[go: up one dir, main page]

CN102303369A - 预制方涵的工艺方法 - Google Patents

预制方涵的工艺方法 Download PDF

Info

Publication number
CN102303369A
CN102303369A CN201110253791A CN201110253791A CN102303369A CN 102303369 A CN102303369 A CN 102303369A CN 201110253791 A CN201110253791 A CN 201110253791A CN 201110253791 A CN201110253791 A CN 201110253791A CN 102303369 A CN102303369 A CN 102303369A
Authority
CN
China
Prior art keywords
mould
concrete
framework
steel reinforcement
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110253791A
Other languages
English (en)
Inventor
张涛
郎鸿鹄
佟晏旭
张靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzyang City Subway Administration Co Ltd
Original Assignee
Shenzyang City Subway Administration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzyang City Subway Administration Co Ltd filed Critical Shenzyang City Subway Administration Co Ltd
Priority to CN201110253791A priority Critical patent/CN102303369A/zh
Publication of CN102303369A publication Critical patent/CN102303369A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

一种预制方涵的工艺方法,用靠模制作钢筋骨架;钢筋骨架入模,另一侧端模就位,同时内模张开就位,整体加固;浇筑混凝土,采用附着振捣器与振捣棒结合振捣方式,采用棚式无压蒸养方式,控制蒸汽养护升温、降温的时间及幅度;混凝土经收水、压光、静养,进行无压蒸养;修补后对方涵构件进行水养,水养的方式可采取喷淋、水泡两种方式进行。用方涵构件铺设地下综合管廊可以有效地避免拉链马路现象的出现,只需要在内部进行布线,不需将道路重复挖掘。一旦有新的线缆加入,只要从入口进入即可。

Description

预制方涵的工艺方法
技术领域
本发明涉及一种地下综合管廊施工构件,特别是一种高精度钢筋混凝土预制方涵构件制作的工艺方法。
背景技术
过去,城市中的马路下面常铺设有通讯、电力、热力、给水等管线,当这些管线遇到故障需要维修时,经常是随时先将马路的路面破坏掉,再挖掘找出管线故障进行修理。城市地下管线相当于条条动脉通道,一旦有故障,便会影响到整个城市的秩序、人们工作和生活的运转;如果当处理地下管路故障时,要经常反复的挖掘马路,不仅会带来整个城市造成交通秩序的混乱,同时会造成人力、物力、财力及能源等多方面资源的浪费。
发明内容
为实现城市管廊工程健设,集电力、通讯、给水、热力等各种管线于一体集约化隧道,本发明公开了一种管件预制方涵的工艺方法。
本发明的技术方案是:一种预制方涵的工艺方法,其特征在于方涵的工艺步骤是:首先,用靠模制作钢筋骨架;钢筋骨架及予埋件安装入模,在钢筋骨架上装塑料专用保护垫块后,钢筋骨架入模前,外模先就位,同时端模就位一侧,内模缩紧,钢筋骨架入模,另一侧端模就位,同时内模张开就位,整体加固;浇筑运至构件模具相应位置进行钢筋笼安装,同时完成各种预埋件的安装,浇筑混凝土,采用附着振捣器与振捣棒结合振捣方式,振动至混凝土与侧板接触所处没有有喷射状气泡、水泡,表面浮浆不再下沉为止;使用木抹进行收水,使构件面平整;使用钢抹精工抹平静养采用棚式无压蒸养方式,控制蒸汽养护升温、降温的时间及幅度;混凝土经收水、压光、静养,进行无压蒸养;当构件强度达到时,先拆除端模、再拆除外模、同时收紧内模,通过升起底部模板使构件顶部与内模脱离,方涵构件制成,底模与构件平移出模具;;对方涵构件局部缺陷进行修补,修补后对方涵构件进行水养,水养的方式可采取喷淋、水泡两种方式进行。
本发明的有益效果是:地下综合管廊可以有效地避免拉链马路现象的出现,建成之后,只需要在内部进行布线,不需将道路重复挖掘。一旦有新的线缆加入,只要从入口进入即可。地下综合管廊的建设还起到美化城市的作用,不再设电线杆、电缆线,使城市建设整洁有序。管廊的顶部可安装“电子眼”进行全天候监控。当管网遇到问题时,管廊可以凭借监控系统第一时间找出问题。
附图说明
图1是本发明的工艺流程图。
图2是本发明方涵构件的内模、外模的组装结构示意图,图中的1表示的是内模,2是外模。
图3是本发明方涵构件的端模组装结构示意图,图中的3和4表示的是端模。
具体实施方案
钢模组装:
模具进场后清理、拼装,模具组装后精度检验,然后将钢模刷脱模剂;
用靠模制作钢筋骨架:
制作钢筋骨架钢筋下料,进行钢筋骨架焊接,钢筋骨架焊接在靠模内进行;
钢筋骨架入模:
钢筋骨架及予埋件安装经检查入模,在钢筋骨架上指定位置装上塑料专用保护垫块后,由吊机配合专用吊具按规格把钢筋笼吊放入模具,各个模具节点就位后安装连接螺栓校紧,钢筋骨架入模后,将钢筋骨架进行校正。对横向、纵向的螺栓孔位置、保护层等进行校正、实测后进行方涵构件混凝土的浇筑、振捣。
端模、内模、外模安装:
钢筋骨架入模前,外模先就位,同时端模就位一侧,内模缩紧,内部清理干净,钢筋骨架入模,另一侧端模就位,同时内模张开就位,整体加固。
混凝土浇筑、振捣
混凝土在混凝土搅拌站进行配比,再注入混凝土浇筑料斗进行混凝土浇筑,坍落度控制在80±10mm范围内,最大不宜超过100mm。采用附着振捣器与振捣棒结合振捣方式,振动至混凝土与侧板接触所处不再有喷射状气泡、水泡,表面浮浆不再下沉为止。振动实后振捣棒必须慢慢拨出,振捣过程中注意预埋管件及吊装孔位置的振捣质量,并加强对预埋件的保护。
全部振动成型完成后,应抹平上部混凝土,修整表面,清理上部模具周边的混凝土灰浆。
表面收水:
去掉上部多余混凝土进行粗抹。然后使用木抹进行收水,使构件面平整。使用钢抹精工抹平,力求使表面光亮无印。每个方涵构件收水过程不少于四次。确保生产的构件内实外美,平整光滑。混凝土表面压光完进入静养阶段。
静停:
混凝土浇筑完成后清理顶部混凝土,同时对上表面混凝土抹平、收水、压光,静停等待混凝土强度提升。混凝土强度提升中,加强角处的芯棒应反复转动,待混凝土强度达到初凝后拆除。
蒸养罩蒸养:
方涵构件采用棚式无压蒸养方式,根据混凝土强度上升原理,控制蒸汽养护升温、降温的时间及幅度。混凝土经收水压光后静养1~2小时后,进行无压蒸养。升温梯度每小时不超过15℃,最高温度为50℃;降温梯度每小时不超过10℃,在整个蒸养过程中有专人负责检查并作好记录,蒸汽养护根据时间数据调整情况采用微机控制系统进行控制。
脱模:
混凝土强度达到可吊装的强度后先拆除端模、再拆除外模、同时收紧内模,底部模板通过千斤顶起升后构件顶部与内模脱离,方涵构件制成,将方涵构件与底模同时平移出模具,脱模时的方涵构件表面温度与环境温度之差不大于20℃。
构件修补、养护:
方涵构件吊装到存放场地后,对方涵构件进行标注(生产日期、产品型号等),同时对方涵构件局部缺陷进行修补,修补后对方涵构件进行水养,水养的方式可采取喷淋、水泡两种方式进行。
构件修补、养护:
对成品构件进行结构尺寸检测,外观检测等相关规范、标准的规定,同时对构件再次进行检查修补、养护,合格产品进行标识等待出厂。
实施例
方涵构件的内尺寸为;宽2600mm×高2400mm×长1500mm,壁厚250mm。
为此,可根据需要管路的长度,将方涵构件组合起来构件地下综合管廊。
预制方涵的端模是根据方涵构件两侧凸凹形式对接的,方涵构件连接还安装遇水膨胀胶条,以确保密封性。
预制方涵的主要原材料为水泥、粉煤灰、砂子、碎石、外加剂、钢筋、预埋铁件等。其中混凝土采用C40防水混凝土,配合比为:水泥360kg、粉煤灰80kg、砂子778kg、碎石1075kg、水150kg、外加剂6.6kg、钢筋550kg。适量掺入微膨胀剂,确保抗渗等级达到P6,抗冻等级F200。

Claims (1)

1.一种预制方涵的工艺方法,其特征在于方涵构件的工艺步骤是:首先,用靠模制作钢筋骨架;钢筋骨架及予埋件安装入模,在钢筋骨架上装塑料专用保护垫块后,钢筋骨架入模前,外模先就位,同时端模就位一侧,内模缩紧,钢筋骨架入模,另一侧端模就位,同时内模张开就位,整体加固;浇筑运至构件模具相应位置进行钢筋笼安装,同时完成各种预埋件的安装,浇筑混凝土,坍落度控制在80±10mm范围内;采用附着振捣器与振捣棒结合振捣方式,振动至混凝土与侧板接触所处没有有喷射状气泡、水泡,表面浮浆不再下沉为止;使用木抹进行收水,使构件面平整;使用钢抹精工抹平静养采用棚式无压蒸养方式,控制蒸汽养护升温、降温的时间及幅度;混凝土经收水、压光、静养1~2小时后,进行无压蒸养;升温梯度每小时不超过15℃,最高温度为50℃;降温梯度每小时不超过10℃;当构件强度达到时,先拆除端模、再拆除外模、同时收紧内模,通过升起底部模板使构件顶部与内模脱离,方涵构件制成,底模与构件平移出模具;脱模时的方涵构件表面温度与环境温度之差不大于20℃;对方涵构件局部缺陷进行修补,修补后对方涵构件进行水养,水养的方式可采取喷淋、水泡两种方式进行。
CN201110253791A 2011-08-31 2011-08-31 预制方涵的工艺方法 Pending CN102303369A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110253791A CN102303369A (zh) 2011-08-31 2011-08-31 预制方涵的工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110253791A CN102303369A (zh) 2011-08-31 2011-08-31 预制方涵的工艺方法

Publications (1)

Publication Number Publication Date
CN102303369A true CN102303369A (zh) 2012-01-04

Family

ID=45377335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110253791A Pending CN102303369A (zh) 2011-08-31 2011-08-31 预制方涵的工艺方法

Country Status (1)

Country Link
CN (1) CN102303369A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104085040A (zh) * 2014-06-27 2014-10-08 中国长江三峡集团公司 预制箱梁的制造方法
CN106808578A (zh) * 2017-01-18 2017-06-09 贾登忠 一种上下分体式预制管廊及预制方法
CN108149709A (zh) * 2017-12-28 2018-06-12 中铁十局集团第五工程有限公司 地下综合管廊预制拼装施工方法
CN108246933A (zh) * 2017-12-20 2018-07-06 江苏诚意住宅工业科技发展有限公司 一种城市综合管廊钢筋骨架成型工装靠模
CN109356126A (zh) * 2018-11-22 2019-02-19 中水电第十工程局(郑州)有限公司 对半预制廊道结构及廊道施工方法
CN112092181A (zh) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 一种装配式预制方涵成型装置及其制作工艺
CN112659332A (zh) * 2020-12-25 2021-04-16 河北东风世景轨道有限公司 一种预制混凝土方涵模具
CN112959472A (zh) * 2021-04-30 2021-06-15 江苏中铁路通装配科技有限公司 混凝土预制模具及其出模方法
CN112982280A (zh) * 2021-02-07 2021-06-18 中铁广州工程局集团深圳工程有限公司 一种码头胸墙管廊模板结构及施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201693658U (zh) * 2010-06-28 2011-01-05 中铁二十局集团有限公司 简支箱梁成型模板
CN201706075U (zh) * 2010-06-04 2011-01-12 朝阳市天龙大型水泥管道(集团)有限公司 钢筋混凝土方型管

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201706075U (zh) * 2010-06-04 2011-01-12 朝阳市天龙大型水泥管道(集团)有限公司 钢筋混凝土方型管
CN201693658U (zh) * 2010-06-28 2011-01-05 中铁二十局集团有限公司 简支箱梁成型模板

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘宁 等: "北京地铁5号线混凝土盾构管片预制技术", 《混凝土》 *
喻伟: "管片生产监理的质量控制要点", 《建设监理》 *
李民强: "预制钢筋混凝土管片生产工法", 《混凝土与水泥制品》 *
李海潮 等: "盾构施工混凝土管片预制质量控制浅析", 《南水北调与水利科技》 *
谈永泉 等: "我国预制混凝土衬砌管片生产技术现状及发展趋势", 《混凝土与水泥制品》 *
郑清君 等: "狮子洋隧道盾构管片试生产技术", 《铁道标准设计》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104085040A (zh) * 2014-06-27 2014-10-08 中国长江三峡集团公司 预制箱梁的制造方法
CN106808578A (zh) * 2017-01-18 2017-06-09 贾登忠 一种上下分体式预制管廊及预制方法
CN108246933A (zh) * 2017-12-20 2018-07-06 江苏诚意住宅工业科技发展有限公司 一种城市综合管廊钢筋骨架成型工装靠模
CN108149709A (zh) * 2017-12-28 2018-06-12 中铁十局集团第五工程有限公司 地下综合管廊预制拼装施工方法
CN109356126A (zh) * 2018-11-22 2019-02-19 中水电第十工程局(郑州)有限公司 对半预制廊道结构及廊道施工方法
CN109356126B (zh) * 2018-11-22 2023-10-31 中电建十一局工程有限公司 对半预制廊道结构及廊道施工方法
CN112092181A (zh) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 一种装配式预制方涵成型装置及其制作工艺
CN112659332A (zh) * 2020-12-25 2021-04-16 河北东风世景轨道有限公司 一种预制混凝土方涵模具
CN112982280A (zh) * 2021-02-07 2021-06-18 中铁广州工程局集团深圳工程有限公司 一种码头胸墙管廊模板结构及施工方法
CN112959472A (zh) * 2021-04-30 2021-06-15 江苏中铁路通装配科技有限公司 混凝土预制模具及其出模方法

Similar Documents

Publication Publication Date Title
CN102303369A (zh) 预制方涵的工艺方法
CN108149706B (zh) 一种现浇暗梁及叠合板拼接的预制装配式综合管廊及其施工方法
CN103924711B (zh) 装配式网格剪力墙结构体系的施工工艺
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN106346595A (zh) 混凝土综合管廊立式成型模具、系统及其使用方法
CN107268878B (zh) 预制夹芯墙板的制作安装方法
CN104947719B (zh) 地下室顶板后浇带吊支模结构的后浇带施工方法
CN108505805B (zh) 膨胀加强带控裂大型现浇水池及其施工方法
CN105862916A (zh) 叠合装配式地下管廊体系及施工制作工艺
CN103410317A (zh) 采用墙体预制构件现场拼装并浇筑的整体墙体施工方法
CN104005502A (zh) 一种预制轻质楼盖板及工业化建筑房屋楼层板结构
CN109537851A (zh) 一种装配式管井的预制方法
CN105780976B (zh) 复合混凝土剪力墙结构及其混凝土浇筑方法
CN106801436B (zh) 一种叠合装配式地下综合管廊的施工方法
CN110219667B (zh) 隧道仰拱与仰拱填充层替代钢混组合结构及施工工艺
CN103469806A (zh) 一种预制砼基础承台侧模替代砖胎模的施工方法
CN108086353B (zh) 一种用现浇暗梁拼接的空芯墙板混合预制装配式综合管廊及其施工方法
CN112112295A (zh) 一种后封闭外墙后浇带加固施工方法
CN106760110A (zh) 基于bim压型钢板‑钢筋混凝土空腹夹层楼盖施工工法
CN103590603A (zh) 大跨度多曲率薄壳钢筋混凝土结构施工方法
CN109025268A (zh) 厨卫间混凝土翻边施工方法
CN102619236A (zh) 复式冷箱基础施工方法
CN105350581A (zh) 一种地下室顶板沉降后浇带提前封闭构造
CN114059654A (zh) 一种污水处理站改良型aao生物池跳仓法快速施工方法
CN206374015U (zh) 混凝土综合管廊立式成型模具及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120104