CN101645548A - Method for grounding single-core high-voltage cable metal sheath - Google Patents
Method for grounding single-core high-voltage cable metal sheath Download PDFInfo
- Publication number
- CN101645548A CN101645548A CN200910017744A CN200910017744A CN101645548A CN 101645548 A CN101645548 A CN 101645548A CN 200910017744 A CN200910017744 A CN 200910017744A CN 200910017744 A CN200910017744 A CN 200910017744A CN 101645548 A CN101645548 A CN 101645548A
- Authority
- CN
- China
- Prior art keywords
- grounding
- ground
- cable
- metal sheath
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002184 metal Substances 0.000 title claims abstract description 36
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000012423 maintenance Methods 0.000 abstract description 14
- 230000005540 biological transmission Effects 0.000 abstract description 7
- 238000010438 heat treatment Methods 0.000 abstract description 4
- 230000001012 protector Effects 0.000 description 8
- 238000010276 construction Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000009933 burial Methods 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000001932 seasonal effect Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000002788 crimping Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 238000013475 authorization Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Images
Landscapes
- Cable Accessories (AREA)
Abstract
本发明公开了一种单芯高压电缆金属护套接地方法,包括先将电缆金属护套用同轴电缆引出至接地箱的进线端,然后将接地箱接地端用接地线与接地带连接,在所述接地箱与接地带之间还有一并联接地线;所述并联接地线一端采用接地线夹与原接地线连接,另一端与接地带之间采用接地螺栓连接,所述接地线夹和接地螺栓均采用防水胶带密封处理。本发明有效解决了隧道架设电缆线路金属护套接地端因受潮发生氧化和锈蚀,接地点电阻增大,导致泄漏电流增大,接地点发热以及需对高压电缆停电进行检修处理的问题,可广泛应用于高压输电线路的运行及检修维护。
The invention discloses a method for grounding the metal sheath of a single-core high-voltage cable. There is also a parallel connection ground wire between the ground box and the ground belt; one end of the parallel connection ground wire is connected to the original ground wire by a ground clamp, and the other end is connected to the ground belt by a ground bolt. Both clips and ground studs are sealed with waterproof tape. The invention effectively solves the problems that the grounding end of the metal sheath of the tunnel erected cable line is oxidized and corroded due to moisture, the resistance of the grounding point increases, resulting in an increase in leakage current, heating of the grounding point, and the need for maintenance and treatment of high-voltage cable power outages, and can be widely used It is applied to the operation and maintenance of high-voltage transmission lines.
Description
技术领域 technical field
本发明涉及输电线路高压电缆接地保护领域,具体涉及一种单芯高压电缆的金属护套接地保护方法。The invention relates to the field of grounding protection for high-voltage cables of transmission lines, in particular to a metal sheath grounding protection method for single-core high-voltage cables.
背景技术 Background technique
随着国民经济的飞速发展和城市化的快速推进,城市建设中高电压、远距离电缆线路增长迅速,直埋和隧道电缆架设方式成为主要方向,高压单芯电力电缆得到普遍使用。With the rapid development of the national economy and the rapid advancement of urbanization, high-voltage and long-distance cable lines in urban construction have grown rapidly, direct burial and tunnel cable erection methods have become the main direction, and high-voltage single-core power cables have been widely used.
为保障电力网络的安全和传输效率,高压单芯电力电缆必须进行可靠接地。原因是当电缆线路发生过电压及短路故障时,在金属护套或金属护层上会形成很高的感应电压,使电缆外护套绝缘发生击穿,故应在金属护套的一定位置采用特殊的连接方式和接地方式,同时安装护层保护器,以合理的接地方式限制电缆护套的感应电压和环流,保障电缆线路的安全运行。In order to ensure the safety and transmission efficiency of the power network, high-voltage single-core power cables must be reliably grounded. The reason is that when an overvoltage or short-circuit fault occurs in the cable line, a high induced voltage will be formed on the metal sheath or the metal sheath, which will cause breakdown of the cable outer sheath insulation, so it should be used in a certain position of the metal sheath Special connection and grounding methods, and the installation of a sheath protector at the same time, limit the induced voltage and circulating current of the cable sheath with a reasonable grounding method, and ensure the safe operation of the cable line.
根据国家《电力工程电缆设计规范》(GB50217-94),交流单相电力电缆的金属护层必须直接接地,且在金属护层上任一点非接地处的正常感应电压不得大于50V,采取了不能任意接触金属护层的安全措施时,不得大于100V。交流单相电力电缆金属护层的接地方式选择,根据线路长度的不同,可选择线路金属护层一端接地、中点接地或两端直接接地方式。对于较长的电缆线路,宜划分适当的单元设置绝缘接头,使电缆金属护层分隔在三个区段以交叉互联接地,从而有效减少金属护套感应电压及环流。According to the national "Code for Design of Electric Power Engineering Cables" (GB50217-94), the metal sheath of AC single-phase power cables must be directly grounded, and the normal induced voltage at any point on the metal sheath that is not grounded must not exceed 50V. When touching the safety measures of the metal sheath, it shall not be greater than 100V. The grounding method of the metal sheath of the AC single-phase power cable can be grounded at one end of the metal sheath of the line, grounded at the middle point or directly grounded at both ends according to the length of the line. For longer cable lines, it is advisable to divide appropriate units and set insulating joints, so that the cable metal sheath is separated into three sections for cross-connection and grounding, so as to effectively reduce the induced voltage and circulating current of the metal sheath.
现有技术的单芯高压电缆金属护层接地方法,电缆金属护套至接地箱、交叉互联箱或护层保护器之间通常采用同轴电缆连接,而接地箱、交叉互联箱或护层保护器的接地端采用接地线接地方式,其存在问题主要是:由于采用单接地线接地方式,接地线与接地带或回流线之间采用电缆接线端子和螺栓压接方式连接,接地点长时间的暴露在地面标高零米以下的地下隧道和直埋环境下,受地下渗透水和季节性的雨水、潮气影响,连接螺栓长时间会发生氧化和锈蚀,接地点电阻增大,导致泄漏电流增大,接地点发热,严重时需对高压电缆停电检修处理,检修时停电操作和管理程序繁琐,劳动人员劳动强度大。In the existing method of grounding the metal sheath of a single-core high-voltage cable, a coaxial cable is usually used to connect the cable metal sheath to the grounding box, cross-connection box or sheath protector, and the grounding box, cross-connection box or sheath protection The grounding terminal of the device adopts the grounding method of the grounding wire, and the main problems are: due to the single grounding wire grounding method, the grounding wire and the grounding belt or the return line are connected by cable terminals and bolt crimping, and the grounding point is connected for a long time. In the underground tunnels and direct burial environments exposed below the ground level of zero meters, the connection bolts will be oxidized and rusted for a long time due to the influence of underground seepage water and seasonal rainwater and moisture, and the resistance of the grounding point will increase, resulting in an increase in leakage current. Large, the grounding point is hot, and in severe cases, it is necessary to conduct power outage maintenance on high-voltage cables. The power outage operation and management procedures during maintenance are cumbersome, and the labor intensity of laborers is high.
授权公告日2008年3月19日,公告号为CN 201038515Y的中国专利公开了一种“高压单芯电力电缆交叉互联箱”,包括箱体和护层保护器,进线电缆通过一插拔头及其插拔座与所述的护层保护器采用插拔式接线结构,具有安装简便、防水防潮的特点,用于高压单芯电力电缆金属护套的交叉互联,很好地解决了绝缘接头两端金属护套经同轴电缆与交叉互联箱和护层保护器的防水连接问题,但是没有解决交叉互联箱与接地带连接部分锈蚀问题。The authorized announcement date was March 19, 2008, and the Chinese patent with the announcement number CN 201038515Y disclosed a "high-voltage single-core power cable cross-connection box", including a box body and a sheath protector, and the incoming cable passes through a plug-in head Its plug-in seat and the sheath protector adopt a plug-in wiring structure, which has the characteristics of easy installation, waterproof and moisture-proof, and is used for cross-connection of the metal sheath of high-voltage single-core power cables, which solves the problem of insulating joints. The metal sheath at both ends is connected waterproofly to the cross-connection box and the sheath protector via the coaxial cable, but the corrosion problem of the connection part between the cross-connection box and the grounding belt is not solved.
授权公告日2008年3月19日,专利号为ZL200720062875.X的中国专利还公开了“一种高压单芯电力电缆用接地装置”,包括箱体、接线柱、接地块,所述的接线柱与进线电缆采用插拔方式连接,接线柱与接地块之间连接有连接件或直接连接,当连接件为护层保护器时可作为接地保护箱使用,接线柱与接地块直接相连时为直接接地箱使用,虽然解决了进线同轴电缆的方便、快捷、防水连接问题,但是依然没有解决其接地块如何与接地带连接及其接地点的防潮锈蚀问题。The date of authorization announcement was March 19, 2008. The Chinese patent No. ZL200720062875.X also disclosed "a grounding device for high-voltage single-core power cables", including a box body, a terminal post, and a grounding block. The column and the incoming cable are connected by plugging and unplugging. There is a connecting piece or a direct connection between the terminal and the grounding block. When the connecting piece is a sheath protector, it can be used as a grounding protection box. The terminal and the grounding block are directly connected. When connected, it is used as a direct grounding box. Although it solves the problem of convenient, fast and waterproof connection of the incoming coaxial cable, it still does not solve the problem of how the grounding block is connected with the grounding strip and the corrosion resistance of the grounding point.
发明内容 Contents of the invention
本发明要解决的技术问题是:隧道架设电缆线路电缆二次接地端接地线与接地带的连接易受潮发生氧化和锈蚀,接地点电阻增大,导致泄漏电流增大,接地点发热问题,以及需对高压电缆停电进行检修处理,检修停电操作和管理程序繁琐,劳动人员劳动强度大问题。The technical problem to be solved by the present invention is: the connection between the grounding wire of the secondary grounding terminal of the tunnel erection cable line and the grounding belt is prone to oxidation and corrosion due to moisture, the resistance of the grounding point increases, resulting in an increase in leakage current, heating problems at the grounding point, and It is necessary to overhaul and deal with the power outage of the high-voltage cable. The operation and management procedures of the power outage are cumbersome, and the labor intensity of the laborers is high.
本发明的技术方案是:一种单芯高压电缆金属护套接地方法,包括先将电缆金属护套用同轴电缆引出至接地箱的进线端,然后将接地箱接地端用接地线与接地带连接,其特征在于,在所述接地箱与接地带之间增加一并联接地线。The technical solution of the present invention is: a method for grounding the metal sheath of a single-core high-voltage cable, which includes first leading the metal sheath of the cable to the incoming line end of the grounding box with a coaxial cable, and then connecting the grounding end of the grounding box with the grounding wire to the grounding terminal. The ground connection is characterized in that a parallel connection ground wire is added between the ground box and the ground belt.
进一步地,所述并联接地线一端采用接地线夹与原接地线连接,另一端与接地带之间采用接地螺栓连接;所述接地线夹和接地螺栓均采用防水胶带密封处理。Further, one end of the parallel connection ground wire is connected to the original ground wire by a ground clamp, and the other end is connected to the ground strap by a ground bolt; both the ground clamp and the ground bolt are sealed with waterproof tape.
本发明与现有技术比较,具有如下优点:Compared with the prior art, the present invention has the following advantages:
1、本发明由于采用了电缆二次接地端并联接地方法,降低了现有的接地端一半的泄漏电流数值和接地电阻值,保证了电缆线路的安全运行。1. The present invention reduces the leakage current value and the grounding resistance value of half of the existing grounding terminal due to the parallel connection method of the secondary grounding terminal of the cable, thereby ensuring the safe operation of the cable line.
2、输电线路电缆接地点发热问题无需高压电缆停电即可应急处理,减少了繁琐的停电操作和管理程序。2. The heat problem at the grounding point of the transmission line cable can be dealt with in an emergency without power failure of the high-voltage cable, which reduces the cumbersome power failure operation and management procedures.
3、本发明简单易行,输电高压电缆线路接地检修施工的作业人员可减少一半,且能在需要处理的地点调整做到最优化,实现省力、省时,减小因作业距离过大引起的各种如需要办理第一种停电作业票,隧道通风,繁华居民区井道口看守等,作业人员容易掌握施工,做到了安全、可靠作业。3. The present invention is simple and easy to operate, and the number of operators for the grounding maintenance construction of the transmission high-voltage cable line can be reduced by half, and it can be adjusted to optimize the location that needs to be processed, so as to save labor and time, and reduce the trouble caused by excessive working distance. For various types of power outage work tickets that need to be processed, tunnel ventilation, and guards at wells in busy residential areas, the operators can easily master the construction and achieve safe and reliable operations.
4、与传统接地检修施工相比,本发明操作难度大大减小,也减小了工作人员的劳动强度,处理时间缩短,间接保证了安全生产,提高了劳动效率。4. Compared with the traditional grounding maintenance construction, the present invention greatly reduces the difficulty of operation, reduces the labor intensity of the staff, shortens the processing time, indirectly ensures safe production, and improves labor efficiency.
附图说明 Description of drawings
图1为本发明的接地箱接地端接地原理示意图;Fig. 1 is a schematic diagram of the grounding principle of the grounding terminal of the grounding box of the present invention;
图中:1-同轴电缆,2-接地箱,3-接地线,4-接地带,5-并联接地线,6-接地线夹,7-接地螺栓。In the figure: 1-coaxial cable, 2-grounding box, 3-grounding wire, 4-grounding belt, 5-parallel connection grounding wire, 6-grounding clamp, 7-grounding bolt.
具体实施方式Detailed ways
以下结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.
图1本发明的接地箱接地端接地原理示意图中,三相电力电缆的金属护套(图中未画出)分别用同轴电缆1引出至接地箱2的进线端,接地箱2的互联接地端或换位母线通过接地线3与接地带4连接。In the schematic diagram of the grounding principle of the grounding terminal of the grounding box of the present invention in Fig. 1, the metal sheath (not shown in the figure) of the three-phase power cable is respectively led out to the incoming line end of the
对于隧道架设的高压电缆线路,由于架设长度不同,接地方式也不同,因而接地箱2的类型也不同,可以为直接接地箱、交叉互联接地箱或接地保护箱(箱内设有电缆护层保护器),三相电力电缆的金属护套分别经同轴电缆引至接地箱内后的互联方式也不同。For the high-voltage cable lines erected in tunnels, due to the different erection lengths, the grounding methods are also different, so the types of
当电缆线路较短,长度在500米及以下时金属护套通常采用一端直接接地、另一端经保护器接地的连接方式,使金属护套不构成回路,消除金属护套上的环行电流。When the cable line is short and the length is 500 meters or less, the metal sheath is usually connected with one end directly grounded and the other end grounded through the protector, so that the metal sheath does not form a loop and eliminates the circulating current on the metal sheath.
当电缆线路较长,在1000米以内时,若电缆线路采用一端接地,其金属护套感应电压将不满足设计规范要求,可以采取在电缆线路的中点将电缆的金属护套进行单点互联接地,而电缆金属护套的两个终端通过保护接地,且保证电缆金属护套感应电压不超过50伏。When the cable line is long and within 1000 meters, if the cable line is grounded at one end, the induced voltage of the metal sheath will not meet the requirements of the design specification, and the metal sheath of the cable can be connected at a single point at the midpoint of the cable line. Grounding, and the two terminals of the cable metal sheath pass through the protective ground, and ensure that the induced voltage of the cable metal sheath does not exceed 50 volts.
如当电缆长度超过1000米时,通常采用电缆金属护套交叉互联接地方式,需要在三相高压输电线路上划分多个单元系统,每个单元系统中应用绝缘接头划分成三个长度相等的分割区段,将每个绝缘接头处的三相金属护套用同轴电缆引出并经交叉互联箱进行交叉互联后通过电缆护层保护器接地,同时每个单元系统两端的三相单芯高压电缆的金属护套通过直接接地箱互联后接地。For example, when the cable length exceeds 1000 meters, the metal sheath of the cable is usually used for cross-connection grounding. It is necessary to divide multiple unit systems on the three-phase high-voltage transmission line, and each unit system should be divided into three equal-length divisions by insulating joints. In the section, the three-phase metal sheath at each insulating joint is led out with a coaxial cable and cross-connected through the cross-connection box and then grounded through the cable sheath protector. At the same time, the three-phase single-core high-voltage cables at both ends of each unit system The metal sheaths are connected to each other through the direct grounding box and then grounded.
通常,接地线3从接地箱2的互联接地端引出后与接地带4采用螺栓连接。若接地线3采用接地电缆,即可首先在接地电缆的端头压接接线端子,然后与接地极或接地带支架通过接地螺栓压紧连接。但是因电缆线路长期运行后接地点及连接螺栓长时间的暴露在地下隧道和直埋环境下,受地下渗透水和季节性的雨水、潮气影响,连接螺栓长时间会发生氧化和锈蚀,接地点电阻增大,导致泄漏电流增大,接地点发热,严重时需高压电缆停电进行检修处理,检修停电操作和管理程序繁琐,劳动人员劳动强度大。Usually, the
本发明在所述接地箱2与接地带4之间增加一并联接地线5,并联接地线5的一端在接地箱外与原接地线3连接,另一端与接地带4连接。具体线路检修安装时,按照电力检修规程先进行位置判定,挂接临时接地线,然后再沿原接地线3平行安装并联接地线5。并联接地线5可采用材料及截面积满足设计接地短路容量的带外护套的接地电缆,其一端采用接地线夹6与原接地线3连接,连接处需破开接地电缆外护套,安装后再用防水胶带缠绕密封处理,做好连接点的防水处理工作;另一端与接地带4之间采用压接接线端子并用接地螺栓7连接固定后涂上导电膏,同样用防水胶带密封处理。检修安装工作完毕后收发信息,撤除临时接地装置,并联接地线投入使用。The present invention adds a
本发明的电缆二次接地端采用接地保护并联接地线的方法,降低了现有的接地端一半的泄漏电流数值和接地电阻值,接地点采用防水胶带密封处理,可有效解决电缆线路长期运行后,接地点连接螺栓受地下渗透水和季节性雨水、潮气的影响而发生氧化和锈蚀,导致泄漏电流增大,接地点发热的问题。电缆线路检修中采用该方法,不需要高压电缆停电即可操作实施,安全可靠,简单实用,提高效率。同时由于并联接地线的实施,确保了电缆接地的可靠性,避免了错误施工或检修人员悬挂地线过程中走错位置容易发生的危险,提高了高压电力电缆运行及人员检修的安全性,可广泛应用于高压输电线路的运行及检修维护。The secondary grounding end of the cable of the present invention adopts the method of grounding protection and connecting the ground wire, which reduces the leakage current value and grounding resistance value of the existing grounding end by half, and the grounding point is sealed with waterproof tape, which can effectively solve the long-term operation of the cable line Finally, the connecting bolts of the grounding point are oxidized and corroded due to the influence of underground seepage water, seasonal rainwater and moisture, resulting in increased leakage current and heating of the grounding point. This method is adopted in the maintenance of cable lines, and it can be operated and implemented without power failure of high-voltage cables. It is safe, reliable, simple and practical, and improves efficiency. At the same time, due to the implementation of parallel ground wires, the reliability of the cable grounding is ensured, avoiding the danger of misplaced positions in the process of wrong construction or maintenance personnel hanging the ground wires, and improving the safety of high-voltage power cable operation and personnel maintenance. It can be widely used in the operation, repair and maintenance of high-voltage transmission lines.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910017744A CN101645548A (en) | 2009-08-25 | 2009-08-25 | Method for grounding single-core high-voltage cable metal sheath |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910017744A CN101645548A (en) | 2009-08-25 | 2009-08-25 | Method for grounding single-core high-voltage cable metal sheath |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101645548A true CN101645548A (en) | 2010-02-10 |
Family
ID=41657311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910017744A Pending CN101645548A (en) | 2009-08-25 | 2009-08-25 | Method for grounding single-core high-voltage cable metal sheath |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101645548A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103346509A (en) * | 2013-07-23 | 2013-10-09 | 国家电网公司 | Improved coaxial cable connector hot-line mounting technology |
CN103579949A (en) * | 2013-11-11 | 2014-02-12 | 国家电网公司 | Method for maintaining high-voltage transformer substation distribution box cable shielded wire |
CN104113004A (en) * | 2014-06-18 | 2014-10-22 | 国家电网公司 | High-voltage cable protection grounding system transfer device |
CN108519537A (en) * | 2018-03-01 | 2018-09-11 | 华南理工大学 | A Calculation Method of Earth Leakage Current Under Multi-point Grounding of Cable Metal Sheath |
CN112117719A (en) * | 2020-08-27 | 2020-12-22 | 上海外高桥造船有限公司 | IP44 and novel electrical equipment inlet wire construction equipment of following grade |
-
2009
- 2009-08-25 CN CN200910017744A patent/CN101645548A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103346509A (en) * | 2013-07-23 | 2013-10-09 | 国家电网公司 | Improved coaxial cable connector hot-line mounting technology |
CN103346509B (en) * | 2013-07-23 | 2016-05-04 | 国家电网公司 | The charged mounting process of a kind of coaxial fitting |
CN103579949A (en) * | 2013-11-11 | 2014-02-12 | 国家电网公司 | Method for maintaining high-voltage transformer substation distribution box cable shielded wire |
CN104113004A (en) * | 2014-06-18 | 2014-10-22 | 国家电网公司 | High-voltage cable protection grounding system transfer device |
CN104113004B (en) * | 2014-06-18 | 2016-08-24 | 国家电网公司 | A kind of high tension cable protective grounding system switching device |
CN108519537A (en) * | 2018-03-01 | 2018-09-11 | 华南理工大学 | A Calculation Method of Earth Leakage Current Under Multi-point Grounding of Cable Metal Sheath |
CN108519537B (en) * | 2018-03-01 | 2019-10-18 | 华南理工大学 | A Calculation Method of Earth Leakage Current Under Multi-point Grounding of Cable Metal Sheath |
CN112117719A (en) * | 2020-08-27 | 2020-12-22 | 上海外高桥造船有限公司 | IP44 and novel electrical equipment inlet wire construction equipment of following grade |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203734209U (en) | Live working device for cable bypass | |
CN101645548A (en) | Method for grounding single-core high-voltage cable metal sheath | |
CN201490354U (en) | Grounding system of metal sheath of single-core high-voltage cable | |
CN107482535A (en) | The Method of Installing Segment Switch on Straight Rod of 10KV Line with Load Breaking | |
CN103840276A (en) | Connecting device of insulating buses | |
CN210957548U (en) | GIS distribution device's transmission of electricity structure | |
CN205666343U (en) | Modular looped netowrk cabinet earthing device | |
CN204835464U (en) | Quick plug cable branch case | |
CN201440584U (en) | The device for replacing the insulator and accessories of the tension tower of the transmission line by the ground potential | |
CN201985284U (en) | Low-voltage tapping box cable grounding device | |
CN201726093U (en) | High-voltage cable connector | |
CN206490397U (en) | A kind of bus duct with protection device | |
CN214384849U (en) | Spacing insulating support rod | |
CN107947097A (en) | A kind of 10kV suspended insulated guide wires with the anti-lightning strike broken string of shielded layer | |
CN203813047U (en) | A connection device for an insulated busbar | |
CN103094721A (en) | Hook-type fast access joint for emergency supply vehicle | |
CN203645104U (en) | Special-purpose grounding wire of low voltage breaker | |
CN210120246U (en) | Auxiliary device and lap-joint mechanism for electrified match of power cable | |
Li et al. | Electric shock in Urban Village: Reflections from a practical accident | |
CN114039319B (en) | GIS type high-voltage cable temporary jump device with protection and remote jump functions | |
CN205231473U (en) | Mounting structure of intelligent substation 35kV inlet wire cable | |
CN204131017U (en) | A kind of engineering insulation puncture line clamping construction system | |
CN221508770U (en) | Insulating tube female mounting structure | |
CN212979962U (en) | Grounding protection system of direct-current traction power supply double-insulation contact network system | |
CN222581513U (en) | 35KV single-core cable metal sleeve grounding structure of photovoltaic power station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20100210 |