CN101692541B - Overhauling and hooking method for earthing lines of power transmission lines - Google Patents
Overhauling and hooking method for earthing lines of power transmission lines Download PDFInfo
- Publication number
- CN101692541B CN101692541B CN2009100177458A CN200910017745A CN101692541B CN 101692541 B CN101692541 B CN 101692541B CN 2009100177458 A CN2009100177458 A CN 2009100177458A CN 200910017745 A CN200910017745 A CN 200910017745A CN 101692541 B CN101692541 B CN 101692541B
- Authority
- CN
- China
- Prior art keywords
- wire
- grounding
- clamp
- ground
- wire end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000004020 conductor Substances 0.000 claims description 11
- 238000009413 insulation Methods 0.000 claims 4
- 238000012423 maintenance Methods 0.000 abstract description 29
- 238000007689 inspection Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000006870 function Effects 0.000 description 5
- 239000000725 suspension Substances 0.000 description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 229910052802 copper Inorganic materials 0.000 description 3
- 239000010949 copper Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000000696 magnetic material Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000001179 sorption measurement Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 206010049565 Muscle fatigue Diseases 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明提供一种输电线路检修接地线及其挂接方法,包括可与输电线路进行挂接和拆除的导线端线夹、可与接地端紧固连接的接地端固定夹以及连接两者的接地短路线,所述导线端线夹还连有一用于导线端线夹挂接和拆除操作的绝缘绳,其中,在接地端固定夹上还安装有一GPS信息收发装置,所述导线端线夹还安装有倒挂钩和磁铁片。本发明实现了输电线路检修施工地点的GPS精确定位,避免了误挂误拆和检修人员悬挂地线过程中走错位置容易发生的危险,降低了作业难度,可广泛应用于高压输电线路的检修接地保护。
The invention provides a power transmission line maintenance grounding wire and its hooking method, including a wire end clip that can be hooked and removed from the power transmission line, a grounding end fixing clip that can be firmly connected with the grounding end, and a grounding short connecting the two. route, the wire end clamp is also connected with an insulating rope for the hooking and removal of the wire end clamp, wherein a GPS information transceiver device is also installed on the ground terminal clamp, and the wire end clamp is also equipped with an upside-down hook and magnets. The present invention realizes accurate GPS positioning of the construction site for transmission line inspection and maintenance, avoids the danger of accidental hanging and dismantling and maintenance personnel going to the wrong position in the process of hanging the ground wire, reduces the difficulty of operation, and can be widely used in the inspection and maintenance of high-voltage transmission lines Ground protection.
Description
技术领域 technical field
本发明涉及输电线路检修时的接地保护工具领域,具体涉及一种输电线路检修接地线及其挂接方法。 The invention relates to the field of grounding protection tools during maintenance of power transmission lines, in particular to a grounding wire for maintenance of power transmission lines and a mounting method thereof. the
背景技术 Background technique
接地线是电力安全生产中经常使用的安全工具,停电、验电、挂接地线是保证输电线路停电检修安全的重要技术措施,是保护工作人员在工作地点防止突然来电的可靠安全措施,是人身安全和设备安全的重要保证。由于装设接地线是为了保护电气检修人员操作过程中的安全,如果地线装设位置不对,则起不到保护人员的作用;同时,如果在输电线路检修完成后不及时拆除地线,则会引起带地线送电的恶性事故,因此防止发生带电挂地线和带地线送电是输电线路电气“五防”的关键。 The grounding wire is a safety tool often used in electric power safety production. Power outage, power inspection, and grounding wire are important technical measures to ensure the safety of transmission line power outage maintenance. An important guarantee for safety and equipment security. Since the grounding wire is installed to protect the safety of the electrical maintenance personnel during operation, if the grounding wire is installed in the wrong position, it will not be able to protect the personnel; at the same time, if the grounding wire is not removed in time after the transmission line maintenance is completed, it will Causing vicious accidents of power transmission with ground wires, so preventing the occurrence of live wires hanging on ground wires and power transmission with ground wires is the key to the "five preventions" of transmission line electrical. the
现有输电线路中接地工具普遍应用的接地线功能较为单一,在实际检修和线路改造施工中,当同塔不同线路以及不同专业、多个工作组作业时,多个接地点的每条地线由于没有信息源的采集和控制,缺少保证安全所需的必要信息。尤其是多家共管的高电压、远距离线路跨省、网、局等临时性作业时,由于配电线路分支接地点多,涉及供电、用户等多家单位,更是需要综合的接地信息,而现有的接地工具不能提供这样的信息源,因此容易发生检修人员误登带电杆塔事故。 The function of the grounding wire commonly used in grounding tools in existing transmission lines is relatively single. In actual maintenance and line reconstruction construction, when different lines on the same tower, different professions, and multiple working groups work, each grounding wire at multiple grounding points Because there is no collection and control of information sources, there is a lack of necessary information to ensure security. Especially when a number of co-managed high-voltage, long-distance lines cross provinces, networks, bureaus and other temporary operations, since there are many branch grounding points of distribution lines, involving multiple units such as power supply and users, comprehensive grounding information is required. However, existing grounding tools cannot provide such an information source, so it is easy for maintenance personnel to mistakenly board live poles and towers. the
按照接地工具、作业类型及整个电网检修规划和具体实施作业标准要求,现有的主要接地线安全保护方法,通常是根据调度计划和统一停电安排,作业单位依据工作票列定的接地线组数和杆塔对照,待整条线路停好电后,发出工作命令;工作人员办理工作票,交待安全措施和危险点;作业人员到达工作票所列位置,验电、做需要保护接地安全措施,保护段两侧需要多个工作组做好接地保护措施。登杆高空作业时,电压等级越高,接地点与导线的距离也越大,线路杆塔转角度数越大,接地线就要求越长,人员作业时就越不容易挂;有时遇有风,作业所需要的悬挂时间就更长。在作业过程中杆上与杆下人员劳动强度高,容易造成肌肉疲劳发生危险。特别是杆塔的作业人员,极易发生高空坠落事故;由于接地线悬挂时间长,工作段得不到保护,其它工作组也无法开始工作,就会影响工作进度和延误作业时间。 According to the requirements of grounding tools, operation types, maintenance planning of the entire power grid, and specific implementation of operation standards, the existing main grounding wire safety protection methods are usually based on dispatching plans and unified power outage arrangements, and the number of grounding wire groups listed by the operating unit according to the work ticket Compared with the pole tower, after the whole line is powered off, a work order is issued; the staff handles the work ticket and explains the safety measures and dangerous points; On both sides of the section, multiple working groups need to take good grounding protection measures. When working at high altitude on poles, the higher the voltage level, the greater the distance between the grounding point and the wire, the larger the angle of rotation of the line pole tower, the longer the grounding wire is required, and the less easy it is for personnel to hang up when working; sometimes when there is wind, The hang time required for the job is just longer. During the operation process, the labor intensity of the personnel on and off the pole is high, which may easily cause muscle fatigue and cause danger. Especially the tower operators are prone to high-altitude fall accidents; due to the long suspension time of the ground wire, the working section is not protected, and other working groups cannot start working, which will affect the work progress and delay the work time. the
发明内容 Contents of the invention
本发明要解决的技术问题是:现有结构的输电线路检修接地线作业难度大,作业时间长,以及由于缺少工作许可人指令线路信息和杆塔定位信息源,检修人员容易发生误登带电杆塔事故问题。 The technical problem to be solved by the present invention is: it is difficult to repair the grounding wire of the transmission line with the existing structure, the operation time is long, and due to the lack of the work permit person's command line information and the tower positioning information source, the maintenance personnel are prone to mistakenly board the live pole tower accident question. the
本发明的技术方案是:一种输电线路检修接地线,包括可与输电线路进行挂接和拆除的导线端线夹、可与接地端紧固连接的接地端固定夹以及连接两者的接地短路线,所述导线端线夹还连有一用于导线端线夹挂接和拆除操作的绝缘绳,其特征在于,在接地端固定夹上还安装有一GPS信息收发装置。 The technical solution of the present invention is: a transmission line inspection and maintenance grounding wire, including a wire end clip that can be connected to and removed from the transmission line, a grounding terminal fixing clip that can be tightly connected to the grounding terminal, and a grounding short-circuit wire connecting the two , the wire end clamp is also connected with an insulating rope for hooking and removing the wire end clamp, and it is characterized in that a GPS information sending and receiving device is also installed on the grounding terminal clamp. the
进一步地,所述导线端线夹还安装有倒挂钩和磁铁片。 Further, the wire end clamp is also equipped with an upside-down hook and a magnet piece. the
一种输电线路检修接地线挂接方法,其特征在于,包括有挂接地线工作流程和拆接地线工作流程,其中挂接地线工作流程包括如下步骤: A method for connecting a ground wire for transmission line maintenance, characterized in that it includes a work process for connecting a ground wire and a work process for removing a ground wire, wherein the work process for connecting a ground wire includes the following steps:
步骤一:收发信息,确认悬挂接地线指令; Step 1: Send and receive information, and confirm the command to suspend the grounding wire;
步骤二:作业人员到达指令作业地点,接收GPS定位信息并发送至控制中心; Step 2: The operator arrives at the command work site, receives GPS positioning information and sends it to the control center;
步骤三:根据工作票和GPS定位信息进行位置判定,正确,进入步骤四,否则,回到步骤二;
Step 3: Determine the location according to the work ticket and GPS positioning information, if it is correct, go to
步骤四:挂接地线,先将接地端固定夹接地,再将绝缘绳放入倒挂钩,利用绝缘绳将导线端线夹倒挂到导线上,完成后松掉绝缘绳使其与倒挂钩脱离; Step 4: Hang the grounding wire, first ground the grounding end clamp, then put the insulating rope into the hook, use the insulating rope to hang the wire end clamp upside down on the wire, and loosen the insulating rope to separate it from the hook after completion;
步骤五:收发信息,确认挂接地线操作结束; Step 5: Send and receive information, and confirm that the operation of connecting the ground wire is completed;
拆接地线工作流程包括如下步骤: The workflow of removing the ground wire includes the following steps:
步骤一:收发信息,确认拆除接地线指令; Step 1: Send and receive information and confirm the command to remove the grounding wire;
步骤二:接收GPS定位信息并发送至控制中心; Step 2: Receive GPS positioning information and send it to the control center;
步骤三:根据工作票和GPS定位信息进行位置判定,同意,进入步骤四,否则,回到步骤三;
Step 3: Determine the location according to the work ticket and GPS positioning information, if you agree, go to
步骤四:拆除接地线,先用绝缘绳将导线端线夹拆除,再将接地端固定夹与接地点脱离; Step 4: Remove the grounding wire, first remove the clamp at the end of the wire with an insulating rope, and then separate the fixing clip of the grounding end from the grounding point;
步骤五:收发信息,确认拆地线结束,撤回全套接地线装置。 Step 5: Send and receive information, confirm the end of the ground wire removal, and withdraw the whole set of ground wire devices. the
本发明与现有技术比较,具有如下优点: Compared with the prior art, the present invention has the following advantages:
1、本发明由于在接地端固定夹上安装了一GPS信息收发装置,增加了接地工具信息源,能够提供GPS定点杆塔接地信息和工作许可人指令线路信息,工作许可人可针对多个不同地点和工作组,下达指令并获取线路的接地信息,保证接地线悬挂地点正确和接地信息的共享,避免了误挂误拆和检修人员悬挂地线过程中走错位置容易发生的危险,保证了检修人员安全。 1. In the present invention, since a GPS information transceiver is installed on the grounding terminal clamp, the grounding tool information source is added, and the grounding information of the GPS fixed-point tower and the command line information of the work permitter can be provided. The work permitter can target multiple different locations. And the working group, issue instructions and obtain the grounding information of the line, ensure the correct location of the grounding wire suspension and the sharing of grounding information, avoid the danger of mistakenly hanging and dismantling and maintenance personnel going to the wrong position during the process of hanging the ground wire, and ensure maintenance Personnel safety. the
2、本发明由于在导线端线夹采用了倒挂钩,导线端接地夹采用倒挂的方法,解决了因线路转角外侧过大、特高压线路导线对地距离大、接地线较长、因大风摇摆等难题,保 证了各种杆塔角度下和一定风偏下接地夹的悬挂。 2. Since the present invention adopts an upside-down hook at the wire end clamp, and the upside-down method is adopted for the grounding clamp at the wire end, it solves problems such as excessively large line corner outside, large distance between UHV line conductors to the ground, long grounding wire, and swaying due to strong winds, etc. Difficult to solve, ensuring the suspension of the grounding clamp under various tower angles and certain wind deflection. the
3、本发明由于在导线端线夹加装了磁铁片,达到了对导线钢芯吸合的目的,磁性材料的吸合使悬挂地线更加便于操作,特别是不容易被大风吹动移位,增加了接地点吸附的稳定性,也提高了接地点的操作效率。 3. The present invention achieves the purpose of attracting the steel core of the wire due to the addition of a magnet piece to the wire end clamp. The suction of the magnetic material makes the suspension ground wire more convenient to operate, especially not easy to be blown and displaced by strong winds. Increased the stability of the ground point adsorption and also improved the operational efficiency of the ground point. the
4、本发明的接地夹采用倒挂钩和磁铁片结构,降低了作业难度。原作业杆上需要2人,本发明杆上需要1人作业即可,人员能在杆上简单地将要悬挂点长度距离调整做到最优化,实现省力、省时,减小因作业距离过大引起的摇摆,保证了杆上作业人员的重心稳定,简单易掌握,实现了安全、可靠作业 4. The grounding clip of the present invention adopts the structure of an upside-down hook and a magnet sheet, which reduces the difficulty of operation. The original work requires 2 people on the pole, but only 1 person is required to work on the pole in the present invention. The personnel can simply adjust the length and distance of the suspension point on the pole to optimize the length and distance, which saves labor and time, and reduces the working distance caused by excessive working distance. The sway caused by it ensures the stability of the center of gravity of the operator on the pole, which is easy to grasp and realizes safe and reliable operation.
5、与传统接地工具相比,本发明操作难度大大减小,减小了工作人员的劳动强度和作业时间,间接保证了安全生产,提高了劳动效率。 5. Compared with traditional grounding tools, the present invention greatly reduces the difficulty of operation, reduces the labor intensity and working time of workers, indirectly ensures safe production, and improves labor efficiency. the
附图说明 Description of drawings
图1为本发明的输电线路检修接地线的结构原理示意图; Fig. 1 is the structural principle schematic diagram of transmission line overhaul grounding wire of the present invention;
图中:1-GPS信息收发装置,2-接地端固定夹,3-接地短路线,4-绝缘绳,5-倒挂钩,6-导线端线夹,7-磁铁片。 In the figure: 1-GPS information sending and receiving device, 2-grounding terminal fixing clip, 3-grounding short circuit, 4-insulating rope, 5-upside-down hook, 6-lead wire end clamp, 7-magnet sheet. the
图2为本发明的GPS信息收发装置的电气原理示意图; Fig. 2 is the electrical principle schematic diagram of GPS information transceiving device of the present invention;
图中:10-微处理器单元,11-GPS模块,12-无线数据传输模块。 In the figure: 10-microprocessor unit, 11-GPS module, 12-wireless data transmission module. the
图3为本发明的输电线路检修接地线挂接方法的挂接地线工作流程示意图。 Fig. 3 is a schematic diagram of the work flow of the connection method of the transmission line maintenance ground wire according to the present invention. the
图4为本发明的输电线路检修接地线挂接方法的拆接地线工作流程示意图。 Fig. 4 is a schematic diagram of the work flow of removing the ground wire of the method for connecting the ground wire for maintenance of the transmission line according to the present invention. the
具体实施方式 Detailed ways
以下结合附图和实施例对本发明作进一步说明。 The present invention will be further described below in conjunction with drawings and embodiments. the
参考图1,本发明的输电线路检修接地线包括可与输电线路进行挂接和拆除的导线端线夹6、可与接地端紧固连接的接地端固定夹2以及连接两者的接地短路线3,所述导线端线夹6还连有一用于导线端线夹挂接和拆除操作的高强度绝缘绳4,其中,在接地端固定夹2上还安装有一GPS信息收发装置1。
Referring to Fig. 1, the grounding wire for maintenance of transmission lines of the present invention includes a
所述导线端线夹6可采用现有技术的接地线夹结构,两块对称设置的夹块呈H型对接,在两夹块上分别对称设置有一连接孔,交叉重合处用螺栓穿过连接孔连成一体,在螺栓上套有一张力弹簧,弹簧的两个张脚分别顶住两夹块使之在着力端张开,另一端夹头自然闭合。线夹的夹尾连接有绝缘绳4和接地短路线3;在连接绝缘绳4的同一侧夹头处设有倒挂钩5,配合绝缘绳可改变线夹的上、下挂接方向;接地短路线3采用材料和截面积符合设计接地短路电流容量的多股软铜线,依据不同电压等级设置长度,各种杆塔、转角度大的都可方便使用,连接时两端先用同铜电缆鼻子与软铜线钳压后,再将铜鼻子分别与接地端固定夹2和导线端线夹6用螺栓紧固压接。导线端线夹6的夹头设置有一弹片,使之挂 接作业打开时不会自动闭合,同时设计成两夹块的挂接导线处内侧凹进呈半圆状,从而在闭合时适应并夹紧导线,其外侧安装有高磁性材料的磁铁片7,也可便携临时性加装,使得在导线端线夹6接近导线时,由于导线具有含铁钢芯,磁铁片7可起到吸引助挂作用,从而可加快挂接速度。具体挂接时,将导线端线夹6夹头张开并用弹片支撑,使之不会自动闭合,检修人员在杆塔上作业时,将绝缘绳4放入倒挂钩5,向上拉使导线端线夹6倒挂向上接近导线,利用磁铁片7吸附作用钩住导线,当导线触碰到支撑弹片时,弹片弹开,线夹闭合夹住导线并与导线紧密相连,挂接牢固后,作业人员将高强度复挂绝缘绳4松掉,使其从倒钩脱离。拆除时,直接向下拉拽即可脱离导线,实现拆除地线。
The
所述接地端固定夹2夹体呈[型,左端连接短路线,上端开丝孔,插入带旋转手柄的螺杆,利用螺杆的旋进和旋出带动其下端的夹块与夹体内端平面形成夹面,与输电线路杆塔接地端或接地极紧固连接。
The clamp body of the grounding
在接地端固定夹2上安装有GPS信息收发装置1,以获取GPS定点信息和工作许可人针对多个不同地点和工作组下达的指令信息,无论检修地点在何位置,控制中心和工作许可人均可跟踪,获取接地位置以及线路的接地信息。
A GPS
GPS信息收发装置1包括至少一个全球经纬度接收定位器GPS模块11、一个无线数据传输模块12和一带有存储器的微处理器单元10,上述设备均采用现有技术和产品并采用电池供电(图中未画出)。其中微处理器单元10分别和GPS模块11和无线传输模块12连接,微处理器单元10通常采用单片机,其主要功能是控制GPS模块11采集接收接地点经纬度和时间数据,进行相应的运算和处理后控制无线数据传输模块12对外发送。GPS模块11主要功能是采集接收检修施工所在杆塔位置的经纬度数据,无线数据传输模块12可采用GPRS技术,其主要功能是完成装置的远程无线数据收发,实现装置的通讯功能。
GPS
所述输电线路检修接地线挂接方法,包括有挂接地线工作流程和拆接地线工作流程,作业人员利用接地线的GPS信息收发装置接收GPS定位信息并发送至控制中心,工作许可人根据定位信息进行位置判定,并依据正确与否决定是否进行挂接接地线操作或拆除接地线操作。 The method for connecting the grounding wire for maintenance of the power transmission line includes a working process of connecting the grounding wire and a working process of removing the grounding wire. The operator uses the GPS information transceiver device of the grounding wire to receive GPS positioning information and sends it to the control center. The information is used to judge the position, and decide whether to carry out the operation of hooking the ground wire or removing the ground wire according to whether it is correct or not. the
如图3所示,所述输电线路检修接地线挂接方法的挂接地线工作流程包括如下步骤: As shown in Figure 3, the ground wire hooking work flow of the transmission line maintenance ground wire hooking method includes the following steps:
步骤一:收发信息,确认悬挂接地线指令; Step 1: Send and receive information, and confirm the command to suspend the grounding wire;
步骤二:作业人员到达指令作业地点,接收GPS定位信息并发送至控制中心; Step 2: The operator arrives at the command work site, receives GPS positioning information and sends it to the control center;
步骤三:根据工作票和GPS定位信息进行位置判定,正确,进入步骤四,否则,回到步骤二;
Step 3: Determine the location according to the work ticket and GPS positioning information, if it is correct, go to
步骤四:挂接地线,先将接地端固定夹接地,再将绝缘绳放入倒挂钩,利用绝缘绳将 导线端线夹倒挂到导线上,完成后松掉绝缘绳使其与倒挂钩脱离; Step 4: Hang the grounding wire, first ground the grounding end clamp, then put the insulating rope into the hook, use the insulating rope to hang the wire end clamp upside down on the wire, and loosen the insulating rope to separate it from the hook after completion;
步骤五:收发信息,确认挂接地线操作结束。 Step 5: Send and receive information, and confirm that the operation of hooking the ground wire is completed. the
如图4所示,所述输电线路检修接地线挂接方法,检修工作完毕,拆除地线工作流程包括如下步骤: As shown in Figure 4, the method for connecting the ground wire for maintenance of the transmission line, after the maintenance work is completed, the work flow of removing the ground wire includes the following steps:
步骤一:收发信息,确认拆除接地线指令; Step 1: Send and receive information and confirm the command to remove the grounding wire;
步骤二:接收GPS定位信息并发送至控制中心; Step 2: Receive GPS positioning information and send it to the control center;
步骤三:根据工作票和GPS定位信息进行位置判定,同意,进入步骤四,否则,回到步骤三;
Step 3: Determine the location according to the work ticket and GPS positioning information, if you agree, go to
步骤四:拆除接地线,先用绝缘绳将导线端线夹拆除,再将接地端固定夹与接地点脱离; Step 4: Remove the grounding wire, first remove the clamp at the end of the wire with an insulating rope, and then separate the fixing clip of the grounding end from the grounding point;
步骤五:收发信息,确认拆地线结束,撤回全套接地线装置。 Step 5: Send and receive information, confirm the end of the ground wire removal, and withdraw the whole set of ground wire devices. the
本发明的GPS信息收发装置不仅实现了电力输电线路检修施工地点的GPS精确定位,而且通过信息的无线传输实现了线路接地信息的共享,检修作业控制中心和工作许可人可跟踪并利用预先储存的线路杆塔位置信息在检修作业开始前进行检修位置判定并对多个不同地点和工作组下达工作指令,避免了误挂误拆和检修人员悬挂地线过程中走错位置容易发生的危险,保证了线路设备和检修人员的安全。 The GPS information sending and receiving device of the present invention not only realizes the GPS precise positioning of the construction site for power transmission line maintenance, but also realizes the sharing of line grounding information through wireless transmission of information. The position information of the line pole and tower is determined before the maintenance work starts, and work orders are issued to multiple different locations and working groups, which avoids the danger of mistaken hanging and dismantling and maintenance personnel going to the wrong position during the process of hanging the ground wire, ensuring Safety of line equipment and maintenance personnel. the
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100177458A CN101692541B (en) | 2009-08-25 | 2009-08-25 | Overhauling and hooking method for earthing lines of power transmission lines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100177458A CN101692541B (en) | 2009-08-25 | 2009-08-25 | Overhauling and hooking method for earthing lines of power transmission lines |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101692541A CN101692541A (en) | 2010-04-07 |
CN101692541B true CN101692541B (en) | 2011-11-16 |
Family
ID=42081205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100177458A Active CN101692541B (en) | 2009-08-25 | 2009-08-25 | Overhauling and hooking method for earthing lines of power transmission lines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101692541B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013047086A (en) * | 2011-08-29 | 2013-03-07 | Nagaki Seiki Co Ltd | Remote management system of ground rod |
CN102402195A (en) * | 2011-10-10 | 2012-04-04 | 江苏省电力公司东台市供电公司 | Remote tracking and monitoring system for power line repair grounding wire |
CN107741192B (en) * | 2017-11-10 | 2023-05-26 | 云南电网有限责任公司昆明供电局 | Live wire, ground wire model measuring instrument |
CN108490307A (en) * | 2018-07-06 | 2018-09-04 | 广东电网有限责任公司 | Grounding integrated device and grounding detection system |
CN109142951B (en) * | 2018-08-08 | 2020-12-04 | 成都保源酷码科技有限公司 | Safety detection method for ground wire hanging connection in electric power operation process |
CN109361084A (en) * | 2018-10-22 | 2019-02-19 | 国网山东省电力公司栖霞市供电公司 | An intelligent positioning device for power security facilities and positioning method thereof |
CN112736504B (en) * | 2021-01-27 | 2023-04-18 | 河北永安线路器材有限公司 | Grounding end of maintenance ground wire of power transformation and distribution line |
CN114361826A (en) * | 2021-10-07 | 2022-04-15 | 国网山东省电力公司潍坊供电公司 | Logic blocking based grounding device, product and method |
-
2009
- 2009-08-25 CN CN2009100177458A patent/CN101692541B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101692541A (en) | 2010-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101692541B (en) | Overhauling and hooking method for earthing lines of power transmission lines | |
CN201490618U (en) | A grounding wire device for transmission line maintenance | |
CN202026034U (en) | Overhead wire insulation wire lifter for 10-kilovolt circuit | |
CN207588353U (en) | A kind of suspension insulator replacement operation robot system | |
CN206471747U (en) | It is a kind of can charged for replacement insulator arrangement | |
CN205070117U (en) | Earthing pole structure | |
CN106450835A (en) | Shoe manufacturer high voltage wire landing device | |
CN105932601A (en) | Method for repairing break strand of overhead ground wire | |
CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
CN203289006U (en) | Insulation adjustable yoke plate | |
CN204835439U (en) | Some devices are hung to close test cluster of insulating alite | |
CN204144786U (en) | Unmanned plane installing 110kV-500kV line security ground wire device | |
CN202422954U (en) | 10KV incoming bridge grounding conductor terminal for transformer | |
CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
CN103078190A (en) | Puller type quick connector for emergency power van | |
CN202534979U (en) | Stay wire-free insulating pole holding apparatus | |
CN201584691U (en) | Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field | |
CN102290738B (en) | Construction method for replacing 35kV line tension pole cross arm | |
CN104184071B (en) | Unmanned plane installs 110kV 500kV line security ground wire device | |
CN102570347A (en) | Work method for overhauling suspension clamp with electricity on 110kv line | |
CN201466565U (en) | Wire lifting device of vehicle with insulating boom | |
CN204012436U (en) | Horizontally changing strain insulator string instrument | |
CN201222612Y (en) | Special grounding wire for looped network cabinet | |
CN201897861U (en) | Automatic electricity induction voice alarm device for grounding wires | |
CN205394393U (en) | Transmission line suspension clamp bolt -up specialized tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130208 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20130208 Address after: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo Patentee after: Zibo Power Supply Company of Shandong Electric Power Corporation Patentee after: State Grid Corporation of China Address before: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo Patentee before: Zibo Power Supply Company of Shandong Electric Power Corporation |