CN101418681A - Oil-gas well separate-layer fracturing co-production primary pipe column process - Google Patents
Oil-gas well separate-layer fracturing co-production primary pipe column process Download PDFInfo
- Publication number
- CN101418681A CN101418681A CNA2008102291699A CN200810229169A CN101418681A CN 101418681 A CN101418681 A CN 101418681A CN A2008102291699 A CNA2008102291699 A CN A2008102291699A CN 200810229169 A CN200810229169 A CN 200810229169A CN 101418681 A CN101418681 A CN 101418681A
- Authority
- CN
- China
- Prior art keywords
- fracturing
- oil
- exploitation
- hydraulic anchor
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention relates to a process method for fracturing reformation and exploitation of oil and gas wells in oil fields, which comprises the steps of determining different fracturing process parameters of each oil and gas layer according to geological data, putting down underground tools such as a hydraulic anchor, a packer, a sliding sleeve, a ball seat and the like into a well according to a certain sequence, sealing the packer by one-time pressing, anchoring the hydraulic anchor, then performing targeted fracturing reformation on each oil and gas layer by ball throwing through the opening and closing action of the sliding sleeve, and performing combined exploitation after the construction operation is finished. The process determines the corresponding fracturing tubular column structure according to different reservoirs and different fracturing parameters, realizes the selective fracturing modification and commingled production mode of the reservoirs at one time, has complete controllability of the fracturing sequence of each layer, has small operation risk, can greatly shorten the fracturing construction operation time, and achieves the purposes of improving the yield and the exploitation effect of the oil-gas well.
Description
Technical field:
The present invention relates to a kind of process that is used for oil and gas wells in oil fields fracturing reform and exploitation, belong to the oil exploitation technology class.
Background technology:
In oil field prospecting exploitation and oil gas well manufacturing process,, often to carry out fracturing reform to production of hydrocarbons well reservoir in order to improve oil gas well production and oil field development effect.At present, pressure break is normally generally carried out to complete all layers of well position in the scene when carrying out the well fracturing construction.Because formation parameters such as the permeability of each reservoir of oil gas well, degree of porosity are different with characteristic, the form of construction work of the general pressure break of this kind can not be treated with a certain discrimination, its result makes and the interlayer contradiction aggravation between the original high less permeable layer that just exists is difficult to the fracturing effect that reaches desirable.
Summary of the invention:
The object of the invention is to provide a kind of and the different reservoir packing of same well can be opened,, carry out purposive separate stratum fracfturing and can behind pressing crack construction, carry out the once tubular column process for combination oil production by multiple fracturing for oil gas well of combination producing at a certain reservoir characteristics.
Purpose technical scheme of the present invention is as follows.This kind technology is to determine each oil, the different fracturing technology parameter of gas-bearing formation according to geologic information, with downhole tools such as hydraulic anchor, packer, sliding sleeve, ball seats according to a definite sequence G.I.H, make packer set by disposable suppressing, the hydraulic anchor grappling, pitching is carried out fracturing reform targetedly by the on-off action of sliding sleeve to each oil-gas Layer then, can merge exploitation after construction operation finishes.This fracturing string can be realized two covers and three cover series of strata separate stratum fracfturings and merge exploitation that main construction course is:
(1) earlier the tubing string string is arrived the precalculated position down, suppress then and make packer set, the hydraulic anchor grappling;
(2) suppress through pitching, according on return mode, successively carry out fracturing reform by different pressing crack construction parameters;
(3) after pressing crack construction finishes, whole sliding sleeves are opened, a whole set of tubing string is stayed in the pit shaft, merges exploitation as flow string.
Technology provided by the invention is determined corresponding fracturing string structure according to different reservoirs and different fracturing parameters, the sleective fracturing transformation of disposable realization reservoir and close the mode of adopting, and each lamination splits order and has controllability completely, operating risk is little, can shorten the pressing crack construction activity duration greatly, reach the purpose that improves oil gas well production and exploitation effect.
Description of drawings:
The oil gas well separate stratum fracfturing that accompanying drawing adopts for the present invention is closed and is adopted the tubular column structure schematic diagram one time.
The specific embodiment:
Below in conjunction with accompanying drawing enforcement of the present invention is illustrated.
As shown in the figure, to close the excavating technology tubing string be three cover series of strata to the oil gas well separate stratum fracfturing that provides of this embodiment.Be assembled with hydraulic anchor 3,6,9 and packer 4,7,10 respectively on the tubing string of three series of strata corresponding positions top, be respectively equipped with sliding sleeve 5,8 with first, second corresponding position, two layer positions, the tubing string lower end is provided with ball seat 11.Among the figure, the subject matter of each label representative is as follows:
The 1-oil pipe; The 2-sleeve pipe; 3,6,9-hydraulic anchor; 4,7,10-separator; 5,8-sliding sleeve; The 11-ball seat; 12,13,14-oil reservoir.
Claims (1)
1, a kind of once tubular column process for combination oil production by multiple fracturing for oil gas well, it is characterized in that: this technology is to determine each oil, the different fracturing technology parameter of gas-bearing formation according to geologic information, with downhole tools such as hydraulic anchor, packer, sliding sleeve, ball seats according to a definite sequence G.I.H, make packer set by disposable suppressing, the hydraulic anchor grappling, pitching is carried out fracturing reform targetedly by the on-off action of sliding sleeve to each oil-gas Layer then, can merge exploitation after construction operation finishes; This fracturing string can be realized two covers and three cover series of strata separate stratum fracfturings and merge exploitation that main construction course is:
(1) earlier the tubing string string is arrived the precalculated position down, suppress then and make packer set, the hydraulic anchor grappling;
(2) suppress through pitching, according on return mode, successively carry out fracturing reform by different pressing crack construction parameters;
(3) after pressing crack construction finishes, whole sliding sleeves are opened, a whole set of tubing string is stayed in the pit shaft, merges exploitation as flow string.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNA2008102291699A CN101418681A (en) | 2008-12-01 | 2008-12-01 | Oil-gas well separate-layer fracturing co-production primary pipe column process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNA2008102291699A CN101418681A (en) | 2008-12-01 | 2008-12-01 | Oil-gas well separate-layer fracturing co-production primary pipe column process |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101418681A true CN101418681A (en) | 2009-04-29 |
Family
ID=40629658
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNA2008102291699A Pending CN101418681A (en) | 2008-12-01 | 2008-12-01 | Oil-gas well separate-layer fracturing co-production primary pipe column process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101418681A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101942986A (en) * | 2010-09-16 | 2011-01-12 | 中国石油化工股份有限公司华北分公司工程技术研究院 | Abrasive jet injection multiple fracturing device |
| CN103857877A (en) * | 2011-08-05 | 2014-06-11 | 普拉德研究及开发股份有限公司 | Method of fracturing multiple zones within a well |
| CN103982167A (en) * | 2014-05-23 | 2014-08-13 | 湖南唯科拓石油科技服务有限公司 | Staged fracturing apparatus with full-bore ball throwing sliding sleeve |
| US9708889B2 (en) | 2011-06-22 | 2017-07-18 | China Petroleum & Chemical Corporation | Sleeve fracturing assembly, device using the same and method for using the same |
| US9915137B2 (en) | 2011-08-05 | 2018-03-13 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well using propellant pre-fracturing |
| CN112360394A (en) * | 2020-11-30 | 2021-02-12 | 中国石油集团渤海钻探工程有限公司 | Closable fracturing, discharging and extracting integrated pipe column and construction method thereof |
-
2008
- 2008-12-01 CN CNA2008102291699A patent/CN101418681A/en active Pending
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101942986A (en) * | 2010-09-16 | 2011-01-12 | 中国石油化工股份有限公司华北分公司工程技术研究院 | Abrasive jet injection multiple fracturing device |
| US9708889B2 (en) | 2011-06-22 | 2017-07-18 | China Petroleum & Chemical Corporation | Sleeve fracturing assembly, device using the same and method for using the same |
| US10450837B2 (en) | 2011-06-22 | 2019-10-22 | China Petroleum & Chemical Corporation | Sleeve fracturing assembly, device using the same and method for using the same |
| CN103857877A (en) * | 2011-08-05 | 2014-06-11 | 普拉德研究及开发股份有限公司 | Method of fracturing multiple zones within a well |
| CN103857877B (en) * | 2011-08-05 | 2016-06-29 | 普拉德研究及开发股份有限公司 | Method of fracturing multiple zones in a well |
| US9915137B2 (en) | 2011-08-05 | 2018-03-13 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well using propellant pre-fracturing |
| CN103982167A (en) * | 2014-05-23 | 2014-08-13 | 湖南唯科拓石油科技服务有限公司 | Staged fracturing apparatus with full-bore ball throwing sliding sleeve |
| CN103982167B (en) * | 2014-05-23 | 2016-10-05 | 湖南唯科拓石油科技服务有限公司 | A kind of full-bore pitching sliding sleeve staged fracturing equipment |
| CN112360394A (en) * | 2020-11-30 | 2021-02-12 | 中国石油集团渤海钻探工程有限公司 | Closable fracturing, discharging and extracting integrated pipe column and construction method thereof |
| CN112360394B (en) * | 2020-11-30 | 2022-01-04 | 中国石油集团渤海钻探工程有限公司 | Closable fracturing, discharging and extracting integrated pipe column and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102733789B (en) | Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer | |
| CN103883293B (en) | Hydraulic jet radial drilling and fracturing integrating method | |
| CN102720528A (en) | Underground coal mine repeating pulsation hydrofracture strengthened gas extracting method | |
| CN206174945U (en) | Three branch U type well multiple spot well pattern mining system are adopted altogether to three gas | |
| CN101418681A (en) | Oil-gas well separate-layer fracturing co-production primary pipe column process | |
| CN202125287U (en) | Anchor fluke type sliding sleeve opening tool | |
| CN203655249U (en) | In-situ leaching uranium mining process well | |
| CN102691495A (en) | Staged fracturing method for casing cementing and completion of horizontal wells in high pressure-breaking formations | |
| CN202125289U (en) | Sliding sleeve assembly of selective switch | |
| CN202125290U (en) | Intelligent sliding sleeve in selective switch sliding sleeve component | |
| CN105587300B (en) | Oil recovery method for horizontal well | |
| CN113006749B (en) | Coal series associated resource one-well multipurpose coordinated mining method | |
| CN202266250U (en) | A ball cage assembly structure of an intelligent sliding sleeve opening tool | |
| CN204827256U (en) | Seal up and adopt down screen pipe and fill sand control integration operating tool string | |
| CN103321626B (en) | A kind of fracturing sand control integration completion tubular column and application process thereof | |
| CN106761611A (en) | Double pressure break horizontal well cyclic water stimulation oil production methods of zip mode cloth seam | |
| CN202810675U (en) | Mechanical water plugging pipe string for multi-stage fracturing horizontal well with casing completion and multi-point water outlet | |
| CN103628848A (en) | Multidirectional interlayer water flooding displacement oil extraction method and system | |
| CN119844047A (en) | Horizontal well level-separation pressure-drive exploitation method | |
| RU2733869C1 (en) | Method for development of a domanic oil reservoir | |
| CN107869334A (en) | Layer recombination and production methods of multi-layer sandstone reservoirs in the middle and late stages of water injection development | |
| CN202108491U (en) | Gas well layered fracturing layered test integrated process string | |
| CN202039824U (en) | Hands-off completion string | |
| CN202510042U (en) | Layering acidification tubular column in sand prevention tube in water injection well of oil field | |
| CN201972663U (en) | Oil and gas well mining sublevel control sliding sleeve |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090429 |