[go: up one dir, main page]

CN102061803A - Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof - Google Patents

Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof Download PDF

Info

Publication number
CN102061803A
CN102061803A CN 201010570185 CN201010570185A CN102061803A CN 102061803 A CN102061803 A CN 102061803A CN 201010570185 CN201010570185 CN 201010570185 CN 201010570185 A CN201010570185 A CN 201010570185A CN 102061803 A CN102061803 A CN 102061803A
Authority
CN
China
Prior art keywords
template
hole
column template
building
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010570185
Other languages
Chinese (zh)
Other versions
CN102061803B (en
Inventor
侯建群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqingda Technology Co ltd
Original Assignee
Architectural Design and Research Institute of Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Tsinghua University filed Critical Architectural Design and Research Institute of Tsinghua University
Priority to CN2010105701851A priority Critical patent/CN102061803B/en
Publication of CN102061803A publication Critical patent/CN102061803A/en
Priority to PCT/CN2011/082172 priority patent/WO2012065534A1/en
Application granted granted Critical
Publication of CN102061803B publication Critical patent/CN102061803B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a shear wall structure building based on a cross-hole prefabricated reinforced concrete template and a construction method thereof, belonging to the technical field of buildings and construction thereof. In the building, a wall template, an L-shaped column template, a T-shaped column template, a rectangular column template, a cruciform column template, a coupling beam template and a superstructure template which are free of removal are mutually connected to form a polyhedral space template system; all templates are the cross-hole prefabricated reinforced concrete templates; a longitudinal through hole and a lateral through hole, which are parallel to the surface, are arranged in the templates to form hollow hole paths in all directions; reinforcing steel bars and filling concrete are alternately inserted in the hollow hole paths to form a one-layer building unit or a single-layer building with the cast-in-place concrete shear wall structure; and multiple-layer building units are lapped and combined to form the multiple-layer building with the cast-in-place concrete shear wall structure. The shear wall structure building disclosed by the invention has the advantages of simpleness of processing, low production equipment investment, reduced construction working procedures, quickened construction speed, labor saving and the like.

Description

Shear wall structure building and construction method based on the precast reinforced concrete form of cross bore
Technical field
The invention belongs to building and building technology field thereof, relate in particular to adopt free removal in the precast reinforced concrete form of cross bore is arranged and the cast-in-situ reinforced concrete shear wall structure building and the construction method thereof that form.
Background technology
Tradition cast-in-situ reinforced concrete shear wall structure needs assembling reinforcement at the scene, a template, form removal, and on-the-spot recruitment is many, and the construction period is long.The prefabricated reinforced concrete shear wall structure member production plantization, has shortened the site operation cycle.Construction costs is higher relatively but in order to solve between the prefabricated units between the whole connectivity problem and prefabricated units problem such as seam crossing infiltration etc.
Application number 200710063862.9 discloses " a kind of architectural structure system of preformed hollow load-bearing wall panel and job practices ", and this system has adopted the interior exterior wall bearing plate of the perforation hollow hole (traditional hollowcore slab) that is provided with unidirectional interval.Be connected weakly in this system between plate and the plate, only be fit to build multistoried building and be not suitable for building high-story house.
Summary of the invention
The object of the invention is that the shortcoming and defect part that remedies the said structure system proposes a kind of shear wall structure and construction method thereof based on the precast reinforced concrete form of cross bore, improved traditional steel bar concrete cast-in-place shear wall structure and job practices especially, the present invention has that processing is simple, small investment of production equipment, minimizing working procedure, accelerate speed of application and save advantages such as artificial.
A kind of shear wall structure building that the present invention proposes based on the precast reinforced concrete form of cross bore, this building is interconnected to constitute polyhedron space template system with the wall form of free removal, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and building (room) cover mold plate; It is characterized in that, described wall form, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and building (room) cover mold plate are cross bore prefabricated reinforced concrete plate, have vertical perforated holes parallel and horizontal perforated holes in this steel bar concrete precast plate with the surface, make the inside of described polyhedron space template system form the hollow duct of extending in all direction, interspersed reinforcing bar and filling concrete form one deck building unit or the single of Cast-in-place concrete shear wall structure among this hollow duct; Multistory building unit overlap joint constitutes the multilayer or the highrise building of Cast-in-place concrete shear wall structure.
The present invention also proposes to adopt the construction method of above-mentioned shear wall structure building, it is characterized in that, may further comprise the steps:
1) wall form of prefabricated cross bore prefabricated reinforced concrete, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and building (room) cover mold plate are transported to the scene;
2) establish placement with column template is vertical with wall form at the scene, the lower end is fixed on the basis;
3) the coupling beam template is placed on the wall form at door, window opening mouth place;
4) building (room) the cover mold plate of horizontal positioned is placed in the top of wall form, column template and coupling beam template, forms the polyhedron space template system that the inside of being made up of template forms the hollow duct of extending in all direction;
5) interspersed additional bar in the post that is interconnected, wall, the hollow hole of coupling beam template;
6) pour concrete in the hollow hole that extends in all direction in described polyhedron space template system is treated that concrete is filled to finish, and forms one deck monolithic architecture unit or the single of Cast-in-place concrete shear wall structure.
This method also comprises:
7) repeatedly repeat 1) to 6), wall form and the column template that will work as anterior layer are fixed on the cast-in-situ reinforced concrete shear wall structure building that forms multilayer or high level on the lower floor monolithic architecture unit.
Characteristics of the present invention and effect thereof:
1. utilize prior art can be in factory prefabricated cross bore steel bar concrete template in enormous quantities, form industrialization; Because template is by plant produced, construction quality and plate surface evenness easily guarantee; Prefabricated cross bore steel bar concrete template can be made into the smaller units plate and cross hole is arranged, and is in light weight with respect to the prefabricated concrete wall of tradition, do not need goliath, convenient lifting; Be convenient to long-distance transport.
2. because the reinforcing bar of primary structure member 80% has been placed in the cross bore steel bar concrete template, significantly reduced the workload of assembling reinforcement at the construction field (site) when factory process is made template.Reduce workload and difficulty of construction that the job site template supports.. end working strength of workers is fallen.And can realize that every layer of house wall template and building (room) face die plate once support and finish, accelerate speed of application.The prefabricated cross bore steel bar concrete of free removal template is that the part of primary structure member can be saved the form removable operation.
3. compare with the shear wall structure that general steel bar concrete prefabricated units form, the house globality ensures that easily the reinforcing bar joint construction between the adjacent members is reliable.The hollow hole of prefabricated cross bore steel bar concrete template intersects and links to each other, and reserves the space between the template, can check the Cast-in-place concrete compactness easily.Cast-in-place concrete connects closely between the floor, can avoid rain leakage.Can intert reinforcing bar in prefabricated cross bore steel bar concrete building (room) face die plate again, form the two-way slab arrangement of reinforcement and strengthened the globality of superstructure.
4. prefabricated cross bore steel bar concrete template itself has intensity, treats that this layer Cast-in-place concrete is filled into after the hollow hole, can carry out the last layer structure construction at once, and it is hard to wait for that new pour concrete solidifies knot.
The present invention is with the difference of disclosed 200710063862.9 patent applications: the precast reinforced concrete form that cross bore is arranged in the free removal that the present invention adopts, the cross hole that two or three directions are arranged in the template, being different from only has a direction up/down perforation hole (traditional hollowcore slab) in the inside and outside wall board in the above-mentioned patent; The present invention also all fills cross hole with concrete, is different from the above-mentioned patent to connect hole in the inside and outside wall board and not exclusively fill concrete.The present invention also will be in cross hole in length and breadth both direction intert additional bar, strengthen the house globality, and connect weak between the above-mentioned patent wallboard.
Description of drawings
Fig. 1 a is a shear wall structure building embodiment schematic diagram based on the precast reinforced concrete form of cross bore of the present invention;
Fig. 1 b is the 1-1 sectional drawing of Fig. 1 a, display wall, post, building (room) cover mold board plane arrangement relation.
Fig. 2 a is the wall form schematic diagram in the embodiment of the invention;
Fig. 2 b is the interior reinforcing cage schematic diagram of the wall form in the present embodiment;
Fig. 2 c is building (room) the cover mold plate schematic diagram in the present embodiment.
Fig. 3 a makes the mould schematic diagram () that body of wall, building (room) cover mold plate are used among the embodiment;
Fig. 3 b makes the mould schematic diagram (two) that body of wall, building (room) cover mold plate are used among the embodiment.
Fig. 4 is the polyhedron space three-dimensional schematic perspective view of forming based on cross bore prefabricated reinforced concrete template in the present embodiment.
Fig. 5 a is the L shaped column template schematic diagram in the present embodiment;
Fig. 5 b is the interior reinforcing cage schematic diagram of the L shaped column template in the present embodiment.
Fig. 6 a is the cross section column template schematic diagram in the present embodiment;
Fig. 6 b is the interior reinforcing cage schematic diagram of the cross section column template in the present embodiment.
Fig. 7 a is the coupling beam template schematic diagram in the embodiment of the invention;
Fig. 7 b is the interior reinforcing cage schematic diagram of the coupling beam template in the present embodiment;
Fig. 7 c is the coupling beam template A-A cut-away view in the present embodiment.
Fig. 8 a is the T shape column template schematic diagram in the embodiment of the invention;
Fig. 8 b is the interior reinforcing cage schematic diagram of the T shape column template in the present embodiment.
Fig. 9 is that L shaped column template of the present invention is connected the horizontal cut-away view of embodiment with wall form.
Figure 10 is that T shape column template of the present invention is connected the horizontal cut-away view of embodiment with wall form.
Figure 11 is that wall form of the present invention is connected the vertical cut-away view of embodiment with the superstructure template.
The specific embodiment
The Cast-in-place concrete shear wall structure building of the precast reinforced concrete form formation of cross bore is arranged in the employing free removal that the present invention proposes, reaches embodiment in conjunction with the accompanying drawings and be described in detail as follows:
The embodiments of the invention general structure is shown in Fig. 1 a, Fig. 1 b, and present embodiment is for adopting one 8 floor building of shear wall structure.Described building comprises: wall form 1, L shaped column template 2, T shape column template 3, cross section column template 4, coupling beam template 5, building (room) cover mold plate 6 and described each template is incorporated into the concrete (not shown) of an integral body.Each template overlaps and forms polyhedron space template system, each template is cross bore prefabricated reinforced concrete plate, have the vertical perforated holes parallel in this steel bar concrete precast plate with the surface, with horizontal perforated holes (size of each hole and spacing can guarantee that all hole connects in length and breadth), make the inside of described polyhedron space template system form the hollow duct of extending in all direction, the reinforcing bar that interts among this hollow duct forms one deck monolithic architecture unit with filling concrete (not shown).
Present embodiment constitutes one deck monolithic architecture unit (Fig. 1 b) by 10 building unit horizontal combination, 8 layers of the superimposed formations of making progress at each layer monolithic architecture unit successively adopt free removal in the Cast-in-place concrete shear wall structure building that the precast reinforced concrete form of cross bore forms is arranged (Fig. 1 a), the body of wall of monolithic architecture unit, upper strata is fixed on the body of wall of substrustion unit; Bottom building unit body of wall lower end is fixed on the basis 13.The body of wall of top building unit links to each other with the roof panel on roof.
The wall form of present embodiment, building (room) cover mold plate adopt the prefabricated flat board of steel bar concrete, and its structure has a vertical perforated holes 22 of row and a horizontal row to perforated holes 23 in prefabricated dull and stereotyped 21 the plane of this steel bar concrete shown in Fig. 2 a; Be arranged on the reinforcing cage 26 in this steel bar concrete precast plate 21, this reinforcing cage 26 is by the longitudinal reinforcement 261 of many arrangements and reinforcing bar is fixed into holistic a plurality of lateral tie 262 forms, shown in Fig. 2 b; Also comprise being arranged on this steel bar concrete precast plate 21 groove 24 of side all around, be arranged on the installation suspension ring 25 of this steel bar concrete precast plate one side; The diameter range of described vertical perforated holes is (generally speaking, to get the thickness of slab size and subtract 60mm between the 60mm to 300mm.For example, during thickness of slab 200mm, vertically the perforated holes diameter is 140mm).The diameter range of this horizontal perforated holes is 40mm to 280mm (generally speaking, the diameter dimension of getting vertical perforated holes subtracts 20mm).This precast plate is generally as wall form.The height of wall form is 2500mm to 5000mm (generally speaking, getting the thickness that the building floor height subtracts building (room) lid size).
If vertically offer many row's plate face 27 (only in the perforate of template upper surface, not running through at the bottom of the plate) of hole on a surface of this steel bar concrete precast plate, shown in Fig. 2 c, then this precast plate is as building (room) cover mold plate.The thickness of building (room) cover mold plate is 90mm to 250mm (needing generally speaking to determine according to span and load size).
L shaped wall form structure embodiment in the present embodiment is shown in Fig. 5 a and Fig. 5 b, comprise the L shaped column template 51 of prefabricated reinforced concrete, be arranged on the vertical perforated holes 52 in the template, level in the template connects hole 53, the groove 54 on L shaped post wall form four limits (left side, front, upper surface, soffit), template suspension ring 55 when being used for construction and installation, and be arranged in the L shaped post wall form by longitudinal reinforcement 561 and interiorly laterally join the reinforcing cage 56 that stirrup 562 is formed.
Cross section column template example structure in the present embodiment is shown in Fig. 6 a and Fig. 6 b, comprise the precast reinforced concrete form 61 of cross section column, be arranged on the vertical perforated holes 62 in this template, level in the template connects hole 63, the groove 64 of cross section column template hexagon (left side, right side, front, back, upper surface, soffit), template suspension ring 65 when being used for construction and installation, and be arranged in this column template by longitudinal reinforcement 661 and laterally join the reinforcing cage 66 that stirrup 662 (cross stirrup) is formed.
Coupling beam formwork structure in the present embodiment as shown in Figure 7, this template adopts the prefabricated coupling beam of steel bar concrete, has vertical perforation hole 72 and level and connect hole 73 in this coupling beam template 71, shown in Fig. 7 c; Be arranged on the groove 74 of three of coupling beam templates, shown in Fig. 7 a; Be arranged on the reinforcing cage 76 in the coupling beam template, this reinforcing cage 76 is by many longitudinal reinforcements 761 and will indulge muscle 761 and be fixed into holistic a plurality of lateral tie 762 and form, shown in Fig. 7 b.Stirrup 762 1 ends expose, can be as suspension ring are installed.The length of coupling beam template generally is about the door and window hole size and adds 600mm, and the height of coupling beam template is that the door and window hole epithelium is very little to the underfloor tape measure, and the thickness of coupling beam template is identical with wall thickness.
The precast reinforced concrete form that cross bore is arranged in the T shape post free removal in the present embodiment, shown in Fig. 8 a, it is the steel bar concrete precast plate 81 of T shape that this template adopts cross section, have vertical perforated holes 82 in this template, level has and connects hole 83 in the template, (left side, T shape column template five limit, the right side, the front, upper surface, soffit) all fluted 84, be provided with template suspension ring 85 when being used for construction and installation at upper surface, in column template, be provided with reinforcing cage 86, this reinforcing cage 86 is by many longitudinal reinforcements 861, a plurality of lateral ties 862 (T u stirrup u) are formed, shown in Fig. 8 b.The vertical height of T shape column template is about 2400mm to 5000mm (being generally the floor height of building), and the thickness on each limit of T shape column template is about 140mm to 360mm (general identical with wall form thickness).
The same wall form of opening diameter in the column template of present embodiment, the coupling beam template.
The thickness of L shaped column template, T shape column template, each vertical section of cross section column template and height are identical with wall form.
The width of coupling beam template is identical with the thickness of wall form, and (room) covers hypodermis to the height of coupling beam template to the building from the door and window hole epithelium.
The construction method of present embodiment may further comprise the steps:
1) wall form of prefabricated cross bore prefabricated reinforced concrete, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and building (room) cover mold plate are transported to the scene;
The method for prefabricating of each template is basic identical, and the existing example that is made as with wall form as shown in Figure 3, may further comprise the steps:
1-1) on the precast plate production site,, adopt one flat plate bed die steel plate 31 according to the dimensional requirement of building, two group's mould steel bars 32, two backform steel bars 33, many long to preformed hole steel pipe 34 and many short preformed hole steel pipes 35 as mold component, as shown in Figure 3; Wherein, this group's mould 32 and backform 33 are the U-type strip steel that both sides have outer rim, and on the bottom surface, have the row via holes 321 (diameter range of described hole be 40mm to 280mm) vertical with the bottom surface, (Fig. 3 a) for 331 (diameter range of described hole is 60mm to 300mm), this length is opened the row perforated holes 341 vertical with tube wall on the tube wall of steel pipe 34, the diameter of the hole 331 that this length is opened on the diameter of steel pipe 34 and backform 33 is identical, long diameter to the perforated holes of opening on the steel pipe 34 341 with help mould 32 on the diameter of the hole 321 opened identical; The diameter of this short preformed hole steel pipe 35 and the diameter identical (Fig. 3 b) of growing the perforated holes of on steel pipe 34, opening 341.
If (as wall form, the length of group's mould 32 is height of wall form, and the height of group's mould 32 is the thickness of wall form.If as building (room) cover mold plate, the length of group's mould 32 is spans of building (room) cover mold plate, and the height of group's mould 32 is the thickness of building (room) cover mold plate.The height of backform 33 equates with the height of group's mould 32)
1-2) will help that mould 32 and backform 33 is vertical mutually, the termination alignment is placed on the bed die 31 and forms mould, (Fig. 2 b) is placed on the bed die 31 with reinforcing cage 26, and installation suspension ring 25.Many are longly penetrated to the hole 331 of preformed hole steel pipe 34 from a side backform 33, and the gap by reinforcing cage 26 penetrates in the hole of opposite side backform again; Again the hole 321 of many short preformed hole steel pipes 35 from a lateral wall mould 32 penetrated, pass the hole of another lateral wall mould 32 by the gap of reinforcing cage again;
Pour concrete in 1-3) from bed die 31 tops toward mould, the concrete upper surface is concordant with the backform epithelium with the group mould, treat concrete as yet all knot hard before, extract short preformed hole steel pipe 35 earlier out, form the lateral direction penetrating hole 23 of template, extract length again out, form vertical perforation hole 22 of template to preformed hole steel pipe 34.
1-4) dismantle after mold component 31,32 and 33, just formed the plane free removal in the precast reinforced concrete form of cross bore is arranged.
Said method also can comprise: 1-5) use super hole cutter to form plate face 27 (Fig. 2 c) in the boring of template 21 upper surfaces.
Above-mentioned prefabricated free removal wall form, building (room) cover mold plate can also utilize existing manufacturing technique (it is traditional hollowcore slab that existing manufacturing technique can be produced the plate that only has a direction hole) preparation method to add and transform, folk prescription is only arranged on the plate of hole what produce, get out hole in a row with super hole cutter in the vertical direction of original hole, the precast reinforced concrete form of cross bore is arranged in final the formation.
2) establish placement with column template is vertical with wall form at the scene, the lower end is fixed on the basis, and the reinforcing bar 41,43 that stretches out is arranged on the basis, just in time inserts in the hole of column template and wall form; As shown in Figure 4;
3) the coupling beam template is placed on the wall form at door, window opening mouth place;
4) building (room) the cover mold plate of horizontal positioned is placed in the top of wall form, column template and coupling beam template, forms the polyhedron space template system that the inside of being made up of template forms the hollow duct of extending in all direction;
5) interspersed additional bar 44,45,46,47 in the post that is interconnected, wall, the hollow hole of coupling beam template, about being used to strengthen, the connection of left-right template, on building (room) cover mold plate, place 48 (being used to make overlapping layers 42) of additional bar net, as shown in Figure 4;
6) pour concrete in the hollow hole that in described polyhedron space template system, extends in all direction, cover mold plate top in building (room) also can make the Cast-in-place concrete overlapping layers 42 of 40mm to 80mm thickness; Treat that concrete is filled and finish, form the Cast-in-place concrete shear wall structure system that one deck monolithic architecture unit constitutes, as shown in Figure 4.
7) repeatedly repeat 1) to 6), will work as the wall form of anterior layer and column template and be fixed on and form 8 layers cast-in-situ reinforced concrete shear wall structure on the lower floor monolithic architecture unit.
Describe annexation between each template in detail in conjunction with Fig. 9, Figure 10, Figure 11 in the said method:
L shaped column template of the present invention is connected embodiment as shown in Figure 9 with wall form, the additional bar 43 that inserts in vertical hole of elder generation with each the L shaped column template 2 of house and the wall form (not shown) on door, window opening mouth limit, adopt mechanical connecting joint (routine techniques) spreading one floor height (being used for being inserted into vertical hole of upper former), in the horizontal hole that L shaped column template communicates with wall form, insert rectangular reinforcing bar 44 and U-shaped reinforcing bar 47, be used to connect L shaped column template and wall form.Last between L shaped column template and wall form the space and the hole in each template in pour concrete.
T shape column template of the present invention is connected embodiment as shown in figure 10 with wall form, additional bar 43 same mechanical connecting joint (routine techniques) spreading one floor heights that adopt that insert in vertical hole with each T shape column template 3 of house and the wall form (not shown) on door, window opening mouth limit earlier, be used for being inserted into upper former, in the horizontal hole that T shape column template communicates with wall form, insert rectangular reinforcing bar 44 and U-shaped reinforcing bar 47, be used to connect T shape column template and wall form.Last between L shaped column template and wall form the space and the hole in each template in pour concrete.
L shaped column template 2 or T shape column template 3 are installed, are made reinforcing bar 43 pass the vertical hole of column template; Wall form 1 and coupling beam template 5 are installed again; In post, wall form horizontal hole, intert additional bar 44,47 then, as Fig. 9, shown in Figure 10.
Wall form of the present invention is connected embodiment as shown in figure 11 with the superstructure template.In the horizontal hole of wall form 1, insert additional bar 44, interspersed additional bar 45 in the horizontal hole of building (room) cover mold plate 6, (room) cover mold plate upper surface is placed additional bar net 48 in the building, between two buildings (room) cover mold plate, insert additional bar 41 in vertical hole of the wall form of top, pour concrete in space between building (room) cover mold plate and wall form and the hole in each template at last, pour concrete forms overlapping layers 42 on building (room) cover mold plate again.

Claims (6)

1. the shear wall structure based on the precast reinforced concrete form of cross bore is built, and this building is interconnected to constitute polyhedron space template system with the wall form of free removal, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and superstructure template; It is characterized in that, described wall form, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and superstructure template are cross bore prefabricated reinforced concrete plate, have vertical perforated holes parallel and horizontal perforated holes in this steel bar concrete precast plate with the surface, make the inside of described polyhedron space template system form the hollow duct of extending in all direction, interspersed reinforcing bar and filling concrete form one deck building unit or the single of Cast-in-place concrete shear wall structure among this hollow duct; Multistory building unit overlap joint constitutes the multilayer or the highrise building of Cast-in-place concrete shear wall structure.
2. shear wall structure building as claimed in claim 1, it is characterized in that, the reinforcing bar that is arranged in this cross bore prefabricated reinforced concrete plate adopts reinforcing cage, and described reinforcing cage is fixed into holistic many reinforcing bars by the lateral tie of the longitudinal reinforcement of many arrangements, a plurality of arrangements and forms.
3. shear wall structure as claimed in claim 1 building is characterized in that, also comprises the groove that is arranged on this plane wall form or superstructure template, T shape wall column template, L shaped wall column template, each side of cross wall column template; Be arranged on the installation suspension ring at described template top.
4. adopt the construction method of shear wall structure building according to claim 1, it is characterized in that, may further comprise the steps:
1) wall form of prefabricated cross bore prefabricated reinforced concrete, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and superstructure template are transported to the scene;
2) establish placement with column template is vertical with wall form at the scene, the lower end is fixed on the basis;
3) the coupling beam template is placed on the wall form at door, window opening mouth place;
4) the superstructure template of horizontal positioned is placed in the top of wall form, column template and coupling beam template, forms the polyhedron space template system that the inside of being made up of template forms the hollow duct of extending in all direction;
5) interspersed additional bar in the post that is interconnected, wall, the hollow hole of coupling beam template;
6) pour concrete in the hollow hole that extends in all direction in described polyhedron space template system is treated that concrete is filled to finish, and forms one deck monolithic architecture unit or the single of Cast-in-place concrete shear wall structure.
5. as method as described in the claim 4, it is characterized in that this method also comprises:
7) repeatedly repeat 1) to 6), wall form and the column template that will work as anterior layer are fixed on the cast-in-situ reinforced concrete shear wall structure building that forms multilayer or high level on the lower floor monolithic architecture unit.
6. as method as described in the claim 4, it is characterized in that described step 1) precast wall body template, L shaped column template, T shape column template, rectangular column template, cross section column template, coupling beam template and superstructure template may further comprise the steps:
1-1) on the precast plate production site, according to the dimensional requirement of building, adopt the bed die steel plate, group's mould steel bar, the backform steel bar, many long to preformed hole steel pipe and many short preformed hole steel pipes as mold component; Wherein, this group's mould has the vertical through hole of a row with backform, this length is opened the row perforated holes vertical with tube wall on the tube wall of steel pipe, the diameter of the hole that this length is opened on the diameter of steel pipe and backform is identical, long diameter to the perforated holes of opening on the steel pipe with help mould on the diameter of the hole opened identical; The diameter of this short preformed hole steel pipe is identical with the diameter of the long perforated holes of opening on steel pipe;
1-2) will help that mould and backform are vertical mutually, align to be placed in the termination forms mould on the bed die, reinforcing bar is placed on the bed die, many are longly penetrated to the hole of preformed hole steel pipe from a side backform, the gap by reinforcing bar penetrates in the hole of opposite side backform again; Again the hole of many short preformed hole steel pipes from a lateral wall mould penetrated, by the gap and the long hole that passes another lateral wall mould to the preformed hole steel pipe again of reinforcing bar;
1-3) pour concrete in the mould, treat concrete as yet all knot hard before, extract short preformed hole steel pipe out, form the lateral direction penetrating hole of template, extract out longly to the preformed hole steel pipe, form vertical perforation hole of template;
1-4) treat that concrete knot is hard after, the mold component of dismantling, form the plane free removal in the precast reinforced concrete form of cross bore is arranged.
CN2010105701851A 2010-11-19 2010-11-26 Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof Active CN102061803B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2010105701851A CN102061803B (en) 2010-11-26 2010-11-26 Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof
PCT/CN2011/082172 WO2012065534A1 (en) 2010-11-19 2011-11-14 Prefabricated reinforced concrete formwork and manufacturing method thereof, as well as building and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105701851A CN102061803B (en) 2010-11-26 2010-11-26 Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof

Publications (2)

Publication Number Publication Date
CN102061803A true CN102061803A (en) 2011-05-18
CN102061803B CN102061803B (en) 2012-05-23

Family

ID=43997282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105701851A Active CN102061803B (en) 2010-11-19 2010-11-26 Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof

Country Status (1)

Country Link
CN (1) CN102061803B (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383592A (en) * 2011-09-01 2012-03-21 吴方伯 Bottom template for building floorslab and construction method thereof
WO2012065534A1 (en) * 2010-11-19 2012-05-24 清华大学建筑设计研究院有限公司 Prefabricated reinforced concrete formwork and manufacturing method thereof, as well as building and construction method thereof
CN102720272A (en) * 2012-06-29 2012-10-10 初明进 Embedded column type prefabricated part connection node and manufacturing method thereof
CN102808450A (en) * 2012-08-28 2012-12-05 初明进 Assembled monolithic shear wall building structure and construction method thereof
CN103015704A (en) * 2012-12-13 2013-04-03 清华大学建筑设计研究院有限公司 Slab column-shear wall structure building based on precast reinforced concrete hollow formworks and construction method thereof
CN103572840A (en) * 2012-08-05 2014-02-12 初明进 Notch-key type prefabricated member connection node and connection method
CN103590623A (en) * 2013-11-12 2014-02-19 河南奥斯派克科技有限公司 Assembled-type integrated residence assembly assembled by thin-wall steel and bar rib units
CN103590603A (en) * 2013-11-14 2014-02-19 中建二局第三建筑工程有限公司 Large-span multi-curvature thin shell reinforced concrete structure construction method
CN103628618A (en) * 2012-08-23 2014-03-12 初明进 Precast concrete hollow component, and manufacturing method thereof
CN103628616A (en) * 2012-08-24 2014-03-12 初明进 Prefabricated concrete hollow member and preparation method thereof
CN103628563A (en) * 2012-08-23 2014-03-12 初明进 Prefabricated concrete hollow component and manufacturing method
CN103669559A (en) * 2012-09-01 2014-03-26 初明进 Assembly integral shear wall building structure and building method
CN103850363A (en) * 2014-03-11 2014-06-11 朱彤 Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN104018675A (en) * 2014-06-13 2014-09-03 富于安(福建)环保模板有限公司 Construction method for shear wall concrete formworks and pillar concrete formworks
CN104234428A (en) * 2014-09-25 2014-12-24 管金平 Construction technology for columns, beams and plates of assembled monolithic structure of building
CN104453013A (en) * 2014-03-11 2015-03-25 朱彤 Prefabricated wall component and fabricated reinforced concrete shear wall
CN104675013A (en) * 2015-03-17 2015-06-03 西安建筑科技大学 Prefabricated steel fiber recycled brick concrete wall based on T-slot connection and construction method thereof
CN104712086A (en) * 2015-03-25 2015-06-17 孟凡林 Assembled type concrete hollow composite floor slab and manufacturing method thereof
CN104895215A (en) * 2014-03-07 2015-09-09 马义和 A combined house plate wall structure and a digital printing production method thereof
CN106066233A (en) * 2016-06-20 2016-11-02 西安建筑科技大学 A kind of big than chi assembled integral Shear wall tube structure structure and manufacture method
CN107035045A (en) * 2017-06-02 2017-08-11 吉林建筑大学 A kind of precast concrete bidirectional hollow plate and preparation method thereof
CN108360716A (en) * 2018-05-04 2018-08-03 中清大装配式建筑有限公司 Assembled level splices frivolous template and its construction method
CN108374506A (en) * 2018-05-04 2018-08-07 中清大装配式建筑有限公司 Assembled vertically splices frivolous template and its construction method
CN108951844A (en) * 2018-10-10 2018-12-07 三筑工科技有限公司 Residential housing method of construction and the indoor residential building system without Liang Wuzhu
CN108951870A (en) * 2018-07-26 2018-12-07 陕西建筑产业投资集团有限公司 A kind of method of construction of the full assembly concrete shear wall structure system of low layer
CN110593449A (en) * 2019-06-28 2019-12-20 中清大科技股份有限公司 Assembly type light vertical bar plate type bearing wall structure and construction method thereof
CN111519795A (en) * 2020-04-27 2020-08-11 金点石(北京)建筑设计咨询服务有限责任公司 Shear wall connector and construction method thereof
CN112681570A (en) * 2020-12-11 2021-04-20 三一筑工科技有限公司 Laminated column, laminated column and laminated wall connecting structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219818A (en) * 1997-02-07 1998-08-18 J Kenchiku Syst Kk Medium span wooden rationalized building
CN2406000Y (en) * 1999-12-22 2000-11-15 吴方伯 Overlapped mould for building
CN1796706A (en) * 2004-12-24 2006-07-05 张东川 Box shaped house model of construction and fabricating method
CN201225001Y (en) * 2008-05-30 2009-04-22 谢新明 Composite die for casting building frame
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN201883529U (en) * 2010-11-26 2011-06-29 清华大学建筑设计研究院 Shear wall structure building based on cross-hole prefabricated reinforced-concrete formwork

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219818A (en) * 1997-02-07 1998-08-18 J Kenchiku Syst Kk Medium span wooden rationalized building
CN2406000Y (en) * 1999-12-22 2000-11-15 吴方伯 Overlapped mould for building
CN1796706A (en) * 2004-12-24 2006-07-05 张东川 Box shaped house model of construction and fabricating method
CN201225001Y (en) * 2008-05-30 2009-04-22 谢新明 Composite die for casting building frame
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN201883529U (en) * 2010-11-26 2011-06-29 清华大学建筑设计研究院 Shear wall structure building based on cross-hole prefabricated reinforced-concrete formwork

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012065534A1 (en) * 2010-11-19 2012-05-24 清华大学建筑设计研究院有限公司 Prefabricated reinforced concrete formwork and manufacturing method thereof, as well as building and construction method thereof
CN102383592A (en) * 2011-09-01 2012-03-21 吴方伯 Bottom template for building floorslab and construction method thereof
CN102720272A (en) * 2012-06-29 2012-10-10 初明进 Embedded column type prefabricated part connection node and manufacturing method thereof
CN102720272B (en) * 2012-06-29 2014-08-27 初明进 Embedded column type prefabricated part connection node and manufacturing method thereof
CN103572840A (en) * 2012-08-05 2014-02-12 初明进 Notch-key type prefabricated member connection node and connection method
CN103628563A (en) * 2012-08-23 2014-03-12 初明进 Prefabricated concrete hollow component and manufacturing method
CN103628563B (en) * 2012-08-23 2015-11-11 初明进 A kind of hollow precast concrete member and preparation method
CN103628618A (en) * 2012-08-23 2014-03-12 初明进 Precast concrete hollow component, and manufacturing method thereof
CN103628616A (en) * 2012-08-24 2014-03-12 初明进 Prefabricated concrete hollow member and preparation method thereof
CN102808450A (en) * 2012-08-28 2012-12-05 初明进 Assembled monolithic shear wall building structure and construction method thereof
WO2014032558A1 (en) * 2012-08-28 2014-03-06 Chu Mingjin Assembled and integrated shear wall building structure and construction method
CN103669559A (en) * 2012-09-01 2014-03-26 初明进 Assembly integral shear wall building structure and building method
CN103669559B (en) * 2012-09-01 2016-06-15 初明进 Assembled integral shear wall building structure and construction method
CN103015704B (en) * 2012-12-13 2016-09-07 清华大学建筑设计研究院有限公司 Flat-plate shearwall structure based on prefabricated reinforced concrete hollow template building and method of construction
CN103015704A (en) * 2012-12-13 2013-04-03 清华大学建筑设计研究院有限公司 Slab column-shear wall structure building based on precast reinforced concrete hollow formworks and construction method thereof
CN103590623A (en) * 2013-11-12 2014-02-19 河南奥斯派克科技有限公司 Assembled-type integrated residence assembly assembled by thin-wall steel and bar rib units
CN103590623B (en) * 2013-11-12 2016-03-09 河南奥斯派克科技有限公司 Combined thin-walled steel ribbed stiffener unit assembling integrated house assembly
CN103590603A (en) * 2013-11-14 2014-02-19 中建二局第三建筑工程有限公司 Large-span multi-curvature thin shell reinforced concrete structure construction method
CN104895215A (en) * 2014-03-07 2015-09-09 马义和 A combined house plate wall structure and a digital printing production method thereof
CN103850363A (en) * 2014-03-11 2014-06-11 朱彤 Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN104453013A (en) * 2014-03-11 2015-03-25 朱彤 Prefabricated wall component and fabricated reinforced concrete shear wall
CN104018675B (en) * 2014-06-13 2016-06-22 富于安(福建)环保模板有限公司 A kind of construction method of shear wall concrete blinding
CN104018675A (en) * 2014-06-13 2014-09-03 富于安(福建)环保模板有限公司 Construction method for shear wall concrete formworks and pillar concrete formworks
CN104234428A (en) * 2014-09-25 2014-12-24 管金平 Construction technology for columns, beams and plates of assembled monolithic structure of building
CN104675013A (en) * 2015-03-17 2015-06-03 西安建筑科技大学 Prefabricated steel fiber recycled brick concrete wall based on T-slot connection and construction method thereof
CN104675013B (en) * 2015-03-17 2016-08-24 西安建筑科技大学 Construction method based on the assembled steel regeneration brick concrete body of wall that T-slot connects
CN104712086A (en) * 2015-03-25 2015-06-17 孟凡林 Assembled type concrete hollow composite floor slab and manufacturing method thereof
CN106066233A (en) * 2016-06-20 2016-11-02 西安建筑科技大学 A kind of big than chi assembled integral Shear wall tube structure structure and manufacture method
CN106066233B (en) * 2016-06-20 2018-06-01 西安建筑科技大学 One kind is greatly than ruler assembled integral Shear wall tube structure structure and production method
CN107035045A (en) * 2017-06-02 2017-08-11 吉林建筑大学 A kind of precast concrete bidirectional hollow plate and preparation method thereof
CN108374506A (en) * 2018-05-04 2018-08-07 中清大装配式建筑有限公司 Assembled vertically splices frivolous template and its construction method
CN108360716A (en) * 2018-05-04 2018-08-03 中清大装配式建筑有限公司 Assembled level splices frivolous template and its construction method
CN108951870A (en) * 2018-07-26 2018-12-07 陕西建筑产业投资集团有限公司 A kind of method of construction of the full assembly concrete shear wall structure system of low layer
CN108951844A (en) * 2018-10-10 2018-12-07 三筑工科技有限公司 Residential housing method of construction and the indoor residential building system without Liang Wuzhu
CN110593449A (en) * 2019-06-28 2019-12-20 中清大科技股份有限公司 Assembly type light vertical bar plate type bearing wall structure and construction method thereof
CN110593449B (en) * 2019-06-28 2024-05-28 中清大科技股份有限公司 Assembled light vertical slat type load-bearing wall structure and construction method thereof
CN111519795A (en) * 2020-04-27 2020-08-11 金点石(北京)建筑设计咨询服务有限责任公司 Shear wall connector and construction method thereof
CN112681570A (en) * 2020-12-11 2021-04-20 三一筑工科技有限公司 Laminated column, laminated column and laminated wall connecting structure and construction method thereof

Also Published As

Publication number Publication date
CN102061803B (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN102061803B (en) Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof
CN201883529U (en) Shear wall structure building based on cross-hole prefabricated reinforced-concrete formwork
CN102061743B (en) Frame-shear wall structure building of dismantling-free prefabricated reinforced concrete formwork and construction method thereof
CN101985856B (en) Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof
CN206070835U (en) A kind of assembled architecture bottom composite floor
CN106592755A (en) Modular multi-storeyed overall assembly type steel structural house structure system
CN107558603B (en) A prefabricated building structure system and its construction method
CN107780576A (en) A kind of assembled architecture bottom composite floor and its connected mode
CN201972393U (en) Dismantling-free precast reinforced concrete template with crossed holes inside
CN101736809B (en) Spatial light steel reinforced concrete frame building and construction method thereof
CN105484403B (en) Assembly concrete two-way ribbed slab floor and its method of construction
CN203452228U (en) Frame-shear wall architectural structure
CN212535440U (en) Integrally prefabricated external window, connected node of wafing
CN208152311U (en) A kind of two-sided folded type steel shear wall
CN101654925B (en) Space fixing truss concrete construction and construction method thereof
CN103498569A (en) Steel frame concrete structure for floor-adding transformation inside old factory building and construction method thereof
CN114482289A (en) A precast concrete modular building
CN105220766A (en) The syndeton of a kind of concrete prefabricated beam and cast-in-place post and construction technology thereof
CN103628616A (en) Prefabricated concrete hollow member and preparation method thereof
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN111691583A (en) Vertical post-cast section concentrates superimposed shear wall vertical and horizontal wall connected node structure of arrangement of reinforcement
CN201883677U (en) Frame-shear wall structure building free of dismantling prefabricated reinforced concrete templates
CN112695914B (en) Assembly type shear wall structure system and construction method thereof
CN212562033U (en) Superposed embedded column with large-diameter vertical stress reinforcing steel bars arranged in cavity and prefabricated wall
CN113323215A (en) Concrete groove type composite floor slab free of truss steel bars and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HOU JIANQUN

Effective date: 20130105

Owner name: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF TSI

Free format text: FORMER OWNER: DESIGN INST. OF ARCHITECTURE, QINGHUA UNIV.

Effective date: 20130105

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130105

Address after: 100084 Haidian District Tsinghua Yuan Beijing No. 1

Patentee after: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF TSINGHUA UNIVERSITY Co.,Ltd.

Patentee after: Hou Jianqun

Address before: 100084 Haidian District Tsinghua Yuan Beijing No. 1

Patentee before: Architectural Design and Research Institute of Tsinghua University

ASS Succession or assignment of patent right

Free format text: FORMER OWNER: HOU JIANQUN

Effective date: 20150624

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150624

Address after: 100084 building center of Tsinghua University, Beijing, Haidian District

Patentee after: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF TSINGHUA UNIVERSITY Co.,Ltd.

Address before: 100084 Haidian District Tsinghua Yuan Beijing No. 1

Patentee before: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF TSINGHUA UNIVERSITY Co.,Ltd.

Patentee before: Hou Jianqun

ASS Succession or assignment of patent right

Owner name: ZHONGQINGDA TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF TSINGHUA UNIVERSITY CO., LTD.

Effective date: 20150731

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150731

Address after: 100084 Beijing Zhongguancun East Road, No. 1, building A903A, No. 8,

Patentee after: ZHONGQINGDA TECHNOLOGY Co.,Ltd.

Address before: 100084 building center of Tsinghua University, Beijing, Haidian District

Patentee before: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF TSINGHUA UNIVERSITY Co.,Ltd.

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: ZHONGQINGDA TECHNOLOGY Co.,Ltd. Person in charge of patents

Document name: payment instructions

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Building and construction method of shear wall structure based on cross hole prefabricated reinforced concrete formwork

Granted publication date: 20120523

Pledgee: Qingkong Habitat Holding Group Co.,Ltd.

Pledgor: ZHONGQINGDA TECHNOLOGY Co.,Ltd.

Registration number: Y2024980023839

PE01 Entry into force of the registration of the contract for pledge of patent right