Summary of the invention
The purpose of this invention is to provide a kind of the have building of surface modeling or the construction method of structure top of concrete, it has reduced a difficult problem and the intensity of constructing, construction speed is fast, construction cost is low, workmanship is high.
For this reason, the invention provides a kind of the have building of surface modeling or the construction method of structure top of concrete, the space curved surface structure is carried out horizontal projection; Horizontal plane is divided into plurality of grids; By setting up local coordinate system, calculate the absolute altitude on the pairing space curved surface of each grid node in the horizontal plane coordinate system; Determine the position of each load steel pipe cross bar according to each elevation data, to finish the built operation, then, stand up plank according to each grid line, elevation data thrown into be drawn as curve on the plank, process then, more formed back of the body a tree, used in making timber for boats is fixed on corresponding each load steel pipe cross bar to form back of the body a tree, used in making timber for boats; In concrete, mix the small particle diameter of an amount of water reducing agent and flyash; Pump line is arranged in the lowest part of double-parabolic slab earlier, along diagonal cloth from the bottom up, advances to peak; Pump truck replaces blanking in cornerwise both sides, builds and vibrates, by manually along with making real, receive light.
The present invention can adopt wooden form, Bamboo Formwork or the steel form of various that reuse or even standards, therefore, can economize on resources.
According to the present invention, the formwork pouring concrete is very fast, and greatly accelerating construction progress is guaranteed Quality of Concrete Construction Entity and outward appearance curve.
According to casting method of the present invention, but one-time-concreting is shaped, do not keep somewhere constuction joint, can avoid the generation of cold seam effectively, guarantee the density of curved surface concrete thin plates roof structure, compare with the timesharing casting method, but labor savings and mechanical organizing time, concrete allotment time, and the time of handling constuction joint, correspondingly shortened the duration.
In a word,, not only can reduce difficulty of construction, improve speed of application, guarantee construction quality and safety, and save the input of labour and material, reduce manufacturing cost, therefore, have tangible economic benefit according to construction method of the present invention.Simultaneously, compare, adopt reusable common bamboo and wood template, saved the lifting energy consumption, also have environment protection significance with the customization punching block.
The specific embodiment
According to the present invention, at first the end face with surface modeling with building or structure carries out refinement, thereby obtains more elevation data according to the limited elevation data that marks on the drawing.
Specifically, as shown in Figure 1, if marked the elevation data of four angle points of a part of Space Double curved surface OBCD on the drawing, can design the lower angle point O of bent plate absolute altitude is that the origin of coordinates is set up ab to coordinate system; Then, OBCD carries out horizontal orthography on datum to this Space Double curved surface, obtains quadrangle oB ' C ' D '; Again quadrangle oB ' C ' D ' is divided into plurality of grids, for example, inserting coordinate on oD ' limit is two points of x1, x2, on oB ', insert y1, y2, four points of y3, y4, so just quadrangle oB ' C ' D ' is divided into 3x5=15 little quadrangle, 4x6=24 node occur, can find 24 nodes of the correspondence on Space Double curved surface OBCD thus.
Owing to can find o, B ', C ', D ' four somes x and y coordinate on design drawing, those skilled in the art can easily obtain the x and the y coordinate at other 4x6-4=20 node place of the interior grid of quadrangle oB ' C ' D '.
In addition, each grid with the Space Double curved-surface structure carries out the front projection again, those skilled in the art can adopt projection vertical absolute altitude design formulas in bent inclined-plane to calculate the z coordinate at the pairing Space Double curved surface of interior each node of quadrangle oB ' C ' D ' OBCD node place by setting up local coordinate system.
Particularly, grid dividing generally is advisable with 1000 * 1000mm.At the bigger position of corresponding curvature, grid dividing can be smaller.
The Space Double curved surface OBCD that like this, has just drawn each grid node place correspondence in the horizontal plane coordinate system goes up the absolute altitude of some position; Then, absolute altitude is carried out the scene draw the mark notes,, all some position absolute altitudes that calculate are linked up the smooth hyperboloid of the formwork that can form designing requirement as the foundation of built and formwork.
Particularly, the order that absolute altitude up draws survey is: at first draw and survey double-parabolic slab angle point all around, draw then and survey the design crossing point of axes, draw at last and survey each grid node.Such benefit is, can with around on angle point and the axis absolute altitude of some spots as controlled absolute altitude each node absolute altitude is checked.Up draw should adopt when surveying instrument or messenger wire check with basal plane on node centering whether.
Then, as shown in Figure 2, begin the position of setting up load steel pipe montant 3, load steel pipe cross bar 2,5 and load steel pipe brace 4, determining each load steel pipe cross bar 6 according to each elevation data from base surface 1.
Setting-out cutting, the laying back of the body a tree, used in making timber for boats 7, i.e. keel.At first, find the grid line of back of the body a tree, used in making timber for boats 7 correspondences, and calculate good size of respectively carrying on the back a tree, used in making timber for boats 7, then, elevation data thrown into be drawn as curve on the plank, process, can guarantee that like this template of laying reaches the curvature requirement of design, to guarantee the bending effect and the load requirement of concrete thin plates bed die.
Afterwards, carry out installing of roofing thin plate bed die 8, on back of the body a tree, used in making timber for boats 7, lay each template 8, and fix and reinforce.Template can be selected wooden model or bamboo splint according to the size of curvature, at the curvature larger part with intensity bamboo splint preferably, so that crooked.
Then, carry out the colligation of roofing beam reinforced steel bar.
As shown in Figure 3, link up, adopt pumping of concrete to build mode, and pump line is arranged in the lower H of double-parabolic slab earlier for guaranteeing concreting
Min, so that along the direction D of diagonal L cloth from the bottom up.Link to each other if any the polylith double-parabolic slab, also be convenient to simultaneously to the blanking of polylith double-parabolic slab.Concrete is from minimum point H
MinTo peak H
MaxAdvance, should be during the pump truck blanking toward the both sides D of diagonal L
1, D
2Alternately blanking is being built when vibrating, can be by manually along with making real, receive light.
According to hyperbolic concrete thin plates characteristic, for controlling concrete trickling, increase concrete workability, avoid stopping up pump line, can adopt the small particle diameter concrete that mixes an amount of water reducing agent and flyash to build, and control out pump line mouth concrete slump within 12~15cm scope.
According to the different curvature of hyperbolic thin plate design, must control the both sides D of boundary line, diagonal angle L well
1, D
2The layer height of concreting highly is advisable with 600~900mm, waits to vibrate to make real and up piles up concrete again after putting in place.Total direction of propulsion D also segmentation implements, and highly controls with 800~1200mm, and next joint height concrete is gone up a joint construction after fully vibrating and making real again, until the hyperboloid highest point.
Particularly, according to the present invention,, need the absolute altitude design formulas in order to draw the absolute altitude of putting the position in the horizontal plane coordinate system on the corresponding Space Double curved surface in each grid node place, if curved surface has clear and definite equation, this equation of coordinate substitution of x and y just can be obtained the z coordinate.Yet, more often than not, need utilize the method for mathematics interpolation to obtain corresponding z coordinate.
According to the present invention, shown in Figure 4 and 5, for the hyperboloid grid, setting up the datum of local coordinate system by the horizontal plane of minimum point, with on the local coordinate plane of facing, do not carry out projection by two of the local coordinate system initial point adjacent grid sidelines.
The vertical absolute altitude Z of point space design formulas is as follows arbitrarily on the hyperboloid:
Wherein, R is illustrated in the radius of curvature in the side orthography, is tried to achieve by following formula:
As shown in Figure 5, H
cThe vertical absolute altitude of any arbitrarily in the drop shadow curve of expression left side, try to achieve by following formula:
Wherein, a, b are the coordinate figure of any point in ab horizontal projection coordinate system on the hyperboloid grid; R
1The radius of curvature of expression left side projection, b
0Expression point of contact m is to the distance of a axle, h
1The vertical absolute altitude of expression point of contact m, h
0Be the vertical relatively absolute altitude of the origin of coordinates, R
1, b
0, h
1, h
0Be the design given value; The m point is the point of contact of curve and b axle parallel lines.
As shown in Figure 6, for the diclinic grid, setting up the datum of local coordinate system by the horizontal plane of peak, with on the local coordinate plane of facing, do not carry out projection by two of the local coordinate system initial point adjacent grid sidelines.The vertical absolute altitude Z of point space design formulas is as follows arbitrarily on the double inclined plane:
Z=H
a+H
b-H
max
H
a, H
bRespectively expression just, the vertical absolute altitude of any arbitrarily on the projection line of right side, try to achieve by following formula:
Wherein, a, b are the coordinate figure of any point in ab horizontal projection coordinate system on the double inclined plane grid; H
MaxPut most the absolute altitude value on the expression diclinic panel; H
1Expression right side projection oblique line low spot absolute altitude value; L
1Expression right side projection oblique line width; L
2Expression orthography oblique line height; L
3Expression orthography oblique line width; H
Max, H
1, L
1, L
2, L
3Be the design given value.
As shown in Figure 7, for bent inclined-plane grid, setting up the datum of local coordinate system by the horizontal plane of peak, with on the local coordinate plane of facing, do not carry out projection by two of the local coordinate system initial point adjacent grid sidelines.The vertical absolute altitude Z of point space design formulas is as follows arbitrarily on the bent inclined-plane:
Z=H
a+H
b-H
max
H
a, H
bRespectively expression just, the vertical absolute altitude of any arbitrarily on the projection line of right side, try to achieve by following formula:
Wherein, a, b are the coordinate figure of any point in ab horizontal projection coordinate system on the bent inclined-plane grid; H
MaxRepresent to put the absolute altitude value most on the bent skewback; H
1Expression right side projection oblique line low spot absolute altitude value; L
xExpression orthography curve low spot and point of contact distance; L
yThe distance of expression orthography curve low spot and horizontal tangent; H
Max, H
1, L
1, L
2, L
x, L
yBe the design given value.
By above explanation, those skilled in the art has understood inner characteristic of the present invention, and can be on this basis to the present invention make amendment, perfect or improve, yet, do so all and will fall into protection scope of the present invention.