[go: up one dir, main page]

CN102943493A - Method for measuring internal force and deformation of precast pile - Google Patents

Method for measuring internal force and deformation of precast pile Download PDF

Info

Publication number
CN102943493A
CN102943493A CN2012105147380A CN201210514738A CN102943493A CN 102943493 A CN102943493 A CN 102943493A CN 2012105147380 A CN2012105147380 A CN 2012105147380A CN 201210514738 A CN201210514738 A CN 201210514738A CN 102943493 A CN102943493 A CN 102943493A
Authority
CN
China
Prior art keywords
pile
section
relative
sensor
deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105147380A
Other languages
Chinese (zh)
Other versions
CN102943493B (en
Inventor
邬俊杰
陈锦剑
王建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiao Tong University
Original Assignee
Shanghai Jiao Tong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiao Tong University filed Critical Shanghai Jiao Tong University
Priority to CN201210514738.0A priority Critical patent/CN102943493B/en
Publication of CN102943493A publication Critical patent/CN102943493A/en
Application granted granted Critical
Publication of CN102943493B publication Critical patent/CN102943493B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

本发明提出一种测量预制桩内力及变形的方法,在完成打桩工序后,再安装传感器以及和所述传感器相连的桩基竖向静载实验设备,施加下一级荷载以前,记录某级荷载下的传感器读数,即该传力索所连接观测点处与基准处的相对变形;将该相对变形除以该段桩长,得到观测断面相对于基准面的相对应变,用相邻两个观测断面相对于基准面的应变,得到该两个断面之间的应变差,根据桩身混凝土弹性模量标定结果,计算每个锚固头断面处的桩身轴力。本发明一种测量预制桩内力及变形的方法采取在完成打桩工序后安装传感器,避免了传感器在打桩过程中受损,且测量精度高,可有效的控制成本。

The invention proposes a method for measuring the internal force and deformation of prefabricated piles. After the piling process is completed, the sensor and the pile foundation vertical static load test equipment connected to the sensor are installed, and the load of a certain level is recorded before the next level of load is applied. The sensor reading below is the relative deformation between the observation point connected by the force cable and the reference point; the relative deformation is divided by the pile length of the section to obtain the relative strain of the observation section relative to the reference plane, and two adjacent observation points The strain difference between the two sections is obtained from the strain of the section relative to the reference plane, and the axial force of the pile body at the section of each anchor head is calculated according to the calibration result of the concrete elastic modulus of the pile body. A method for measuring the internal force and deformation of prefabricated piles in the present invention adopts the installation of sensors after the piling process is completed, avoiding damage to the sensors during the piling process, and has high measurement accuracy and can effectively control costs.

Description

Measure the method for preformed pile internal force and distortion
Technical field
The present invention relates to a kind of method of civil engineering pile foundation technical field of quality detection, be specifically related to a kind of method of measuring preformed pile internal force and distortion.
Background technology
Pile foundation is as a large amount of base forms that adopt of engineering construction at present, and is little except having sedimentation, the bearing capacity advantages of higher, and it also relates to the important component part of structural safety, and therefore the detection for pile foundation is vital.
Main method for the Internal forces test has reinforcing rib meter method and slip micrometer method at present.(1) reinforcing rib meter method: reinforcing rib meter is embedded on the pile body master muscle according to substructure, the ess-strain at the bottom of the detection a certain cross section of pile body and the post.This method of testing principle is simple, testing element is easy to install, but strain that can only measuring point, and the distortion between 2 can only be leaned on deduction, and because reinforcing rib meter is the average internal force of extrapolating stake according to the strain of any on the reinforcing bar, can there be no small error like this.Because the sensor such as reinforcing rib meter need to be embedded in the pile body, in the making of stake and piling process, cause damage easily, and affect test performance and the calibration coefficient of sensor, thereby can be lowered into motility rate and affect test result.In addition, because sensor can not be recycled after pre-buried, belong to medical disposable material, the cost of the test of increase.(2) slip micrometer method: with respect to the reinforcing rib meter method, slip micrometer method can be measured the strain under all each point axis directions loads at different levels on the whole pile body axis continuously, and can effectively revise and float zero.Measuring point is many although it has, and continuity is good, and precision advantages of higher, the shortcoming that its cost is high also are the factors that needs are considered.
Patent 200910056699.2 provides a kind of method, by vertical service sleeve or directly at the pile body longitudinal drilling, installs and measures system at pile body in sleeve pipe or boring, and this measuring system is comprised of anchor head, multiple position extensometer, extension bar and force pipe.According to the vertical deformation between adjacent two the anchor head positions with all of stake top vertical displacement observed result, a layering frictional resistance, stake end bearing power and the anchor head of each soil layer of reckoning stake side are buried the vertical displacement of section underground, thereby realize Internal forces and section vertical displacement measurement.
All there is at least one shortcoming in the above traditional method.For example, the former precision is not high enough, and because sensor is installed first, produces easily damage problem; Although latter's precision can reach requirement, high cost, economical not.
Summary of the invention
The problem that the object of the invention is to solve in the prior art low precision when measuring preformed pile internal force and distortion or high cost.
To achieve these goals, the present invention proposes a kind of method of measuring preformed pile internal force and distortion, it is characterized in that, may further comprise the steps: determine observation point anchorage head quantity and the position of burying section underground; Service sleeve on the pile body of described preformed pile is vertical; The benchmark anchorage head that has the hole is installed on stake top at described preformed pile; In the described position of burying section underground described observation point anchorage head is installed, and described observation point anchorage head and described sleeve pipe are fixedly linked, if run into the situation of pile extension, one anchoring temporarily point then is set in stake the last period, be used for fixedly passing the power transmission rope of pile extension section, the hole of passing through for described power transmission rope is set on the described anchoring temporarily point; The operation of driving piles if need pile extension, is then proceeded the pile extension operation; One sensor is provided, by the hole on the described benchmark anchorage head, is installed on the described power transmission rope, and described sensor is demarcated; The pile foundation vertical static loading experiment equipment that links to each other with described sensor is installed, is applied before the next stage load, record the sensor reading under certain grade of load, namely this power transmission rope connects the relative deformation of observation point place and benchmark place; This relative deformation is long divided by this section stake, obtain measuring frequency section with respect to the relative strain of datum, with the strain of adjacent two measuring frequency sections with respect to datum, obtain the strain value between these two sections, according to pile concrete modulus of elasticity calibration result, calculate the pile body axle power of each anchorage head section part.
Optionally, may further comprise the steps: the first step, determine that according to geotechnical investigation report, construction note, regional experience and the designing requirement in place, test pile place suitable observation point anchorage head quantity and its bury cross section place underground; Second step, casing axis should be parallel to the pile body longitudinal axis, and sleeve pipe should mate with the anchorage head of selecting; Burying sleeve pipe underground should be arranged symmetrically with along the cross-section center axis direction, the benchmark anchorage head of installing at place, stake top, in the middle of need perforate, convenient at last sensor is packed into, at determined section part the observation point anchorage head is installed, anchorage head and sleeve pipe is firmly fixing, if meet the situation that pile extension is arranged, then the anchoring temporarily point need to be set in stake the last period, convenient fixing need to be passed the power transmission rope of pile extension section, the anchoring temporarily point needs perforate, so that the power transmission rope can be passed through; The 3rd step began piling, according to normal construction process stake was squeezed into, if need pile extension, also carried out as requested pile extension; The 4th step after stake is squeezed into, by the hole of stake top benchmark anchorage head, installed to sensor on the power transmission rope, and sensor requires can free-hand perforate by the reference point anchorage head to pack in the sleeve pipe, and is stuck on the power transmission rope; The 5th step, conventional pile foundation vertical static loading experiment equipment is installed, record according to a conventional method load after on-test; The 6th step, stable at certain grade of load action bottom offset, apply before the next stage load, record the sensor reading under certain grade of load, namely this power transmission rope connects the relative deformation of observation point place and benchmark place, this relative deformation is long divided by this section stake, obtain measuring frequency section with respect to the relative strain of datum, with the strain of adjacent two measuring frequency sections with respect to datum, obtain the strain value between these two sections, according to pile concrete modulus of elasticity calibration result, calculate the pile body axle power of each anchorage head section part.
The useful technique effect that the present invention measures the method for preformed pile internal force and distortion is: the present invention measures the method for preformed pile internal force and distortion and takes sensor installation after finishing the piling operation, avoided sensor impaired in the piling process, and certainty of measurement is high, can effectively control cost.
Description of drawings
Fig. 1 is the apparatus structure schematic diagram of the present invention's method of measuring preformed pile internal force and distortion.
The specific embodiment
Below, 1 the present invention is described in further detail by reference to the accompanying drawings.Label among Fig. 1: 1-observation point anchorage head; The 2-sleeve pipe; 3-reference point anchorage head; The 4-sensor; 5-power transmission rope; The temporary fixed point of 6-power transmission rope; 7-pile extension head; The 8-data acquisition instrument.
Please refer to Fig. 1, Fig. 1 is the apparatus structure schematic diagram of the present invention's method of measuring preformed pile internal force and distortion, and the concrete steps of the inventive method are:
(1) determines that according to geotechnical investigation report, construction note, regional experience and the designing requirement in place, test pile place suitable observation point anchorage head quantity and its bury cross section place underground.Observation point anchorage head 1 generally can be embedded in two kinds of heterogeneity soil layers at the interface.
(2) when the system stake, bury sleeve pipe 2 underground.The sleeve pipe material will not limit, but requires casing axis should be parallel to the pile body longitudinal axis, and sleeve pipe 2 should mate with the observation point anchorage head 1 of selecting and reference point anchorage head 3; Burying sleeve pipe underground should be arranged symmetrically with along the cross-section center axis direction.At place, stake top reference for installation anchorage head 3, need perforate in the middle of the benchmark anchorage head 3, conveniently at last sensor 4 is packed into.At determined section part observation point anchorage head 1 is installed, with observation point anchorage head 1, reference point anchorage head 3 is firmly fixing with sleeve pipe 2.With power transmission rope 5 each observation point anchorage head 1 is connected with benchmark anchorage head 3 respectively, if meet the situation that pile extension is arranged, then anchoring temporarily point 6 need to be set in stake the last period, convenient fixing need to be passed the power transmission rope 5 of pile extension section.Anchoring temporarily point 6 needs perforate, so that the power transmission rope can be passed through
(3) begin piling, according to normal construction process stake is squeezed into, if need pile extension, also carry out as requested pile extension.
(4) after stake is squeezed into, by the hole of stake top benchmark anchorage head 3, sensor 4 is put into stake, and be installed on the power transmission rope 5.Transmitting wire by data links to each other with the data acquisition instrument 8 of outside.Install the demarcation of laggard line sensor, be that standard volume inputs to sensor undetermined 4, obtain simultaneously the output quantity of sensor 4, the sensor input and output amount that obtains is compared and treated, thereby obtain the calibration curve of both corresponding relations of a series of signs, obtain the measured result of sensor performance index.
(5) conventional pile foundation vertical static loading experiment equipment is installed, is recorded according to a conventional method load after on-test.
(6) stable at certain grade of load action bottom offset, apply before the next stage load, record the reading of the data acquisition instrument 8 under certain grade of load, i.e. the observation point place that connects of this power transmission rope and the relative deformation δ of benchmark place.This relative deformation δ divided by the long L of this section stake, then can be obtained measuring frequency section for the relative strain ε of datum.ε=δ/L。With the strain of adjacent two measuring frequency sections with respect to datum, then can obtain the strain value between these two sections.dε ii+1i。ε iBe that i observation point anchorage head place is with respect to the strain value of datum.According to pile concrete modulus of elasticity calibration result E=f (ε), pile body cross sectional area A then can calculate the pile body axle power N of each anchorage head section part i=EA d ε i
Although the present invention discloses as above with preferred embodiment, so it is not to limit the present invention.Have in the technical field of the present invention and usually know the knowledgeable, without departing from the spirit and scope of the present invention, when being used for a variety of modifications and variations.Therefore, protection scope of the present invention is as the criterion when looking claims person of defining.

Claims (2)

1.一种测量预制桩内力及变形的方法,其特征在于,包括以下步骤:1. A method for measuring prefabricated pile internal force and deformation, is characterized in that, comprises the following steps: 确定观测点锚固头数量和埋设断面的位置;Determine the number of anchor heads at the observation point and the position of the buried section; 在所述预制桩的桩身纵向上预埋套管;pre-embed casing in the longitudinal direction of the pile body of the prefabricated pile; 在所述预制桩的桩顶安装开有孔的基准锚固头;A benchmark anchor head with holes is installed on the pile top of the prefabricated pile; 在所述埋设断面的位置处安装所述观测点锚固头,且将所述观测点锚固头和所述套管固定相连,若遇到接桩的情况,则在前一段桩内设置一临时锚固点,用于固定穿过接桩段的传力索,所述临时锚固点上设置供所述传力索通过的孔;The observation point anchor head is installed at the position of the buried section, and the observation point anchor head is fixedly connected with the casing. If a pile is encountered, a temporary anchor is set in the previous pile point, used to fix the catenary cable passing through the pile-connecting section, and the temporary anchor point is provided with a hole for the catenary cable to pass through; 进行打桩工序,若需要接桩,则继续进行接桩工序;Carry out the piling process, if the pile needs to be connected, then continue to carry out the pile connection process; 提供一传感器,通过所述基准锚固头上的孔,安装到所述传力索上,且对所述传感器进行标定;providing a sensor, mounted on the force cable through the hole on the reference anchor head, and calibrating the sensor; 安装和所述传感器相连的桩基竖向静载实验设备,施加下一级荷载以前,记录某级荷载下的传感器读数,即该传力索所连接观测点处与基准处的相对变形;Install the pile foundation vertical static load test equipment connected to the sensor, before applying the next level of load, record the sensor reading under a certain level of load, that is, the relative deformation between the observation point connected by the force cable and the reference point; 将该相对变形除以该段桩长,得到观测断面相对于基准面的相对应变,用相邻两个观测断面相对于基准面的应变,得到该两个断面之间的应变值,根据桩身混凝土弹性模量标定结果,计算每个锚固头断面处的桩身轴力。Divide the relative deformation by the pile length of this section to obtain the relative strain of the observed section relative to the datum plane, and use the strains of two adjacent observed sections relative to the datum plane to obtain the strain value between the two sections, according to the pile body The calibration result of the concrete elastic modulus is used to calculate the axial force of the pile body at the section of each anchor head. 2.根据权利要求1所述的桩身内力及变形测量装置,其特征在于,包括以下步骤:2. pile body internal force and deformation measuring device according to claim 1, is characterized in that, comprises the following steps: 第一步,依据试桩所在场地的岩土工程勘察报告、施工记录、地区经验以及设计要求确定合适的观测点锚固头数量和其埋设断面位置;The first step is to determine the appropriate number of anchor heads at the observation point and the position of the buried section according to the geotechnical engineering investigation report, construction records, regional experience and design requirements of the site where the test pile is located; 第二步,套管轴线应平行于桩身纵轴线,套管应与选用的锚固头匹配;埋设套管宜沿横截面中心轴线方向对称布置,在桩顶处安装的基准锚固头,当中需要开孔,方便最后将传感器装入,在所确定的断面处安装观测点锚固头,将锚固头与套管牢牢固定,如果遇见有接桩的情况,则需要在前一段桩内设置临时锚固点,方便固定需要穿过接桩段的传力索,临时锚固点需要开孔,以便于让传力索能通过;In the second step, the axis of the casing should be parallel to the longitudinal axis of the pile, and the casing should match the selected anchor head; the embedded casing should be arranged symmetrically along the central axis of the cross section, and the reference anchor head installed at the top of the pile should be Open a hole to facilitate the final installation of the sensor, install the anchor head of the observation point at the determined section, and firmly fix the anchor head and the casing. If there is a pile connection, it is necessary to set up a temporary anchor in the previous section of the pile point, to facilitate the fixation of the transmission cable that needs to pass through the pile section, and the temporary anchor point needs to open a hole so that the transmission cable can pass through; 第三步,开始打桩,按照正常的施工流程将桩打入,如果需要接桩,也按照要求进行接桩;The third step is to start piling and drive the piles according to the normal construction process. If piles need to be connected, they should also be connected according to the requirements; 第四步,桩打入后,通过桩顶基准锚固头的孔,将传感器装到传力索上,传感器要求能徒手通过基准点锚固头的开孔装入套管内,并且卡在传力索上;Step 4: After the pile is driven in, install the sensor on the force transmission cable through the hole of the reference anchor head on the top of the pile. superior; 第五步,安装常规的桩基竖向静载实验设备,试验开始后按常规方法记录荷载大小;The fifth step is to install conventional pile foundation vertical static load test equipment, and record the load according to the conventional method after the test starts; 第六步,在某级荷载作用下位移稳定,施加下一级荷载以前,记录某级荷载下的传感器读数,即该传力索所连接观测点处与基准处的相对变形,将该相对变形除以该段桩长,得到观测断面相对于基准面的相对应变,用相邻两个观测断面相对于基准面的应变,得到该两个断面之间的应变值,根据桩身混凝土弹性模量标定结果,计算每个锚固头断面处的桩身轴力。The sixth step is that the displacement is stable under a certain level of load. Before applying the next level of load, record the sensor readings under a certain level of load, that is, the relative deformation between the observation point connected by the force cable and the reference point, and the relative deformation Divide by the pile length of this section to obtain the relative strain of the observed section relative to the datum level, and use the strains of two adjacent observed sections relative to the datum level to obtain the strain value between the two sections, according to the concrete elastic modulus of the pile body Calibrate the results and calculate the axial force of the pile body at the section of each anchor head.
CN201210514738.0A 2012-12-04 2012-12-04 Method for measuring internal force and deformation of precast pile Active CN102943493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210514738.0A CN102943493B (en) 2012-12-04 2012-12-04 Method for measuring internal force and deformation of precast pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210514738.0A CN102943493B (en) 2012-12-04 2012-12-04 Method for measuring internal force and deformation of precast pile

Publications (2)

Publication Number Publication Date
CN102943493A true CN102943493A (en) 2013-02-27
CN102943493B CN102943493B (en) 2015-05-20

Family

ID=47726473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210514738.0A Active CN102943493B (en) 2012-12-04 2012-12-04 Method for measuring internal force and deformation of precast pile

Country Status (1)

Country Link
CN (1) CN102943493B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967057A (en) * 2014-04-30 2014-08-06 河海大学 Soil body displacement field visualization testing device used in pile sinking process and using method
CN104075664A (en) * 2014-07-02 2014-10-01 中国矿业大学 Shaft deformation rapid scanning and obtaining device
CN104631518A (en) * 2015-01-04 2015-05-20 东南大学 Device and method for monitoring internal force of rear sensor opening steel pipe pile
CN104662442A (en) * 2013-08-16 2015-05-27 皇家飞利浦有限公司 System and method for detecting physical deformation of a pole
CN105133671A (en) * 2015-08-26 2015-12-09 上海交通大学 Device for connecting indoor vertical static load model pile with pressure sensor
CN105696633A (en) * 2016-03-31 2016-06-22 中国电建集团华东勘测设计研究院有限公司 Monitoring system and monitoring method for support effect of slide-resistant piles
CN105821912A (en) * 2016-04-01 2016-08-03 上海筑邦测控科技有限公司 Method for detecting supporting axial force of foundation pit, intelligent foundation pit supporting device and intelligent foundation pit supporting system
CN111576504A (en) * 2020-05-29 2020-08-25 武汉至科检测技术有限公司 PHC pile body internal force testing method based on optical fiber strain and optical fiber layout method
CN111576507A (en) * 2020-05-29 2020-08-25 海安东大岩土桩基工程检测有限公司 Method for measuring displacement and internal force of pile foundation
CN115075309A (en) * 2022-07-27 2022-09-20 河海大学 System and method for testing axial force and side friction resistance of pile body

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3823255B2 (en) * 2004-03-15 2006-09-20 株式会社竹中工務店 Measuring method of axial force of ground improved pile
CN1900434A (en) * 2006-07-25 2007-01-24 南京大学 Distributive optical fiber detecting method and system for prefabricated pile damage
CN101638902A (en) * 2009-08-20 2010-02-03 高飞 Method for measuring pile shaft internal force and cross section displacement in vertical dead-load test of foundation pile
CN102409705A (en) * 2011-09-22 2012-04-11 深圳思量微系统有限公司 Pile foundation damage real-time monitoring and early warning system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3823255B2 (en) * 2004-03-15 2006-09-20 株式会社竹中工務店 Measuring method of axial force of ground improved pile
CN1900434A (en) * 2006-07-25 2007-01-24 南京大学 Distributive optical fiber detecting method and system for prefabricated pile damage
CN101638902A (en) * 2009-08-20 2010-02-03 高飞 Method for measuring pile shaft internal force and cross section displacement in vertical dead-load test of foundation pile
CN102409705A (en) * 2011-09-22 2012-04-11 深圳思量微系统有限公司 Pile foundation damage real-time monitoring and early warning system

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104662442A (en) * 2013-08-16 2015-05-27 皇家飞利浦有限公司 System and method for detecting physical deformation of a pole
US9983313B2 (en) 2013-08-16 2018-05-29 Philips Lighting Holding B.V. System and method for detecting physical deformation of a pole
CN103967057B (en) * 2014-04-30 2016-08-17 河海大学 Soil displacement field visual test device and using method in a kind of pile driving process
CN103967057A (en) * 2014-04-30 2014-08-06 河海大学 Soil body displacement field visualization testing device used in pile sinking process and using method
CN104075664A (en) * 2014-07-02 2014-10-01 中国矿业大学 Shaft deformation rapid scanning and obtaining device
CN104631518A (en) * 2015-01-04 2015-05-20 东南大学 Device and method for monitoring internal force of rear sensor opening steel pipe pile
CN105133671B (en) * 2015-08-26 2017-03-22 上海交通大学 Device for connecting indoor vertical static load model pile with pressure sensor
CN105133671A (en) * 2015-08-26 2015-12-09 上海交通大学 Device for connecting indoor vertical static load model pile with pressure sensor
CN105696633A (en) * 2016-03-31 2016-06-22 中国电建集团华东勘测设计研究院有限公司 Monitoring system and monitoring method for support effect of slide-resistant piles
CN105696633B (en) * 2016-03-31 2018-08-07 中国电建集团华东勘测设计研究院有限公司 A kind of friction pile supporting effect monitoring system and monitoring method
CN105821912A (en) * 2016-04-01 2016-08-03 上海筑邦测控科技有限公司 Method for detecting supporting axial force of foundation pit, intelligent foundation pit supporting device and intelligent foundation pit supporting system
CN105821912B (en) * 2016-04-01 2017-12-22 上海筑邦测控科技有限公司 Detect method, intelligent foundation ditch support meanss and the intelligent foundation pit support system of foundation ditch axial force of the supports
CN111576504A (en) * 2020-05-29 2020-08-25 武汉至科检测技术有限公司 PHC pile body internal force testing method based on optical fiber strain and optical fiber layout method
CN111576507A (en) * 2020-05-29 2020-08-25 海安东大岩土桩基工程检测有限公司 Method for measuring displacement and internal force of pile foundation
CN115075309A (en) * 2022-07-27 2022-09-20 河海大学 System and method for testing axial force and side friction resistance of pile body
CN115075309B (en) * 2022-07-27 2023-08-18 河海大学 Pile shaft axial force and side friction resistance testing system and method

Also Published As

Publication number Publication date
CN102943493B (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN102943493A (en) Method for measuring internal force and deformation of precast pile
CN101638902B (en) Method for measuring pile shaft internal force and cross section displacement in vertical dead-load test of foundation pile
CN102011415A (en) Method and device for detecting strain/stress of pile body by prestress pipe file field static load test
CN102878893B (en) Landslide depth displacement monitoring system and method
CN104631519A (en) Pile foundation bearing characteristic model test device and method under complicated load effect
CN105157999B (en) Appraisal procedure based on Distributed Optical Fiber Sensing Techniques pile integrality and lateral displacement
CN103195042B (en) A kind of can deep layer load screw plate test devices and methods therefor
CN103278384A (en) Testing device and measuring method for anchorage performance of coal and rock mass in coal mine tunnel
Liu et al. Mechanical behaviors of SD and CFA piles using BOTDA-based fiber optic sensor system: A comparative field test study
CN107462211B (en) A Subgrade Settlement Monitoring Sensor Suitable for Roads with Semi/Rigid Structural Layers
Kania et al. A static pile load test on a bored pile instrumented with distributed fibre optic sensors
CN203479436U (en) Static pressure high-strength prestressed concrete pipe pile body stress testing device
CN108867605B (en) A kind of vehicle-mounted feeler inspection device
CN113447074B (en) Identification method of borehole wall deformation state in alpine region based on distributed optical fiber technology
CN107543568A (en) A kind of distributed sensing optical cable with boring distribution method and device
CN109029338B (en) Embedded concrete strain measurement device and construction method thereof
CN207335689U (en) It is a kind of to be suitable for having semi-rigid or rigid structural layer road foundation settlement monitoring sensor
CN207228185U (en) Open-end PHC tubular pile end resistance testing device
CN110258663B (en) Device and method for verifying foundation pile internal force test result
CN104897321A (en) Prefabricated opening concrete tubular pile body inner wall shearing strength testing device and method
CN107860496A (en) Method for testing shear stress on surface of full-length bonded steel bar anchor rod body
Piao et al. Characteristics and application of BOTDR in distributed detection of pile foundation
CN106679619B (en) Test the device of the sedimentation of road-bridge transition section platform back and top course the tensile strain at the bottom
CN100565225C (en) A kind of with a single hole or the long method of contrast resistivity method measurement stake
CN109778923A (en) A kind of foundation pile buckling critical load test device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant