[go: up one dir, main page]

CN102134978B - Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof - Google Patents

Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof Download PDF

Info

Publication number
CN102134978B
CN102134978B CN2011100568745A CN201110056874A CN102134978B CN 102134978 B CN102134978 B CN 102134978B CN 2011100568745 A CN2011100568745 A CN 2011100568745A CN 201110056874 A CN201110056874 A CN 201110056874A CN 102134978 B CN102134978 B CN 102134978B
Authority
CN
China
Prior art keywords
pipe
pvc
hole
drilling
pvc material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100568745A
Other languages
Chinese (zh)
Other versions
CN102134978A (en
Inventor
胡郁乐
张晓西
张恒春
罗光强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN2011100568745A priority Critical patent/CN102134978B/en
Publication of CN102134978A publication Critical patent/CN102134978A/en
Application granted granted Critical
Publication of CN102134978B publication Critical patent/CN102134978B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明公开了一种钻孔护壁堵漏或导斜偏钻方法及其所用的PVC盛料管装置。所述方法包括:制备PVC盛料管装置;将所述PVC盛料管装置通过钻杆送入钻孔目标位置;用孔内搅拌钻头在孔内进行局部搅拌,搅碎PVC盛料管,使管内盛料在目标位置充分混合、挤压,与地层胶结合成整体,在短时间内形成人工孔壁,或者快速形成与地层岩石匹配的人工孔底。所使用的PVC盛料管装置至少包括PVC盛料管及孔内搅拌钻头,PVC盛料管通过设于其上端的挂环悬挂于孔内搅拌钻头下端。本发明提供的方法及装置使得下入钻孔时能准确定位,不易流失,凝结时间可控,固结体强度可控,经济有效,操作性好。

Figure 201110056874

The invention discloses a method for plugging or deflecting and deflecting the drill hole and a PVC material holding pipe device used therein. The method includes: preparing a PVC material-filling pipe device; sending the PVC material-holding pipe device into the target position of the drilling hole through a drill pipe; using a stirring drill bit in the hole to perform partial stirring in the hole, breaking the PVC material-filling pipe, and making The material in the pipe is fully mixed and extruded at the target position, and combined with the formation glue to form an artificial hole wall in a short time, or quickly form an artificial hole bottom that matches the formation rock. The used PVC material pipe device at least includes a PVC material pipe and a stirring drill in the hole, and the PVC material pipe is suspended at the lower end of the agitating drill in the hole through a hanging ring arranged at its upper end. The method and device provided by the invention enable accurate positioning when entering into a borehole, are not easy to be lost, have controllable coagulation time, controllable strength of a consolidated body, are economical and effective, and have good operability.

Figure 201110056874

Description

一种钻孔护壁堵漏或导斜偏钻方法及其所用装置A method for plugging or deflecting and deflecting drilling on the retaining wall of a drilling hole and the device used therefor

技术领域 technical field

本发明涉及一种钻孔护壁堵漏或导斜偏钻方法及其所用装置,属于钻探工程领域。The invention relates to a method for plugging leakage or deflecting and deflecting drilling with a retaining wall of a drilling hole and a device used therefor, belonging to the field of drilling engineering.

背景技术 Background technique

迄今为止,钻探是获取地下深部实物资料的惟一技术途径。但由于钻探工程是以不同地质成因的地质体(地层)为工作对象的隐蔽性工程,钻探施工经常遭遇断层带、构造带、破碎带,裂隙、多空隙、空洞等不良地质体,孔内普遍存在漏失、涌水、垮塌、掉块等复杂情况,导致井眼失稳严重,钻探效率低下,事故多,钻井周期长,钻探质量难以得到保障。钻探过程中的常规技术,如泥浆技术、灌浆护壁堵漏技术和套管方案往往不能解决复杂条件下的护壁堵漏问题,或者说技术经济性、可操作性并不能满足现场的要求。So far, drilling is the only technical way to obtain deep underground physical data. However, because the drilling project is a concealed project with geological bodies (strata) of different geological origins as the work object, the drilling construction often encounters unfavorable geological bodies such as fault zones, structural zones, broken zones, fissures, multiple voids, and cavities. There are complex situations such as leakage, water gushing, collapse, and block falling, which lead to serious wellbore instability, low drilling efficiency, many accidents, long drilling cycle, and difficult to guarantee drilling quality. Conventional technologies in the drilling process, such as mud technology, grouting retaining wall plugging technology and casing schemes often cannot solve the problem of retaining wall plugging under complex conditions, or the technical economy and operability cannot meet the requirements of the site.

同时,在钻井过程中,钻井井身轨迹的防斜、稳斜和控斜也是不可回避的问题,为了维持正常钻进,并达到地质目标要求,斜度超标的钻孔需要导斜钻进,进行纠斜;钻孔事故需要绕斜偏钻。这些导斜钻进是一个复杂的技术过程,需要相应的技术条件,但不论是螺杆钻具纠斜还是连续造斜器纠斜,在水泥灌浆形成的人造孔底上进行纠斜时,候凝时间长,也往往由于水泥浆结石体和地层可钻性差别大,不容易按既定方向偏斜,或造斜效率低。At the same time, in the process of drilling, the deflection prevention, stabilization and deflection control of the drilling wellbore trajectory are also unavoidable problems. In order to maintain normal drilling and meet the requirements of geological targets, drilling with an inclination exceeding the standard requires deflection drilling. Perform deflection correction; drilling accidents require drilling around deflection. These deflection drilling is a complex technical process that requires corresponding technical conditions, but whether it is screw drilling tool deflection correction or continuous whipstock deflection correction, when the deflection correction is performed on the bottom of the artificial hole formed by cement grouting, the waiting time It takes a long time, and it is often difficult to deviate in the predetermined direction due to the large difference between the cement slurry stone body and the drillability of the formation, or the deflection efficiency is low.

发明内容 Contents of the invention

为解决现有技术中的上述问题,本发明提供一种钻孔护壁堵漏或导斜偏钻方法及其所用装置,本发明提供的方法及装置使得下入钻孔时能准确定位,不易流失,凝结时间可控,固结体强度可控,经济有效,操作性好。In order to solve the above-mentioned problems in the prior art, the present invention provides a method for plugging or guiding and deflecting the drill hole and the device used therefor. The method and device provided by the present invention enable accurate positioning when entering into the borehole, and are not easy to be lost. , the coagulation time is controllable, the strength of the consolidated body is controllable, economical and effective, and the operability is good.

为达成上述目的,本发明采用如下技术方案:一种钻孔护壁堵漏或导斜偏钻方法,所述方法包括以下步骤:In order to achieve the above object, the present invention adopts the following technical solution: a method for plugging or deflecting and deflecting the drill hole wall, said method comprising the following steps:

(1)制备PVC盛料管装置:(1) Preparation of PVC material pipe device:

将PVC管一端的管头切割成瓜瓣状,将其并拢成圆锥状并用密封胶布包好作为管尖;Cut the pipe head at one end of the PVC pipe into a melon shape, put them together into a cone shape and wrap it with sealing tape as the pipe tip;

将由主料、辅料及拌合水组成的盛料置入PVC管内;Put the material consisting of main material, auxiliary material and mixing water into the PVC pipe;

在PVC管上端安装堵头,并在堵头上安装挂环;Install a plug on the upper end of the PVC pipe, and install a hanging ring on the plug;

通过设于PVC盛料管上端的挂环将所述PVC盛料管悬挂于设于孔内搅拌钻头下端的悬挂环连接扣上,组成PVC盛料管装置;Suspend the PVC material holding pipe on the suspension ring connection buckle located at the lower end of the stirring drill bit in the hole through the hanging ring arranged at the upper end of the PVC material holding pipe to form a PVC material holding pipe device;

(2)将所述PVC盛料管装置通过钻杆送入钻孔目标位置;(2) The PVC material holding pipe device is sent into the drilling target position through the drill rod;

(3)将所述PVC盛料管装置送入钻孔目标位置后,用孔内搅拌钻头在孔内进行局部搅拌,搅碎PVC盛料管,使管内盛料在目标位置充分混合、挤压,与地层胶结合成整体,在短时间内形成人工孔壁,或者快速形成与地层岩石匹配的人工孔底。(3) After sending the PVC material pipe device into the target position of the drilling hole, use the in-hole agitation drill bit to perform local stirring in the hole, smash the PVC material pipe, and make the material in the pipe fully mix and extrude at the target position , combined with the formation glue to form an artificial hole wall in a short time, or quickly form an artificial hole bottom that matches the formation rock.

用于不同用途时,盛料填装方式不同。当用于钻孔护壁堵漏时,将拌合水和辅料置于易碎容器中;将主料搅拌均匀,与易碎容器以间隔方式分层置于PVC管中,直到所有主料和辅料装完为止。当用于导斜偏钻时,存在两种盛料填装方式。可将拌合水置于易碎容器中;将所有主料与辅料在地表混合均匀,与易碎容器以间隔方式分层置于PVC管中。还可将所有主料、辅料与拌合水在地表混合均匀形成浆液;将所形成的浆液装入盛料管中。When used for different purposes, the filling method of the material is different. When used for plugging of drilling wall, put the mixing water and auxiliary materials in a fragile container; stir the main materials evenly, and place them in PVC pipes in layers at intervals with the fragile container until all the main materials and auxiliary materials until finished. When used for deflection drilling, there are two filling methods. The mixing water can be placed in a fragile container; all the main ingredients and auxiliary materials are mixed evenly on the surface, and the fragile container is layered in a PVC pipe at intervals. All the main materials, auxiliary materials and mixing water can also be mixed evenly on the surface to form a slurry; the formed slurry is loaded into the material holding pipe.

用于不同用途时,所用盛料中主料与辅料的配伍方式不同,如下表所示:When used for different purposes, the compatibility of the main materials and auxiliary materials in the used materials is different, as shown in the following table:

Figure BDA0000049445380000021
Figure BDA0000049445380000021

可针对不同钻孔口径选配相应规格的PVC管,其中Φ59钻孔配Φ50PVC管;Φ75钻孔配Φ63PVC管;Φ95、Φ110钻孔配Φ90PVC管;Φ150,Φ130、Φ122钻孔配Φ110PVC管;Φ215钻孔配Φ200PVC管。PVC pipes of corresponding specifications can be selected for different drilling diameters, among which Φ59 drilling holes are equipped with Φ50 PVC pipes; Φ75 drilling holes are equipped with Φ63 PVC pipes; Φ95, Φ110 drilling holes are equipped with Φ90 PVC pipes; Drilling with Φ200PVC pipe.

本方法所使用的PVC盛料管装置至少包括PVC盛料管及孔内搅拌钻头,其中PVC盛料管由管尖、管身、堵头及挂环组成,管尖设于PVC盛料管下端、呈圆锥状,盛料置于管身内,堵头设于PVC盛料管的上端,挂环设于堵头上;所述孔内搅拌钻头为双翼式钻头,由小直径钻杆、硬质合金齿、双翼片、单向阀及悬挂环连接扣组成,单向阀上设有过流孔,硬质合金齿安装于双翼片上,悬挂环连接扣设于孔内搅拌钻头下端,PVC盛料管通过设于其上端的挂环悬挂于悬挂环连接扣上。单向阀位于钻杆与钻头连接部位。The PVC material pipe device used in this method at least includes a PVC material pipe and a stirring drill in the hole, wherein the PVC material pipe is composed of a pipe tip, a pipe body, a plug and a hanging ring, and the pipe tip is arranged at the lower end of the PVC material pipe. , in a conical shape, the material is placed in the pipe body, the plug is set on the upper end of the PVC material tube, and the hanging ring is set on the plug; the stirring drill bit in the hole is a double-wing drill bit, which is composed of a small diameter drill rod, a hard Composed of alloy teeth, double wings, one-way valve and suspension ring connecting buckle, the one-way valve is provided with a flow hole, hard alloy teeth are installed on the double wings, the suspension ring connecting buckle is set at the lower end of the stirring drill in the hole, PVC material The pipe is suspended on the connecting buckle of the suspension ring through the hanging ring arranged at its upper end. The one-way valve is located at the connecting part of the drill pipe and the drill bit.

与现有技术相比,本发明提供的方法及装置具有以下优点:Compared with the prior art, the method and device provided by the invention have the following advantages:

1.使得下入钻孔时能准确定位,不易流失;1. Make it possible to accurately locate when entering the drilling hole, and it is not easy to lose;

2.凝结时间可控,固结体强度可控;可用于复杂情形下的护壁堵漏及造斜,经济有效,操作性好。2. The coagulation time is controllable, and the strength of the consolidated body is controllable; it can be used for wall plugging and deflection in complex situations, which is economical and effective, and has good operability.

附图说明 Description of drawings

图1是本发明的PVC盛料管装置的整体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the PVC material holding pipe device of the present invention.

图2是本发明的PVC盛料管的结构示意图。Fig. 2 is a schematic structural view of the PVC material holding pipe of the present invention.

图3是本发明的孔内搅拌钻头的结构示意图。Fig. 3 is a schematic structural view of the in-hole stirring drill bit of the present invention.

图中:1-管尖;2-管身;3-堵头;4-挂环;5-辅料;6-易碎容器;7-主料;8-小直径钻杆;9-硬质合金齿;10-双翼片;11-过流孔;12-单向阀。13-孔内搅拌钻头;14-悬挂环连接扣;15-PVC盛料管。In the figure: 1-pipe tip; 2-pipe body; 3-plug; 4-hanging ring; 5-auxiliary material; 6-fragile container; 7-main material; 8-small diameter drill pipe; 9-hard alloy Teeth; 10-double fins; 11-flow holes; 12-one-way valve. 13-stirring drill bit in the hole; 14-suspension ring connection buckle; 15-PVC material pipe.

具体实施方式 Detailed ways

下面将结合附图对本发明提供的钻孔护壁堵漏或导斜偏钻方法及其所用装置做进一步详细说明。The leak-stopping or deflection-drilling method provided by the present invention and the device used in it will be described in further detail below in conjunction with the accompanying drawings.

本发明的钻孔护壁堵漏或导斜偏钻方法是基于一种PVC盛料管装置,所述PVC盛料管装置至少包括PVC盛料管15及孔内搅拌钻头13,其中PVC盛料管由管尖1、管身2、堵头3及挂环4组成,管尖1设于PVC盛料管下端、呈圆锥状,盛料置于管内,堵头3设于PVC盛料管的上端,挂环4设于堵头3上;所述孔内搅拌钻头为双翼式钻头,由小直径钻杆8、硬质合金齿9、双翼片10、单向阀12及悬挂环连接扣14组成,单向阀上设有过流孔11,硬质合金齿9镶嵌安装于双翼片10上,悬挂环连接扣14设于孔内搅拌钻头13下端,PVC盛料管通过设于其上端的挂环4悬挂于悬挂环连接扣14上。单向阀12位于钻杆与钻头连接部位。The method for plugging or deflecting and deflecting the drill hole of the present invention is based on a PVC material-filling pipe device, which at least includes a PVC material-filling pipe 15 and a stirring drill bit 13 in the hole, wherein the PVC material-holding pipe It is composed of pipe tip 1, pipe body 2, plug 3 and hanging ring 4. The pipe tip 1 is set at the lower end of the PVC material holding pipe in a conical shape. The material is placed in the pipe, and the plug 3 is set at the upper end of the PVC material holding pipe. , the hanging ring 4 is located on the plug 3; the stirring drill bit in the hole is a double-wing drill bit, which is composed of a small-diameter drill rod 8, a hard alloy tooth 9, a double wing piece 10, a one-way valve 12 and a suspension ring connecting buckle 14. , the one-way valve is provided with an overflow hole 11, the hard alloy teeth 9 are inlaid and installed on the double wings 10, the suspension ring connection buckle 14 is located at the lower end of the stirring drill bit 13 in the hole, and the PVC material pipe passes through the hanging ring located at the upper end. The ring 4 is suspended on the connecting buckle 14 of the suspension ring. The one-way valve 12 is located at the connection part between the drill pipe and the drill bit.

所选用的小直径钻杆为3m长、Φ42mm的短钻杆,其与工作钻杆连接,在保障传递钻机搅拌轴载和扭矩的同时,还有利于盛料管在孔内得到充分均匀的搅拌。设于钻杆与钻头连接部位的单向阀12保障在送PVC料管的起下钻过程中,钻杆内泥浆的正常流动,单向阀则在搅拌过程中上顶,自动封闭钻杆端口,防止被搅拌的固化浆液进入钻杆内腔,堵塞钻杆。搅拌完成后,送水使单向阀下行,过流孔11外露,使钻杆内腔与钻孔环隙相通,避免提钻时,钻杆内堵水。下文分别以进行护壁堵漏及导斜偏钻为实施例对本发明提供的方法进行详细说明。The selected small-diameter drill pipe is a short drill pipe with a length of 3m and Φ42mm. It is connected with the working drill pipe, which not only ensures the transmission of the shaft load and torque of the drilling rig, but also facilitates the full and uniform mixing of the material pipe in the hole. . The one-way valve 12 installed at the joint between the drill pipe and the drill bit ensures the normal flow of mud in the drill pipe during the tripping process of the PVC feeding pipe, and the one-way valve is lifted during the stirring process to automatically close the port of the drill pipe , to prevent the stirred solidified slurry from entering the inner cavity of the drill pipe and blocking the drill pipe. After the stirring is completed, send water to make the one-way valve go down, and the flow hole 11 is exposed, so that the inner cavity of the drill pipe communicates with the annulus of the drill hole, so as to avoid water blocking in the drill pipe when the drill is lifted. The method provided by the present invention will be described in detail below by taking the retaining wall plugging and deflection drilling as examples.

实施例1:护壁堵漏Embodiment 1: retaining wall plugging

当在钻探过程中遭遇漏失、涌水、垮塌、掉块等复杂情况,可采用本发明提供的方法及装置进行护壁堵漏。When complex situations such as leakage, water gushing, collapse, and block falling are encountered during the drilling process, the method and device provided by the present invention can be used for wall plugging.

具体护壁堵漏步骤如下:The specific steps for wall plugging are as follows:

(1)制备PVC盛料管装置;(1) Preparing a PVC material holding pipe device;

如图所示,将PVC管一端的管头切割成瓜瓣状,将其并拢成圆锥状并用密封胶布包好作为管尖1。在进行护壁堵漏时,将拌合水和辅料5置于易碎容器6中;将主料7搅拌均匀,与易碎容器6以间隔方式分层置于PVC管内,直到所有主料和辅料装完为止。然后在PVC管上端安装堵头3,并在堵头上安装挂环4。接着通过设于PVC盛料管上端的挂环4将所述PVC盛料管悬挂于设于孔内搅拌钻头下端的悬挂环连接扣上,组成PVC盛料管装置。As shown in the figure, cut the pipe head at one end of the PVC pipe into a melon shape, put them together into a cone shape and wrap it with sealing tape as the pipe tip 1. When carrying out wall plugging, put the mixing water and auxiliary material 5 in the fragile container 6; stir the main material 7 evenly, and place the fragile container 6 in the PVC pipe in layers at intervals until all the main materials and auxiliary materials until finished. Plug 3 is then installed on the PVC pipe upper end, and hanging ring 4 is installed on the plug. Then by the hanging ring 4 that is located at the upper end of the PVC material holding pipe, the PVC material holding pipe is suspended on the suspension ring connection buckle that is located at the lower end of the stirring drill bit in the hole to form a PVC material holding pipe device.

(2)将所述PVC盛料管装置通过钻杆送入钻孔目标位置;(2) The PVC material holding pipe device is sent into the drilling target position through the drill rod;

(3)将所述PVC盛料管装置送入钻孔目标位置后,用孔内搅拌钻头在孔内进行局部搅拌,搅碎PVC盛料管,使管内盛料在目标位置充分混合、挤压,与地层胶结合成整体,在短时间内形成人工孔壁,达到护壁堵漏目的。(3) After sending the PVC material pipe device into the target position of the drilling hole, use the in-hole agitation drill bit to perform local stirring in the hole, smash the PVC material pipe, and make the material in the pipe fully mix and extrude at the target position , combined with the formation glue to form a whole, to form an artificial hole wall in a short time, to achieve the purpose of retaining wall plugging.

可针对不同用途选用不同主料与辅料配伍,如下表所示:Different combinations of main materials and auxiliary materials can be selected for different purposes, as shown in the table below:

Figure BDA0000049445380000041
Figure BDA0000049445380000041

上表中,早强剂可选用氯化钙、氯化钠、三氯化铁、三乙醇胺、硫酸盐类等;速凝剂可选用水玻璃、氢氧化钙、711型、红星1型等。减水剂可选用M型、MF型、NNO型、FDN型等;固化剂可选用二氨基甲苯(催化剂)和水(反应剂)等;树脂类可选用脲醛树脂、糠醛树脂、环氧树脂等;酸性固化剂可选用磷酸、硫酸铝、氟硅酸以及盐酸等。In the above table, calcium chloride, sodium chloride, ferric chloride, triethanolamine, sulfates, etc. can be used as early strength agents; water glass, calcium hydroxide, 711 type, Hongxing 1 type, etc. can be used as accelerators. The water reducing agent can be selected from M type, MF type, NNO type, FDN type, etc.; the curing agent can be selected from diaminotoluene (catalyst) and water (reactant); the resin can be selected from urea-formaldehyde resin, furfural resin, epoxy resin, etc. ; Acidic curing agent can choose phosphoric acid, aluminum sulfate, fluosilicic acid and hydrochloric acid and so on.

可针对不同钻孔口径选配相应规格的PVC管,其中Φ59钻孔配Φ50PVC管;Φ75钻孔配Φ63PVC管;Φ95、Φ110钻孔配Φ90PVC管;Φ150,Φ130、Φ122钻孔配Φ110PVC管;Φ215钻孔配Φ200PVC管。PVC pipes of corresponding specifications can be selected for different drilling diameters, among which Φ59 drilling holes are equipped with Φ50 PVC pipes; Φ75 drilling holes are equipped with Φ63 PVC pipes; Φ95, Φ110 drilling holes are equipped with Φ90 PVC pipes; Drilling with Φ200PVC pipe.

实施例2:导斜偏钻Example 2: Guided deflection drilling

当在钻探过程中出现井身倾斜时,可采用本发明提供的方法及装置进行导斜偏钻。When the wellbore deviates during the drilling process, the method and device provided by the invention can be used to guide the deflection and deviate the drilling.

具体导斜偏钻步骤如下:The specific steps of guiding and deflecting drilling are as follows:

(1)制备PVC盛料管装置;(1) Preparing a PVC material holding pipe device;

如图所示,将PVC管一端的管头切割成瓜瓣状,将其并拢成圆锥状并用密封胶布包好作为管尖1。在进行导斜偏钻时,存在两种填装盛料的方式,可将拌合水置于易碎容器6中;将所有主料7与辅料5在地表混合均匀,与易碎容器6以间隔方式分层置于PVC管内。也可将所有主料7、辅料5与拌合水在地表混合均匀形成浆液;将所形成的浆液装入盛料管内。然后在PVC管上端安装堵头3,并在堵头上安装挂环4。接着通过设于PVC盛料管上端的挂环4将所述PVC盛料管悬挂于设于孔内搅拌钻头下端的悬挂环连接扣上,组成PVC盛料管装置。As shown in the figure, cut the pipe head at one end of the PVC pipe into a melon shape, put them together into a cone shape and wrap it with sealing tape as the pipe tip 1. When conducting deflection drilling, there are two ways to fill the material. The mixing water can be placed in the fragile container 6; The interval method is layered in the PVC pipe. It is also possible to mix all the main ingredients 7, auxiliary materials 5 and mixing water uniformly on the surface to form a slurry; put the formed slurry into the material holding pipe. Plug 3 is then installed on the PVC pipe upper end, and hanging ring 4 is installed on the plug. Then by the hanging ring 4 that is located at the upper end of the PVC material holding pipe, the PVC material holding pipe is suspended on the suspension ring connection buckle that is located at the lower end of the stirring drill bit in the hole to form a PVC material holding pipe device.

(2)将所述PVC盛料管装置通过钻杆送入钻孔目标位置;(2) The PVC material holding pipe device is sent into the drilling target position through the drill rod;

(3)将所述PVC盛料管装置送入钻孔目标位置后,用孔内搅拌钻头在孔内进行局部搅拌,搅碎PVC盛料管,使管内盛料在目标位置充分混合、挤压,快速形成与地层岩石匹配的人工孔底,利于导斜偏钻。(3) After sending the PVC material pipe device into the target position of the drilling hole, use the in-hole agitation drill bit to perform local stirring in the hole, smash the PVC material pipe, and make the material in the pipe fully mix and extrude at the target position , and quickly form an artificial hole bottom that matches the formation rock, which is conducive to deflection and deflection drilling.

用于导斜偏钻时,主料为水泥浆,辅料为碎石,砂等骨料。When used for deflection drilling, the main material is cement slurry, and the auxiliary material is gravel, sand and other aggregates.

针对不同钻孔口径选配相应规格的PVC管,其中Φ59钻孔配Φ50PVC管;Φ75钻孔配Φ63PVC管;Φ95、Φ110钻孔配Φ90PVC管;Φ150,Φ130、Φ122钻孔配Φ110PVC管;Φ215钻孔配Φ200PVC管。Choose PVC pipes of corresponding specifications for different drilling diameters, among which Φ59 drilling holes are equipped with Φ50 PVC pipes; Φ75 drilling holes are equipped with Φ63 PVC pipes; Φ95, Φ110 drilling holes are equipped with Φ90 PVC pipes; The hole is equipped with Φ200PVC pipe.

Claims (6)

1.一种钻孔护壁堵漏或导斜偏钻方法,其特征在于包含如下步骤:1. A method for plugging or deflecting and deflecting drilling of a borehole retaining wall, is characterized in that comprising the steps: (1)制备PVC盛料管装置:(1) Preparation of PVC material pipe device: 将PVC管一端的管头切割成瓜瓣状,将其并拢成圆锥状并用密封胶布包好作为管尖;Cut the pipe head at one end of the PVC pipe into a melon shape, put them together into a cone shape and wrap it with sealing tape as the pipe tip; 将由主料、辅料及拌合水组成的盛料置入PVC管内,用于导斜偏钻时,主料为水泥浆,辅料为骨料;用于护壁堵漏时盛料中的主料与辅料配比如下表:Put the material consisting of main material, auxiliary material and mixing water into the PVC pipe. When it is used to guide the deflection drilling, the main material is cement slurry, and the auxiliary material is aggregate; it is used for the main material and the auxiliary material in the material for wall plugging. The proportion of auxiliary materials is as follows:
Figure FDA0000340604991
Figure FDA0000340604991
; 在PVC管上端安装堵头,并在堵头上安装挂环;Install a plug on the upper end of the PVC pipe, and install a hanging ring on the plug; 通过设于PVC盛料管上端的挂环将所述PVC盛料管悬挂于设于孔内搅拌钻头下端的悬挂环连接扣上,组成PVC盛料管装置;Suspend the PVC material holding pipe on the suspension ring connection buckle located at the lower end of the stirring drill bit in the hole through the hanging ring arranged at the upper end of the PVC material holding pipe to form a PVC material holding pipe device; (2)将所述PVC盛料管装置通过钻杆送入钻孔目标位置;(2) Send the PVC material holding pipe device to the target position of the drilling hole through the drill pipe; (3)将所述PVC盛料管装置送入钻孔目标位置后,用孔内搅拌钻头在孔内进行局部搅拌,搅碎PVC盛料管,使管内盛料在目标位置充分混合、挤压,与地层胶结合成整体,在短时间内形成人工孔壁,或者快速形成与地层岩石匹配的人工孔底。(3) After sending the PVC material pipe device into the target position of the drilling hole, use the in-hole stirring drill to perform partial stirring in the hole to crush the PVC material pipe, so that the material in the pipe can be fully mixed and squeezed at the target position , combined with the formation glue to form an artificial hole wall in a short time, or quickly form an artificial hole bottom that matches the formation rock.
2.根据权利要求1所述的钻孔护壁堵漏或导斜偏钻方法,其特征在于:当用于钻孔护壁堵漏时,将拌合水和辅料置于易碎容器中;将主料搅拌均匀,与易碎容器以间隔方式分层置于PVC管中,直到所有主料和辅料装完为止。2. according to claim 1, the method for plugging or guiding deflection and deflection of the drilling wall, is characterized in that: when used for plugging the drilling wall, the mixing water and auxiliary materials are placed in a fragile container; the main Stir the ingredients evenly, and layer them with the fragile container in the PVC pipe at intervals until all the main ingredients and auxiliary materials are filled. 3.根据权利要求1所述的钻孔护壁堵漏或导斜偏钻方法,其特征在于:当用于导斜偏钻时,将拌合水置于易碎容器中;将所有主料与辅料在地表混合均匀,与易碎容器以间隔方式分层置于PVC管中。3. according to claim 1, the method for plugging or deflecting and deflecting drilling according to the drilling retaining wall, is characterized in that: when being used for deflecting and deflecting drilling, the mixing water is placed in the frangible container; The auxiliary materials are evenly mixed on the surface, and placed in PVC pipes layered with fragile containers at intervals. 4.根据权利要求1所述的钻孔护壁堵漏或导斜偏钻方法,其特征在于:当用于导斜偏钻时,将所有主料、辅料与拌合水在地表混合均匀形成浆液;将所形成的浆液装入盛料管中。4. The method according to claim 1, characterized in that: when used for deflection and deflection drilling, all main materials, auxiliary materials and mixing water are uniformly mixed on the surface to form a slurry ; Fill the resulting slurry into the holding tube. 5.根据权利要求1所述的钻孔护壁堵漏或导斜偏钻方法,其特征在于:针对不同钻孔口径选配相应规格的PVC管,其中Ф59钻孔配Ф50PVC管;Ф75钻孔配Ф63PVC管;Ф95、Ф110钻孔配Ф90PVC管;Ф150,Ф130、Ф122钻孔配Ф110PVC管;Ф215钻孔配Ф200PVC管。5. The method according to claim 1 for leak plugging or deflection drilling, characterized in that PVC pipes of corresponding specifications are selected for different borehole diameters, wherein Ф59 holes are equipped with Ф50 PVC pipes; Ф75 holes are equipped with Ф50 PVC pipes; Ф63 PVC pipe; Ф95, Ф110 holes are matched with Ф90 PVC pipe; Ф150, Ф130, Ф122 holes are matched with Ф110 PVC pipe; Ф215 holes are matched with Ф200 PVC pipe. 6.一种根据权利要求1所述的方法所用的PVC盛料管装置,其特征在于:至少包括PVC盛料管及孔内搅拌钻头,其中PVC盛料管由管尖、管身、堵头及挂环组成,管尖设于PVC盛料管下端、呈圆锥状,盛料置于管身内,堵头设于PVC盛料管的上端,挂环设于堵头上;所述孔内搅拌钻头为双翼式钻头,由小直径钻杆、硬质合金齿、双翼片、单向阀及悬挂环连接扣组成,单向阀位于钻杆与钻头连接部位,单向阀上设有过流孔,硬质合金齿安装于双翼片上,悬挂环连接扣设于孔内搅拌钻头下端,PVC盛料管通过设于其上端的挂环悬挂于悬挂环连接扣上。6. A PVC material holding pipe device used in the method according to claim 1, characterized in that: it at least comprises a PVC material holding pipe and a stirring drill bit in the hole, wherein the PVC material holding pipe is composed of a pipe tip, a pipe body, a plug and a hanging ring, the tip of the pipe is set at the lower end of the PVC material pipe, which is conical, the material is placed in the pipe body, the plug is set at the upper end of the PVC material pipe, and the hanging ring is set on the plug; the stirring in the hole The drill bit is a double-wing drill bit, which is composed of a small-diameter drill pipe, hard alloy teeth, double-wing pieces, a one-way valve and a suspension ring connecting buckle. , Carbide teeth are installed on the double fins, the suspension ring connection buckle is located at the lower end of the stirring drill bit in the hole, and the PVC material pipe is suspended on the suspension ring connection buckle through the suspension ring located at its upper end.
CN2011100568745A 2011-03-09 2011-03-09 Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof Expired - Fee Related CN102134978B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100568745A CN102134978B (en) 2011-03-09 2011-03-09 Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100568745A CN102134978B (en) 2011-03-09 2011-03-09 Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof

Publications (2)

Publication Number Publication Date
CN102134978A CN102134978A (en) 2011-07-27
CN102134978B true CN102134978B (en) 2013-12-11

Family

ID=44294886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100568745A Expired - Fee Related CN102134978B (en) 2011-03-09 2011-03-09 Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof

Country Status (1)

Country Link
CN (1) CN102134978B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301807B (en) * 2018-04-24 2020-01-24 中煤科工集团重庆研究院有限公司 Hole wall fixing device for gas extraction drill hole of soft coal seam and construction method
CN110886586B (en) * 2019-12-18 2023-12-12 贵州高峰石油机械股份有限公司 Method for improving cutting efficiency of mill shoes and fracture centering mill shoes used by method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US768564A (en) * 1902-11-13 1904-08-23 William H Ernst Safety device for oil-well torpedo-shells.
US2352805A (en) * 1943-03-22 1944-07-04 Leonhard N Scheuermann Method and article for cleaning oil wells and the like
US2609880A (en) * 1948-03-04 1952-09-09 Joseph G Dyer Apparatus for sealing wells
US2778603A (en) * 1953-06-22 1957-01-22 Oilwell Drain Hole Drilling Co Preparation of well drain holes for production
US3190373A (en) * 1962-08-22 1965-06-22 Gerald H Weathersby Method and apparatus for plugging wells
US3362476A (en) * 1966-10-10 1968-01-09 Marathon Oil Co Process and device for restoring lost circulation
SU685808A1 (en) * 1978-07-11 1979-09-15 Ленинградский Ордена Ленина, Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Горный Институт Им. Г.В.Плеханова Arrangement for isolating difficult zones in borehole
US4378050A (en) * 1981-01-28 1983-03-29 Tatevosian Ruben A Arrangement for full hole drilling
CN2648056Y (en) * 2003-08-14 2004-10-13 四川石油管理局 Bag type pluging leaking device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1393311A (en) * 1920-09-01 1921-10-11 Harry C Pendleton Method and means for facilitating sealing deep wells
WO1982002923A1 (en) * 1981-02-23 1982-09-02 Lipatov Nikolai Konstantinovich Device for feeding and processing of pluging and cementing materials in a given section of bore hole
CN1029518C (en) * 1993-02-23 1995-08-16 何庆林 Superfluid concrete and its pouring pile-forming method and drilling machine used by said method
CN1218134A (en) * 1998-09-22 1999-06-02 杜铁民 Vulcanized rubber powder blocking agent

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US768564A (en) * 1902-11-13 1904-08-23 William H Ernst Safety device for oil-well torpedo-shells.
US2352805A (en) * 1943-03-22 1944-07-04 Leonhard N Scheuermann Method and article for cleaning oil wells and the like
US2609880A (en) * 1948-03-04 1952-09-09 Joseph G Dyer Apparatus for sealing wells
US2778603A (en) * 1953-06-22 1957-01-22 Oilwell Drain Hole Drilling Co Preparation of well drain holes for production
US3190373A (en) * 1962-08-22 1965-06-22 Gerald H Weathersby Method and apparatus for plugging wells
US3362476A (en) * 1966-10-10 1968-01-09 Marathon Oil Co Process and device for restoring lost circulation
SU685808A1 (en) * 1978-07-11 1979-09-15 Ленинградский Ордена Ленина, Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Горный Институт Им. Г.В.Плеханова Arrangement for isolating difficult zones in borehole
US4378050A (en) * 1981-01-28 1983-03-29 Tatevosian Ruben A Arrangement for full hole drilling
CN2648056Y (en) * 2003-08-14 2004-10-13 四川石油管理局 Bag type pluging leaking device

Also Published As

Publication number Publication date
CN102134978A (en) 2011-07-27

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
US7748455B2 (en) Surfaced mixed epoxy method for primary cementing of a well
CN105317396B (en) Slurries mixing arrangement and its application method in a kind of surface grout injection drilling
CN105200978B (en) A forward-type localized double-fluid grouting device and construction method
Burwell Jr Cement and clay grouting of foundations: practice of the corps of engineers
CN103485345A (en) Construction method for covering layer closed porthole high-pressure curtain grouting
US10619088B2 (en) Fracture having a bottom portion of reduced permeability and a top portion having a higher permeability
BR112017020361B1 (en) METHOD TO FORM AN UNDERGROUND GAS STORAGE CONTAINER
US7281576B2 (en) Apparatus and methods for sealing voids in a subterranean formation
EP3080226A1 (en) Settable compositions comprising cement kiln dust and methods of use
CN104775787A (en) Hydraulic fracturing crossing hole pitchup hole sealing method of broken surrounding rock
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN102704936A (en) Caving control method for fully mechanized mining face tip mining road way top plate
CN108386193A (en) A kind of hard integrality top plate chemically expansible pressure break pressure relief method in end
CN106894414B (en) Double-liquid deep hole bottom precise mixing construction technology and grouting structure
CN206646495U (en) Biliquid deep hole bottom fixed point precisely mixes slip casting structure
CN104389587A (en) Quick measurement method of coal seam gas pressure
CN204252934U (en) Test boring device for plugging
CN102134978B (en) Drill hole wall protecting and leakage plugging method or slope guide deviation drilling method and used device thereof
CN106285524B (en) To drilling macromolecular mud dreg removing system, method and macromolecular mud under coal mine
NO180042B (en) Method of injecting a mortar material
CN206144587U (en) Odd -shaped cross section cavity self -drilling stock
CN102979087A (en) Construction method for rotary excavation pile
CN117449799A (en) A multi-stage plugging and sealing method for gas drainage boreholes
CN104674831B (en) Water-stopping curtain construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20150309

EXPY Termination of patent right or utility model