp-proof layer and heat-insulation layer are provided between diaphram wall and outer wall of basement, waterproof layer is arranged on the even curface of diaphram wall, damp-proof layer is laid on waterproof layer, and heat-insulation layer is pasted on damp-proof layer.Beneficial effect:Ensure that basement structure outer wall and foundation ditch diaphram wall have as best one can be capable of the reduction basement combined type out-wall crack of high degree and the probability of seepage with the space of displacement relatively.

Description

A kind of basement composite external wall anti-cracking and seepage control structure construction
Technical field
The utility model is related to technical field of building construction, more particularly to a kind of basement composite external wall anti-cracking and seepage control structure Construction.
Background technology
The quickening of urbanization process causes the growing tension of urban land resource, particularly in the environment for building limit for height The exploitation of the lower underground space and the highest attention for rationally utilizing more developer.In recent years, the fast development of underground engineering causes Engineering accident hidden danger of quality it is more frequent, the particularly common quality defect such as percolating water of underground engineering long-standing problem engineer .Armored concrete undergrounds such as " the two wall superposed types ", " two walls separate, are independently arranged formula ", " two wall Integral types " that uses at present Outdoor wall construction, because it is influenceed by the temperature difference, the contraction of concrete itself and Water And Earth Pressures;In addition design, material, coagulation Soil coordinates the when various factors such as construction, and outer wall of basement structure quite a lot exists vertical, oblique through splitting according to investigations Stitch and percolating water, even if two walls, which are separated, can set up waterproof layer on the outside of the outer wall of basement for the formula that is independently arranged, but eventually because of its protection Layer is often not in place and backfill expects fragile waterproof layer and can still occur outer wall of basement percolating water.Need to carry out for quite a long time Leak stopping is repaired repeatedly, not only needs to spend an expensive leak stopping cost of repairs, produces very big worry, and influence basement uses work( Can, and steel bar corrosion at outer wall of basement percolating water can be caused to rot, influence its service life.It is not known for design and requires Or else some practicable crack and leak preventing measures are taken under the premise of closed sticked type basement composite external wall processing method, are easily made Into external wall structure Seepage, it is bigger that the later stage repairs difficulty.
Utility model content
The purpose of this utility model is that the defect for overcoming prior art to exist can effectively prevent basement from answering there is provided one kind Box-like out-wall crack and the external wall structure of seepage construction.
The utility model is realized by following technical scheme:
A kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall and outer wall of basement, its feature It is, waterproof layer, damp-proof layer and heat-insulation layer are provided between the diaphram wall and outer wall of basement, and the waterproof layer is arranged at On the even curface of diaphram wall, the damp-proof layer is laid on waterproof layer, and the heat-insulation layer is pasted on damp-proof layer.It is anti- Only building enclosure diaphram wall protruding parts produces stress concentration to it and causes cracking phenomena to enter after outer wall of basement concrete placings And seepage is produced, therefore before basement structure outer wall construction, building enclosure diaphram wall surface irregularity is rebuild in advance Region, and then lay waterproof layer, damp-proof layer, heat-insulation layer successively on the surface of smooth diaphram wall body.
As a further improvement, the waterproof layer includes cement sand bed and waterproof layer, the cement sand bed It is coated on the even curface of diaphram wall, the waterproof layer is coated in cement mortar layer surface.
As a further improvement, the thickness of the cement sand bed is 8mm.
As a further improvement, the damp-proof layer is malthoid layer, and the malthoid layer is two layers.
As a further improvement, the heat-insulation layer is polyethylene flaggy.
As a further improvement, the thickness of the polyethylene flaggy is 40-50mm.
As a further improvement, the steel fabric sheets of 4@of Φ 200 are laid in the outer surface of the outer wall of basement.
The beneficial effects of the utility model are:It ensure that basement structure outer wall has phase with foundation ditch diaphram wall as best one can Pair can with the space of displacement, be capable of high degree reduction basement combined type out-wall crack and seepage probability.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 A-A portions sectional view.
Label in figure:
1st, diaphram wall 2, outer wall of basement 3, cement sand bed
4th, waterproof layer 6, the steel fabric sheets of 4@of Φ 200
7th, malthoid layer 8, polyethylene flaggy
Embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
As shown in Figure 1-2, a kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall 1 and underground Room exterior wall 2, is provided with waterproof layer, damp-proof layer and heat-insulation layer between diaphram wall 1 and outer wall of basement 2, waterproof layer is arranged at ground On the even curface of lower diaphragm wall 1, damp-proof layer is laid on waterproof layer, and heat-insulation layer is pasted on damp-proof layer.Waterproof layer includes Cement sand bed 3 and waterproof layer 4, cement sand bed 3 are coated on the even curface of diaphram wall body 1, waterproof material The bed of material 4 is coated on the surface of cement sand bed 3.The thickness of cement sand bed 3 is 8mm.Damp-proof layer is malthoid layer 7, and malthoid layer 7 is Two layers.Heat-insulation layer is polyethylene flaggy 8.The thickness of polyethylene flaggy 8 is 40-50mm.The appearance of underground external wall body 2 The steel fabric sheets 6 of Φ 4 200 are namely laid facing surface of wall on the inside of foundation ditch in face.
Specific implementation step is as follows:
1st, trimming foundation pit enclosure structure diaphram wall surface, particularly protruding parts exceed 30mm wedge angle or concrete Block is cleared up, and makes every effort to surfacing;
2nd, drill embedded tool-type screw sleeve, and consolidates it;
3rd, the thick waterproof mortars of 8mm are painted on the diaphram wall surface after the completion of rebuilding;
4th, the brushing waterproof material in the case of construction requirement is met after its drying simultaneously;
5th, two layers of malthoid is laid, the sky for ensureing the slip relative with foundation pit enclosure diaphram wall of outer wall of basement structure Between;
6th, paste and lay the thick polystyrene foam plates of 40-50mm, for insulation;
7th, integral hoisting or live colligation outer wall of basement steel reinforcement cage, and Φ 4 is laid facing surface of wall on the inside of foundation ditch 200 anticracking steel fabric sheets;
8th, mounting tool type screw rod, and ensure effective connection with diaphram wall embedded sleeve barrel;
9th, it is unilateral to seal template and carry out effective support reinforcing, it is ensured that the stabilization of template;
10th, pour basement structure outer wall concrete and arrange special messenger to implement effective maintenance;
11st, after concrete strength reaches design strength removal tool formula screw rod and to hole be implemented with effect closure, it is ensured that Screw arbor assembly position is non-leakage.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (7)

1. a kind of basement composite external wall anti-cracking and seepage control structure construction, including diaphram wall and outer wall of basement, its feature exist In provided with waterproof layer, damp-proof layer and heat-insulation layer between the diaphram wall and outer wall of basement, the waterproof layer is arranged at ground On the even curface of lower diaphragm wall, the damp-proof layer is laid on waterproof layer, and the heat-insulation layer is pasted on damp-proof layer.
2. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 1, it is characterised in that the waterproof Layer includes cement sand bed and waterproof layer, and the cement sand bed is coated on the even curface of diaphram wall, institute Waterproof layer is stated to be coated in cement mortar layer surface.
3. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 2, it is characterised in that the cement The thickness of screed is 8mm.
4. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 1, it is characterised in that the protection against the tide Layer is malthoid layer, and the malthoid layer is two layers.
5. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 1, it is characterised in that the insulation Layer is polyethylene flaggy.
6. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 5, it is characterised in that the poly- second The thickness of alkene foam sheet is 40-50mm.
7. a kind of basement composite external wall anti-cracking and seepage control structure construction as claimed in claim 5, it is characterised in that the underground Outdoor face of wall lays the steel fabric sheets of 4@of Φ 200.
CN201720339523.8U 2017-04-01 2017-04-01 A kind of basement composite external wall anti-cracking and seepage control structure construction Expired - Fee Related CN206607675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720339523.8U CN206607675U (en) 2017-04-01 2017-04-01 A kind of basement composite external wall anti-cracking and seepage control structure construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720339523.8U CN206607675U (en) 2017-04-01 2017-04-01 A kind of basement composite external wall anti-cracking and seepage control structure construction

Publications (1)

Publication Number Publication Date
CN206607675U true CN206607675U (en) 2017-11-03

Family

ID=60173380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720339523.8U Expired - Fee Related CN206607675U (en) 2017-04-01 2017-04-01 A kind of basement composite external wall anti-cracking and seepage control structure construction

Country Status (1)

Country Link
CN (1) CN206607675U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351675A (en) * 2022-01-14 2022-04-15 江苏盐城水利建设有限公司 Heat-insulation construction method for lock chamber wall of integrally combined large steel mould ship lock
CN114991121A (en) * 2022-05-16 2022-09-02 中国建筑第八工程局有限公司 Inner lining wall structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351675A (en) * 2022-01-14 2022-04-15 江苏盐城水利建设有限公司 Heat-insulation construction method for lock chamber wall of integrally combined large steel mould ship lock
CN114991121A (en) * 2022-05-16 2022-09-02 中国建筑第八工程局有限公司 Inner lining wall structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN107268688B (en) Construction method for reinforcing and sealing I-shaped steel joint of underground continuous wall
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN205444257U (en) Novel drainage system is prevented to bottom plate
CN206607675U (en) A kind of basement composite external wall anti-cracking and seepage control structure construction
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN211257093U (en) Underground cast-in-place structure outer wall post-cast strip template pre-supporting device
CN104975607A (en) Offshore area local deep foundation pit stanching pit construction method
CN106948502A (en) A kind of water-proof top cover and its construction method
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN107035006B (en) A kind of node waterproof method at laminated floor slab difference of height
CN211735379U (en) Waterproof structure of anti-floating anchor rod penetrating through basement bottom plate
KR101380782B1 (en) Eco-composite type steel temporary construction and construction method thereof
CN204385775U (en) Underground waterproof engineering water-stopping structure
CN208056126U (en) A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system
CN204298860U (en) Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN210216499U (en) A bottom plate and side wall handing-over department waterproof construction for piping lane
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN203960912U (en) A kind of ater-casting waterproof construction
CN106013911B (en) A kind of interior steel plated assembled circle underground granary with premoulded filler strip
CN214090006U (en) Basement lateral wall post-cast strip block structure
CN205399499U (en) Waterproofing membrane basic unit
CN205502069U (en) Basement outer wall fabricated construction based on excavation supporting stake
CN204959763U (en) Stake wall composite construction structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

Termination date: 20210401

CF01 Termination of patent right due to non-payment of annual fee