CN102748071A - Underground backfilling and transporting method for ground gangue of coal mine - Google Patents
Underground backfilling and transporting method for ground gangue of coal mine Download PDFInfo
- Publication number
- CN102748071A CN102748071A CN2012102039295A CN201210203929A CN102748071A CN 102748071 A CN102748071 A CN 102748071A CN 2012102039295 A CN2012102039295 A CN 2012102039295A CN 201210203929 A CN201210203929 A CN 201210203929A CN 102748071 A CN102748071 A CN 102748071A
- Authority
- CN
- China
- Prior art keywords
- gangue
- ground
- spoil
- cash
- bin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000003245 coal Substances 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title abstract description 12
- 239000000463 material Substances 0.000 claims description 10
- 239000002699 waste material Substances 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 claims description 4
- 239000011449 brick Substances 0.000 claims description 3
- 230000003139 buffering effect Effects 0.000 claims description 3
- 230000002452 interceptive effect Effects 0.000 abstract description 2
- 238000005553 drilling Methods 0.000 abstract 1
- 238000012545 processing Methods 0.000 description 7
- 238000005065 mining Methods 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 239000010878 waste rock Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000029087 digestion Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000000383 hazardous chemical Substances 0.000 description 1
- 239000005416 organic matter Substances 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses an underground backfilling and transporting method for ground gangue of a coal mine. The method comprises the following steps of: arranging a gangue crusher and a belt conveyer on the ground, constructing a vertical gangue conveying hole of which the diameter is more than 0.5 meter from the ground to an underground constructed overhauling roadway, establishing a surge bin on one side of the overhauling roadway, drilling a gangue slipway with the diameter of 1 meter between the surge bin and the conventional gangue storage bin which is a gangue bin or a coal bin, and arranging an upper pipeline in the gangue slipway; and crushing the gangue on the ground, then loading the gangue into the vertical gangue conveying hole by using the belt conveyer, allowing the gangue to fall to the surge bin due to self weight and automatically fall to the gangue bin for storage through the gangue slipway, and transporting and backfilling a certain quantity of gangue to a goaf. The method is not affected by interactive interference of main shaft and secondary shaft hoisting systems, facilitates transportation by using self weight of the gangue, and is low in treatment cost.
Description
Technical field
The present invention relates to the coal mine waste rock backfill technology.The cash backfill of washing that is specially adapted to the coal separation plant, colliery is handled.
Background technology
In the exploitation in colliery; The inevitable a large amount of spoil of association, along with the raising year by year of pit mining intensity, the output of spoil is increasing; The spoil of opening up stone head except that operating mine can directly directly be backfilling into the goaf in the down-hole; Spoil between mine construction stage, the spoil of operating mine coal separation plant all is put in ground, and pile up like a mountain.Existing mine spoil is handled has following several kinds of processing modes:
1. filling subsidence area: the surface subsidence district after mine is a kind of important mode of reclaiming with waste filling.Utilize the colliery cash as the subsidence area filler, can consume spoil in large quantities, solve the problem of reclaiming on the ground that subsides.But, containing a large amount of S, Mg, Na, K, Ca, Si, Fe, Al plasma panel in the coal mine waste rock, thereby there are serious pollution in environment and underground water and atmosphere, this kind method has greater environmental impacts.
2. generating: the discarded spoil of discharging in the coal mining process contains a certain amount of organic matter mostly, can utilize gangue in fluidized bed furnace, to burn and heat or generating, and the lime-ash after the burning can be used to produce constructional materialss such as cement.This kind method is had relatively high expectations to the calorific value of gangue, under the particular case, also must join colm and cooperate burning, and after the gangue burning, and emission gases processing cost up to standard is higher, and economic worth is not high, the applicable elements restriction.
3. brickmaking: the primary spoil of mine can and can utilize wherein contained organic spontaneous combustion, thereby economize in raw materials coal in order to batching brickmaking, and this method investment is little, and method is simple, and is widely-used.But in the brickmaking process, the part hazardous substances in the gangue is still residual, and the mankind are had potential health threat.And the spoil amount of brickmaking digestion is limited, does not possess the condition of extensive processing.
4. without any processing, directly be deposited in ground: this processing method land occupation, atmosphere pollution and water body, and destroy surface vegetation and view, have endless trouble.
5. waste filling: gangue is transported to the down-hole through mine car and belt, carries out the stope filling.This method meets the green exploitation policy of country, but the link of spoil transportation is many, and the equipment of input is many, can not realize continuous processing, and the cost that spoil is handled is higher.
Therefore, existing spoil treatment technology can not satisfy the raising of pit mining intensity far away, how to realize high strength, low cost, large-scale spoil processing, is the another new problem of current coal mining technical development.
Summary of the invention
The objective of the invention is to propose the backfill transportation resources of a kind of down-hole for solving the handling problem of spoil.
Technical scheme of the present invention is: spoil crushing engine and belt conveyer are set on ground; From ground to the maintenance tunnel of having constructed in the down-hole construction diameter greater than 0.5 meter vertical spoil material transport hole; One side is set up a surge bunker in the maintenance tunnel, utilizes existing waste bin or coal bunker as storage cash storehouse, between surge bunker and storage cash storehouse, gets through the slide cash road of 1 meter of a diameter; The slide cash is installed pipeline in the road, and slide angle of inclination, cash road is not less than 60 °; Spoil after pulverize on ground, is discharged in the vertical spoil material transport hole with belt conveyer, and the spoil deadweight falls to surge bunker, falls in the waste bin voluntarily through slide cash road to store again, and utilizes existing means of transportation to be backfilling into the goaf to a certain amount of back.
Be provided with wear-resistant sleeve in the above-mentioned spoil material transport hole;
The effective buffering of above-mentioned surge bunker highly is not less than 3 meters; Cut off with the brick wall of access path with thickness 50cm.
The present invention has the following advantages with present similar compared with techniques:
1. transportation system is independent, and the interactive interference that does not receive main shaft and auxiliary shaft to put forward system influences.
2. cost of transportation is low, utilizes spoil deadweight transportation, practices thrift processing cost.
3. system is simple, and corollary equipment is few, and early investment is few.
4. it is few to take personnel, and link is simple.
5. closed transportation, safe and reliable.
Description of drawings
Fig. 1 is the sketch map of the embodiment of the invention.
Among the figure: 1-crushing engine, 2-belt conveyer, 3-spoil material transport hole, 4-surge bunker, 5-access path, 6-slide cash road, 7-storage cash storehouse.
The specific embodiment
As shown in Figure 1, construction sequence of the present invention is following:
1. transportation system at first designes and constructes
Confirm the position in storage cash storehouse; Can utilize existing waste bin of mine or no coal bunker as storage cash storehouse 7; Access path 5 one sides of storage 7 tops, cash storehouse are widened, be divided into surge bunker 4, be not more than 60 degree inclination angles on the vertical direction of requirement storage cash storehouse 7 and surge bunker 4 with brick wall; Construct greater than the boring of 0.5 rice diameter at the vertical ground of surge bunker 4 simultaneously; Establish sleeve pipe in the boring as spoil material transport hole 3, to of the boring of storage cash storehouse 7 construction diameter, install pipeline in the boring as slipping cash road 6 greater than 1.0 meters at surge bunker 4; At ground configuration crushing engine 1 and belt conveyer 2 to spoil material transport hole.
2. the broken transportation of spoil
Wash cash and the digging gangue of coal separation plant, ground are discharged to spoil material transport hole 3 through belt conveyer 2 after crushing engine 1 is broken; The spoil freely falling body is transported to surge bunker 4; Utilize and pile up buffering, prevent to destroy bulkhead, piling height is not less than 3 meters; The spoil of piling up is passed to the waste filling work plane through transportation system's air transport then and carries out goaf filling through slipping cash road 6 from slipping in the storage cash storehouse 7.
Claims (1)
1. backfill transportation resources under the coal mine ground waste shaft is characterized in that, spoil crushing engine and belt conveyer are set on ground; From ground to the maintenance tunnel of having constructed in the down-hole construction diameter greater than 0.5 meter vertical spoil material transport hole; One side is set up a surge bunker in the maintenance tunnel, utilizes existing waste bin or coal bunker as storage cash storehouse, between surge bunker and storage cash storehouse, gets through the slide cash road of 1 meter of a diameter; The slide cash is installed pipeline in the road, and slide angle of inclination, cash road is not less than 60 °; Spoil after pulverize on ground, is discharged in the vertical spoil material transport hole with belt conveyer, and the spoil deadweight falls to surge bunker, falls in the waste bin voluntarily through slide cash road to store again, and is backfilling into the goaf to the transportation of a certain amount of back; Wherein:
Be provided with wear-resistant sleeve in the above-mentioned spoil material transport hole;
The effective buffering of above-mentioned surge bunker highly is not less than 3 meters; Cut off with the brick wall of access path with thickness 50cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210203929.5A CN102748071B (en) | 2012-06-20 | 2012-06-20 | Underground backfilling and transporting method for ground gangue of coal mine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210203929.5A CN102748071B (en) | 2012-06-20 | 2012-06-20 | Underground backfilling and transporting method for ground gangue of coal mine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102748071A true CN102748071A (en) | 2012-10-24 |
CN102748071B CN102748071B (en) | 2014-08-06 |
Family
ID=47028525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210203929.5A Expired - Fee Related CN102748071B (en) | 2012-06-20 | 2012-06-20 | Underground backfilling and transporting method for ground gangue of coal mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102748071B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603680A (en) * | 2013-11-14 | 2014-02-26 | 山西潞安环保能源开发股份有限公司 | One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials |
WO2014131323A1 (en) * | 2013-02-28 | 2014-09-04 | 中国矿业大学 | Method and device for using gangue aboveground to backfill mine goaf |
CN107120139A (en) * | 2017-06-06 | 2017-09-01 | 中煤第五建设有限公司第工程处 | A kind of shaft coal pocket construction fast and safely goes out cash system and goes out cash method |
CN108005717A (en) * | 2017-11-28 | 2018-05-08 | 中国矿业大学 | A kind of mine multipurpose vertical spiral material transport system |
CN108005715A (en) * | 2017-11-28 | 2018-05-08 | 中国矿业大学 | A mine multi-purpose vertical shaft pipeline material conveying system |
CN108331581A (en) * | 2018-03-27 | 2018-07-27 | 新汶矿业集团有限责任公司翟镇煤矿 | A kind of system that single block filling mining can be achieved |
CN110284883A (en) * | 2019-07-08 | 2019-09-27 | 中国矿业大学 | Recovery method is filled by a kind of row of adopting, open coal mine end side |
CN114033480A (en) * | 2021-11-09 | 2022-02-11 | 晋能控股装备制造集团金鼎山西煤机有限责任公司 | Modular angle-variable waste rock square bin |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU688646A1 (en) * | 1977-08-18 | 1979-09-30 | Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука | Inclined rock delivery shaft |
SU1416715A1 (en) * | 1986-06-30 | 1988-08-15 | Московский Горный Институт | Arrangement for delivering sticking ore |
RU1810589C (en) * | 1990-04-16 | 1993-04-23 | Всесоюзный научно-исследовательский горно-металлургический институт цветных металлов | Ore chute |
CN101566072A (en) * | 2009-05-22 | 2009-10-28 | 中国矿业大学 | Large vertical depth solid feeding system and large vertical depth solid feeding process for filling extracted coal |
CN201554495U (en) * | 2009-12-04 | 2010-08-18 | 中国矿业大学 | A tray-type solid material vertical continuous feeding system |
CN101915100A (en) * | 2010-08-24 | 2010-12-15 | 霍州煤电集团有限责任公司 | Loess-filling coal-mining method in a coal mine |
CN101845965B (en) * | 2010-05-11 | 2012-05-23 | 中国矿业大学 | Pressure discharge method for anti-blocking bin of feeding well |
-
2012
- 2012-06-20 CN CN201210203929.5A patent/CN102748071B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU688646A1 (en) * | 1977-08-18 | 1979-09-30 | Среднеазиатское Отделение Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им. С.Я.Жука | Inclined rock delivery shaft |
SU1416715A1 (en) * | 1986-06-30 | 1988-08-15 | Московский Горный Институт | Arrangement for delivering sticking ore |
RU1810589C (en) * | 1990-04-16 | 1993-04-23 | Всесоюзный научно-исследовательский горно-металлургический институт цветных металлов | Ore chute |
CN101566072A (en) * | 2009-05-22 | 2009-10-28 | 中国矿业大学 | Large vertical depth solid feeding system and large vertical depth solid feeding process for filling extracted coal |
CN201554495U (en) * | 2009-12-04 | 2010-08-18 | 中国矿业大学 | A tray-type solid material vertical continuous feeding system |
CN101845965B (en) * | 2010-05-11 | 2012-05-23 | 中国矿业大学 | Pressure discharge method for anti-blocking bin of feeding well |
CN101915100A (en) * | 2010-08-24 | 2010-12-15 | 霍州煤电集团有限责任公司 | Loess-filling coal-mining method in a coal mine |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014131323A1 (en) * | 2013-02-28 | 2014-09-04 | 中国矿业大学 | Method and device for using gangue aboveground to backfill mine goaf |
CN103603680A (en) * | 2013-11-14 | 2014-02-26 | 山西潞安环保能源开发股份有限公司 | One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials |
CN103603680B (en) * | 2013-11-14 | 2015-09-02 | 山西潞安环保能源开发股份有限公司 | Deep tunnel whitewashing and the quick Transfer method of concreting material one well two storehouse formula |
CN107120139A (en) * | 2017-06-06 | 2017-09-01 | 中煤第五建设有限公司第工程处 | A kind of shaft coal pocket construction fast and safely goes out cash system and goes out cash method |
CN108005717A (en) * | 2017-11-28 | 2018-05-08 | 中国矿业大学 | A kind of mine multipurpose vertical spiral material transport system |
CN108005715A (en) * | 2017-11-28 | 2018-05-08 | 中国矿业大学 | A mine multi-purpose vertical shaft pipeline material conveying system |
CN108331581A (en) * | 2018-03-27 | 2018-07-27 | 新汶矿业集团有限责任公司翟镇煤矿 | A kind of system that single block filling mining can be achieved |
CN110284883A (en) * | 2019-07-08 | 2019-09-27 | 中国矿业大学 | Recovery method is filled by a kind of row of adopting, open coal mine end side |
CN114033480A (en) * | 2021-11-09 | 2022-02-11 | 晋能控股装备制造集团金鼎山西煤机有限责任公司 | Modular angle-variable waste rock square bin |
CN114033480B (en) * | 2021-11-09 | 2024-03-12 | 晋能控股装备制造集团金鼎山西煤机有限责任公司 | Modular angle-variable gangue square bin |
Also Published As
Publication number | Publication date |
---|---|
CN102748071B (en) | 2014-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102748071B (en) | Underground backfilling and transporting method for ground gangue of coal mine | |
Zheng et al. | Challenges and opportunities of using tunnel boring machines in mining | |
AU2014223132B2 (en) | Method and device for using gangue aboveground to backfill mine goaf | |
CN102889084B (en) | Continuous mining technique for thin coal layer of opencast coal mine | |
CN101566072B (en) | Large vertical depth solid feeding system and large vertical depth solid feeding process for filling extracted coal | |
Ju et al. | Fluidized mining and in-situ transformation of deep underground coal resources: a novel approach to ensuring safe, environmentally friendly, low-carbon, and clean utilisation | |
Ju et al. | Vertical transportation system of solid material for backfilling coal mining technology | |
CN109736808B (en) | Underground mine mining process without tailing pond building | |
CN107676096A (en) | A kind of continuous mining system of iron and steel industry surface mine and production practice | |
CN202745931U (en) | Underground backfilling and conveying system for ground gangue of coal mine | |
SS et al. | Outlook on the implementation of steep inclined conveyors in deep open pits | |
Cherniaiev et al. | On the issue of shipping finished products in mining of non-metallic mineral raw materials | |
RU2196895C2 (en) | Method of kimberlite pipe mining | |
CN109184784A (en) | Based on the synchronous filling system of fully mechanized mining gangue for mitigating coal mining subsidence area degree and method | |
CN102716901A (en) | Method for disposing and reusing building waste nearby coal mine | |
CN102720532A (en) | Method for transporting grouting material vertical delivery pipe used for mine | |
Wei et al. | A novel clean mining technology involving the underground disposal of waste rock in coal mines | |
CN202745925U (en) | Conveying system of mining spouting material vertical feed delivery pipe | |
Medvedev et al. | Cleaner production in mining industry: a flowsheet for underground mining of iron ore deposit | |
CN102444418A (en) | Device for filling roadway | |
Egerton | Presidential address: The mechanisation of UG2 mining in the Bushveld Complex | |
CN107218077B (en) | Rock gangway multimode combines cash technique out | |
CN206174998U (en) | Material conveying system is thrown to fly ash and waste rock | |
Munro | Incline caving as a massive mining method | |
CN111396120A (en) | Chute crushing transportation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140806 Termination date: 20150620 |
|
EXPY | Termination of patent right or utility model |