[go: up one dir, main page]

CN102146665B - Treatment method for slowing gully erosion - Google Patents

Treatment method for slowing gully erosion Download PDF

Info

Publication number
CN102146665B
CN102146665B CN201010595193A CN201010595193A CN102146665B CN 102146665 B CN102146665 B CN 102146665B CN 201010595193 A CN201010595193 A CN 201010595193A CN 201010595193 A CN201010595193 A CN 201010595193A CN 102146665 B CN102146665 B CN 102146665B
Authority
CN
China
Prior art keywords
gully
ditch head
ditch
head
coombe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010595193A
Other languages
Chinese (zh)
Other versions
CN102146665A (en
Inventor
彭辉
纪中华
潘志贤
杨艳鲜
岳学文
钱坤建
方晋
奎建蕊
方海东
沙毓沧
李建增
袁理春
史亮涛
龙会英
张明忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RESEARCH INSTITUTE OF TROPICAL ECO-AGRICULTURAL SCIENCES YUNAN ACADEMY OF AGRICULTURAL SCIENCES
Original Assignee
RESEARCH INSTITUTE OF TROPICAL ECO-AGRICULTURAL SCIENCES YUNAN ACADEMY OF AGRICULTURAL SCIENCES
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RESEARCH INSTITUTE OF TROPICAL ECO-AGRICULTURAL SCIENCES YUNAN ACADEMY OF AGRICULTURAL SCIENCES filed Critical RESEARCH INSTITUTE OF TROPICAL ECO-AGRICULTURAL SCIENCES YUNAN ACADEMY OF AGRICULTURAL SCIENCES
Priority to CN201010595193A priority Critical patent/CN102146665B/en
Publication of CN102146665A publication Critical patent/CN102146665A/en
Application granted granted Critical
Publication of CN102146665B publication Critical patent/CN102146665B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a treatment method for slowing gully erosion, and belongs to the technical field of water and soil conservation. The method comprises four parts, namely gully selection, gully head treatment, gully bottom treatment and gully head wall treatment. In the gully, the slope of the left gully wall or the gully wall is less than or equal to 45 degrees and the height of the gully head wall is less than or equal to 5 meters; jatropha curcas and dodonaea viscose are planted above the gully head to form an inverted U-shaped buffer plant hedge belt above the gully head; timber piles are embedded into the plant hedge belt crookedly; the width of an inverted U-shaped opening is equal to that of the gully head or the width is 1 to 1.5 meters; the top of the inverted U-shaped curve is 3 to 5 meters away from the gully head; leucaena glauca are planted on the gully bottom to form a U-shaped buffer plant hedge belt on the gully bottom; the bottom of the U-shaped curve is 3 to 5 meters away from the gully head; lianas are planted and the timer piles are embedded into the soil between the buffer plant hedge belts above the gully head and the gully bottom; and the two ends of iron wires are respectively fixed to the timber piles at the gully bottom and above the gully head and are attached to the ground surface. In the method, key points of slowing the gully erosion are grasped; and the treatment configuration mode has high comprehensiveness, scientificity and reasonability.

Description

A kind of improvement method of slowing down gully erosion
Technical field
The invention belongs to the conservation technology field, be specifically related to slow down the improvement method of gully erosion.
Background technology
The dry-hot valley of China be positioned at 23 ° 00 of north latitude '-28 ° 10 ', 98 ° 50 '-103 ° 50 of east longitude ', Forest Space in Dry-hot Valley Yuanmou is in downstream, Jinsha jiang River; And Jinsha jiang River is the upstream portion in the Changjiang river, and ecological environment is extremely fragile here, and land deterioration is serious; Form a large amount of coombes because of storm runoff corrodes, coombe generally is made up of ditch head, bottom of trench and furrow bank, and the source of coombe is called the ditch head; Gathering ground on the ditch head is ditch head top, and the wall of coombe the right and left is called left coombe wall and right coombe wall, and the wall with the bottom of trench coupling part under the ditch head is called Gou Toubi; Because rainwater is when dirty; The earth of gulley head wall at first, therefore, the inventor thinks that the improvement of ditch head wall is more crucial than the improvement of the left and right sides wall of coombe; Gully erosion is the main path of soil erosion; Coombe often is connected with the farmland or directly links to each other with the river; Some big coombe flows into Jinsha jiang River always; When gully erosion was serious, the water and soil silt impulse force that is produced by coombe was bigger, washed away and damaged the farmland and plough thereby pour table soil that the farmland can be more with the nutrient in farmland downwards LeadCause desertification of land; Or the water and soil silt that coombe produced directly gets into the river; Cause harm such as soil erosion, a large amount of water and soil silts that gully erosion produced in Forest Space in Dry-hot Valley Yuanmou district can directly influence the water quality in Jinsha jiang River and the Changjiang river, therefore; How effectively to retain the precipitation of concentrating relatively rainy season, thereby the erosion that slows down coombe is played and is slowed down soil erosion arable land, the river of protection coombe below had great significance.In the prior art to slow down gully erosion usually adopt forbid that people and animals get into the coombe area close and build method such as cement works measure naturally, exist regulation effect poor, cost is crossed high defective.
Summary of the invention
The technical problem that the present invention will solve be overcome prior art adopt forbid that people and animals get into the coombe area close and build method such as cement works measure naturally; Exist regulation effect poor; Cost is crossed high defective, its objective is a kind of improvement method of slowing down gully erosion that provides, to reduce the coombe soil erosion; Arable land, the river of protection coombe below, the while also promotes the soil restoration of coombe itself.
For solving the problems of the technologies described above and realize the object of the invention, technical scheme of the present invention is following:
A kind of improvement method of slowing down gully erosion, this method are by the selection of coombe, and the ditch head is administered, and bottom of trench is administered and ditch head wall is administered four parts composition, and the step of each several part is following:
1, the selection of coombe, selected coombe are the coombe of early development, height≤5 of the left coombe wall of the coombe of described early development or the gradient≤45 of right coombe wall ° and ditch head wall meter;
2, the ditch head is administered, above the ditch head, plant Jatropha curcas ( Jatropha curcasL.) and akeake ( Dodonaea viscosa) plant formation ditch head top buffering plant hedge band; Described ditch head top buffering plant hedge band is inverted U; The bandwidth of its buffering plant hedge band is 1~2 meter, and the U type mouth of described inverted U is relative with the ditch head, and the width of the U type mouth of inverted U equates with the width of ditch head or be wideer 1~1.5 meter than the width of ditch head; The curve top of described inverted U and ditch head vertical distance apart are 3~5 meters, the crooked location embedded set timber of the inverted U of buffering plant hedge band above described ditch head; The seeding row spacing of the plant of being planted is 20cm * 20cm, to reach the dense planting effect;
3, bottom of trench is administered; The ditch bottom buffering plant hedge band that is the U type in the bottom of trench plantation; The curve of described U type bottom is 3~5 meters with the vertical distance of ditch head, and the bandwidth of described ditch bottom buffering plant hedge band is 2~5 meters, the plant of described ditch bottom buffering plant hedge band plantation be white popinac ( Leucaena leucocephala) plant, the seeding row spacing of the plant of being planted is 20cm * 20cm, to reach the dense planting effect;
4, ditch head wall is administered; On the soil between ditch head and the ditch bottom buffering plant hedge band, plant liana; And on this soil embedding timber; The two ends of iron wire are separately fixed on the timber of bottom of trench with ditch head top buffering plant hedge band in timber on, make the face of land attaching between the buffering plant hedge band of iron wire and Gou Toubi and ditch head and ditch head top, climb on iron wire after making the plant growing of being planted.
Embedding timber get final product with the width that the quantity that is fixed on the iron wire on the described timber makes the branches and leaves of the liana of climbing on iron wire can cover ditch head wall.
Described embedding timber can also be the white popinac trunk that adopts cuttage life in 3~5 years.
Described liana be the root of kudzu vine ( Pueraria lobata(Willd.) Ohwi), grape ( Vitis viniferaLinn.) or Fructus Fici tikouae ( Ficus tikoua)
Compared with prior art; The invention has the beneficial effects as follows: 1, prior art is not administered the key position that whole coombe is easy to produce a large amount of soil erosions; Four parts that improvement method of the present invention adopts are administered, the key position of having caught ecological puberty of coombe and gully erosion to administer, and it is comprehensive strong that it administers configuration mode; Scientific and reasonable, resultant effect is good.The present invention at first selects on the object of being administered; Selecting the coombe of early development is that the coombe development time is shorter; Corrode the less coombe of area; This type of coombe administered could produce good regulation effect, if the ditch depth of coombe greater than the gradient of 5 meters and left coombe wall or right coombe wall greater than 45 °, the effect of improvement is often relatively poor.Plant hedge band up and down of the present invention and ditch head wall are administered the reasonable in design ingenious of part; Soil sand was easy to moving area (the curve top of inverted U and ditch head vertical distance apart are bottom 3~5 meters curves with the U type and the vertical distance of ditch head is 3~5 meters zone) when the soil band above the ditch head between buffering plant hedge band and the ditch bottom buffering plant hedge band was rain drop erosion; So; Have above the ditch head buffering plant hedge band above the ditch head retain the precipitation of concentrating relatively rainy season and silt after; Adhere to this soil helps liana to adhere to this regional soil growth also to be easy to the restore vegetation of on the Gou Toubi soil, taking root with iron wire in the zone that this native sand is easy to move; Just far better to this regional erosion regulation effect; The measure of ditch bottom buffering plant hedge band is arranged again, produced the comprehensive regulation mode of the system of slowing down gully erosion.
2, the whole green element that adopts of the present invention adheres to and the ditch head configuration mode of plant hedge up and down the Gou Toubi liana, not only environmental protection but also with low cost, and help the soil restoration of coombe itself.
3, the plant that the plant hedge is selected for use among the present invention is the good seeds of Forest Space in Dry-hot Valley Yuanmou compliance; The drought-enduring high temperature resistant less relatively place of the moisture growth that can become to live above the ditch head of Jatropha curcas and akeake; And plant Jatropha curcas and akeake two kind of plant simultaneously; Constitute bio-diversity, help of the growth of these plants in this soil; White popinac is to breed the darker plant of root system easily, forms good barrier at bottom of trench and holds back water and soil.
4, the inventive method is easy to operate, implements easily.
The specific embodiment
Below in conjunction with embodiment the present invention is further described; The place of each embodiment is the Yuanmou County dry-hot valley in Yunnan Province all; This zone severe water and soil erosion, the coombe of formation is more, even forms " native woods " landforms; Especially damage the farmland in a large number in the gully erosion in rainy season and plough, make a large amount of water and soil flow into Jinsha jiang River.
Embodiment 1
A kind of improvement method of slowing down gully erosion, this method are by the selection of coombe, and the ditch head is administered, and bottom of trench is administered and ditch head wall is administered four parts composition, and its concrete steps are following:
1, the selection of coombe, the gradient of the left coombe wall of selected coombe are that 45 ° of height with ditch head wall are 5 meters;
2, the ditch head is administered; Buffering plant hedge band above plantation Jatropha curcas and akeake plant above the ditch head constitute the ditch head; Described ditch head top buffering plant hedge band is inverted U; The bandwidth of its buffering plant hedge band is 2 meters, and the U type mouth of described inverted U is relative with the ditch head, and the width of the U type mouth of inverted U is wideer 1.5 meters than the width of ditch head; The curve top of described inverted U and ditch head vertical distance apart are 5 meters, the white popinac trunk of 5 lifes in 5 years of cuttage in the crooked location of the inverted U of buffering plant hedge band above described ditch head; The seeding row spacing of the plant of being planted is 20cm * 20cm, to reach the dense planting effect;
3, bottom of trench is administered; The ditch bottom buffering plant hedge band that is the U type in the bottom of trench plantation; The curve bottom of described U type is 3 meters with the vertical distance of ditch head, and the bandwidth of described ditch bottom buffering plant hedge band is 5 meters, and the plant of planting at described ditch bottom buffering plant hedge band is a white popinac; The seeding row spacing of the plant of being planted is 20cm * 20cm, to reach the dense planting effect;
4, ditch head wall is administered; On the soil between ditch head and the ditch bottom buffering plant hedge band, plant vine; And the white popinac trunk of 5 lifes in 3 years of cuttage on this soil; With the two ends of 5 iron wires be separately fixed at life in 3 years of bottom of trench institute cuttage the white popinac trunk (hereinafter to be referred as: bottom of trench white popinac trunk) and the white popinac trunk of lifes in 5 years of institute's cuttage in the ditch head top buffering plant hedge band (hereinafter to be referred as: white popinac trunk above the ditch head); Wherein 3 iron wires and bottom of trench white popinac trunk and ditch head top white popinac trunk one by one line correspondence be connected; In addition 2 iron wires and bottom of trench white popinac trunk and the white popinac trunk interconnection of ditch head top, and cushion the face of land attaching between the plant hedge band above making described iron wire and Gou Toubi and ditch head and ditch head are climbed on iron wire after making the plant growing of being planted.Or be separately fixed on the white popinac trunk of bottom of trench white popinac trunk and ditch head top with 7 iron wires; Wherein 5 iron wires and bottom of trench white popinac trunk and ditch head top white popinac trunk one by one line correspondence be connected; In addition white popinac trunk interconnection above 2 iron wires and bottom of trench white popinac trunk and the ditch head; And the face of land between described iron wire and Gou Toubi and ditch head and the ditch head top buffering plant hedge band is attached, make the plant growing of being planted after climbing on iron wire.
Adopt the part iron wire with the white popinac trunk of the embedding timber of bottom of trench or institute's cuttage and above the ditch head embedding timber or the white popinac trunk interconnection of institute's cuttage; Its objective is that the branches and leaves that make the liana of climbing on iron wire can cover the width of ditch head wall better; Therefore; The quantity of the quantity of described embedding timber or the trunk of cuttage and be fixed on the described timber or width that the quantity of the iron wire on the trunk of cuttage can make the branches and leaves of the liana of climbing on iron wire can cover ditch head wall is advisable (getting final product) can reach the object of the invention; Iron wire the white popinac trunk of the embedding timber of bottom of trench or institute's cuttage with above the ditch head embedding timber or the white popinac trunk of institute's cuttage be that line correspondence is connected or interconnection or the interconnection of part iron wire one by one; All allow; As long as can make width that the branches and leaves of the liana of climbing on iron wire can cover ditch head wall all can, all can reach the object of the invention.
Embodiment 2, and embodiment 3 is except that following measure difference, and all the other measures are identical with embodiment 1, repeat no more.
Embodiment 2
1, the selection of coombe, the left coombe wall of coombe and the gradient of right coombe wall are that 30 ° of height with ditch head wall are 4 meters;
2, the ditch head is administered; The bandwidth of the ditch head top buffering plant hedge band of inverted U is 1.5 meters; The width of the U type mouth of described inverted U is wideer 1 meter than the width of ditch head, and the curve top of described inverted U and ditch head vertical distance apart are 4 meters, buffering plant hedge band above described ditch head 4 timbers of crooked location embedded set of inverted U;
3, bottom of trench is administered, and the vertical distance of curve bottom and ditch head of U type that is the ditch bottom buffering plant hedge band of U type is 4 meters, and the bandwidth of described ditch bottom buffering plant hedge band is 4 meters;
4, ditch head wall is administered, and on the soil between ditch head and the ditch bottom buffering plant hedge band, plants the root of kudzu vine, and 4 of cuttages on this soil 4The white popinac trunk of year giving birth to is separately fixed at the cuttage of bottom of trench institute with the two ends of 4 iron wires 4Cushion on the timber of plant hedge band embedded set with ditch head top on the white popinac trunk of giving birth in year.
Embodiment 3
1, the selection of coombe, the gradient of the right coombe wall of coombe are that 25 ° of height with ditch head wall are 2 meters;
2, the ditch head is administered; The bandwidth of the ditch head top buffering plant hedge band of inverted U is 1 meter; The width of the U type mouth of described inverted U equates that with the width of ditch head the curve top of described inverted U and ditch head vertical distance apart are 3 meters, buffering plant hedge band above described ditch head 3 timbers of crooked location embedded set of inverted U;
3, bottom of trench is administered, and the vertical distance of curve bottom and ditch head of U type that is the ditch bottom buffering plant hedge band of U type is 3 meters, and the bandwidth of described ditch bottom buffering plant hedge band is 2 meters;
4, ditch head wall is administered, and cushions on the timber of plant hedge band embedded set above planting site pomegranate and embedding 3 timbers on the soil between ditch head and the ditch bottom buffering plant hedge band, the timber that the two ends of 3 iron wires is separately fixed at bottom of trench and ditch head.

Claims (4)

1. improvement method of slowing down gully erosion is characterized in that: the described selection that slows down the improvement method of gully erosion by coombe, and the ditch head is administered, and bottom of trench is administered with ditch head wall and is administered four parts composition, and the step of each several part is following:
(1) selection of coombe, selected coombe are the coombe of early development, height≤5 of the left coombe wall of the coombe of described early development or the gradient≤45 of right coombe wall ° and ditch head wall meter;
(2) the ditch head is administered; Buffering plant hedge band above plantation Jatropha curcas and akeake plant above the ditch head constitute the ditch head; Described ditch head top buffering plant hedge band is inverted U; The bandwidth of this buffering plant hedge band is 1~2 meter, and the U type mouth of described inverted U is relative with the ditch head, and the width of the U type mouth of inverted U equates with the width of ditch head or be wideer 1~1.5 meter than the width of ditch head; The curve top of described inverted U and ditch head vertical distance apart are 3~5 meters, the crooked location embedded set timber of the inverted U of buffering plant hedge band above described ditch head; The seeding row spacing of the plant of being planted is 20cm * 20cm;
(3) bottom of trench is administered; The ditch bottom buffering plant hedge band that is the U type in the bottom of trench plantation; The curve bottom of described U type is 3~5 meters with the vertical distance of ditch head; The bandwidth of described ditch bottom buffering plant hedge band is 2~5 meters, and the plant of planting at described ditch bottom buffering plant hedge band is the white popinac plant, and the seeding row spacing of the plant of being planted is 20cm * 20cm;
(4) ditch head wall is administered; Plantation liana and embedding timber on the soil between ditch head and the ditch bottom buffering plant hedge band; With the two ends of iron wire be separately fixed at bottom of trench on the timber of embedding timber and ditch head top buffering plant hedge band embedded set; Make the face of land of iron wire and ditch head wall attach and make the iron wire and the face of land of ditch head to ditch head top buffering plant hedge band to attach, climb on iron wire after making the plant growing of being planted.
2. improvement method of slowing down gully erosion according to claim 1 is characterized in that: described embedding timber makes the branches and leaves of the liana of climbing on iron wire can cover the width of ditch head wall with the quantity that is fixed on the iron wire on the described timber.
3. improvement method of slowing down gully erosion according to claim 1 and 2 is characterized in that: described embedding timber is the white popinac trunk of cuttage life in 3~5 years.
4. improvement method of slowing down gully erosion according to claim 1 is characterized in that: described liana is the root of kudzu vine, grape or Fructus Fici tikouae.
CN201010595193A 2010-12-20 2010-12-20 Treatment method for slowing gully erosion Expired - Fee Related CN102146665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010595193A CN102146665B (en) 2010-12-20 2010-12-20 Treatment method for slowing gully erosion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010595193A CN102146665B (en) 2010-12-20 2010-12-20 Treatment method for slowing gully erosion

Publications (2)

Publication Number Publication Date
CN102146665A CN102146665A (en) 2011-08-10
CN102146665B true CN102146665B (en) 2012-09-26

Family

ID=44421121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010595193A Expired - Fee Related CN102146665B (en) 2010-12-20 2010-12-20 Treatment method for slowing gully erosion

Country Status (1)

Country Link
CN (1) CN102146665B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484225A (en) * 2015-12-25 2016-04-13 中国科学院、水利部成都山地灾害与环境研究所 Method for gully head energy dissipation and gully bank stabilization

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102988466B (en) * 2012-11-20 2016-03-23 亳州市永刚饮片厂有限公司 A kind of production method of Cortex Albiziae decoction pieces
CN104389302B (en) * 2014-10-30 2016-02-10 天津城建大学 A kind of plant in treating method controlling feldspathic sandstone small watershed raceway groove sediment bypassing
CN104303799A (en) * 2014-10-31 2015-01-28 贵州师范大学 Karst slope hedgerow planting method
CN104604494B (en) * 2015-01-26 2017-12-08 云南大学 A kind of cuttage breeding method of Fructus Fici tikouae
CN105325156A (en) * 2015-11-13 2016-02-17 杭州大地科技有限公司 Water and soil conservation method for slope land in torreya grandis forest
CN108288284B (en) * 2018-03-03 2021-07-27 鲁东大学 A method of extracting gully network based on terrain model threshold

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093203C (en) * 1999-05-26 2002-10-23 陈国生 Method for preventing soil erosion of river dike and ditch
RU2255169C1 (en) * 2004-02-16 2005-06-27 ФГОУ ВПО "Чувашская государственная сельскохозяйственная академия" Gully erosion controlling apparatus
WO2007005895A2 (en) * 2005-07-05 2007-01-11 Ertec Environmental Systems Llc Controlling sediment
AT502680B1 (en) * 2006-07-31 2007-05-15 Cordt Gerhard Dipl Ing Dr Protection device for use in gulley, for e.g. snow, sliding from higher location, has supporting device with bars, which run transverse to mass flow and are transferred from locking position to downstream lying opened position
CN101349053A (en) * 2008-08-29 2009-01-21 徐桦 Channel erosion ground valley anti-dam ecological restoring method
CN101893543A (en) * 2010-06-29 2010-11-24 云南省农业科学院热区生态农业研究所 Method for long-term fixed-position measuring soil erosion in gully

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484225A (en) * 2015-12-25 2016-04-13 中国科学院、水利部成都山地灾害与环境研究所 Method for gully head energy dissipation and gully bank stabilization

Also Published As

Publication number Publication date
CN102146665A (en) 2011-08-10

Similar Documents

Publication Publication Date Title
CN102146665B (en) Treatment method for slowing gully erosion
CN102812843B (en) Comprehensive supporting construction technology for road protection forests in heavy saline-alkaline areas in coastal areas
CN104186137B (en) The cultivating green method of beach salt-soda soil, a kind of coastal waters tall grass
CN103004452A (en) Lotus root simple and laborsaving cultivation and loach intercropping method
CN201390967Y (en) Slope ecological protective structure
CN101536643A (en) Saline and alkali land improvement method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN102206005A (en) River ecological reactor system and construction method thereof
CN103422466B (en) A kind of black smelly river regulation and restoration methods
CN107211814A (en) A kind of dust storm forward position Oasis economy shelter-forest implantation methods
CN106381837A (en) Ecological restoration structural system and restoration method for lakeside zone
CN104737735B (en) A method for ecological greening of coastal saline-alkali land by using original soil planting
CN103262747A (en) Interplanting method of shiny-leaved yellowhorn and lycium barbarum
CN102257915A (en) Method for transversely growing yam and interplanting spring and autumn potato under coverage of straw
CN111172943A (en) Ecological construction method for river bank side band in northern low mountain and hilly area
CN101543162B (en) A kind of rapid propagation method of reed bamboo
CN105178269B (en) Low-maintenance durable landscape ecology ditch
CN103321194A (en) Dry land ecological interception channel adopting slope protection technology and construction method thereof
CN109644762A (en) A low-density planting method of rain-fed Haloxylon ammonium sand-fixing forest
CN105393893A (en) Constructing and building method for non-suitable-for-forestry new diked tidal flat coast protection forest backbone shelterbelt
CN106034896B (en) Ili River Valley Hills And Low Mountains abrupt slope cheuch soil erosion biological control method
KR100860241B1 (en) Slope recording method
CN205475268U (en) Ecological protective structure of living matrix is planted to rock slope
CN104264652A (en) Method for arranging movable wheat sand-protecting barrier on moving dune
CN111296146A (en) A composite ecological wind barrier for vegetation restoration on windward slopes of islands

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120926

Termination date: 20191220