CN102978509B - A kind of casting preparation method regulating valve body - Google Patents

A kind of casting preparation method regulating valve body Download PDF

Info

Publication number
CN102978509B
CN102978509B CN201210452882.6A CN201210452882A CN102978509B CN 102978509 B CN102978509 B CN 102978509B CN 201210452882 A CN201210452882 A CN 201210452882A CN 102978509 B CN102978509 B CN 102978509B
Authority
CN
China
Prior art keywords
hour
temperature
treatment
valve body
stove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210452882.6A
Other languages
Chinese (zh)
Other versions
CN102978509A (en
Inventor
沈必亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Chunhui Instrument Cable Group Co Ltd
Original Assignee
Anhui Chunhui Instrument Cable Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Chunhui Instrument Cable Group Co Ltd filed Critical Anhui Chunhui Instrument Cable Group Co Ltd
Priority to CN201210452882.6A priority Critical patent/CN102978509B/en
Publication of CN102978509A publication Critical patent/CN102978509A/en
Application granted granted Critical
Publication of CN102978509B publication Critical patent/CN102978509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a kind of casting preparation method regulating valve body, include following steps: a, molten metal processed, control its chemical composition content percentage ratio as follows: C 2.4-3.2%, Si 2.0-2.5%, Mn 0.8-1.2%, P 0.06-0.08%, S 0.05-0.07%, Cr 0.25-0.35%, Ti 0.05-0.22%, Cu 0.7-0.9%, Al 0.7-0.9%, Mg 0.1-0.2%, surplus is ferrum;<b>b</b>, by cast gate to cast potting syrup in sand mold, cooled and solidified, after taking-up, namely steam treatment obtains adjustment valve body, and described steam treatment is water atomization steam treatment, and the process time is 3-4 hour, and temperature is 550-650 DEG C;Manufacturing process of the present invention has higher continuous production, and stock utilization is high, is suitable for producing in enormous quantities, reduces cost.

Description

A kind of casting preparation method regulating valve body
Technical field
The present invention relates to a kind of preparation method regulating valve, particularly belong to a kind of casting preparation method regulating valve body.
Background technology
Regulate valve be useful in-50~150 DEG C the chloroazotic acid of various concentration, sulphuric acid, hydrochloric acid, Fluohydric acid. and various organic acid, strong acid, strong oxidizer, apply also for highly basic organic solvent and other corrosive gas of various concentration, the pipeline of liquid medium use.
At present, preparation regulates valve industry, and domestic spherical adjustment valve body all adopts common high-speed steel material, or rustless steel material is by machining spherical adjustment valve body.Compared with regulating valve with powder metallurgy, the adjustment valve body process velocity that common high-speed steel material or the machining of rustless steel material manufacture is slower, stock utilization is not high, and powder metallurgical technique manufacture regulates valve, not only stock utilization is high, and be unsuitable for producing in enormous quantities, before assembling uses, needing that powder metallurgy is regulated valve carry out a small amount of ground finish, a period of time rear valve body there will be seminess.
Summary of the invention
The technical problem to be solved is for regulating valve Technology present situation, and a kind of casting preparation method regulating valve body that a kind of production efficiency provided is high, manufacturing cost is relatively low.
The technical solution used in the present invention is as follows:
A kind of casting preparation method regulating valve body, includes following steps:
A, molten metal processed, control its chemical composition content percentage ratio as follows: C2.4-3.2%, Si2.0-2.5%, Mn0.8-1.2%, P0.06-0.08%, S0.05-0.07%, Cr0.25-0.35%, Ti0.05-0.22%, Cu0.7-0.9%, Al0.7-0.9%, Mg0.1-0.2%, surplus is ferrum;
B, by cast gate to cast potting syrup, cooled and solidified in sand mold, put into stove steam treatment after taking-up and namely obtain adjustment valve body, described steam treatment is water atomization steam treatment, and the process time is 3-4 hour, and in-furnace temperature is 550-650 DEG C;
C, conditioning treatment: the foundry goods that will have cleared up, be not less than 180 DEG C of loading heat-treatment furnace heating in temperature and within 10-13 hour, be warming up to 650-750 DEG C of maintenance this temperature 2-5 hour;It is again heated to be warming up to 980-1100 DEG C 8-12 hour keep this temperature 26-30 hour, is then shut off burner and makes foundry goods come out of the stove to 200-350 DEG C with stove cooling down in stove;
After d, conditioning treatment terminate, from heat-treatment furnace pull-out, foundry goods being carried out heat immediately and cuts rising head, when heat cuts rising head, casting temperature is maintained at 150-350 DEG C;
E, normalizing heat treating castings, foundry goods is loaded heat-treatment furnace heating and within 8-9 hour, is warming up to 600-650 DEG C of maintenance this temperature 2-5 hour, reheat and within 8-12 hour, be warming up to 900-1000 DEG C of maintenance this temperature 16-22 hour, then foundry goods is pulled out from stove, to cast(ing) surface atomized water spray, first spray 40-60 minute, stop 50-60 minute, then spray 15-20 minute, then stop 50-60 minute, circulation second time spray process, until less than 100 DEG C;
F, bonderizing, at 100-150 DEG C, the surface conditioner adopting pH value to be 8 processes 1min to regulating valve body, after dripping most 1-2min, adopt bonderite to process 15-20min again, after dripping most 1-2min, adopt clean water 1-2min, after dripping most 1-2min again, workpiece be placed in the hot water of 78-100 DEG C and to process 0.5-1min.
After bonderizing, carrying out subzero treatment recently: part after tempering is loaded container, add liquid nitrogen and carry out subzero treatment, the time is 11 hours, finally obtains adjustment valve finished product.
Compared with prior art, it is an advantage of the current invention that:
Composition of raw materials of the present invention is reasonable, and technique is simple, and alloy has high temperature hardness and the high temperature compression strength of improvement, is suitably applied the valve that high temperature occasion is made, the long service life of valve, and qualification rate is high, substantially increases the quality of product, is suitable for being widely popularized.
The mechanics detection performance of the present invention is as follows:
Tensile strength sigma b (MPa): >=780
Yield strength σ s (MPa): >=730
Percentage elongation δ 5 (%): >=12
Contraction percentage of area ψ (%): >=45.
Detailed description of the invention
A kind of casting preparation method regulating valve body, includes following steps:
A, molten metal processed, control its chemical composition content percentage ratio as follows: C2.4-3.2%, Si2.0-2.5%, Mn0.8-1.2%, P0.06-0.08%, S0.05-0.07%, Cr0.25-0.35%, Ti0.05-0.22%, Cu0.7-0.9%, Al0.7-0.9%, Mg0.1-0.2%, surplus is ferrum;
B, by cast gate to cast potting syrup, cooled and solidified in sand mold, put into stove steam treatment after taking-up and namely obtain adjustment valve body, described steam treatment is water atomization steam treatment, and the process time is 3-4 hour, and in-furnace temperature is 550-650 DEG C;
C, conditioning treatment: the foundry goods that will have cleared up, be not less than 180 DEG C of loading heat-treatment furnace heating in temperature and within 10-13 hour, be warming up to 650-750 DEG C of maintenance this temperature 2-5 hour;It is again heated to be warming up to 980-1100 DEG C 8-12 hour keep this temperature 26-30 hour, is then shut off burner and makes foundry goods come out of the stove to 200-350 DEG C with stove cooling down in stove;
After d, conditioning treatment terminate, from heat-treatment furnace pull-out, foundry goods being carried out heat immediately and cuts rising head, when heat cuts rising head, casting temperature is maintained at 150-350 DEG C;
E, normalizing heat treating castings, foundry goods is loaded heat-treatment furnace heating and within 8-9 hour, is warming up to 600-650 DEG C of maintenance this temperature 2-5 hour, reheat and within 8-12 hour, be warming up to 900-1000 DEG C of maintenance this temperature 16-22 hour, then foundry goods is pulled out from stove, to cast(ing) surface atomized water spray, first spray 40-60 minute, stop 50-60 minute, then spray 15-20 minute, then stop 50-60 minute, circulation second time spray process, until less than 100 DEG C;
F, bonderizing, at 100-150 DEG C, the surface conditioner adopting pH value to be 8 processes 1min to regulating valve body, after dripping most 1-2min, adopt bonderite to process 15-20min again, after dripping most 1-2min, adopt clean water 1-2min, after dripping most 1-2min again, workpiece be placed in the hot water of 78-100 DEG C and to process 0.5-1min.
After bonderizing, carrying out subzero treatment recently: part after tempering is loaded container, add liquid nitrogen and carry out subzero treatment, the time is 11 hours, finally obtains adjustment valve finished product.
The mechanics detection performance of the present invention is as follows:
Tensile strength sigma b (MPa): >=780
Yield strength σ s (MPa): >=730
Percentage elongation δ 5 (%): >=12
Contraction percentage of area ψ (%): >=45.

Claims (1)

1. the casting preparation method regulating valve body, it is characterised in that include following steps:
A, molten metal processed, control its chemical composition content percentage ratio as follows: C2.4-3.2%, Si2.0-2.5%, Mn0.8-1.2%, P0.06-0.08%, S0.05-0.07%, Cr0.25-0.35%, Ti0.05-0.22%, Cu0.7-0.9%, Al0.7-0.9%, Mg0.1-0.2%, surplus is ferrum;
B, by cast gate to cast potting syrup, cooled and solidified in sand mold, put into stove steam treatment after taking-up and namely obtain adjustment valve body, described steam treatment is water atomization steam treatment, and the process time is 3-4 hour, and in-furnace temperature is 550-650 DEG C;
C, conditioning treatment: the foundry goods that will have cleared up, be not less than 180 DEG C of loading heat-treatment furnace heating in temperature and within 10-13 hour, be warming up to 650-750 DEG C of maintenance this temperature 2-5 hour;It is again heated to be warming up to 980-1100 DEG C 8-12 hour keep this temperature 26-30 hour, is then shut off burner and makes foundry goods come out of the stove to 200-350 DEG C with stove cooling down in stove;
After d, conditioning treatment terminate, from heat-treatment furnace pull-out, foundry goods being carried out heat immediately and cuts rising head, when heat cuts rising head, casting temperature is maintained at 150-350 DEG C;
E, normalizing heat treating castings, foundry goods is loaded heat-treatment furnace heating and within 8-9 hour, is warming up to 600-650 DEG C of maintenance this temperature 2-5 hour, reheat and within 8-12 hour, be warming up to 900-1000 DEG C of maintenance this temperature 16-22 hour, then foundry goods is pulled out from stove, to cast(ing) surface atomized water spray, first spray 40-60 minute, stop 50-60 minute, then spray 15-20 minute, then stop 50-60 minute, circulation second time spray process, until less than 100 DEG C;
F, bonderizing, at 100-150 DEG C, the surface conditioner adopting pH value to be 8 processes 1min to regulating valve body, after dripping most 1-2min, adopt bonderite to process 15-20min again, after dripping most 1-2min, adopt clean water 1-2min, after dripping most 1-2min again, workpiece is placed in the hot water of 78-100 DEG C and processes 0.5-1min;
After bonderizing, carrying out subzero treatment: part after tempering is loaded container, add liquid nitrogen and carry out subzero treatment, the time is 11 hours, finally obtains adjustment valve finished product.
CN201210452882.6A 2012-11-13 2012-11-13 A kind of casting preparation method regulating valve body Active CN102978509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210452882.6A CN102978509B (en) 2012-11-13 2012-11-13 A kind of casting preparation method regulating valve body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210452882.6A CN102978509B (en) 2012-11-13 2012-11-13 A kind of casting preparation method regulating valve body

Publications (2)

Publication Number Publication Date
CN102978509A CN102978509A (en) 2013-03-20
CN102978509B true CN102978509B (en) 2016-07-06

Family

ID=47852843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210452882.6A Active CN102978509B (en) 2012-11-13 2012-11-13 A kind of casting preparation method regulating valve body

Country Status (1)

Country Link
CN (1) CN102978509B (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1009283B (en) * 1988-10-20 1990-08-22 山东省新材料研究所 Cast iron material for glass bottle forming die
DE19654893C2 (en) * 1996-07-25 1999-06-10 Federal Mogul Burscheid Gmbh Piston rings of internal combustion engines made of a cast iron alloy
CN1067443C (en) * 1998-10-15 2001-06-20 冶金工业部北京冶金设备研究院 Multi-element w-alloy cast iron roll collar and its making technology

Also Published As

Publication number Publication date
CN102978509A (en) 2013-03-20

Similar Documents

Publication Publication Date Title
CN100567548C (en) A kind of manufacturing method of high vanadium high cobalt high speed steel
CN106544592A (en) Obdurability hot die steel and its production method
CN102433513A (en) Preparation and heat treatment method of low-alloy heat-resistant high-strength steel member
CN102965576B (en) Preparation method of pump shaft of oil feed pump
CN110592476A (en) Non-quenched and tempered round steel for direct cutting and method for manufacturing truck pin shaft by using same
CN102978486A (en) Aluminum alloy casting forming method for valve clack of sluice valve
CN102899589A (en) High-strength non-tempered bainite steel and preparation method thereof
CN110656286A (en) High-strength bolt and processing method thereof
CN102994907A (en) Casting method of check valve body
CN110484826A (en) 05Cr17Ni4Cu4Nb martensitic stain less steel and its heat-treatment technology method
CN109482654B (en) Composite roll collar for Kocks rolling mill and manufacturing method thereof
CN102979938B (en) Casting method of valve body of check valve
CN107201475A (en) A kind of casting preparation method of valve body
CN102994890B (en) A kind of valve body of anti-explosion valve castmethod
CN102978509B (en) A kind of casting preparation method regulating valve body
CN109321717A (en) A kind of fastener manufacturing method
CN102994910A (en) Casting method of gate valve rod
CN102974771A (en) Casting forming preparation method of pressure reducing valve body
CN100345982C (en) Prehardening treatment method of NAK80 mould steel
CN100352964C (en) Production of high-alloy cold mould steel
CN102994906A (en) Preparation method of ball valve body
CN102936693B (en) Drawing die mold steel processing method
CN102994868B (en) A kind of casting preparation method of wafer type valve flap
CN102979956B (en) A kind of warm forging forming method of throttle valve stem
CN102994886B (en) A kind of method of casting stopping valve valve plate processed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant