CN102209183B - system and method for monitoring program making process and cost - Google Patents
system and method for monitoring program making process and cost Download PDFInfo
- Publication number
- CN102209183B CN102209183B CN201010135249.5A CN201010135249A CN102209183B CN 102209183 B CN102209183 B CN 102209183B CN 201010135249 A CN201010135249 A CN 201010135249A CN 102209183 B CN102209183 B CN 102209183B
- Authority
- CN
- China
- Prior art keywords
- program
- control device
- information
- task
- cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000004519 manufacturing process Methods 0.000 claims abstract description 17
- 238000012544 monitoring process Methods 0.000 abstract 2
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000008713 feedback mechanism Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Images
Landscapes
- Stored Programmes (AREA)
Abstract
The invention, which belongs to the production technical field of a TV station program, discloses a system and a method for monitoring a program making process and a program making cost. In the prior art, because the completion situation of a program making task and cost information of the program making can not be known timely, a potential safety hazard exists and costs of finished programs can not be checked. According to the monitoring method provided in the invention, a selected topic is established by a topic selection device, and the established selected topic is sent to a control device; a production program task /production program tasks is/ are sent to a or a plurality of production devices by the control device according to the content of the selected topic; After the production device /the production devices receive/ receives the task/ the tasks, a program is produced; and result information of program production and cost information of program production are feedbacked to the control device; and the task completion state/ states and cost information are updated by the control device according to the information feedbacked by the production device/devices. According to the invention, information of a program making flow can be grasped timely, and the check on the program cost can be realized easily.
Description
Technical field
The invention belongs to station synchronization production technical field, be specifically related to a kind of supervisory control system and the method for program making process and cost.
Background technology
In station synchronization manufacturing process, Subject Selection personnel, in planning first phase program, can create the selected topic according to factors such as program source, types, issue the relevant collection of material task of including to acceptance system, acquisition system, manufacturing system etc. simultaneously.After task issues, because task reception staff is the people who belongs to different departments from practical operation personnel etc., be often dispersed in even strange land of different rooms and floor, traditional communication mode often can not be reacted the actual implementation status of task timely.Subject Selection personnel are issuing after task, and compiling single member needs scheduling programs, and programme needs broadcasting list to broadcasting after completing.Owing to cannot recognizing in time the performance of task, whether unclear actual no the ging wrong of program making meeting, can change, and therefore usually compiling a large amount of repeated works repeatedly of monocycle festival-gathering generation.And ageing very strong program tends to, because execution information can not be grasped to have influence on completely to be compiled list and broadcast, therefore produce in a large number without the single program directly broadcasting of volume.Because programme and actual broadcast are recorded inconsistently, thereby there is hidden danger in fail safe.
In addition, because the information of links in program making process is all disperseed, therefore cause carrying out cost accounting to final finished product program, program exchange is had a negative impact.
Summary of the invention
For the defect existing in prior art, the object of this invention is to provide a kind of supervisory control system and the method for program making process and cost.This system and method can solve the problem that executing state cannot be monitored and program making cost accounting information dispersion lacks of task in program making process.
To achieve these goals, the technical solution used in the present invention is as follows:
A supervisory control system for program making process and cost, comprising:
Titles selector, for creating the selected topic;
Control device, issues program making task for the selected topic creating according to titles selector;
Generating apparatus, generates program for the task of issuing according to control device, and program is generated to object information and program manufacturing cost information feeds back to control device;
Described control device is also for receiving after the information that generating apparatus returns, more new task completion status information and cost information.
The supervisory control system of program making process as above and cost, wherein, generating apparatus comprises the device of including for including program, for gathering the harvester of program, and producing device for programming.Receive if include device the task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device, if harvester receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device, if producing device receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device.
The supervisory control system of program making process as above and cost, wherein, generating apparatus immediately program is generated to object information after program generates and program manufacturing cost information feeds back to control device.
A method for supervising for program making process and cost, comprises the following steps:
Create the selected topic and the selected topic of establishment is sent to control device;
Control device sends to one or more generating apparatus the program task that generates according to content topic;
Generating apparatus receives after task, generates program, and program is generated to object information and program manufacturing cost information feeds back to control device;
Control device is according to more new task completion status and cost information of generating apparatus feedack.
The method for supervising of program making process as above and cost, wherein, the mode of generating apparatus generation program comprises to be included, gathers and makes.
The method for supervising of program making process as above and cost wherein, immediately generates program object information and program manufacturing cost information feeds back to control device after program generates.
System and method of the present invention, in program making process, by setting up the mode of tasks carrying situation and cost information immediate feedback mechanism, can trigger next step flow process without compartment of terrain, make Subject Selection personnel and compile single member and grasp in time programming process information, arranged rational work.Meanwhile, by the unified management of cost information, the cost of whole program making links is very clear, can realize easily the cost of program is adjusted.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of supervisory control system in embodiment;
Fig. 2 is structure and the data flow diagram of supervisory control system in embodiment;
Fig. 3 is the flow chart of method for supervising in embodiment;
Fig. 4 is the structure chart of data object in embodiment.
Embodiment
Below in conjunction with embodiment and accompanying drawing, describe the present invention.
The present invention is mainly used in station synchronization production field, and Fig. 1 is the structured flowchart of a kind of execution mode of supervisory control system of the present invention.This system comprises titles selector 11, the control device 12 being connected with titles selector 11, and the generating apparatus 13 being connected with control device 12.
Generating apparatus 13 comprises multiple devices, and the different modes generating according to program is set.In present embodiment, generating apparatus 13 comprises includes device 131, harvester 132 and producing device 133.Include device 131 for including program, harvester 132 is for gathering program, and producing device 133 is for programming.Other modes that generating apparatus 13 can generate according to program are expanded.
In said system, control device 12 is core apparatus, and unified interface is externally provided, and other install according to interface specification calling interface.Like this, control device 12 can access other devices easily, convenient expansion.Control device 12 is collected all titles selectors 11 and is selected a topic, and according to the selected topic, program generation task is handed down to include, gather, the generating apparatus 13 such as making, by unified to control device 12 various generating apparatus 13 feedacks, more new task completes object information and cost information again.
Fig. 2 is an example of system shown in Figure 1.Control device 12 with include device 131, harvester 132 and producing device 133 and be connected.Control device 12 is selected a topic according to titles selector 11, and task is handed down to and includes device 131, harvester 132 and/or producing device 133.Include, collection and/or producing device receive after task, generate program, and object information and cost information fed back to control device 12.
Fig. 3 is the method flow diagram that adopts system shown in Figure 1 monitor programme manufacturing process and cost of manufacture.The method comprises the following steps:
(1) create the selected topic and the selected topic of establishment is sent to control device.
(2) control device sends to one or more generating apparatus the program task that generates according to content topic.
(3) generating apparatus receives after task, generates program, and generation object information and manufacturing cost information are fed back to control device.
The mode of generating apparatus generation program comprises to be included, gathers and makes, and correspondence is included device, harvester and producing device respectively.Receive if include device the task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device.If harvester receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device.If producing device receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device.
(4) control device is according to more new task completion status and cost information of generating apparatus feedack.
Fig. 4 is the structure chart of data object in present embodiment.Selected topic information comprises selected topic state information and selected topic cost information, and selected topic cost information forms by including cost, acquisition cost and cost of manufacture etc.Selected topic information externally provides unified interface.This structure has facilitated the expansion of selected topic information subclass, and the expansion of selected topic cost information subclass.If increase other guide in selected topic information, or the mode of composition selected topic cost information increases, and is easy to new content to add in system.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technology thereof, the present invention is also intended to comprise these changes and modification interior.
Claims (2)
1. a supervisory control system for program making process and cost, comprising:
Titles selector (11), for creating the selected topic;
Control device (12), issues program making task for the selected topic creating according to titles selector (11);
Generating apparatus (13), generates program for the task of issuing according to control device (12), and after program generates, immediately program is generated to object information and program manufacturing cost information feeds back to control device (12), generating apparatus (13) comprises includes device (131) for what include program, for gathering the harvester (132) of program, and producing device (133) for programming, receive if include device (131) task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device (12), if harvester (132) receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device (12), if producing device (133) receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device (12),
Described control device (12) is also for receiving after the information that generating apparatus (13) returns, more new task completion status information and cost information.
2. a method for supervising for program making process and cost, is characterized in that comprising the following steps:
Create the selected topic and the selected topic of establishment is sent to control device;
Control device sends to one or more generating apparatus the program task that generates according to content topic;
Generating apparatus receives after task, generates program, and immediately program is generated to object information and program manufacturing cost information feeds back to control device after program generates, generating apparatus comprises the device of including for including program, for gathering the harvester of program, and producing device for programming, receive if include device the task of including, start to include program according to the task of including, after having included, will include object information and include cost information immediate feedback to control device, if harvester receives acquisition tasks, start to gather program according to acquisition tasks, after collection completes by collection result information and the immediate feedback of acquisition cost information to control device, if producing device receives making task, start to programme according to making task, after completing, will make object information and the immediate feedback of cost of manufacture information to control device,
Control device is according to more new task completion status and cost information of generating apparatus feedack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010135249.5A CN102209183B (en) | 2010-03-29 | 2010-03-29 | system and method for monitoring program making process and cost |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010135249.5A CN102209183B (en) | 2010-03-29 | 2010-03-29 | system and method for monitoring program making process and cost |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102209183A CN102209183A (en) | 2011-10-05 |
CN102209183B true CN102209183B (en) | 2014-06-04 |
Family
ID=44697828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010135249.5A Expired - Fee Related CN102209183B (en) | 2010-03-29 | 2010-03-29 | system and method for monitoring program making process and cost |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102209183B (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1416263A (en) * | 2002-11-26 | 2003-05-07 | 廖作全 | System for controlling and managing post production facilities in TV station |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3529759B2 (en) * | 2001-01-26 | 2004-05-24 | 株式会社ソニー・コンピュータエンタテインメント | Image processing program, computer-readable recording medium storing image processing program, program execution device, image processing device, and image processing method |
-
2010
- 2010-03-29 CN CN201010135249.5A patent/CN102209183B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1416263A (en) * | 2002-11-26 | 2003-05-07 | 廖作全 | System for controlling and managing post production facilities in TV station |
Non-Patent Citations (2)
Title |
---|
电视编辑机房制作设备管理系统设计方案;皇甫潇红;《广播电视信息》;20080531;88-90 * |
皇甫潇红.电视编辑机房制作设备管理系统设计方案.《广播电视信息》.2008,88-90. |
Also Published As
Publication number | Publication date |
---|---|
CN102209183A (en) | 2011-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106815071A (en) | Big data job scheduling system based on directed acyclic graph | |
CN104494653B (en) | A kind of track traffic synthetic monitoring system | |
CN104639587A (en) | Robot fault monitoring system and method based on Internet of Things | |
CN104460589B (en) | Mobile debugging system with simulation dispatching master station | |
CN110969286B (en) | Building operation safety diagnosis and analysis system and method based on Internet of things data | |
CN202975721U (en) | Intelligent stage control system based on intelligent visual positioning technology | |
EP3690561A1 (en) | Method and system for 3d visually monitoring a building, and memorizer | |
CN107341609B (en) | Energy efficiency management system and method based on cloud platform | |
CN101807075B (en) | Automatic control system of hot rolled strip steel leveling unit | |
CN102222270A (en) | Production-manufacturing executing management system and production task manager as well as process position terminals | |
CN104484751A (en) | Dynamic optimization method and device for production planning and resource allocation | |
CN103699760B (en) | A kind of multilayer closed-loop main station detection data source simulation method | |
CN102209183B (en) | system and method for monitoring program making process and cost | |
CN102169343A (en) | Programmed remote operation system and method of grid centralized monitoring center | |
CN103731319B (en) | Distribution scheduling platform remote control trouble intelligent diagnosing method | |
CN101753386A (en) | Method and system for setting networking of alarm equipment and home appliance equipment of residential district | |
CN106655520B (en) | Ensure the method that relay protection remote operation securely and reliably executes | |
CN106059073A (en) | Programmed control method based on cooperative misoperation prevention of master station and substation | |
TWI235900B (en) | System and method for managing equipments | |
CN102883350A (en) | Equipment information collection method and system | |
WO2019033296A1 (en) | Interactive management system for smart control of air conditioner based on internet of things | |
CN105488573A (en) | Substation inspection management method based on online and offline modes | |
CN105335145B (en) | Operating result processing method, apparatus and system | |
CN219351760U (en) | Programmable intelligent industrial control gateway | |
CN102393820A (en) | Logical implementation method for controlling building monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140604 Termination date: 20170329 |