[go: up one dir, main page]

CN101418681A - Oil-gas well separate-layer fracturing co-production primary pipe column process - Google Patents

Oil-gas well separate-layer fracturing co-production primary pipe column process Download PDF

Info

Publication number
CN101418681A
CN101418681A CNA2008102291699A CN200810229169A CN101418681A CN 101418681 A CN101418681 A CN 101418681A CN A2008102291699 A CNA2008102291699 A CN A2008102291699A CN 200810229169 A CN200810229169 A CN 200810229169A CN 101418681 A CN101418681 A CN 101418681A
Authority
CN
China
Prior art keywords
fracturing
oil
exploitation
hydraulic anchor
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008102291699A
Other languages
Chinese (zh)
Inventor
姜涛
李志龙
王成
方旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Great Wall Drilling Co
Original Assignee
CNPC Great Wall Drilling Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Great Wall Drilling Co filed Critical CNPC Great Wall Drilling Co
Priority to CNA2008102291699A priority Critical patent/CN101418681A/en
Publication of CN101418681A publication Critical patent/CN101418681A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to a process method for fracturing reformation and exploitation of oil and gas wells in oil fields, which comprises the steps of determining different fracturing process parameters of each oil and gas layer according to geological data, putting down underground tools such as a hydraulic anchor, a packer, a sliding sleeve, a ball seat and the like into a well according to a certain sequence, sealing the packer by one-time pressing, anchoring the hydraulic anchor, then performing targeted fracturing reformation on each oil and gas layer by ball throwing through the opening and closing action of the sliding sleeve, and performing combined exploitation after the construction operation is finished. The process determines the corresponding fracturing tubular column structure according to different reservoirs and different fracturing parameters, realizes the selective fracturing modification and commingled production mode of the reservoirs at one time, has complete controllability of the fracturing sequence of each layer, has small operation risk, can greatly shorten the fracturing construction operation time, and achieves the purposes of improving the yield and the exploitation effect of the oil-gas well.

Description

Once tubular column process for combination oil production by multiple fracturing for oil gas well
Technical field:
The present invention relates to a kind of process that is used for oil and gas wells in oil fields fracturing reform and exploitation, belong to the oil exploitation technology class.
Background technology:
In oil field prospecting exploitation and oil gas well manufacturing process,, often to carry out fracturing reform to production of hydrocarbons well reservoir in order to improve oil gas well production and oil field development effect.At present, pressure break is normally generally carried out to complete all layers of well position in the scene when carrying out the well fracturing construction.Because formation parameters such as the permeability of each reservoir of oil gas well, degree of porosity are different with characteristic, the form of construction work of the general pressure break of this kind can not be treated with a certain discrimination, its result makes and the interlayer contradiction aggravation between the original high less permeable layer that just exists is difficult to the fracturing effect that reaches desirable.
Summary of the invention:
The object of the invention is to provide a kind of and the different reservoir packing of same well can be opened,, carry out purposive separate stratum fracfturing and can behind pressing crack construction, carry out the once tubular column process for combination oil production by multiple fracturing for oil gas well of combination producing at a certain reservoir characteristics.
Purpose technical scheme of the present invention is as follows.This kind technology is to determine each oil, the different fracturing technology parameter of gas-bearing formation according to geologic information, with downhole tools such as hydraulic anchor, packer, sliding sleeve, ball seats according to a definite sequence G.I.H, make packer set by disposable suppressing, the hydraulic anchor grappling, pitching is carried out fracturing reform targetedly by the on-off action of sliding sleeve to each oil-gas Layer then, can merge exploitation after construction operation finishes.This fracturing string can be realized two covers and three cover series of strata separate stratum fracfturings and merge exploitation that main construction course is:
(1) earlier the tubing string string is arrived the precalculated position down, suppress then and make packer set, the hydraulic anchor grappling;
(2) suppress through pitching, according on return mode, successively carry out fracturing reform by different pressing crack construction parameters;
(3) after pressing crack construction finishes, whole sliding sleeves are opened, a whole set of tubing string is stayed in the pit shaft, merges exploitation as flow string.
Technology provided by the invention is determined corresponding fracturing string structure according to different reservoirs and different fracturing parameters, the sleective fracturing transformation of disposable realization reservoir and close the mode of adopting, and each lamination splits order and has controllability completely, operating risk is little, can shorten the pressing crack construction activity duration greatly, reach the purpose that improves oil gas well production and exploitation effect.
Description of drawings:
The oil gas well separate stratum fracfturing that accompanying drawing adopts for the present invention is closed and is adopted the tubular column structure schematic diagram one time.
The specific embodiment:
Below in conjunction with accompanying drawing enforcement of the present invention is illustrated.
As shown in the figure, to close the excavating technology tubing string be three cover series of strata to the oil gas well separate stratum fracfturing that provides of this embodiment.Be assembled with hydraulic anchor 3,6,9 and packer 4,7,10 respectively on the tubing string of three series of strata corresponding positions top, be respectively equipped with sliding sleeve 5,8 with first, second corresponding position, two layer positions, the tubing string lower end is provided with ball seat 11.Among the figure, the subject matter of each label representative is as follows:
The 1-oil pipe; The 2-sleeve pipe; 3,6,9-hydraulic anchor; 4,7,10-separator; 5,8-sliding sleeve; The 11-ball seat; 12,13,14-oil reservoir.

Claims (1)

1, a kind of once tubular column process for combination oil production by multiple fracturing for oil gas well, it is characterized in that: this technology is to determine each oil, the different fracturing technology parameter of gas-bearing formation according to geologic information, with downhole tools such as hydraulic anchor, packer, sliding sleeve, ball seats according to a definite sequence G.I.H, make packer set by disposable suppressing, the hydraulic anchor grappling, pitching is carried out fracturing reform targetedly by the on-off action of sliding sleeve to each oil-gas Layer then, can merge exploitation after construction operation finishes; This fracturing string can be realized two covers and three cover series of strata separate stratum fracfturings and merge exploitation that main construction course is:
(1) earlier the tubing string string is arrived the precalculated position down, suppress then and make packer set, the hydraulic anchor grappling;
(2) suppress through pitching, according on return mode, successively carry out fracturing reform by different pressing crack construction parameters;
(3) after pressing crack construction finishes, whole sliding sleeves are opened, a whole set of tubing string is stayed in the pit shaft, merges exploitation as flow string.
CNA2008102291699A 2008-12-01 2008-12-01 Oil-gas well separate-layer fracturing co-production primary pipe column process Pending CN101418681A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008102291699A CN101418681A (en) 2008-12-01 2008-12-01 Oil-gas well separate-layer fracturing co-production primary pipe column process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008102291699A CN101418681A (en) 2008-12-01 2008-12-01 Oil-gas well separate-layer fracturing co-production primary pipe column process

Publications (1)

Publication Number Publication Date
CN101418681A true CN101418681A (en) 2009-04-29

Family

ID=40629658

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008102291699A Pending CN101418681A (en) 2008-12-01 2008-12-01 Oil-gas well separate-layer fracturing co-production primary pipe column process

Country Status (1)

Country Link
CN (1) CN101418681A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942986A (en) * 2010-09-16 2011-01-12 中国石油化工股份有限公司华北分公司工程技术研究院 Abrasive jet injection multiple fracturing device
CN103857877A (en) * 2011-08-05 2014-06-11 普拉德研究及开发股份有限公司 Method of fracturing multiple zones within a well
CN103982167A (en) * 2014-05-23 2014-08-13 湖南唯科拓石油科技服务有限公司 Staged fracturing apparatus with full-bore ball throwing sliding sleeve
US9708889B2 (en) 2011-06-22 2017-07-18 China Petroleum & Chemical Corporation Sleeve fracturing assembly, device using the same and method for using the same
US9915137B2 (en) 2011-08-05 2018-03-13 Schlumberger Technology Corporation Method of fracturing multiple zones within a well using propellant pre-fracturing
CN112360394A (en) * 2020-11-30 2021-02-12 中国石油集团渤海钻探工程有限公司 Closable fracturing, discharging and extracting integrated pipe column and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942986A (en) * 2010-09-16 2011-01-12 中国石油化工股份有限公司华北分公司工程技术研究院 Abrasive jet injection multiple fracturing device
US9708889B2 (en) 2011-06-22 2017-07-18 China Petroleum & Chemical Corporation Sleeve fracturing assembly, device using the same and method for using the same
US10450837B2 (en) 2011-06-22 2019-10-22 China Petroleum & Chemical Corporation Sleeve fracturing assembly, device using the same and method for using the same
CN103857877A (en) * 2011-08-05 2014-06-11 普拉德研究及开发股份有限公司 Method of fracturing multiple zones within a well
CN103857877B (en) * 2011-08-05 2016-06-29 普拉德研究及开发股份有限公司 Method of fracturing multiple zones in a well
US9915137B2 (en) 2011-08-05 2018-03-13 Schlumberger Technology Corporation Method of fracturing multiple zones within a well using propellant pre-fracturing
CN103982167A (en) * 2014-05-23 2014-08-13 湖南唯科拓石油科技服务有限公司 Staged fracturing apparatus with full-bore ball throwing sliding sleeve
CN103982167B (en) * 2014-05-23 2016-10-05 湖南唯科拓石油科技服务有限公司 A kind of full-bore pitching sliding sleeve staged fracturing equipment
CN112360394A (en) * 2020-11-30 2021-02-12 中国石油集团渤海钻探工程有限公司 Closable fracturing, discharging and extracting integrated pipe column and construction method thereof
CN112360394B (en) * 2020-11-30 2022-01-04 中国石油集团渤海钻探工程有限公司 Closable fracturing, discharging and extracting integrated pipe column and construction method thereof

Similar Documents

Publication Publication Date Title
CN102733789B (en) Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer
CN103883293B (en) Hydraulic jet radial drilling and fracturing integrating method
CN102720528A (en) Underground coal mine repeating pulsation hydrofracture strengthened gas extracting method
CN206174945U (en) Three branch U type well multiple spot well pattern mining system are adopted altogether to three gas
CN101418681A (en) Oil-gas well separate-layer fracturing co-production primary pipe column process
CN202125287U (en) Anchor fluke type sliding sleeve opening tool
CN203655249U (en) In-situ leaching uranium mining process well
CN102691495A (en) Staged fracturing method for casing cementing and completion of horizontal wells in high pressure-breaking formations
CN202125289U (en) Sliding sleeve assembly of selective switch
CN202125290U (en) Intelligent sliding sleeve in selective switch sliding sleeve component
CN105587300B (en) Oil recovery method for horizontal well
CN113006749B (en) Coal series associated resource one-well multipurpose coordinated mining method
CN202266250U (en) A ball cage assembly structure of an intelligent sliding sleeve opening tool
CN204827256U (en) Seal up and adopt down screen pipe and fill sand control integration operating tool string
CN103321626B (en) A kind of fracturing sand control integration completion tubular column and application process thereof
CN106761611A (en) Double pressure break horizontal well cyclic water stimulation oil production methods of zip mode cloth seam
CN202810675U (en) Mechanical water plugging pipe string for multi-stage fracturing horizontal well with casing completion and multi-point water outlet
CN103628848A (en) Multidirectional interlayer water flooding displacement oil extraction method and system
CN119844047A (en) Horizontal well level-separation pressure-drive exploitation method
RU2733869C1 (en) Method for development of a domanic oil reservoir
CN107869334A (en) Layer recombination and production methods of multi-layer sandstone reservoirs in the middle and late stages of water injection development
CN202108491U (en) Gas well layered fracturing layered test integrated process string
CN202039824U (en) Hands-off completion string
CN202510042U (en) Layering acidification tubular column in sand prevention tube in water injection well of oil field
CN201972663U (en) Oil and gas well mining sublevel control sliding sleeve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090429