CN103010657B - The collapsible transfer structure of legerity type - Google Patents

The collapsible transfer structure of legerity type Download PDF

Info

Publication number
CN103010657B
CN103010657B CN201110288969.XA CN201110288969A CN103010657B CN 103010657 B CN103010657 B CN 103010657B CN 201110288969 A CN201110288969 A CN 201110288969A CN 103010657 B CN103010657 B CN 103010657B
Authority
CN
China
Prior art keywords
major axis
positioning plate
plane
pair
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110288969.XA
Other languages
Chinese (zh)
Other versions
CN103010657A (en
Inventor
陈海水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Expedition Refrigeration Equipment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110288969.XA priority Critical patent/CN103010657B/en
Publication of CN103010657A publication Critical patent/CN103010657A/en
Application granted granted Critical
Publication of CN103010657B publication Critical patent/CN103010657B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)
  • Punching Or Piercing (AREA)

Abstract

The invention discloses the collapsible transfer structure of a kind of legerity type, by cylinder, major axis, opens plate, adapter plate, main locating plate, pay locating plate, clamping cylinder, four-bladed vane forms, and in the unitized construction of opening plate, is provided with cylinder, major axis, adapter plate, main locating plate, pays locating plate, clamping cylinder, four-bladed vane.The invention has the beneficial effects as follows: 1, can greatly save material, productive costs is reduced greatly.2, flexible and convenient to use, multiple occasion can be adapted to.

Description

轻巧型折叠式传送结构Lightweight folding transport structure

技术领域technical field

本发明涉及一种传送结构,更具体的说涉及一种轻巧型折叠式传送结构。The present invention relates to a transmission structure, more specifically to a light and handy folding transmission structure.

背景技术 Background technique

目前所使用的传送结构都是膀大腰圆,傻大黑粗的,使用时移动,极不方便,生产成本高,不用时又占地方。The transmission structures currently used are all big and round, stupid and thick, and they are very inconvenient to move when in use, and the production cost is high, and they take up space when not in use.

发明内容Contents of the invention

本发明的轻巧型折叠式传送结构是在张开板的组合结构中,安装有滚筒,长轴,固定板,主定位板,付定位板,压紧筒和十字板。The light and handy foldable conveying structure of the present invention is that in the combined structure of the expanded plates, a roller, a long axis, a fixed plate, a main positioning plate, an auxiliary positioning plate, a pressing cylinder and a cross plate are installed.

滚筒的整体形状为圆柱体,两端外径各自从外向里作斜向形相应缩小,中间段的外径从左到右相同,左右两端截面的中心位置上有一孔对穿,该对穿孔的近两端处的内径大于中间处的内径。The overall shape of the drum is a cylinder, and the outer diameters of both ends are reduced obliquely from the outside to the inside, and the outer diameter of the middle section is the same from left to right. The inner diameter at the proximal ends is larger than the inner diameter in the middle.

长轴的整体形状为圆柱体,两个近顶端处外形呈双凸出形,两个最近顶端处的圆弧面上都有螺纹,并且各有一个细孔对穿。The overall shape of the major axis is a cylinder, and the two near-tops are double-convex in shape. There are threads on the circular arc surfaces of the two near-tops, and each has a thin hole passing through.

张开板的整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿。The overall shape of the expanded plate is a strip body, and a circular plane is respectively connected and fixed outside the two top ends, and a hole is oppositely pierced in the middle of the two circular planes.

固定板的整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿,长条体中间的侧面位置上有两个耳环体平面连接固定,耳环体平面上的中间处有孔对穿。The overall shape of the fixing plate is a long strip, and there is a circular plane outside the two tops to connect and fix it. There is a hole in the middle of the two circular planes, and there are two earrings on the side of the long strip. The plane is connected and fixed, and the middle of the plane of the earring body is provided with a hole to pass through.

主定位板的整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿,其中一个前端圆平面的中间孔外还有一孔对穿,孔中有螺纹,一端侧面上的两端各近顶端处各有一个凸出体凸出,凸出体平面上各有一孔对穿。The overall shape of the main positioning plate is a long strip, and there is a circular plane outside the two tops to connect and fix it. There is a hole in the middle of the two circular planes, and there is a hole outside the middle hole of one of the front circular planes. There are screw threads in the hole, and there is a protruding body protruding from the two ends on the side of one end near the top, and each protruding body has a hole on the plane of the protruding body.

付定位板的整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿,其中一个前端圆平面上的中间孔外还有一孔对穿。The overall shape of the auxiliary positioning plate is a long strip, and there is a circular plane outside the two tops to connect and fix it. There is a hole in the middle of the two circular planes, and there is a hole outside the middle hole on one of the front circular planes. The holes are opposite.

压紧筒的整体形状为圆柱体,两个近端处呈凸出形。The overall shape of the compression cylinder is a cylinder, and the two proximal ends are convex.

十字板的整体形状为十字形,平面上的四个凸出体平面上的近顶端处各有一孔对穿。The overall shape of the cross plate is a cross shape, and each of the four protruding bodies on the plane has a hole opposite to each other near the top of the plane.

附图说明Description of drawings

图1A,图1B分别为本发明轻巧型折叠式传送结构的俯视图和正视图Fig. 1A and Fig. 1B are the top view and the front view of the lightweight folding transport structure of the present invention respectively

图2A为本发明轻巧型折叠式传送结构的侧视图Fig. 2A is the side view of the lightweight folding transport structure of the present invention

图2B图2C分别为本发明轻巧型折叠式传送结构中的滚筒侧视图和正视图Fig. 2B and Fig. 2C are the side view and the front view of the drum in the lightweight folding transmission structure of the present invention respectively

图3A,图3B分别为本发明轻巧型折叠式传送结构中的付定位板正视图和俯视图Fig. 3A and Fig. 3B are respectively the front view and the top view of the auxiliary positioning plate in the lightweight folding transport structure of the present invention

图3C,图3D分别为本发明轻巧型折叠式传送结构中的张开板正视图和俯视图Figure 3C and Figure 3D are the front view and top view of the unfolded board in the light-weight folding transport structure of the present invention respectively

图3E,图3F分别为本发明轻巧型折叠式传送结构中的长轴侧视图和正视图Fig. 3E, Fig. 3F are respectively the long-axis side view and the front view in the lightweight folding transmission structure of the present invention

图4A图4B分别为本发明轻巧型折叠式传送结构中的主定位板侧视图和正视图Fig. 4A and Fig. 4B are the side view and the front view of the main positioning plate in the lightweight folding transport structure of the present invention respectively

图4C,图4D分别为本发明轻巧型折叠式传送结构中的直流马达侧视图和正视图Fig. 4C and Fig. 4D are the side view and the front view of the DC motor in the lightweight folding transmission structure of the present invention respectively

图4E,图4F分别为本发明轻巧型折叠式传送结构中的压紧轮侧视图和正视图Fig. 4E, Fig. 4F are the side view and the front view of the pressing wheel in the lightweight folding transmission structure of the present invention respectively

图4G为本发明轻巧型折叠式传送结构中的固定板正视图Fig. 4G is the front view of the fixed plate in the lightweight folding transmission structure of the present invention

图5A为本发明轻巧型折叠式传送结构中的固定板侧视图Fig. 5A is a side view of the fixed plate in the lightweight folding transport structure of the present invention

图5B,图5C分别为本发明轻巧型折叠式传送结构中的十字板正视图和侧视图Figure 5B and Figure 5C are the front view and side view of the cross plate in the lightweight folding transport structure of the present invention respectively

具体实施方式detailed description

孔对准第六长轴(17)上的另一端轴头后也套上去;最后在第一长轴(12),第二长轴(13),第三长轴(14),第四长轴(15),第五长轴(16),第六长轴(17)和第七长轴(18)上的另一端轴头上后,分先后各套上一块平垫圈和螺帽,并且分别拧紧和插入开口销后分开口子封口;The hole is aligned with the other end shaft head on the sixth major axis (17) and then put on; at last the first major axis (12), the second major axis (13), the third major axis (14), and the fourth major axis Axle (15), after the 5th major axis (16), the 6th major axis (17) and the other end axle head on the 7th major axis (18), respectively put on a piece of flat washer and nut successively, and Tighten and insert the cotter pin separately and seal the cotter separately;

把第四主定位板(30)的前端平面上的对穿孔对准第九长轴(20)上的另一端轴头,后端平面上的对穿孔对准第八长轴(19)上的另一端轴头后套上去,然后把第五主定位板(32)的前端平面上的对穿孔对准第十一长轴(22)上的另一端轴头,后端平面上的对穿孔对准第十长轴(21)上的另一端轴头后也套上去,把第四付定位板(31)前端平面上的对穿孔对准第十长轴(21)上的另一端轴头,后端平面上的对穿孔对准第九长轴(20)上的另一端轴头后套上去;然后把第五付定位板(33)前端平面上的对穿孔对准第十二长轴(23)上的另一端轴头,后端平面上的对穿孔对准第十一长轴(22)上的另一端轴头后也套上去;最后在第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)上的另一端轴头上,分别各套上一块平垫圈,并且另外在第八长轴(19)和第十二长轴(23)的另一端轴头上分别各套上一个轮子(41)(42),最后在第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)上的另一端轴头上分别套上螺帽拧紧和插入开口销后分开口子封口;The pair of perforations on the front end plane of the fourth main positioning plate (30) is aligned with the other end shaft head on the ninth major axis (20), and the pair of perforations on the rear end plane are aligned with the eighth major axis (19). Put behind the other end shaft head, then align the pair of perforations on the front end plane of the fifth main positioning plate (32) with the other end shaft head on the eleventh major axis (22), and the pair of perforations on the rear end plane Also put on after the other end axle nose on the quasi-tenth major axis (21), align the other end axle nose on the tenth major axis (21) to the perforation on the fourth pair of positioning plate (31) front end plane, Go up after the other end axle head that aligns the other end axle head on the rear end plane to the perforation on the ninth major axis (20); Then align the perforation on the fifth pair of positioning plate (33) front end planes to the twelfth major axis ( 23) on the other end of the shaft head, and the pair of perforations on the rear end plane are aligned with the other end of the shaft head on the eleventh major axis (22); finally on the eighth major axis (19), the ninth longest Axle (20), on the tenth major axis (21), on the other end axle head on the eleventh major axis (22) and the twelfth major axis (23), respectively put a flat washer, and in addition On the other end shaft head of eight long shafts (19) and the twelfth long shaft (23), respectively put on a wheel (41) (42), finally at the eighth long shaft (19), the ninth long shaft (20 ), the tenth major axis (21), the other end axle head on the eleventh major axis (22) and the twelfth major axis (23) respectively puts on the nut and tightens and inserts the cotter pin and separates the opening seal;

把十字板(39)置于两组第一张开板(34),第二张开板(35),第三张开板(36),第四张开板(37)和第五张开板(38)内的内侧平面之间的空档,交叉平面上的四个顶端处的四个对穿孔,分别对准两组第一张开板(34),第二张开板(35),第三张开板(36),第四张开板(37)和第五张开板(38)的内侧平面上的耳环状平面上的相应对穿孔贴上去,此后分别串入螺栓和套上螺帽(40)后拧紧,至此组装结束。Put the cross plate (39) on two groups of the first opening plate (34), the second opening plate (35), the third opening plate (36), the fourth opening plate (37) and the fifth opening The gap between the inner planes in the plate (38), the four pairs of perforations at the four tops on the crossing plane, are respectively aligned with two groups of the first expansion plate (34), the second expansion plate (35) , the third opening plate (36), the corresponding pair of perforations on the earring-shaped plane on the inner plane of the fourth opening plate (37) and the fifth opening plate (38) are affixed, and thereafter respectively strung into bolts and sleeves Tighten after the upper nut (40), and the assembly is completed.

把第一主定位板24,第二主定位板26,第三主定位板28,第四主定位板30和第五主定位板32的平面在上,第一付定位板25,第二付定位板27,第三付定位板29,第四付定位板31和第五付定位板33的平面在下,第一主定位板24的后端与第一付定位板25的前端上下叠合,第一付定位板25的后端与第二主定位板26的前端上下叠合,第二主定位板26的后端与第二付定位板27的前端上下叠合,第二付定位板27的后端与第三主定位板28的前端上下叠合,第三主定位板28的后端与第三付定位板29的前端上下叠合,第四主定位板30的后端与第四付定位板31的前端上下叠合,第四付定位板31的后端与第五主定位板32的前端上下叠合,第五主定位板32的后端与第五付定位板33的前端上下叠合;The first main positioning plate 24, the second main positioning plate 26, the third main positioning plate 28, the plane of the fourth main positioning plate 30 and the fifth main positioning plate 32, the first auxiliary positioning plate 25, the second auxiliary positioning plate Positioning plate 27, the 3rd auxiliary positioning plate 29, the plane of the 4th auxiliary positioning plate 31 and the 5th auxiliary positioning plate 33 is down, the rear end of the first main positioning plate 24 overlaps up and down with the front end of the first auxiliary positioning plate 25, The rear end of the first auxiliary positioning plate 25 overlaps up and down with the front end of the second main positioning plate 26, and the rear end of the second main positioning plate 26 overlaps up and down with the front end of the second auxiliary positioning plate 27, and the second auxiliary positioning plate 27 The rear end of the third main positioning plate 28 overlaps up and down, the rear end of the third main positioning plate 28 overlaps the front end of the third secondary positioning plate 29 up and down, and the rear end of the fourth main positioning plate 30 overlaps with the fourth main positioning plate 30. The front end of the auxiliary positioning plate 31 is stacked up and down, the rear end of the fourth auxiliary positioning plate 31 is superposed up and down with the front end of the fifth main positioning plate 32, and the rear end of the fifth main positioning plate 32 is overlapped with the front end of the fifth auxiliary positioning plate 33. fold up and down;

此后在第一长轴12,第二长轴13,第三长轴14,第四长轴15,第五长轴16,第六长轴17,第七长轴18,第八长轴19,第九长轴20,第十长轴21,第十一长轴22和第十二长轴23的一端轴头上先分别各套上一个轴承11后,再分别各套上一块平垫圈。Afterwards, the first major axis 12, the second major axis 13, the third major axis 14, the fourth major axis 15, the fifth major axis 16, the sixth major axis 17, the seventh major axis 18, and the eighth major axis 19, The ninth long shaft 20, the tenth long shaft 21, the eleventh long shaft 22 and the one end shaft head of the twelfth long shaft 23 are respectively put on a bearing 11 respectively, and then respectively put on a flat washer.

把第一主定位板24的前端平面上的对穿孔对准第一长轴12上的一端轴头,后端平面上的对穿孔对准第二长轴13上的一端轴头;第二主定位板26的前端平面上的对穿孔对准第三长轴14上的一端轴头,后端平面上的对穿孔对准第四长轴(15上的一端轴头;第三主定位板28的前端平面上的对穿孔对准第五长轴16上的一端轴头,后端平面上的对穿孔对准第六长轴17上的一端轴头;第四主定位板30的前端平面上的对穿孔对准第八长轴19上的一端轴头,后端平面上的对穿孔对准第九长轴20上的一端轴头;第五主定位板32的前端平面上的对穿孔对准第十长轴21上的一端轴头,后端平面上的对穿孔对准第十一长轴22上的一端轴头;第三付定位板29前端平面上的对穿孔对准第六长轴17上的一端轴头,后端平面上的对穿孔对准第七长轴18上的一端轴头;第五付定位板33的前端平面上的对穿孔对准第十一长轴22上的一端轴头,后端平面上的对穿孔对准第十二长轴23上的一端轴头;Align the pair of perforations on the front end plane of the first main positioning plate 24 with one end shaft head on the first major axis 12, and align the pair of perforations on the rear end plane with one end shaft head on the second major axis 13; The pair of perforations on the front end plane of the positioning plate 26 is aligned with one end of the third major axis 14, and the pair of perforations on the rear end plane is aligned with the fourth major axis (one end of the shaft on 15; the third main positioning plate 28 The pair of perforations on the front end plane is aligned with one end of the fifth major axis 16, and the pair of perforations on the rear end plane is aligned with one end of the sixth major axis 17; on the front end of the fourth main positioning plate 30 The pair of perforations on the eighth major axis 19 is aligned with one end of the shaft head on the eighth major axis 19, and the pair of perforations on the rear end plane is aligned with one end of the ninth major axis 20; the pair of perforations on the front end plane of the fifth main positioning plate 32 Quasi one end shaft head on the tenth major axis 21, the opposite perforation on the rear end plane is aligned with one end shaft end on the eleventh major axis 22; One end shaft head on the shaft 17, the pair of perforations on the rear end plane are aligned with the one end shaft head on the seventh long axis 18; the pair of perforations on the front end plane of the fifth auxiliary positioning plate 33 are aligned on the eleventh long axis 22 One end of the shaft head, the pair of perforations on the rear end plane is aligned with the end of the shaft head on the twelfth major axis 23;

然后把第一长轴12,第二长轴13,第三长轴14,第四长轴15,第五长轴16,第六长轴17,第七长轴18,第八长轴19,第九长轴20,第十长轴21,第十一长轴22和第十二长轴23上的一端轴头各自对准相应的主定位板和付定位板的平面上的对穿孔后分别串入,待这些长轴往下串出在主定位板和付定位板的前端平面上的对穿孔后,分别各套上一块平垫圈,接着再在第二长轴13,第四长轴15,第六长轴17,第九长轴20和第十一长轴22的一端轴头上的细孔中串入开口销后封口。Then the first long axis 12, the second long axis 13, the third long axis 14, the fourth long axis 15, the fifth long axis 16, the sixth long axis 17, the seventh long axis 18, the eighth long axis 19, One end of the ninth major axis 20, the tenth major axis 21, the eleventh major axis 22 and the twelfth major axis 23 are respectively aligned with the paired holes on the plane of the corresponding main positioning plate and the auxiliary positioning plate. String in, after these long shafts go out of the pair of perforations on the front plane of the main positioning plate and the auxiliary positioning plate, put a flat washer on each, and then install the second long shaft 13 and the fourth long shaft 15 , the sixth major axis 17, the ninth major axis 20 and the 11th major axis 22 in the thin hole on one end shaft head of stringing into cotter pin rear sealing.

把固定板3的上端对准第一主定位板24上的后平面,固定板3的下端对准第四主定位板30上的后平面后从上往下放上去叠合。The upper end of the fixed plate 3 is aligned with the back plane on the first main positioning plate 24, and the lower end of the fixed plate 3 is aligned with the rear plane on the fourth main positioning plate 30 and then stacked from top to bottom.

先把第二张开板35上的一端对准第二主定位板26和第一付定位板25上的叠合处,另一端也对准第五主定位板32和第四付定位板31上的后端叠合处后从上往下放上去叠合,First align one end on the second opening plate 35 with the overlapping place on the second main positioning plate 26 and the first auxiliary positioning plate 25, and the other end is also aligned with the fifth main positioning plate 32 and the fourth secondary positioning plate 31 After the upper rear end is stacked, it is stacked from top to bottom,

后把第四张开板37上的一端对准第三主定位板28和第二付定位板27上的叠合处,另一端对准第五付定位板33上的后端叠合处后从上往下放上去叠合,Afterwards, one end on the fourth opening plate 37 is aligned with the overlapping place on the third main positioning plate 28 and the second auxiliary positioning plate 27, and the other end is aligned with the rear end overlapping portion on the fifth auxiliary positioning plate 33 Lay it up and stack it from top to bottom,

再把第一张开板34上的一端对准第二主定位板26和第一付定位板25上的叠合处,另一端也对准固定板3和第四付定位板31上的后端叠合处后从上往下放上去叠合;Then one end on the first opening plate 34 is aimed at the overlapping place on the second main positioning plate 26 and the first auxiliary positioning plate 25, and the other end is also aimed at the back on the fixed plate 3 and the fourth auxiliary positioning plate 31 After the ends are stacked, put them up and stack them from top to bottom;

此后把第三张开板36上的一端对准第三主定位板28和第二付定位板27上的叠合处,另一端也对准第五主定位板32和第四付定位板31上的后端叠合处后从上往下放上去叠合。Thereafter, one end on the third opening plate 36 is aligned with the overlapping place on the third main positioning plate 28 and the second auxiliary positioning plate 27, and the other end is also aligned with the fifth main positioning plate 32 and the fourth secondary positioning plate 31 After the upper rear end is stacked, it is stacked from top to bottom.

先在第一长轴12,第三长轴14,第五长轴16,第七长轴18,第八长轴19和第十长轴21的一端轴头上分别各套上一个轴承后,再分别套上一块平垫圈,此后把这些长轴的一端轴头分先后分别对准第一张开板34,第二张开板35,第三张开板36,第四张开板37和第五张开板38平面上的对穿孔后,从上往下串入,待各根长轴上的轴头分别串出下平面后,先在第八长轴19和第十二长轴23的一端轴头上套上轮子,然后再在第一长轴12,第三长轴14,第五长轴16,第七长轴18,第八长轴19和第十长轴21上分别套上平垫圈,再分别套上螺帽拧紧此后再在这些长轴的一端轴头上的细孔中插入开口销后分开口子封口。先把直流马达6竖起来,再把一端的轴头先串入固定板3平面上的相应对穿孔中后固定,然后在压紧轮5的两端轴头上各套上一个轴承后,也把压紧轮5竖起来,也把一端的轴头串入固定板3平面上的相应对穿孔中。After the first major axis 12, the third major axis 14, the fifth major axis 16, the seventh major axis 18, the eighth major axis 19 and one end of the tenth major axis 21 are fitted with a bearing respectively, Then respectively put on a flat washer, after this, one end of these long shafts is aligned with the first opening plate 34, the second opening plate 35, the third opening plate 36, the fourth opening plate 37 and After opening the pair of perforations on the plane of the fifth plate 38, string them in from top to bottom. Put the wheel on one end of the shaft head, and then put the wheels on the first major axis 12, the third major axis 14, the fifth major axis 16, the seventh major axis 18, the eighth major axis 19 and the tenth major axis 21 respectively. Upper flat washer, then respectively put on the nuts and tighten, after that, insert cotter pins in the fine holes on one end of these long shafts and then seal the openings. The DC motor 6 is erected earlier, and the shaft head at one end is inserted into the corresponding pair of perforations on the plane of the fixed plate 3 and then fixed, and then a bearing is respectively put on the shaft heads at both ends of the pressure wheel 5. The pinch wheel 5 is erected, and the shaft head at one end is also inserted into the corresponding pair of perforations on the fixed plate 3 planes.

在第一长轴12,第二长轴13,第三长轴14,第四长轴15,第五长轴16,第六长轴17,第七长轴18第八长轴19,第九长轴20,第十长轴21,第十一长轴22和第十二长轴23上的外弧面外,先把各个滚筒7分先后逐个对准后套上去;In the first major axis 12, the second major axis 13, the third major axis 14, the fourth major axis 15, the fifth major axis 16, the sixth major axis 17, the seventh major axis 18, the eighth major axis 19, the ninth major axis Out of the outer arc surface on the major axis 20, the tenth major axis 21, the eleventh major axis 22 and the twelfth major axis 23, first align each roller 7 points one by one and put them on;

后在第一长轴12,第二长轴13,第三长轴14,第四长轴15,第五长轴16,第六长轴17,第七长轴18,第八长轴19,第九长轴20,第十长轴21,第十一长轴22和第十二长轴23的另一端上分别套上轴承11,并且使每个轴承都在进入各个滚筒7上下截面上的凹孔中后,再在这些轴头上都放上平垫圈。After the first major axis 12, the second major axis 13, the third major axis 14, the fourth major axis 15, the fifth major axis 16, the sixth major axis 17, the seventh major axis 18, and the eighth major axis 19, The ninth major axis 20, the tenth major axis 21, the other ends of the eleventh major axis 22 and the twelfth major axis 23 are respectively put on bearings 11, and each bearing is entered into the upper and lower sections of each cylinder 7. After the recessed holes, put flat washers on these shaft heads.

此时把皮带盘4上的内孔根据要求套在和半包在各个滚筒7以及直流马达的外圆弧面上。Now the endoporus on the belt pulley 4 is enclosed within and half-wrapped on the outer arc surface of each cylinder 7 and DC motor as required.

此后在轻巧型折叠式传送结构的正视面上,重新开始另一组第一主定位板24,第一付定位板25,第二主定位板26,第二付定位板27,第三主定位板28,第三付定位板29,第四主定位板30,第四付定位板31,第五主定位板32,和第五付定位板33,固定板3,第一张开板34,第二张开板35,第三张开板36,第四张开板37和第五张开板38的组装。After this on the front view of light and handy type folding transmission structure, start another group of the first main positioning board 24 again, the first auxiliary positioning board 25, the second main positioning board 26, the second auxiliary positioning board 27, the 3rd main positioning board Plate 28, the third auxiliary positioning plate 29, the fourth main positioning plate 30, the fourth auxiliary positioning plate 31, the fifth main positioning plate 32, and the fifth auxiliary positioning plate 33, fixed plate 3, first opening plate 34, Assembly of the second expansion plate 35 , the third expansion plate 36 , the fourth expansion plate 37 and the fifth expansion plate 38 .

把第一块张开板34的两端平面上的对穿孔分别对准第三长轴14和第八长轴19上的另一端轴头后套上去,然后把第三张开板36的两端平面上的对穿孔分别对准第五长轴16和第十长轴21上的另一端轴头后套上去,最后再把第五张开板38两端平面上的对穿孔分别对准第七长轴18和第十二长轴23上的另一端轴头后也套上去。The pair of perforations on the two ends planes of the first expansion plate 34 are respectively aligned with the other end axle heads on the third major axis 14 and the eighth major axis 19, and then put on the two ends of the third expansion plate 36. The pair of perforations on the end planes are respectively aligned with the other end shaft heads on the fifth major axis 16 and the tenth major axis 21, and finally the pair of perforations on the planes at both ends of the fifth open plate 38 are aligned with the first respectively. The other end axle head on the seven major shafts 18 and the twelfth major shaft 23 is also put on behind.

把另一固定板3平面上的各个对穿孔对准直流马达6,压紧轮5,第一长轴12和第八长轴19的另一端轴头后套上去。Align each pair of perforations on the plane of the other fixed plate 3 with the DC motor 6, the pinch wheel 5, the other end of the first major axis 12 and the eighth major axis 19 and then put it on.

此后把第二张开板35的两端平面上的对穿孔分别对准第三长轴14和第十长轴21上的另一端轴头后也套上去,然后把第四张开板37的两端平面上的对穿孔分别对准第五长轴16和第十二长轴23的另一端轴头后也套上去。Thereafter, the pair of perforations on the two ends of the second expansion plate 35 are aligned with the other end shaft head on the third major axis 14 and the tenth major axis 21 respectively, and then the fourth expansion plate 37 is put on. The pair of perforations on the planes at both ends are respectively aligned with the other end shaft heads of the fifth major axis 16 and the twelfth major axis 23 and then put on.

把第一主定位板24前端平面上的对穿孔对准第二长轴13的另一端轴头,后端平面上的对穿孔对准第一长轴12上的另一端轴头后套上去;然后把第二主定位板26的前端平面上的对穿孔对准第四长轴15上的另一端轴头,后端平面上的对穿孔对准第三长轴14上的另一端轴头后也套上去;最后再把第三主定位板28前端平面上的对穿孔对准第六长轴17上的另一端轴头,后端平面上的对穿孔对准第五长轴16上的另一端轴头后也套上去;把第一付定位板25前端平面上的对穿孔对准第三长轴14上的另一端轴头,后端平面上的对穿孔对准第二长轴13上的另一端轴头后套上去;然后把第二付定位板27的前端平面上的对穿孔对准第三长轴16上的另一端轴头,后端平面上的对穿孔对准第四长轴15的另一端轴头后也套上去,此后把第三主定位板28前端平面上的对穿孔对准第七长轴18上的另一端轴头,后端平面上的对穿孔对准第六长轴17上的另一端轴头后也套上去;最后在第一长轴12,第二长轴13,第三长轴14,第四长轴15,第五长轴16,第六长轴17和第七长轴18上的另一端轴头上后,分先后各套上一块平垫圈和螺帽,并且分别拧紧和插入开口销后分开口子封口。Align the pair of perforations on the front end plane of the first main positioning plate 24 with the other end of the second major axis 13, and align the pair of perforations on the rear end plane with the other end of the first major axis 12, then put it on; Then align the pair of perforations on the front end plane of the second main positioning plate 26 with the other end shaft head on the fourth major axis 15, and align the pair of perforations on the rear end plane with the other end shaft head on the 3rd major axis 14 Also put on; Finally align the pair of perforations on the third main positioning plate 28 front end planes with the other end shaft head on the sixth major axis 17, and align the pair of perforations on the rear end plane with the other end on the fifth major axis 16 Put it on after one end of the shaft head; align the pair of perforations on the front end plane of the first pair of positioning plates 25 with the other end of the shaft head on the third major axis 14, and align the pair of perforations on the rear end plane with the second major axis 13 Put it back on the other end of the axle head; then align the pair of perforations on the front end plane of the second positioning plate 27 with the other end of the third major axis 16, and align the pair of perforations on the rear end plane with the fourth long axis. Also put on after the other end axle head of axle 15, after this the pair of perforations on the plane of the 3rd main positioning plate 28 front ends are aligned with the other end axle head on the seventh major axis 18, and the pair of perforations on the rear end plane are aligned with the first The other end shaft head on the six long shafts 17 is also put on; finally the first long shaft 12, the second long shaft 13, the third long shaft 14, the fourth long shaft 15, the fifth long shaft 16, the sixth long After the other end shaft head on the axle 17 and the seventh long axis 18, respectively put on a piece of flat washer and nut successively, and respectively tighten and insert the split opening seal after the cotter pin.

把第四主定位板30的前端平面上的对穿孔对准第九长轴20上的另一端轴头,后端平面上的对穿孔对准第八长轴19上的另一端轴头后套上去,然后把第五主定位板32的前端平面上的对穿孔对准第十一长轴22上的另一端轴头,后端平面上的对穿孔对准第十长轴21上的另一端轴头后也套上去,把第四付定位板31前端平面上的对穿孔对准第十长轴21上的另一端轴头,后端平面上的对穿孔对准第九长轴(20)上的另一端轴头后套上去;然后把第五付定位板33前端平面上的对穿孔对准第十二长轴23上的另一端轴头,后端平面上的对穿孔对准第十一长轴22上的另一端轴头后也套上去;最后在第八长轴19,第九长轴20,第十长轴21,第十一长轴22和第十二长轴23上的另一端轴头上,分别各套上一块平垫圈,并且另外在第八长轴19和第十二长轴23的另一端轴头上分别各套上一个轮子41,42,最后在第八长轴19,第九长轴20,第十长轴21,第十一长轴22和第十二长轴23上的另一端轴头上分别套上螺帽拧紧和插入开口销后分开口子封口。Align the pair of perforations on the front end plane of the fourth main positioning plate 30 with the other end shaft head on the ninth major axis 20, and align the pair of perforations on the rear end plane with the other end shaft head rear sleeve on the eighth major axis 19 Go up, then align the pair of perforations on the front end plane of the fifth main positioning plate 32 with the other end of the eleventh major axis 22, and align the pair of perforations on the rear end plane with the other end on the tenth major axis 21 Put it on behind the shaft head, align the pair of perforations on the front end plane of the fourth positioning plate 31 with the other end of the shaft head on the tenth major axis 21, and align the pair of perforations on the rear end plane with the ninth major axis (20) Then put the pair of perforations on the front end plane of the fifth positioning plate 33 to the other end of the twelfth major axis 23, and the pair of perforations on the rear end plane to the tenth The other end shaft head on a long shaft 22 is also put on behind; Finally, the eighth long shaft 19, the ninth long shaft 20, the tenth long shaft 21, the eleventh long shaft 22 and the twelfth long shaft 23 On the other end axle head, respectively put on a flat washer, and in addition respectively put on a wheel 41,42 on the other end axle head of the eighth major axis 19 and the twelfth major axis 23, finally on the eighth long axis Axle 19, the ninth long shaft 20, the tenth long shaft 21, the other end shaft head on the eleventh long shaft 22 and the twelfth long shaft 23 respectively put on nuts to tighten and insert split pins to separate the opening seals.

把十字板39置于两组第一张开板34,第二张开板35,第三张开板36,第四张开板37和第五张开板38内的内侧平面之间的空档,交叉平面上的四个顶端处的四个对穿孔,分别对准两组第一张开板34,第二张开板35,第三张开板36,第四张开板37和第五张开板38的内侧平面上的耳环状平面上的相应对穿孔贴上去,此后分别串入螺栓和套上螺帽40后拧紧,至此组装结束。The cross plate 39 is placed in two groups of the first expansion plate 34, the second expansion plate 35, the third expansion plate 36, the space between the fourth expansion plate 37 and the inside plane in the fifth expansion plate 38 Gear, four pairs of perforations at the four tops on the intersecting plane are respectively aligned with two groups of the first opening plate 34, the second opening plate 35, the third opening plate 36, the fourth opening plate 37 and the second opening plate The corresponding pair of perforations on the earring-shaped plane on the inboard plane of the five opening plates 38 are pasted up, and after this, the bolts are strung in respectively and tightened after putting on the nut 40, so far the assembly is completed.

使用时,把整个轻巧型折叠式传送结构的上平面翻上来,然后把整个轻巧型折叠式传送结构的左右两端拉开来,使其舒展开来,最后把第一主定位板24,第二主定位板26,第三主定位板28,第四主定位板30和第五主定位板32,第一付定位板25,第二付定位板27,第三付定位板29,第四付定位板31和第五付定位板33伸直,并且在相应的孔中串入螺栓43后拧紧,当直流马达通电后旋转,带动皮带盘跟着一起旋转,从而实现传送物品的效果。During use, turn up the upper plane of the whole light and handy type folding transmission structure, then pull the left and right ends of the whole light and handy type folding transmission structure to make it stretch out, and finally put the first main positioning plate 24, the second Two main positioning plates 26, the third main positioning plate 28, the fourth main positioning plate 30 and the fifth main positioning plate 32, the first auxiliary positioning plate 25, the second auxiliary positioning plate 27, the third auxiliary positioning plate 29, the fourth The auxiliary positioning plate 31 and the fifth auxiliary positioning plate 33 are straightened, and the bolts 43 are inserted in the corresponding holes and then tightened. When the DC motor is energized, it rotates and drives the belt pulley to rotate together, thereby realizing the effect of conveying articles.

Claims (1)

1.一种轻巧型折叠式传送结构,其特征在于,在张开板的组合结构中,安装有滚筒,长轴,固定板,主定位板,付定位板,压紧筒和十字板;1. A light and handy folding transmission structure, characterized in that, in the combined structure of the expanded plates, a roller, a long shaft, a fixed plate, a main positioning plate, a secondary positioning plate, a pressing cylinder and a cross plate are installed; 所述的滚筒,整体形状为圆柱体,两端外径各自从外向里作斜向形相应缩小,中间段外径从左到右相同,左右两端截面的中心位置上有一孔对穿,该对穿孔的近两端处的内径大于中间处的内径;The overall shape of the drum is a cylinder, and the outer diameters of both ends are respectively reduced obliquely from the outside to the inside, and the outer diameter of the middle section is the same from left to right. The inner diameter at the near two ends of the perforation is larger than the inner diameter at the middle; 所述的长轴,整体形状为圆柱体,两个近顶端处外形呈双凸出形,两个最近顶端处的圆弧面上都有螺纹,并且各有一个细孔对穿;The overall shape of the long axis is a cylinder, and the two near-tops are double-convex in shape, and the two arc-shaped surfaces near the top are threaded, and each has a thin hole passing through; 所述的张开板,整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面的中间处都有一孔对穿;The opening plate has an overall shape of a long strip, with a circular plane connected to and fixed on the outside of the two top ends, and a hole piercing through the middle of the two circular planes; 所述的固定板,整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿,长条体中间的侧面位置上有两个耳环体平面连接固定,耳环体平面上的中间处有孔对穿;Said fixing plate has an overall shape of a strip body, and there is a circular plane outside the two tops to connect and fix it. There is a hole in the middle of the two circular planes, and there are two holes on the side of the strip body. The two earring body planes are connected and fixed, and there is a hole in the middle of the earring body plane; 所述的主定位板,整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿,其中一个前端圆平面的中间孔外还有一孔对穿,孔中有螺纹,一端侧面上的两端各近顶端处各有一个凸出体凸出,凸出体平面上各有一孔对穿;The main positioning plate has an overall shape of a long strip, and there is a circular plane outside the two tops to connect and fix it, and there is a hole in the middle of the two circular planes, and the middle hole of one of the front circular planes is There is also a hole piercing through, and there are threads in the hole, and a protrusion protrudes from the two ends on the side of one end near the top, and each protrusion has a hole piercing on the plane; 所述的付定位板,整体形状为长条体,两个顶端外各有一个圆平面与其连接固定,两个圆平面上的中间处都有一孔对穿,其中一个前端圆平面上的中间孔外还有一孔对穿;The auxiliary positioning plate has an overall shape of a long strip, and there is a circular plane outside the two top ends to connect and fix it. There is a hole in the middle of the two circular planes, and the middle hole on the front circular plane is There is a hole on the outside; 所述的压紧筒,整体形状为圆柱体,两个近端处呈凸出形;The overall shape of the compression cylinder is a cylinder, and the two proximal ends are convex; 所述的十字板,整体形状为十字形,平面上的四个凸出体平面上的近顶端处都有一孔对穿;The overall shape of the cross plate is cross-shaped, and the four protrusions on the plane have a hole on the plane near the top; 把第一主定位板(24),第二主定位板(26),第三主定位板(28),第四主定位板(30)和第五主定位板(32)的平面在上,第一付定位板(25),第二付定位板(27),第三付定位板(29),第四付定位板(31)和第五付定位板(33)的平面在下,第一主定位板(24)的后端与第一付定位板(25)的前端上下叠合,第一付定位板(25)的后端与第二主定位板(26)的前端上下叠合,第二主定位板(26)的后端与第二付定位板(27)的前端上下叠合,第二付定位板(27)的后端与第三主定位板(28)的前端上下叠合,第三主定位板(28)的后端与第三付定位板(29)的前端上下叠合,第四主定位板(30)的后端与第四付定位板(31)的前端上下叠合,第四付定位板(31)的后端与第五主定位板(32)的前端上下叠合,第五主定位板(32)的后端与第五付定位板(33)的前端上下叠合;The first main positioning plate (24), the second main positioning plate (26), the third main positioning plate (28), the plane of the fourth main positioning plate (30) and the fifth main positioning plate (32), The first pair of positioning plate (25), the second pair of positioning plate (27), the 3rd pair of positioning plate (29), the plane of the fourth pair of positioning plate (31) and the fifth pair of positioning plate (33), the first The rear end of the main positioning plate (24) overlaps up and down with the front end of the first auxiliary positioning plate (25), and the rear end of the first auxiliary positioning plate (25) overlaps up and down with the front end of the second main positioning plate (26), The rear end of the second main positioning plate (26) overlaps up and down with the front end of the second auxiliary positioning plate (27), and the rear end of the second auxiliary positioning plate (27) overlaps up and down with the front end of the third main positioning plate (28). Close, the rear end of the 3rd main positioning board (28) and the front end of the 3rd auxiliary positioning board (29) overlap up and down, the rear end of the 4th main positioning board (30) and the front end of the 4th auxiliary positioning board (31) Stack up and down, the rear end of the fourth pair of positioning plate (31) and the front end of the fifth main positioning plate (32) overlap up and down, the rear end of the fifth main positioning plate (32) and the fifth auxiliary positioning plate (33) The front end of the stack is stacked up and down; 此后在第一长轴(12),第二长轴(13),第三长轴(14),第四长轴(15),第五长轴(16),第六长轴(17),第七长轴(18),第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)的一端轴头上先分别各套上一个轴承(11)后,再分别各套上一块平垫圈;Thereafter at the first long axis (12), the second long axis (13), the third long axis (14), the fourth long axis (15), the fifth long axis (16), the sixth long axis (17), Seventh major axis (18), eighth major axis (19), ninth major axis (20), tenth major axis (21), eleventh major axis (22) and twelfth major axis (23) Put a bearing (11) on the shaft head at one end respectively, and then put a flat washer on it respectively; 把第一主定位板(24)的前端平面上的对穿孔对准第一长轴(12)上的一端轴头,后端平面上的对穿孔对准第二长轴(13)上的一端轴头;第二主定位板(26)的前端平面上的对穿孔对准第三长轴(14)上的一端轴头,后端平面上的对穿孔对准第四长轴(15)上的一端轴头;第三主定位板(28)的前端平面上的对穿孔对准第五长轴(16)上的一端轴头,后端平面上的对穿孔对准第六长轴(17)上的一端轴头;第四主定位板(30)的前端平面上的对穿孔对准第八长轴(19)上的一端轴头,后端平面上的对穿孔对准第九长轴(20)上的一端轴头;第五主定位板(32)的前端平面上的对穿孔对准第十长轴(21)上的一端轴头,后端平面上的对穿孔对准第十一长轴(22)上的一端轴头;第三付定位板(29)前端平面上的对穿孔对准第六长轴(17)上的一端轴头,后端平面上的对穿孔对准第七长轴(18)上的一端轴头;第五付定位板(33)的前端平面上的对穿孔对准第十一长轴(22)上的一端轴头,后端平面上的对穿孔对准第十二长轴(23)上的一端轴头;Align the pair of perforations on the front end plane of the first main positioning plate (24) with one end of the first major axis (12), and align the pair of perforations on the rear end plane with one end on the second major axis (13) Shaft head; the pair of perforations on the front end plane of the second main positioning plate (26) is aligned with one end of the shaft head on the third major axis (14), and the pair of perforations on the rear end plane is aligned with the fourth major axis (15) One end of the axle head; the pair of perforations on the front end plane of the third main positioning plate (28) is aligned with one end of the axle head on the fifth major axis (16), and the pair of perforations on the rear end plane is aligned with the sixth major axis (17 ) on one end of the shaft head; the pair of perforations on the front plane of the fourth main positioning plate (30) is aligned with one end of the shaft head on the eighth major axis (19), and the pair of perforations on the rear end plane is aligned with the ninth major axis One end shaft nose on (20); the pair of perforations on the front end plane of the fifth main positioning plate (32) is aligned with one end shaft nose on the tenth long axis (21), and the pair of perforations on the rear end plane is aligned with the tenth One end shaft head on a major axis (22); the pair of perforations on the front plane of the third pair of positioning plates (29) are aligned with one end of the shaft head on the sixth major axis (17), and the pair of perforations on the rear end plane are aligned One end shaft nose on the seventh long axis (18); the opposite perforation on the front end plane of the fifth pair of positioning plate (33) is aligned with one end shaft nose on the eleventh long axis (22), and the opposite end on the rear end plane The perforation is aligned with one end shaft head on the twelfth major axis (23); 然后把第一长轴(12),第二长轴(13),第三长轴(14),第四长轴(15),第五长轴(16),第六长轴(17),第七长轴(18),第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)上的一端轴头各自对准相应的主定位板和付定位板的平面上的对穿孔后分别串入,待这些长轴往下串出在主定位板和付定位板的前端平面上的对穿孔后,分别各套上一块平垫圈,接着再在第二长轴(13),第四长轴(15),第六长轴(17),第九长轴(20)和第十一长轴(22)的一端轴头上的细孔中串入开口销后封口;Then the first long axis (12), the second long axis (13), the third long axis (14), the fourth long axis (15), the fifth long axis (16), the sixth long axis (17), The seventh major axis (18), the eighth major axis (19), the ninth major axis (20), the tenth major axis (21), the eleventh major axis (22) and the twelfth major axis (23) One end of the shaft head is respectively aligned with the paired perforation holes on the plane of the corresponding main positioning plate and the auxiliary positioning plate, and then threaded in respectively, and these long axes are threaded down to the paired perforation holes on the front plane of the main positioning plate and the auxiliary positioning plate. Finally, put a piece of flat washer on respectively, and then on the second major axis (13), the fourth major axis (15), the sixth major axis (17), the ninth major axis (20) and the eleventh major axis (22) The fine hole on one end of the shaft head is strung into the cotter pin and then sealed; 把固定板(3)的上端对准第一主定位板(24)上的后平面,固定板(3)的下端对准第四主定位板(30)上的后平面后从上往下放上去叠合;Align the upper end of the fixed plate (3) with the rear plane on the first main positioning plate (24), and put the lower end of the fixed plate (3) at the rear plane on the fourth main positioning plate (30) from top to bottom overlap; 先把第二张开板(35)上的一端对准第二主定位板(26)和第一付定位板(25)上的叠合处,另一端也对准第五主定位板(32)和第四付定位板(31)上的后端叠合处后从上往下放上去叠合,First align one end on the second opening plate (35) with the overlapping place on the second main positioning plate (26) and the first auxiliary positioning plate (25), and the other end is also aligned with the fifth main positioning plate (32 ) and the rear end superimposition place on the fourth pair of positioning plate (31) and put it up from top to bottom to superimpose, 后把第四张开板(37)上的一端对准第三主定位板(28)和第二付定位板(27)上的叠合处,另一端对准第五付定位板(33)上的后端叠合处后从上往下放上去后从上往下放上去叠合,Afterwards, one end on the fourth opening plate (37) is aligned with the overlapping place on the third main positioning plate (28) and the second secondary positioning plate (27), and the other end is aligned with the fifth secondary positioning plate (33) After the rear end of the upper part is stacked, put it up from top to bottom, then put it up from top to bottom and stack it, 再把第一张开板(34)上的一端对准第二主定位板(26)和第一付定位板(25)上的叠合处,另一端也对准固定板(3)和第四付定位板(31)上的后端叠合处后从上往下放上去叠合,Then one end on the first opening plate (34) is aimed at the overlapping place on the second main positioning plate (26) and the first secondary positioning plate (25), and the other end is also aimed at the fixed plate (3) and the second Put back the rear end stacking place on the four pair of positioning plates (31) from top to bottom and stack up, 此后把第三张开板(36)上的一端对准第三主定位板(28)和第二付定位板(27)上的叠合处,另一端也对准第五主定位板(32)和第四付定位板(31)上的后端叠合处后从上往下放上去叠合,Thereafter, one end on the 3rd opening plate (36) is aligned with the overlapping place on the 3rd main positioning plate (28) and the second auxiliary positioning plate (27), and the other end is also aimed at the 5th main positioning plate (32 ) and the rear end superimposition place on the fourth pair of positioning plate (31) and put it up from top to bottom to superimpose, 先在第一长轴(12),第三长轴(14),第五长轴(16),第七长轴(18),第八长轴(19)和第十长轴(21)的一端轴头上分别各套上一个轴承后,再分别套上一块平垫圈,此后把这些长轴的一端轴头分先后分别对准第一张开板(34),第二张开板(35),第三张开板(36),第四张开板(37)和第五张开板(38)平面上的对穿孔后,从上往下串入,待各根长轴上的轴头分别串出下平面后,先在第八长轴(19)和第十二长轴(23)的一端轴头上套上轮子,然后再在第一长轴(12),第三长轴(14),第五长轴(16),第七长轴(18),第八长轴(19)和第十长轴(21)上分别套上平垫圈,再分别套上螺帽拧紧此后再在这些长轴的一端轴头上的细孔中插入开口销后分开口子封口;First at the first major axis (12), third major axis (14), fifth major axis (16), seventh major axis (18), eighth major axis (19) and tenth major axis (21) After being respectively put on a bearing on one end shaft head, put on a flat washer respectively again, after this the one end shaft head of these major shafts is respectively aligned with the first opening plate (34), the second opening plate (35 ), the third opening plate (36), the fourth opening plate (37) and the fifth opening plate (38) after the pair of perforations on the plane, string in from top to bottom, and treat the axis on each long axis After the heads are strung out of the lower plane respectively, put the wheels on one end of the eighth major axis (19) and the twelfth major axis (23), then on the first major axis (12), the third major axis (14), the fifth major axis (16), the seventh major axis (18), the eighth major axis (19) and the tenth major axis (21) are respectively put on flat washers, then respectively put on the nuts and tighten them Insert cotter pins in the fine holes on the shaft heads at one end of these long shafts and then seal the openings; 先把直流马达(6)竖起来,再把一端的轴头先串入固定板(3)平面上的相应对穿孔中后固定,然后在压紧轮(5)的两端轴头上各套上一个轴承后,也把压紧轮(5)竖起来,也把一端的轴头串入固定板(3)平面上的相应对穿孔中;Put the DC motor (6) upright first, then string the shaft head at one end into the corresponding pair of perforations on the plane of the fixed plate (3) and then fix it, and then set each of the shaft heads on the two ends of the pressing wheel (5). After the last bearing, also put the pressure wheel (5) upright, and also string the shaft head at one end into the corresponding pair of perforations on the plane of the fixed plate (3); 在第一长轴(12),第二长轴(13),第三长轴(14),第四长轴(15),第五长轴(16),第六长轴(17),第七长轴(18)第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)上的外弧面外,先把各个滚筒(7)分先后逐个对准后套上去;In the first major axis (12), the second major axis (13), the third major axis (14), the fourth major axis (15), the fifth major axis (16), the sixth major axis (17), the The seven major axis (18), the eighth major axis (19), the ninth major axis (20), the tenth major axis (21), the eleventh major axis (22) and the twelfth major axis (23) Outside the arc surface, first align each roller (7) one by one and put them on; 后在第一长轴(12),第二长轴(13),第三长轴(14),第四长轴(15),第五长轴(16),第六长轴(17),第七长轴(18),第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)的另一端上分别套上轴承(11),并且使每个轴承都在进入各个滚筒(7)上下截面上的凹孔中后,再在这些轴头上都放上平垫圈,After the first long axis (12), the second long axis (13), the third long axis (14), the fourth long axis (15), the fifth long axis (16), the sixth long axis (17), Seventh major axis (18), eighth major axis (19), ninth major axis (20), tenth major axis (21), eleventh major axis (22) and twelfth major axis (23) Put bearings (11) on the other end respectively, and after making each bearing all enter in the concave hole on the upper and lower sections of each cylinder (7), put flat washers on these axle heads again, 此时把皮带盘(4)上的内孔根据要求套在和半包在各个滚筒(7)以及直流马达的外圆弧面上;At this time, put the inner hole on the belt pulley (4) on the outer arc surface of each drum (7) and the DC motor according to the requirements and half-wrap it; 此后在轻巧型折叠式传送结构的正视面上,重新开始另一组第一主定位板(24),第一付定位板(25),第二主定位板(26),第二付定位板(27),第三主定位板(28),第三付定位板(29),第四主定位板(30),第四付定位板(31),第五主定位板(32),和第五付定位板(33),固定板(3),第一张开板(34),第二张开板(35),第三张开板(36),第四张开板(37)和第五张开板(38)的组装;After this on the front view of light and handy type folding transmission structure, start another group of the first main positioning plate (24), the first auxiliary positioning plate (25), the second main positioning plate (26), the second auxiliary positioning plate (27), the 3rd main positioning plate (28), the 3rd auxiliary positioning plate (29), the 4th main positioning plate (30), the 4th auxiliary positioning plate (31), the 5th main positioning plate (32), and The fifth pay positioning plate (33), fixed plate (3), the first opening plate (34), the second opening plate (35), the third opening plate (36), the fourth opening plate (37) And the assembly of the fifth opening plate (38); 把第一块张开板(34)的两端平面上的对穿孔分别对准第三长轴(14)和第八长轴(19)上的另一端轴头后套上去,然后把第三张开板(36)的两端平面上的对穿孔分别对准第五长轴(16)和第十长轴(21)上的另一端轴头后套上去,最后再把第五张开板(38)两端平面上的对穿孔分别对准第七长轴(18)和第十二长轴(23)上的另一端轴头后也套上去;The pair of perforations on the two ends planes of the first piece of expansion plate (34) are respectively aligned with the other end axle head on the 3rd major axis (14) and the 8th major axis (19) and put on, then put the third The opposite perforations on the two ends planes of the expansion plate (36) are respectively aligned with the other end shaft heads on the fifth major axis (16) and the tenth major axis (21), and then put the fifth expansion plate at last (38) The pair of perforations on the planes at both ends are respectively aligned with the other end shaft heads on the seventh major axis (18) and the twelfth major axis (23); 把另一固定板(3)平面上的各个对穿孔对准直流马达(6),压紧轮(5),第一长轴(12)和第八长轴(19)的另一端轴头后套上去,Align each pair of perforations on the plane of the other fixing plate (3) to the DC motor (6), the pinch wheel (5), the other end of the first major axis (12) and the eighth major axis (19) put it on, 此后把第二张开板(35)的两端平面上的对穿孔分别对准第三长轴(14)和第十长轴(21)上的另一端轴头后也套上去,然后把第四张开板(37)的两端平面上的对穿孔分别对准第五长轴(16)和第十二长轴(23)的另一端轴头后也套上去,After this, the pair of perforations on the two ends planes of the second opening plate (35) are aligned respectively after the other end shaft head on the third major axis (14) and the tenth major axis (21), and then put the second The pair of perforations on the two end planes of the four opening plates (37) are respectively aligned with the other end axle heads of the fifth major axis (16) and the twelfth major axis (23) and also put on, 把第一主定位板(24)前端平面上的对穿孔对准第二长轴(13)的另一端轴头,后端平面上的对穿孔对准第一长轴(12)上的另一端轴头后套上去;然后把第二主定位板(26)的前端平面上的对穿孔对准第四长轴(15)上的另一端轴头,后端平面上的对穿孔对准第三长轴(14)上的另一端轴头后也套上去;最后再把第三主定位板(28)前端平面上的对穿孔对准第六长轴(17)上的另一端轴头,后端平面上的对穿孔对准第五长轴(16)上的另一端轴头后也套上去;把第一付定位板(25)前端平面上的对穿孔对准第三长轴(14)上的另一端轴头,后端平面上的对穿孔对准第二长轴(13)上的另一端轴头后套上去;然后把第二付定位板(27)的前端平面上的对穿孔对准第五长轴(16)上的另一端轴头,后端平面上的对穿孔对准第四长轴(15)的另一端轴头后也套上去,此后把第三主定位板(28)前端平面上的对穿孔对准第七长轴(18)上的另一端轴头,后端平面上的对穿孔对准第六长轴(17)上的另一端轴头后也套上去;最后在第一长轴(12),第二长轴(13),第三长轴(14),第四长轴(15),第五长轴(16),第六长轴(17)和第七长轴(18)上的另一端轴头上后,分先后各套上一块平垫圈和螺帽,并且分别拧紧和插入开口销后分开口子封口;Align the pair of perforations on the front end plane of the first main positioning plate (24) with the other end of the second major axis (13), and align the pair of perforations on the rear end plane with the other end on the first major axis (12) Put back the shaft head; then align the pair of perforations on the front end plane of the second main positioning plate (26) with the other end shaft head on the fourth major axis (15), and align the pair of perforations on the rear end plane with the third The other end axle head on the long axis (14) is also put on behind; Finally, the pair of perforations on the front end plane of the third main positioning plate (28) are aligned with the other end axle head on the sixth long axis (17), and the rear The pair of perforations on the end plane is aligned with the other end shaft head on the fifth major axis (16); the pair of perforations on the front end plane of the first pair of positioning plates (25) are aligned with the third major axis (14) On the other end of the shaft head, the pair of perforations on the rear end plane is aligned with the other end of the second long axis (13) and then put on; then put the pair of perforations on the front end of the second positioning plate (27) Align the other end axle nose on the 5th major axis (16), also put on after the opposite end axle nose of the 4th major axis (15) is aligned to the perforation on the rear end plane, after this the 3rd main positioning plate ( 28) The paired hole on the front plane is aligned with the other end of the seventh major axis (18), and the paired hole on the back plane is aligned with the other end of the sixth major axis (17). ;Finally at the first major axis (12), the second major axis (13), the third major axis (14), the fourth major axis (15), the fifth major axis (16), the sixth major axis (17) After the other end shaft head on the seventh long axis (18), put a piece of flat washer and nut successively, and respectively tighten and insert the cotter pin and then seal the cotter; 把第四主定位板(30)的前端平面上的对穿孔对准第九长轴(20)上的另一端轴头,后端平面上的对穿孔对准第八长轴(19)上的另一端轴头后套上去,然后把第五主定位板(32)的前端平面上的对穿孔对准第十一长轴(22)上的另一端轴头,后端平面上的对穿孔对准第十长轴(21)上的另一端轴头后也套上去,把第四付定位板(31)前端平面上的对穿孔对准第十长轴(21)上的另一端轴头,后端平面上的对穿孔对准第九长轴(20)上的另一端轴头后套上去;然后把第五付定位板(33)前端平面上的对穿孔对准第十二长轴(23)上的另一端轴头,后端平面上的对穿孔对准第十一长轴(22)上的另一端轴头后也套上去;最后在第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)上的另一端轴头上,分别各套上一块平垫圈,并且另外在第八长轴(19)和第十二长轴(23)的另一端轴头上分别各套上一个轮子(41)(42),最后在第八长轴(19),第九长轴(20),第十长轴(21),第十一长轴(22)和第十二长轴(23)上的另一端轴头上分别套上螺帽拧紧和插入开口销后分开口子封口;The pair of perforations on the front end plane of the fourth main positioning plate (30) is aligned with the other end shaft head on the ninth major axis (20), and the pair of perforations on the rear end plane are aligned with the eighth major axis (19). Put behind the other end shaft head, then align the pair of perforations on the front end plane of the fifth main positioning plate (32) with the other end shaft head on the eleventh major axis (22), and the pair of perforations on the rear end plane Also put on after the other end axle nose on the quasi-tenth major axis (21), align the other end axle nose on the tenth major axis (21) to the perforation on the fourth pair of positioning plate (31) front end plane, Go up after the other end axle head that aligns the other end axle head on the rear end plane to the perforation on the ninth major axis (20); Then align the perforation on the fifth pair of positioning plate (33) front end planes to the twelfth major axis ( 23) on the other end of the shaft head, and the pair of perforations on the rear end plane are aligned with the other end of the shaft head on the eleventh major axis (22); finally on the eighth major axis (19), the ninth longest Axle (20), on the tenth major axis (21), on the other end axle head on the eleventh major axis (22) and the twelfth major axis (23), respectively put a flat washer, and in addition On the other end shaft head of eight long shafts (19) and the twelfth long shaft (23), respectively put on a wheel (41) (42), finally at the eighth long shaft (19), the ninth long shaft (20 ), the tenth major axis (21), the other end axle head on the eleventh major axis (22) and the twelfth major axis (23) respectively puts on the nut and tightens and inserts the cotter pin and separates the opening seal; 把十字板(39)置于两组第一张开板(34),第二张开板(35),第三张开板(36),第四张开板(37)和第五张开板(38)内的内侧平面之间的空档,交叉平面上的四个顶端处的四个对穿孔,分别对准两组第一张开板(34),第二张开板(35),第三张开板(36),第四张开板(37)和第五张开板(38)的内侧平面上的耳环状平面上的相应对穿孔贴上去,此后分别串入螺栓和套上螺帽(40)后拧紧,至此组装结束。Put the cross plate (39) on two groups of the first opening plate (34), the second opening plate (35), the third opening plate (36), the fourth opening plate (37) and the fifth opening The gap between the inner planes in the plate (38), the four pairs of perforations at the four tops on the crossing plane, are respectively aligned with two groups of the first expansion plate (34), the second expansion plate (35) , the third opening plate (36), the corresponding pair of perforations on the earring-shaped plane on the inner plane of the fourth opening plate (37) and the fifth opening plate (38) are affixed, and thereafter respectively strung into bolts and sleeves Tighten after the upper nut (40), and the assembly is completed.
CN201110288969.XA 2011-09-26 2011-09-26 The collapsible transfer structure of legerity type Expired - Fee Related CN103010657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110288969.XA CN103010657B (en) 2011-09-26 2011-09-26 The collapsible transfer structure of legerity type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110288969.XA CN103010657B (en) 2011-09-26 2011-09-26 The collapsible transfer structure of legerity type

Publications (2)

Publication Number Publication Date
CN103010657A CN103010657A (en) 2013-04-03
CN103010657B true CN103010657B (en) 2016-01-20

Family

ID=47959874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110288969.XA Expired - Fee Related CN103010657B (en) 2011-09-26 2011-09-26 The collapsible transfer structure of legerity type

Country Status (1)

Country Link
CN (1) CN103010657B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB564798A (en) * 1941-10-10 1944-10-13 Wingfoot Corp Portable conveyor system
CN2044963U (en) * 1989-03-18 1989-09-27 俞开茂 Pulley for belt conveyer
EP0341468A2 (en) * 1988-05-13 1989-11-15 Protech Automation GmbH Duplex conveyor
US5181600A (en) * 1989-01-24 1993-01-26 Chappell Ian C Conveyor structure
JPH1017154A (en) * 1996-07-04 1998-01-20 Komatsu Ltd Belt conveyor and support truck
KR20090047189A (en) * 2007-11-07 2009-05-12 주식회사 포스코 Adjustable roller stand unit
CN201545447U (en) * 2009-10-29 2010-08-11 天津钢铁集团有限公司 Anti-skidding device of single transmission rubber belt conveyor

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3313108A1 (en) * 1983-04-12 1984-10-25 Helmut 5162 Niederzier Geppert Device for influencing the tensioning of the conveying means of a band-conveying apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB564798A (en) * 1941-10-10 1944-10-13 Wingfoot Corp Portable conveyor system
EP0341468A2 (en) * 1988-05-13 1989-11-15 Protech Automation GmbH Duplex conveyor
US5181600A (en) * 1989-01-24 1993-01-26 Chappell Ian C Conveyor structure
CN2044963U (en) * 1989-03-18 1989-09-27 俞开茂 Pulley for belt conveyer
JPH1017154A (en) * 1996-07-04 1998-01-20 Komatsu Ltd Belt conveyor and support truck
KR20090047189A (en) * 2007-11-07 2009-05-12 주식회사 포스코 Adjustable roller stand unit
CN201545447U (en) * 2009-10-29 2010-08-11 天津钢铁集团有限公司 Anti-skidding device of single transmission rubber belt conveyor

Also Published As

Publication number Publication date
CN103010657A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
US2703724A (en) Sectional bamboo building structure with coupling
JP2013527075A5 (en)
WO2007062323A3 (en) Machine and method for pharmaceutical and pharmaceutical-like product assembly
CN205971824U (en) Unmanned aerial vehicle
CN103010657B (en) The collapsible transfer structure of legerity type
CN205239625U (en) But drive wheel of reducing, vice vehicle that reaches of transmission turn to device
CN208328662U (en) A kind of combinable folding steel truss
CN209193508U (en) A kind of overturning platform for cardboard printing
CN103560314B (en) Reinforcing framework of flexible parabolic antenna
CN201842200U (en) Scooter folding mechanism
CN103151596A (en) Inflatable radial rib antenna tail rod connecting piece for spacecraft
CN203176150U (en) Plug-in multi-section shaft structure
CN206224822U (en) A kind of security knowledge learning board
CN210654025U (en) Combined packaging box with tenon-and-mortise structure
CN203877458U (en) Hub overturning material rack
CN106586037A (en) Framework type telescopic mechanism capable of being repeatedly expanded and contracted
CN107139537A (en) HEXAGONAL POCKET drives bottom getter device
CN204261312U (en) A kind of folding picture mosaic
CN205118940U (en) Dismantled and assembled lamp shade
CN203681608U (en) Portable and foldable carrier
CN204512375U (en) A kind of combination herringbone gear ring gear floating structure
US10948118B1 (en) Methods, apparatus, and kits for interconnecting cylindrical tubes
CN203297329U (en) Bidirectional folding sleeve type hinge
CN203295080U (en) Combined type fast mounting tower section capable of being folded for transportation
CN216402096U (en) A side card box packaging of the same structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170718

Address after: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Patentee after: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

Address before: 200072, room 59, No. 1051, Lane 302, Shanghai Zhabei District Road, Shanghai

Patentee before: Chen Haishui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170808

Address after: 226000, Jiangsu Town, Tongzhou District, Nantong Province Li village, five sets of Xingren high school on the eastern side of Xingren

Patentee after: Nantong expedition refrigeration equipment Co., Ltd.

Address before: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Patentee before: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20180926

CF01 Termination of patent right due to non-payment of annual fee