CN102535488A - Waterproof construction method and system for bottom plate of high-water-level basement - Google Patents
Waterproof construction method and system for bottom plate of high-water-level basement Download PDFInfo
- Publication number
- CN102535488A CN102535488A CN201210065838XA CN201210065838A CN102535488A CN 102535488 A CN102535488 A CN 102535488A CN 201210065838X A CN201210065838X A CN 201210065838XA CN 201210065838 A CN201210065838 A CN 201210065838A CN 102535488 A CN102535488 A CN 102535488A
- Authority
- CN
- China
- Prior art keywords
- ditch
- basement
- precipitation well
- hydrophobic
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明公开了一种高水位地下室底板防水施工方法,包括下列步骤:(1)利用基坑支护的止水帷幕,将基坑深度范围土层的水止隔在基坑周边外,同时在基坑支护的地面及基坑底周边均设置排水沟;(2)桩承台之间的间隔位置下方设置1条以上的疏水沟,桩承台底部距疏水沟顶部500~1000mm;(3)基坑周边按疏水沟出水口端设置相对应降水井,降水井内设置潜水泵,潜水泵通过抽水管与排水沟连通。本发明还公开了一种高水位地下室底板防水系统。本发明克服了现有技术中柔性防水层施工面干燥度不高、旋喷桩成本过高、渗水严重及费工费料等问题,具有结构简单、造价便宜、有效降水、缩减工期、节约成本及便于施工质量控制等特点。
The invention discloses a waterproof construction method for a basement floor with a high water level, which comprises the following steps: (1) using a water-stop curtain supported by the foundation pit to stop the water in the soil layer in the depth range of the foundation pit from the periphery of the foundation pit, and at the same time Drainage ditches shall be set on the ground supported by the foundation pit and around the bottom of the foundation pit; (2) more than one drainage ditch shall be set below the interval between the pile caps, and the distance between the bottom of the pile caps and the top of the drainage ditch shall be 500-1000 mm; (3 ) Around the foundation pit, corresponding dewatering wells are arranged at the outlet of the drainage ditch, and submersible pumps are installed in the dewatering wells, and the submersible pumps are connected to the drainage ditch through the suction pipe. The invention also discloses a high water level basement floor waterproof system. The invention overcomes the problems of low dryness of the construction surface of the flexible waterproof layer, high cost of rotary spraying piles, serious water seepage and labor and material waste in the prior art, and has the advantages of simple structure, low cost, effective precipitation, shortened construction period, and cost saving And it is convenient for construction quality control and so on.
Description
技术领域 technical field
本发明涉及土木工程的地下室底板防水施工技术领域,具体来说是一种高水位地下室底板防水施工方法及其系统。The invention relates to the technical field of basement floor waterproof construction in civil engineering, in particular to a high water level basement floor waterproof construction method and a system thereof.
背景技术 Background technique
随着建筑设计地下工程水平的提高,地下室的使用功能将不仅用于地下防空、地下车库等用途。由于城市建筑用地的紧缺和跟随国际建筑物往地下扩大空间的流行趋势,建筑使用空间(层)往地下深扩展,地下办公,地下商业购物广场日趋多样化。目前我国长江、珠江三角洲冲积层地质低洼地区的建筑地下室多层化,使用功能多样化日趋突出。地下功能使用要求越高,地下室防水等级要求就越高;地下水位越高水压力越大,施工难度也就越大。With the improvement of the level of underground engineering in architectural design, the use function of the basement will not only be used for underground air defense, underground garages and other purposes. Due to the shortage of urban construction land and following the popular trend of international buildings to expand space underground, the building use space (layer) is deeply expanded underground, and underground offices and underground commercial shopping plazas are becoming more and more diverse. At present, the basements of buildings in the low-lying alluvial areas of the Yangtze River and Pearl River Delta in my country are multi-layered, and the diversification of functions is becoming more and more prominent. The higher the requirements for the use of underground functions, the higher the requirements for the waterproof level of the basement; the higher the groundwater level, the greater the water pressure, and the greater the difficulty of construction.
高等级防水的地下室底板防水层一般采用外防外贴方法。其防水结构由迎水面到结构层依次是柔性防水层→保护层→卷材(干铺)粘贴层→保护层→结构层;而最前沿的第一层柔性防水层是合成高分子防水涂膜或聚氨酯涂膜,其水泥沙浆批挡基层的干燥度要求很高,基层干燥度越高,质量就越好。The waterproof layer of the basement floor with high-level waterproof generally adopts the method of external anti-external sticking. Its waterproof structure is flexible waterproof layer→protective layer→roll material (dry laying) adhesive layer→protective layer→structural layer from the water-facing surface to the structural layer; and the first flexible waterproof layer at the forefront is a synthetic polymer waterproof coating film Or polyurethane coating film, the dryness of the cement mortar batch blocking base is very high, the higher the dryness of the base, the better the quality.
处于高地下水水位的基坑,特别是越靠近江河、湖泊、海边区域的饱和淤泥质土层,设置止水帷幕并不能完全保证基底土的干燥,因为巨大的水压力会使地下室底板的工作垫层(砼垫层)和桩承台结构的砖模水渗透性加大,导致基底渗水。因此,其基面就难以达到柔性防水层合成高分子防水涂膜或聚氨酯涂膜施工要求的干燥度,施工质量难以保证。For foundation pits with high groundwater levels, especially the saturated muddy soil layers closer to rivers, lakes, and seaside areas, the installation of water-stop curtains cannot completely guarantee the drying of the base soil, because the huge water pressure will make the working pad of the basement floor Layer (concrete cushion) and the brick mold water permeability of the pile cap structure increase, resulting in water seepage of the base. Therefore, it is difficult for the base surface to reach the dryness required for the construction of the flexible waterproof layer synthetic polymer waterproof coating film or polyurethane coating film, and the construction quality is difficult to guarantee.
工程中针对基底渗水的问题,最直接的方法就是采用井点降水,即在基坑四周或内部设置降水井点,把地下水位降低到施工面以下,但是对于对地下水较为敏感的周边地质环境,该方法并不适用。此外可以采用旋喷桩止水,即在渗水的位置做旋喷桩,在基底处形成一道止水层。这种做法可以有效解决基底渗水的问题,保证基底的干燥度,但是这种方法的缺点是成本偏高,而且要花费大量的时间,况且对于处于高地下水位的基坑,渗水情况更为严重,这种方法的缺点更加突显。还可以在混凝土垫层下增设100~200mm砂卵石垫层。面积大的基坑还应在砂石垫层中设置纵横向盲沟,以利于将水向两侧边沟排出抽走。该方法可以保证将基底渗水迅速排走,但是在基坑面积较大的情况下,该做法比较费工费料。The most direct way to solve the problem of basement seepage in engineering is to use well point dewatering, that is, set dewatering well points around or inside the foundation pit to lower the groundwater level below the construction surface. However, for the surrounding geological environment that is more sensitive to groundwater, This method is not applicable. In addition, rotary spray piles can be used to stop water, that is, rotary spray piles can be installed at the position of water seepage to form a water-stop layer at the base. This method can effectively solve the problem of base water seepage and ensure the dryness of the base, but the disadvantage of this method is that the cost is high and it takes a lot of time. Moreover, for foundation pits with high groundwater levels, the seepage situation is more serious , the shortcomings of this method are more prominent. A 100-200mm sand and pebble cushion can also be added under the concrete cushion. For foundation pits with a large area, vertical and horizontal blind ditches should also be set in the sand and gravel cushion to facilitate the drainage of water to the side ditches on both sides. This method can ensure that the base seepage water is quickly drained away, but in the case of a large foundation pit area, this method is more labor-intensive and material-intensive.
发明内容 Contents of the invention
本发明的目的在于克服以上现有技术存在的不足,提供了一种结构简单、造价便宜、有效降水、缩减工期、节约成本及便于施工质量控制的高水位地下室底板防水施工方法。The purpose of the present invention is to overcome the shortcomings of the prior art above, and provide a waterproof construction method for high water level basement floor with simple structure, low cost, effective precipitation, shortened construction period, cost saving and convenient construction quality control.
本发明的另一目的在于提供一种高水位地下室底板防水系统。Another object of the present invention is to provide a waterproof system for basement floor with high water level.
为了达到上述目的,本发明采用以下技术方案:一种高水位地下室底板防水施工方法,包括下列步骤:In order to achieve the above object, the present invention adopts the following technical solutions: a method for waterproofing construction of basement basement with high water level, comprising the following steps:
(1)首先利用基坑支护的止水帷幕,将基坑深度范围土层的水止隔在基坑周边以外,同时在基坑支护的地面及基坑底周边均设置贯通排水沟;(1) First, use the water-stop curtain of the foundation pit support to stop the water in the soil layer in the depth range of the foundation pit from the periphery of the foundation pit, and at the same time set through drainage ditches on the ground supported by the foundation pit and around the bottom of the foundation pit;
(2)在地下室底板桩承台之间的间隔位置下方设置1条以上的用松砖及纤维网砌成的疏水沟,桩承台底部距疏水沟顶部500~1000mm;(2) Set up more than one drainage ditch made of loose bricks and fiber nets below the interval between pile caps on the basement floor, and the distance between the bottom of the pile caps and the top of the drainage ditch is 500-1000mm;
(3)在基坑周边按疏水沟出水口端设置相对应的降水井,降水井设在距离地下室基础最外周边缘的外部,降水井内设置潜水泵,潜水泵通过抽水管与排水沟连通。(3) Corresponding dewatering wells are set at the outlet of the drainage ditch around the foundation pit. The dewatering wells are located outside the outermost edge of the basement foundation. A submersible pump is installed in the dewatering well, and the submersible pump is connected to the drainage ditch through a suction pipe.
作为一种优选的方案,所述步骤(2)中的疏水沟和步骤(3)中的降水井的开挖方法为:基坑土方开挖挖至桩承台一半高度的标高时,根据疏水沟和降水井的平面布置图进行测量放线,完成之后同时进行疏水沟的土方开挖和降水井的土方开挖。As a preferred solution, the excavation method of the drainage ditch in the step (2) and the dewatering well in the step (3) is: when excavating the earthwork of the foundation pit to the elevation of half the height of the pile cap, according to the drainage The groundwork of the drainage ditch and the earthwork excavation of the precipitation well will be carried out at the same time after completion.
为了避开地下室底板结构及防水层位置,所述步骤(3)中的降水井设在距离地下室基础最外周边缘600mm以外。In order to avoid the basement floor structure and the position of the waterproof layer, the dewatering well in the step (3) is set beyond 600mm from the outermost peripheral edge of the basement foundation.
作为一种优选的方案,所述步骤(2)中的疏水沟施工方法为:先在疏水沟的底部平铺一层厚度为60~120mm的松砖,疏水沟两侧均铺设厚度为120~240mm的松砖,疏水沟的内空宽度为120~160mm,疏水沟的内空松填粒径为20~30mm的碎石,疏水沟的顶部平铺厚度为60~120mm长度为240mm的松砖,顶部的松砖与松砖之间留30~60mm宽的泄水缝,然后在疏水沟的顶部松砖上表面及两侧松砖外表面铺设2~3层纤维网,纤维网为每平方厘米9~16目,同时疏水沟的底部与降水井具有0.5~1%的坡度,使沟内水顺利往降水井排走。As a preferred solution, the construction method of the drainage ditch in the step (2) is: first lay a layer of pine bricks with a thickness of 60-120 mm at the bottom of the drainage ditch, and lay bricks with a thickness of 120-120 mm on both sides of the drainage ditch. 240mm loose bricks, the width of the inner space of the drainage ditch is 120-160mm, the inner space of the drainage ditch is loosely filled with gravel with a particle size of 20-30mm, and the top of the drainage ditch is tiled with loose bricks with a thickness of 60-120mm and a length of 240mm , leave a 30-60mm wide drainage joint between the top pine bricks and pine bricks, and then lay 2-3 layers of fiber mesh on the upper surface of the top pine bricks and the outer surfaces of the pine bricks on both sides of the drainage ditch. 9 to 16 meshes per centimeter, and at the same time, the bottom of the drainage ditch and the dewatering well have a slope of 0.5 to 1%, so that the water in the ditch can be smoothly drained to the dewatering well.
作为一种优选的方案,所述步骤(2)中的疏水沟平面布置为通长贯通结构或非通长贯通结构。只需保证疏水沟出水口端与降水井连通即可。As a preferred solution, the planar arrangement of the hydrophobic grooves in the step (2) is a full-length through structure or a non-through-length through structure. It is only necessary to ensure that the outlet end of the drain ditch is connected with the precipitation well.
作为另一种优选的方案,所述步骤(2)中的疏水沟平面布置为弯转结构,疏水沟出水口端与步骤(3)中的降水井连通。As another preferred solution, the planar arrangement of the drainage ditch in the step (2) is a curved structure, and the outlet end of the drainage ditch communicates with the precipitation well in the step (3).
一种高水位地下室底板防水系统,包括桩承台、疏水沟、排水沟、降水井和潜水泵;其中,桩承台之间的间隔位置下方设置1条以上的用松砖及纤维网砌成的疏水沟,桩承台底部距疏水沟顶部500~1000mm,基坑支护的地面及基坑底周边均设置贯通排水沟,地下室基础最外周边缘的外部设置降水井,疏水沟出水口端与相对应的降水井连通,降水井内设置潜水泵,潜水泵通过抽水管与排水沟连通。A high water level basement floor waterproofing system, comprising pile caps, drains, drainage ditches, dewatering wells and submersible pumps; wherein, at the bottom of the interval between pile caps, there is more than one pine brick and fiber net. The bottom of the pile cap is 500-1000mm away from the top of the drainage ditch. The ground supported by the foundation pit and the periphery of the foundation pit bottom are provided with a through-drainage ditch. The corresponding dewatering wells are connected, and a submersible pump is arranged in the dewatering well, and the submersible pump is connected with the drainage ditch through a suction pipe.
作为一种优选的方案,所述疏水沟为底部铺设1层60~120mm的松砖,两侧均铺设厚度为120~240mm的松砖,其内空宽度为120~160mm,疏水沟的内空松填粒径为20~30mm的碎石,疏水沟的顶部平铺厚度为60~120mm长度为240mm的松砖,顶部的松砖与松砖之间留30~60mm宽的泄水缝,疏水沟的顶部松砖上表面及两侧松砖外表面铺设2~3层纤维网,纤维网为每平方厘米9~16目,同时疏水沟的底部与降水井具有0.5~1%的坡度。As a preferred solution, the drain ditch is laid with a layer of 60-120mm loose bricks at the bottom, and loose bricks with a thickness of 120-240mm are laid on both sides, and the width of the inner space is 120-160mm. Loosely fill gravel with a particle size of 20-30mm, pave loose bricks with a thickness of 60-120mm and a length of 240mm on the top of the drainage ditch, and leave a 30-60mm wide drainage joint between the top loose bricks and loose bricks. The upper surface of the pine bricks on the top of the ditch and the outer surface of the pine bricks on both sides are laid with 2 to 3 layers of fiber mesh, the fiber mesh is 9 to 16 meshes per square centimeter, and the bottom of the drainage ditch and the precipitation well have a slope of 0.5 to 1%.
为了能支撑土壤的压力及能够好的排水,所述降水井包括钢筋笼、加劲环、箍筋及滤水网;其中,箍筋螺旋固接在钢筋笼上,加劲环套设固接在钢筋笼上,钢筋笼外部包覆3层以上每平方厘米具有9~12目的滤水网,钢筋笼的长度小于等于4.5m且小于基坑支护的基坑支护桩的入土深度,所述降水井设在距离地下室基础最外周边缘600mm以外。降水井的主要的功能是集水、降水和抽排水,降水井的尺寸是根据疏水沟的排水量设计的。In order to support the pressure of the soil and enable good drainage, the dewatering well includes a reinforcement cage, a stiffening ring, stirrups and a water filter net; wherein, the stirrups are helically fixed on the reinforcement cage, and the stiffening ring is sleeved and fixed on the reinforcement On the cage, the outside of the steel cage is covered with more than 3 layers and has 9 to 12 mesh water filter nets per square centimeter. The length of the steel cage is less than or equal to 4.5m and is less than the depth of the foundation pit supporting piles. The precipitation The well is located 600mm away from the outermost edge of the basement foundation. The main functions of the precipitation well are water collection, precipitation and pumping and drainage. The size of the precipitation well is designed according to the drainage capacity of the drainage ditch.
为了能更好的排水、过滤及不堵塞,还包括行程开关,行程开关设置在潜水泵上方的降水井内壁上,所述潜水泵的扬程为30m以上,直径50mm以上,所述抽水管为硬质PVC管,其硬质PVC管与潜水泵的出水口连接处的减振用300~500mm长软管连接。In order to better drain water, filter and prevent clogging, a travel switch is also included. The travel switch is arranged on the inner wall of the dewatering well above the submersible pump. The head of the submersible pump is more than 30m and the diameter is more than 50mm. Quality PVC pipe, the connection between the hard PVC pipe and the water outlet of the submersible pump is connected with a 300-500mm long hose for vibration reduction.
本发明相对于现有技术,具有如下的优点及效果:Compared with the prior art, the present invention has the following advantages and effects:
1、采用本发明施工方法,能有效降水,为下一道工序提供作业面,避免了以往因降水失败或积水而无法进入一道工序的情况,可以大大缩减工期。1. Adopting the construction method of the present invention can effectively dewater and provide a working surface for the next process, avoiding the failure to enter a process due to precipitation failure or water accumulation in the past, and can greatly reduce the construction period.
2、本发明中的疏水沟和降水井等结构,用材简单、便宜且能有效保证地下室底板防水基层的干燥度,节省了以往因降水失败或积水而导致防水层施工返工产生的费用。2. Structures such as drainage ditch and dewatering well in the present invention use simple and cheap materials and can effectively ensure the dryness of the waterproof base of the basement floor, saving the cost of rework of the waterproof layer construction caused by the failure of precipitation or water accumulation in the past.
3、采用本发明施工方法,保证了地下室底板基层的干燥度及防水层施工的质量,保证了防水层检查及验收的合格率达100%以上,质量优良率达90%以上。3. By adopting the construction method of the present invention, the dryness of the base of the basement floor and the construction quality of the waterproof layer are guaranteed, and the pass rate of waterproof layer inspection and acceptance is more than 100%, and the excellent quality rate is more than 90%.
4、本发明中的纤维网和滤水网均可采用旧的安全网,废物利用,节约成本。4. Both the fiber net and the water filter net in the present invention can adopt the old safety net, waste utilization and cost saving.
5、本发明中的疏水沟的底部与降水井具有0.5~1%的坡度,具有能使水更易向排水沟流动的特点。5. The bottom of the drainage ditch in the present invention has a slope of 0.5-1% with the precipitation well, which has the feature of making water flow to the drainage ditch more easily.
6、本发明中的降水井包括钢筋笼、加劲环、箍筋及滤水网,且钢筋笼的长度小于等于4.5m且小于基坑支护的基坑支护桩的入土深度,具有能有效的支撑土壤压力及便于挖掘机分两级平台挖坑埋设。6. The dewatering well in the present invention comprises a reinforcement cage, a stiffening ring, stirrups and a water filter net, and the length of the reinforcement cage is less than or equal to 4.5m and less than the depth of penetration of the foundation pit support piles of the foundation pit support, and has the ability to effectively The supporting soil pressure and the excavator are divided into two levels of platforms to dig pits and bury them.
7、本发明中的抽水管为硬质PVC管避免抽水管因为泥沙而堵塞,且硬质PVC管与潜水泵的出水口连接处的减振用300~500mm长软管连接。7. The suction pipe in the present invention is a hard PVC pipe to prevent the water suction pipe from being blocked by silt, and the vibration damping at the joint between the hard PVC pipe and the water outlet of the submersible pump is connected with a 300-500mm long hose.
附图说明 Description of drawings
图1为本发明高水位地下室底板防水系统的结构示意图;Fig. 1 is the structural representation of high water level basement floor waterproofing system of the present invention;
图2为本发明高水位地下室底板防水系统的剖视图;Fig. 2 is the sectional view of high water level basement floor waterproofing system of the present invention;
图3为本发明高水位地下室底板防水系统疏水沟的平面布置图;Fig. 3 is the plane layout drawing of the drainage ditch of the basement floor waterproofing system of the present invention;
图4为本发明高水位地下室底板防水系统疏水沟的截面图;Fig. 4 is the cross-sectional view of the drainage ditch of the waterproof system of the basement basement with high water level of the present invention;
图5为本发明高水位地下室底板防水系统降水井的结构示意图。Fig. 5 is a structural schematic diagram of the dewatering well of the high water level basement floor waterproofing system of the present invention.
图中标号与名称如下:The labels and names in the figure are as follows:
具体实施方式 Detailed ways
为便于本领域技术人员理解,下面结合附图及实施例对本发明作进一步的详细说明。For the convenience of those skilled in the art to understand, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
实施例1:Example 1:
如图1~5所示,一种高水位地下室底板防水施工方法,包括下列步骤:As shown in Figures 1 to 5, a waterproof construction method for a basement floor with a high water level comprises the following steps:
(1)首先利用基坑支护的止水帷幕,将基坑18深度范围土层的水止隔在基坑17周边以外,同时在基坑支护的地面17及基坑底周边均设置贯通排水沟1;(1) First, use the water-stop curtain of the foundation pit support to stop the water in the soil layer in the depth range of the foundation pit 18 from the periphery of the foundation pit 17, and at the same time, set a through hole on the ground 17 of the foundation pit support and the periphery of the bottom of the foundation pit.
(2)在地下室底板桩承台之间的间隔位置下方设置1条以上的用松砖及纤维网砌成的疏水沟3,桩承台底部2距疏水沟3顶部500~1000mm;(2) Set up more than one
(3)在基坑1周边按疏水沟3出水口端设置相对应的降水井4,降水井4设在距离地下室基础最外周边缘5的外部,降水井4内设置潜水泵6,潜水泵6通过抽水管7与排水沟1连通。(3)
其中,高水位是指基坑所处位置靠近江河、湖泊、海边区域的饱和淤泥质土层,地下水位较高,同时由于条件限制不允许采用井点降水,设置止水帷幕并不能完全保证基底土的干燥。Among them, the high water level refers to the saturated muddy soil layer where the foundation pit is located close to rivers, lakes, and seaside areas. The drying of the soil.
如图1所示,所述步骤(2)中的疏水沟3和步骤(3)中的降水井4的开挖方法为:基坑1土方开挖挖至桩承台一半高度的标高时,根据疏水沟3和降水井4的平面布置图进行测量放线,完成之后同时进行疏水沟3的土方开挖和降水井4的土方开挖,所述步骤(3)中的降水井4设在距离地下室基础最外周边缘5的600mm以外。所述步骤(2)中的疏水沟3平面布置为通长贯通结构或非通长贯通结构,本实施例中的疏水沟3均为直线结构。As shown in Figure 1, the excavation method of the
如图4所示,所述步骤(2)中的疏水沟3施工方法为:先在疏水沟3的底部平铺一层厚度为60~120mm的松砖12,疏水沟3两侧均铺设厚度为120~240mm的松砖13,疏水沟3的内空宽度为120~160mm,疏水沟3内空松填粒径为20~30mm的碎石19,疏水沟3的顶部平铺厚度为60~120mm长度为240mm的松砖14,顶部的松砖14与松砖之间留30~60mm宽的泄水缝15,然后在疏水沟的顶部松砖14上表面及两侧松砖13外表面铺设2~3层纤维网16,纤维网16为每平方厘米9~16目,同时疏水沟3的底部与降水井4具有0.5~1%的坡度,使沟内水顺利往降水井排走。纤维网16的作用为:使得土壤的水既能往疏水沟3内排泄又将泥土阻隔于疏水沟3外,保持畅通。As shown in Figure 4, the construction method of the
其中,疏水沟3的截面尺寸及布置密度按地下室底板底桩承台所在土层的涌水量计算决定,从而保证涌水量通过地下疏水沟3泄排至降水井4及抽排至排水沟1排走;降水井4的直径及潜水泵6的抽排量按疏水沟的排水量而定。基坑中的降水井在地下室施工完成之后,与地下室侧壁土一起回填,回填前可将其钢筋笼取出重复利用。Among them, the cross-sectional size and layout density of the
一种高水位地下室底板防水系统,包括桩承台、疏水沟3、排水沟1、降水井4和潜水泵6;其中,桩承台之间的间隔位置下方设置1条以上的用松砖及纤维网砌成的疏水沟3,桩承台底部2距疏水沟3顶部500~1000mm,基坑支护的地面17及基坑底周边均设置贯通排水沟1,地下室基础最外周边缘5的外部设置降水井4,疏水沟3出水口端与相对应的降水井4连通,降水井4内设置潜水泵6,潜水泵6通过抽水管7与排水沟1连通。A high water level basement floor waterproofing system, comprising pile caps,
如图4所示,所述疏水沟3为底部铺设1层60~120mm的松砖,两侧均铺设厚度为120~240mm的松砖,其内空宽度为120~160mm,疏水沟3的内空松填粒径为20~30mm的碎石19,疏水沟3的顶部平铺厚度为60~120mm长度为240mm的松砖14,顶部的松砖14与松砖之间留30~60mm宽的泄水缝15,疏水沟的顶部松砖14上表面及两侧松砖13外表面铺设2~3层纤维网16,纤维网16为每平方厘米9~16目,同时疏水沟3的底部与降水井4具有0.5~1%的坡度。纤维网16的作用为:使得土壤的水既能往疏水沟3内排泄又将泥土阻隔于疏水沟3外,保持畅通。As shown in Figure 4, the
如图5所示,所述降水井4包括钢筋笼8、加劲环9、箍筋10及滤水网11;其中,箍筋10螺旋焊接在钢筋笼8上,加劲环9套设焊接在钢筋笼8上,钢筋笼8外部包覆3层以上每平方厘米具有9~12目的滤水网11,钢筋笼8的长度小于等于4.5m且小于基坑支护的基坑支护桩的入土深度,所述降水井4设在距离地下室基础最外周边缘5的600mm以外,还包括行程开关,行程开关设置在潜水泵6上方的降水井4内壁上,所述潜水泵6的扬程为30m以上,直径50mm以上,所述抽水管7为硬质PVC管,降水井4的主要作用为集水、降水和抽排水,降水井4的尺寸及潜水泵6的规格均根据实际需要而设定。抽水管7不能用软管,必须用硬质PVC管,以免抽上的水中沙将管堵塞,其硬质PVC管与潜水泵的出水口连接处的减振用300~500mm长软管连接。滤水网11和纤维网16均可采用旧安全网代替,达到废物利用的效果。基坑中的降水井在地下室施工完成之后,与地下室侧壁土一起回填,回填前可将其钢筋笼取出重复利用。As shown in Figure 5, the
实施例2:Example 2:
本实施例与实施例1不同之处在于:所述步骤(2)中的疏水沟3平面布置为弯转结构,疏水沟3出水口端与步骤(3)中的降水井4连通。也就是说本实施例中的疏水沟3可以在承台间弯转,只要能够把水送到降水井4即可。The difference between this embodiment and
上述具体实施方式为本发明的优选实施例,并不能对本发明进行限定,其他的任何未背离本发明的技术方案而所做的改变或其它等效的置换方式,都包含在本发明的保护范围之内。The specific implementation described above is a preferred embodiment of the present invention, and does not limit the present invention. Any other changes or other equivalent replacement methods that do not deviate from the technical solution of the present invention are included in the scope of protection of the present invention. within.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210065838.XA CN102535488B (en) | 2012-03-13 | 2012-03-13 | Waterproof construction method for bottom plate of high-water-level basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210065838.XA CN102535488B (en) | 2012-03-13 | 2012-03-13 | Waterproof construction method for bottom plate of high-water-level basement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102535488A true CN102535488A (en) | 2012-07-04 |
CN102535488B CN102535488B (en) | 2014-03-26 |
Family
ID=46343393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210065838.XA Expired - Fee Related CN102535488B (en) | 2012-03-13 | 2012-03-13 | Waterproof construction method for bottom plate of high-water-level basement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535488B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103898943A (en) * | 2014-03-26 | 2014-07-02 | 东莞市建之都建设工程有限公司 | Basement water resource collection and utilization method and water recycling system |
CN104480964A (en) * | 2014-11-24 | 2015-04-01 | 广西壮族自治区冶金建设公司 | Construction method for local water eruption source of underground damp proofing course |
CN104805855A (en) * | 2015-02-25 | 2015-07-29 | 成都格瑞思文化传播有限公司 | Drainage device |
CN104805856A (en) * | 2015-03-31 | 2015-07-29 | 成都聚智工业设计有限公司 | Water lowering and drainage mechanism |
CN104988936A (en) * | 2015-07-07 | 2015-10-21 | 苏州汇诚智造工业设计有限公司 | Automatic drain system for bottom plate construction or reinforcement construction of stilling pool and manufacturing and use method thereof |
CN105350552A (en) * | 2015-09-25 | 2016-02-24 | 中国二十冶集团有限公司 | Underground water control method for backfilled sediment layer |
CN106632871A (en) * | 2017-01-04 | 2017-05-10 | 广东锦绣天地市政工程有限公司 | High-strength anti-breaking plastic steel sheet pile |
CN106836252A (en) * | 2017-03-14 | 2017-06-13 | 中国十七冶集团有限公司 | Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling |
CN108867674A (en) * | 2018-08-17 | 2018-11-23 | 南京吉士达防水工程有限公司 | Basement waterproofing keeps the temperature drainage system |
CN108868063A (en) * | 2018-06-07 | 2018-11-23 | 上海宝冶集团有限公司 | A kind of method for constructing terrace |
CN112921999A (en) * | 2021-01-26 | 2021-06-08 | 中建四局第一建筑工程有限公司 | Structure of integrated circulating system for recycling rainwater in drainage zone of lower layer of bottom plate of high-water-level basement and construction method of structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19935366A1 (en) * | 1998-07-29 | 2000-02-03 | Zueblin Ag | Foundation pit of floor plate and sidewalls depresses floor plate below sidewall ends and joins these via arched sector of floor plate thickness to resist floor lift via ground-embedded ties. |
CN201125391Y (en) * | 2007-09-11 | 2008-10-01 | 中国建筑第六工程局有限公司 | Basement waterproofing drainage structure |
CN101446084A (en) * | 2007-11-27 | 2009-06-03 | 贵阳铝镁设计研究院 | Underground building outdoor-indoor water drainage combination structure and method thereof |
CN201883450U (en) * | 2010-11-25 | 2011-06-29 | 中国京冶工程技术有限公司 | Coastal deep-foundation anti-seepage waterproof basement structure |
CN202440826U (en) * | 2012-03-13 | 2012-09-19 | 广东中城建设集团有限公司 | Waterproof system for high-water level basement foundation slabs |
-
2012
- 2012-03-13 CN CN201210065838.XA patent/CN102535488B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19935366A1 (en) * | 1998-07-29 | 2000-02-03 | Zueblin Ag | Foundation pit of floor plate and sidewalls depresses floor plate below sidewall ends and joins these via arched sector of floor plate thickness to resist floor lift via ground-embedded ties. |
CN201125391Y (en) * | 2007-09-11 | 2008-10-01 | 中国建筑第六工程局有限公司 | Basement waterproofing drainage structure |
CN101446084A (en) * | 2007-11-27 | 2009-06-03 | 贵阳铝镁设计研究院 | Underground building outdoor-indoor water drainage combination structure and method thereof |
CN201883450U (en) * | 2010-11-25 | 2011-06-29 | 中国京冶工程技术有限公司 | Coastal deep-foundation anti-seepage waterproof basement structure |
CN202440826U (en) * | 2012-03-13 | 2012-09-19 | 广东中城建设集团有限公司 | Waterproof system for high-water level basement foundation slabs |
Non-Patent Citations (2)
Title |
---|
王桂华: "复杂环境下超大规模深基坑支护施工技术", 《福建建筑》 * |
雷磊等: "浅谈疏水层在地下室底板防水中的应用", 《广东土木与建筑》 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103898943B (en) * | 2014-03-26 | 2016-06-15 | 东莞市建之都建设工程有限公司 | A kind of basement water resource Collection utilization method and water circulation utilization system |
CN103898943A (en) * | 2014-03-26 | 2014-07-02 | 东莞市建之都建设工程有限公司 | Basement water resource collection and utilization method and water recycling system |
CN104480964A (en) * | 2014-11-24 | 2015-04-01 | 广西壮族自治区冶金建设公司 | Construction method for local water eruption source of underground damp proofing course |
CN104805855A (en) * | 2015-02-25 | 2015-07-29 | 成都格瑞思文化传播有限公司 | Drainage device |
CN104805856A (en) * | 2015-03-31 | 2015-07-29 | 成都聚智工业设计有限公司 | Water lowering and drainage mechanism |
CN106480894A (en) * | 2015-07-07 | 2017-03-08 | 苏州汇诚智造工业设计有限公司 | Force reduction pool bottom construction or the manufacture method of strengthening construction automatic drain system |
CN104988936B (en) * | 2015-07-07 | 2017-01-18 | 郭广军 | Automatic drain system for bottom plate construction or reinforcement construction of stilling pool |
CN104988936A (en) * | 2015-07-07 | 2015-10-21 | 苏州汇诚智造工业设计有限公司 | Automatic drain system for bottom plate construction or reinforcement construction of stilling pool and manufacturing and use method thereof |
CN106480894B (en) * | 2015-07-07 | 2018-11-06 | 泗洪仁益自来水有限公司 | The manufacturing method of force reduction pool bottom construction or strengthening construction automatic drain system |
CN105350552A (en) * | 2015-09-25 | 2016-02-24 | 中国二十冶集团有限公司 | Underground water control method for backfilled sediment layer |
CN106632871A (en) * | 2017-01-04 | 2017-05-10 | 广东锦绣天地市政工程有限公司 | High-strength anti-breaking plastic steel sheet pile |
CN106632871B (en) * | 2017-01-04 | 2018-09-14 | 广东锦绣天地市政工程有限公司 | A kind of anti-plastic-steel sheet pile that fractures of high intensity |
CN106836252A (en) * | 2017-03-14 | 2017-06-13 | 中国十七冶集团有限公司 | Tower crane combination precipitation pipe well forms the construction method of natural drainage and recycling |
CN108868063A (en) * | 2018-06-07 | 2018-11-23 | 上海宝冶集团有限公司 | A kind of method for constructing terrace |
CN108867674A (en) * | 2018-08-17 | 2018-11-23 | 南京吉士达防水工程有限公司 | Basement waterproofing keeps the temperature drainage system |
CN112921999A (en) * | 2021-01-26 | 2021-06-08 | 中建四局第一建筑工程有限公司 | Structure of integrated circulating system for recycling rainwater in drainage zone of lower layer of bottom plate of high-water-level basement and construction method of structure |
Also Published As
Publication number | Publication date |
---|---|
CN102535488B (en) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535488B (en) | Waterproof construction method for bottom plate of high-water-level basement | |
CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN105544576B (en) | A kind of foundation pit Yield rainfall relation excavation method | |
LU500273B1 (en) | New comprehensive dewatering and drainage method and drainage device for mudstone subway station | |
CN102383437B (en) | Well point positioned pumping tubular well and well point positioned pumping method | |
CN110004935A (en) | A local deep pit diversion drainage ditch system and construction method | |
CN110397050B (en) | Beam-anchor type light drainage retaining wall and construction method thereof | |
CN112281882A (en) | Method for treating water and sand gushing from substrate | |
CN105569094A (en) | Water discharge and drainage system and construction method adopting basement bottom plate water buoyant force releasing method | |
CN111236284A (en) | A method and structure for groundwater drainage at the bottom of a basement and surrounding areas | |
CN202440826U (en) | Waterproof system for high-water level basement foundation slabs | |
CN113931209A (en) | Large-area deep foundation pit weakly permeable stratum underground water level control method | |
CN104234089B (en) | The construction method that a kind of basement guarded drainage combines | |
CN214245855U (en) | Water-proof pressure-control anti-floating structure | |
CN205662938U (en) | Drainage excavation structure falls in foundation ditch | |
CN112195980A (en) | Water-resisting pressure-controlling anti-floating structure and construction method | |
CN205077527U (en) | Drainage system is dredged to basement bottom plate release water buoyancy method | |
CN106638641B (en) | Base pit dewatering well structure and its construction method | |
CN112523272B (en) | Anti-floating blind ditch for strongly weathered rock stratum and construction method thereof | |
CN211547830U (en) | Structure for preventing ground from being wetted | |
CN203654332U (en) | Novel water prevention and dredge construction structure of basement | |
CN114737589A (en) | Foundation pit shallow layer drainage method | |
JP5669192B2 (en) | Quay structure or revetment structure | |
CN221167881U (en) | Foundation pit hydrophobic structure suitable for under rich water stratum condition | |
CN113106995A (en) | Strong drainage system of ultra-large deep foundation pit and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140326 |
|
CF01 | Termination of patent right due to non-payment of annual fee |